Attachment H Project Price Breakdown.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z2DA--Design Build Replace Air Handling Units 9, 15, 17, 24, 28, 29, 34, and 39
Solicitation number
36C24821R0082
Issued by

About this file

This document provides details on a federal contract opportunity for design-build services to replace air handling units at a Veterans Affairs medical center. The Department of Veterans Affairs, Veterans Integrated Service Network 8 is seeking to award a firm-fixed-price contract between $2,000,000 to $5,000,000 to provide design-build services necessary for designing, demolishing, and constructing new air handling systems and mixing boxes, filter sections, heating and cooling valves, actuators, all dampers, and all pneumatic controls to replace eight air handling units at the West Palm Beach Veterans Affairs Medical Center in West Palm Beach, Florida. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and will be issued on or around May 12, 2021, with a closing response date of June 14, 2021. All relevant information will be posted to beta.SAM.gov. Interested firms must be registered in the System for Award Management.

View the file

Other files

File Type Posted
Attachment J Specialized Experience Information Sheet.docx DOCX document
36C24821R0082 0005.docx DOCX document
Questions and Answers.pdf PDF
36C24821R0082 0004.docx DOCX document
H3 Drawing.pdf PDF
36C24821R0082 0003.docx DOCX document
36C24821R0082 0002.docx DOCX document
36C24821R0082 Sign In Sheet_Redacted.pdf PDF
36C24821R0082 0001.docx DOCX document
1-H9R.pdf PDF
Attachment E VHA Directive 7712 FIRE PROTECTION CODE REVIEWS.pdf PDF
1-H106R.pdf PDF
1-H107.pdf PDF
1-H4R.pdf PDF
Attachment J Experience Information Sheet.pdf PDF
1-H32.pdf PDF
Design and Construction Procedures - Drawings.pdf PDF
Attachment L Architect Engineering Submission Instructions.pdf PDF
1-H48R.pdf PDF
Design and Construction Procedures - Piping Ducts and Electrical Conduits.pdf PDF
Attachment 1 AHU Unit(s) and Return Fan Expansion Detail Specifications.pdf PDF
1-H104.pdf PDF
Technical Information Library Specifications.pdf PDF
Attachment C CITP Statement of Work.pdf PDF
Attachment D Pre-Award Contractor Safety and Environmental Record Form.pdf PDF
Design Review Check List Electrical.pdf PDF
36C24821R0082_1.pdf PDF
1-108R.pdf PDF
1-H110R.pdf PDF
1-57.pdf PDF
1-H106.pdf PDF
3-H3.pdf PDF
Attachment G Limitations on Subcontracting Offerors Certification.pdf PDF
1-106.pdf PDF
Attachment K PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
1-H34.pdf PDF
1-H107R.pdf PDF
AHU Test and Balance Reports.pdf PDF
36C24821R0082_1.docx DOCX document
1-H105.pdf PDF
Attachment P Mask Specification.pdf PDF
Attachment A Wage Grade Determination FL20210220 04092021.pdf PDF
1-105.pdf PDF
AE Check List HVAC.pdf PDF
Design and Construction Procedures - Codes Standards and Executive Orders.pdf PDF
Design Review Checklist HVAC.pdf PDF
Attachment F Above Ceiling Permit 11-10-17.pdf PDF
HVAC Design Manual.pdf PDF
Attachment B West Palm Beach VAMC Campus Map.pdf PDF
1-H108.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Project Price Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .