This is Addendum No. 3 to a Request for Qualifications issued by the Franklin County Board of Commissioners for professional engineering services related to the S. Grener Avenue, Emmit Avenue, Mix Avenue, and Sullivant Avenue (GEMS) Water Main Replacement Project. The addendum clarifies project scope, timeline, and submission requirements for qualified engineering firms. The project involves water main replacement across four streets with specific geographic limits: S. Grener from Sullivant to Stiles, Mix from Sullivant to Bunker, Emmit from Stiles to Bunker, and Sullivant from S. Grener to Emmit. The submittal deadline remains April 24, 2025, at 2:00 PM EST. Design services are anticipated to take eight months from contract award, with bidding for construction anticipated to begin mid-February 2026 and last approximately three months, resulting in construction award in late May 2026.

The County intends to commence construction by the end of June 2026, contingent upon funding availability. The construction phase will be jointly funded by the Water System Loan and Repayment Assistance (WSLRA) program and the Ohio Public Works Commission (OPWC), with OPWC imposing the requirement that construction commence by end of June 2026. Respondents must submit single-sided PDFs on flash drives as part of their qualifications. All addenda and additional information are available on the Franklin County purchasing department website at https://bids.franklincountyohio.gov/.

View the file

Other files

File Type Posted
441CC2FC-B00B-E914-728A3B9F6E284C71.pdf PDF
4ADBF0DE-FA15-F6CB-0B2B1FFF2D166DEF.pdf PDF
56D1C126-97D3-4C35-9D201EE3F38956EA.pdf PDF
56D21EF1-090E-9236-DC87D4ABB226948A.pdf PDF
44F2C847-DCDE-D822-A4337D82DBDE228F.xlsx XLSX spreadsheet
47649CE8-A0E3-2433-AC9846884D7DA4C4.pdf PDF
82C4A68E-CF20-D525-DD84F11D8BE54C23.pdf PDF
365FC443-9C1D-6871-4B183773D28A5AB9.pdf PDF
340E518F-B0A2-92CD-5CE67BE8C5C74ADC.pdf PDF
451DAC14-D169-2A9F-1266443CD504A357.xlsx XLSX spreadsheet
58D37F6D-B16E-1BC2-6AA94BEC83501089.pdf PDF
477F0E99-DAE2-3C20-3E7D603ABFDF3EFB.pdf PDF
4ADBDA30-A10A-65AC-2585EBF3396EC49F.pdf PDF
1FF7B35A-B067-E38B-5984FBC2B840ECE1.pdf PDF
441C7CE8-FE79-FFAD-86876E5C9E330E9F.pdf PDF
1FF79148-03D3-7B1B-77CF64FD687ECA4C.pdf PDF
441CE78D-F987-C11E-794F97DB70EF1A64.xlsx XLSX spreadsheet
4ADB9154-92D0-FA39-8C51818579A9E699.pdf PDF
E990E137-C5A3-F52C-C390BB811E5E078A.pdf PDF
47A070EA-AA3B-485A-6C240303241C99D2.pdf PDF
D465A6BC-B38E-009F-4BA8EFA38CE55315.pdf PDF
1FF6D412-D5CF-E3DA-42373990EB63A4DE.docx DOCX document
8B0111A9-AB26-EF6C-1377B5BEC77C1480.pdf PDF
47A09361-9A16-2F9F-03970F0DC73EAB8D.pdf PDF
56D1E25C-D6F7-A070-782594700401C348.docx DOCX document
BEA8591A-F056-8D68-013C92A00C2DA843.pdf PDF
4740E487-E21E-8839-C282065471954566.pdf PDF
48C71F36-F14E-8501-2A85945F358C6068.xlsx XLSX spreadsheet
8D7E2732-E2EF-8808-10498B0343D0DB6B.pdf PDF
9705A9CE-B76B-3514-2AB6D46F5013FD96.pdf PDF
455CA489-AF8F-CF71-6FFA3A68482AEF22.pdf PDF
BEA8D216-B719-D18D-2A1EF07B83D22C78.xlsx XLSX spreadsheet
6A9BE711-E1B2-9B67-147E88484CF79F1A.pdf PDF
2D575AB7-B92A-4C61-DE1B68E18F3B1809.pdf PDF
F13E338C-C030-4C55-2FE32EE64813CA9E.docx DOCX document
44B739A8-A554-F8F5-C38D97EF8EFBF991.xlsx XLSX spreadsheet
47039A14-CC1D-3979-F8226F8E1E768343.pdf PDF
8BD45E27-AD3D-2A81-9DC34421F6415618.pdf PDF
A3F924CA-A2E1-A38A-2E6F296BD4EAE5D4.pdf PDF
260F9701-94BA-EFEA-FCAED968AC730EE0.docx DOCX document
CCC737E4-C815-7DA9-BAFDD4D8BCA83EAE.pdf PDF
1FF81613-C943-E907-903208614AFFB273.pdf PDF
BCCA0BAC-C5BA-CDB6-49D2EFF559EDAF11.pdf PDF
8BE169B1-0EA5-67F3-FE8D32CD74B2BC3C.pdf PDF
48C51FFE-B1BA-D9DA-11337A7B04016CA4.pdf PDF
4ADC0CC3-B76B-A18D-C62DDED0F769FB5E.xlsx XLSX spreadsheet
4540076D-DA44-888C-413CAB868FEC6141.xlsx XLSX spreadsheet
4703BAFF-A637-A4BC-D31224A6D85981B6.pdf PDF
600B193E-A6DE-E459-0374B7046DEB49BE.xlsx XLSX spreadsheet
3D557BC1-D80F-2E25-C9390E0BF5A59073.pdf PDF
Show 40 more

