This document provides details for a design-build federal contract opportunity to replace eight air handling units at the West Palm Beach Veterans Affairs Medical Center. The Department of Veterans Affairs seeks proposals to design and construct new air handling systems for units 9, 15, 17, 24, 28, 29, 34, and 39. Proposals are due by June 14, 2021. The contract award is set aside for Service-Disabled Veteran-Owned Small Businesses and will have a value between $2-5 million. The contractor will be responsible for demolition of existing units, design of new air handling systems, and construction including new fans, coils, dampers, controls and other components. The solicitation will be issued on or about May 12, 2021 via the SAM.gov website. The Department of Veterans Affairs Veterans Integrated Service Network 8 located in Tampa, Florida will administer the contract.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AHU # Service Area Existing Demand (Original Design) / Expansion / Minimum Total Static Pressure Design /Actual New Demand (Design) / Expansion
9 Emergency Room 11960 (4320 Outside Air) / 12,310 / 5,490 5.3 / 5.16 11960 (4320 Outside Air) / 12,310 / 5,490 15 Radiology 22850 (6060 Outside Air) / 25,780 / 13,285 5.65 / 5.5 22850 (6060 Outside Air) / 25,780 / 13,285 17 Atrium West 21400 (4260 Outside Air) / 24,560 / ‐‐‐‐‐‐‐‐‐ 6.3 / 5.58 21400 (4260 Outside Air) / 24,560 / ‐‐‐‐‐‐‐‐‐ 24 ICU (6 Bed, 300 series) 6100 (1700 Outside Air) / 6,440 / 4,230 5.92/ 4.81 6100 (1700 Outside Air) / 6,440 / 4,230 28 GI / Admin 24130 (5030 Outside Air) / 27,750 / 12,780 6.2 / 5.9 25820 (7000 Outside Air) / 29690 29 Dental 7760 (3690 Outside Air) / 8,060 / 5,300 5.5 / 5.15 7760 (3690 Outside Air) / 8,060 / 5,300 34 3C Mental Health 12730 (4460 Outside Air) / 14,640 / 7,970 5.7 / 5.6 12730 (4460 Outside Air) / 14,640 / 7,970 39 4C MH OPC 13860 (4070 Outside Air) / 15,940 / 8,490 5.6 / 5.4 13860 (4070 Outside Air) / 15,940 / 8,490
Fan # Service Area Existing Design / Test cfm Total Static Pressure Design /Actual
15 Radiology 16790 / 17145 1.85 / 1.04 24 ICU (6 Bed, 300 series) 4090 / 4230 1.27 / 1.17 29 Dental 4370 / 4050 1.00 / 0.83 34 3C Mental Health 8270 / 9390 1.58 / 1.37
39 4C MH OPC 9790 / 9775 1.73 / 1.30
(1) Selection of Air Handler fans (Fan Wall Units) shall be based upon the air quantities listed under "Expansion" column.
Provide fan curves for both "Design" and "Expansion" air quantities to assure stable fan operation
(2) Air Handler Fans shall be balanced upon completion of installation, to delivered scheduled "Design" air quantities.
(3) Scheduled Fan brake horsepower is for scheduled "Expansion" air quantity.
(4) Cooling coils shall be selected to satisfy total sensible capacities scheduled under "Expansion" column. Capacities shall be based on listed entering and leaving conditions and "Expansion" air quantities. In order to assure satisfactory coil operation, provide printout of the selected coils using operating parameters scheduled under the "Design" Columns.
(5) Heating design CFM for VAV systems denotes minimum air quantity during heating operation, coil face areas shall be based on scheduled cooling "Expansion" CFM.