Attachment C CITP Statement of Work.pdf

PDF 101 KB Posted

Attached to
Z2DA--Design Build Replace Air Handling Units 9, 15, 17, 24, 28, 29, 34, and 39
Solicitation number
36C24821R0082
Issued by

About this file

This document outlines requirements for a design-build contract opportunity to replace air handling units at a Veterans Affairs medical center. The Department of Veterans Affairs Network Contracting Office 8 is seeking proposals to design and replace eight air handling units at the West Palm Beach Veterans Affairs Medical Center in Florida. Proposals are due by June 14, 2021, with an anticipated award of a firm-fixed-price contract valued between $2-5 million. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. The selected contractor will be responsible for designing, demolishing, and constructing new air handling systems, filter sections, heating/cooling valves, actuators, dampers, and pneumatic controls.

View the file

Other files

File Type Posted
Attachment J Specialized Experience Information Sheet.docx DOCX document
36C24821R0082 0005.docx DOCX document
Questions and Answers.pdf PDF
36C24821R0082 0004.docx DOCX document
H3 Drawing.pdf PDF
36C24821R0082 0003.docx DOCX document
36C24821R0082 0002.docx DOCX document
36C24821R0082 Sign In Sheet_Redacted.pdf PDF
36C24821R0082 0001.docx DOCX document
1-H9R.pdf PDF
Attachment E VHA Directive 7712 FIRE PROTECTION CODE REVIEWS.pdf PDF
1-H106R.pdf PDF
1-H107.pdf PDF
1-H4R.pdf PDF
Attachment J Experience Information Sheet.pdf PDF
1-H32.pdf PDF
Design and Construction Procedures - Drawings.pdf PDF
Attachment L Architect Engineering Submission Instructions.pdf PDF
1-H48R.pdf PDF
Design and Construction Procedures - Piping Ducts and Electrical Conduits.pdf PDF
Attachment 1 AHU Unit(s) and Return Fan Expansion Detail Specifications.pdf PDF
1-H104.pdf PDF
Technical Information Library Specifications.pdf PDF
Attachment D Pre-Award Contractor Safety and Environmental Record Form.pdf PDF
Design Review Check List Electrical.pdf PDF
36C24821R0082_1.pdf PDF
1-108R.pdf PDF
1-H110R.pdf PDF
1-57.pdf PDF
1-H106.pdf PDF
3-H3.pdf PDF
Attachment G Limitations on Subcontracting Offerors Certification.pdf PDF
Attachment H Project Price Breakdown.xlsx XLSX spreadsheet
1-106.pdf PDF
Attachment K PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
1-H34.pdf PDF
1-H107R.pdf PDF
AHU Test and Balance Reports.pdf PDF
36C24821R0082_1.docx DOCX document
1-H105.pdf PDF
Attachment P Mask Specification.pdf PDF
Attachment A Wage Grade Determination FL20210220 04092021.pdf PDF
1-105.pdf PDF
AE Check List HVAC.pdf PDF
Design and Construction Procedures - Codes Standards and Executive Orders.pdf PDF
Design Review Checklist HVAC.pdf PDF
Attachment F Above Ceiling Permit 11-10-17.pdf PDF
HVAC Design Manual.pdf PDF
Attachment B West Palm Beach VAMC Campus Map.pdf PDF
1-H108.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A/E Services

The A/E firm will be required to retain an external Certified Independent Third-Party Safety Professional or Professional Credential (CITP) for the design of the above project.

The CITP will review the design of the above project to verify compliance with the National Fire Protection Agency (NFPA), National Fire Codes, OSHA, Life Safety Codes, as well as other codes as described in attachment “C” (Statement of Work for Third Party Document Reviews).

Attachment ‘C”

STATEMENT OF WORK

FOR THIRD-PARTY DESIGN DOCUMENT REVIEWS

(This document is intended to be included as part of project’s A/E contract)

I. Requirement for acquiring and incorporating a Certified Independent Third-Party Safety Professional or Professional Credential (CITP) review of design documents

VA must comply with national and local codes, standards and regulatory requirements in order to comply with Public Law 100-678, Public Buildings Amendment Act of 1988 and Public Law 102-522, Federal Fire Safety Act of 1992. Like other federal agencies with real property and construction authority, VA acts as its own building and code enforcing official or as the “Authority Having Jurisdiction” (AHJ) for meeting code requirements. As such, the VA has overall responsibility of ensuring compliance with codes.

Prior to requesting A/E or D/B funding, the CITP Review Assessment Checklist must be completed and attached to the funding request. The VA or A/E will hire a CITP consultant(s) for the review of design documents in compliance with applicable national and local codes, standards, and federal and state regulations. At the very minimum, NFPA Life Safety has been identified as a key element to the scope of work for ALL VISN 8 NRM and Minor projects and requires a CITP Review. In addition, you are asked to practice professional judgment if other safety and environmental elements, as identified below, are relevant to the SOW and require third party review.

► OSHA Standards ► Disability Accessibility Standards ► National and Local Building Codes ► EPA Regulations ► Emergency Preparedness ► Security infrastructure vulnerabilities ► Others as applicable

As an example, if your project involves solely work on interstitial space, then no handicap accessibility review will be required. However, if your project involves significant work to facility grounds that could potentially negatively impact handicap accessibility, then a CITP is required.

II. Certified Independent Third-Party Professional or Professional Credential Review and Approval

Project plans and construction funding requests must include certification on the CITP company letterhead that the plans have been reviewed for compliance with applicable codes, standards, and regulatory requirements. At the time of review, the CITP should identify all corrections necessary for the A/E to bring the design into compliance. The A/E is required to incorporate and make necessary corrections to the design to bring the design into compliance prior to the final design documents being issued for a construction contract award.

Design / Build

Certified Independent Third-Party (CITP) Consultant

The Design Build Contractor is responsible to obtain a CITP to review drawings in refence to

NFPA Life Safety and Fire Protection Compliance per VHA Directive 7712, attachment E.

1. In each submission, the DB Contractor shall incorporate all material specified and all revisions according to comments made by the Department of Veterans Affairs, as well as the CITP.

2. For the final construction documents, the DB Contractor will be required to submit written documentation, signed by the CITP that the design has been reviewed to be compliant with Statement of Work.

VHA Directive 7712.pdf

File details come from the government source that posted it. Updated .