Latest 50 of 148 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

cleanwater.franklincountyohio.gov

April 18, 2025

FRANKLIN COUNTY BOARD OF COMMISSIONERS

REQUEST FOR QUALIFICATIONS 2025-09-03

PROVISION OF PROFESSIONAL ENGINEERING SERVICES FOR S.GRENER AVENUE, EMMIT

AVENUE, MIX AVENUE, AND SULLIVANT AVENUE (GEMS) WATER MAIN REPLACEMENT

PROJECT

373 South High Street, 25th Floor Purchasing Department Columbus, Ohio 43215

Franklin County

Addendum No. 3

TO ALL BIDDERS:

This Addendum supplements and amends the original Request for Qualifications and shall be taken into account in preparing submissions. When returning your statement of qualifications, please sign and return the signature page of the Addendum with your response.

Company name and signature of authorized company representative Date

Provision of Professional Engineering Services for S. Grener Avenue, Emmit Avenue, Mix Avenue, and

Sullivant Avenue (GEMS) Water Main Replacement Project

RFQ 2025-09-03

Addendum No. 3

April 18, 2025

1. The Submittal Deadline Date/Time shall remain the same: April 24, 2025, at 2:00 PM (EST).

2. Question 1: What is the anticipated schedule for bidding of this project?

Response 1: Per Response 2 (below), the project should be ready for bid around mid-February 2026.

Bidding is anticipated to take 3 months, which makes the award for construction in late-May 2026.

3. Question 2: What is FCSE’s desired date of design completion for this project?

Response 2: The County anticipates Design will take 8 months from the Award of Contract to Bidding.

4. Question 3: For the flash drives requested for the GEMS Project, do you want single-sided PDF for ease of copying, rather than the double-sided we are using for our spiral-bound submittals?

Response 3: Please submit single-sided PDFs on the flash drives.

5. Question 4: I had trouble with my audio for the meeting. It seems pretty short, so I assume there were no changes/addendums to the requirements originally published.

Response 4: Please see the Purchasing Department’s website (https://bids.franklincountyohio.gov/) for all addenda published related to this RFQ.

6. Question 5: We understand that this is funding dependent, but is the intent to begin construction in 2026?

Response 5: Yes. The County would like to start construction by end of June 2026.

7. Question 6: Could you please confirm the extents of the water main replacement for each street?

From the exhibit included in the RFQ it appears that the project limits are:

• S. Grener from Sullivant to Stiles

• Mix from Sullivant to Bunker

• Emmit from Stiles to Bunker

• Sullivant from S. Grener to Emmit

Response 6: The extents listed above are correct.

https://bids.franklincountyohio.gov/

8. Question 7: Has funding been established for the construction phase of this project? If so, are there any constraints placed on the construction schedule due the funding source(s)?

Response 7: The construction phase of this project will be jointly funded by WSLRA and OPWC. Per the requirements of OPWC, construction is to commence by the end of June 2026.

ATTACHMENTS:

None.

END OF ADDENDUM