600B193E-A6DE-E459-0374B7046DEB49BE.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Voluntary Programs: Short and Long Term Disability, Legal Plan, Identity Theft, and Pet Insurance
- Solicitation number
- RFP #2025-06-09
- Issued by
- Franklin County, Ohio
About this file
This is a pricing sheet for the FCEMHS EOC Upgrade Project, a state or local emergency operations center infrastructure improvement initiative. The document outlines a structured pricing form requiring vendors to submit itemized cost breakdowns across six distinct project areas: Network Server, System Control, Network Cabling, EOC, Assessment Center, and JIC/Training Room. Vendors must provide a total project cost along with detailed notes explaining costs specific to each area, enabling transparent evaluation of pricing across different components of the emergency operations center upgrade.
The pricing sheet establishes a standardized submission format to facilitate consistent cost comparison among bidders. Vendors are required to include their company name and submission date on the form. The itemized breakdown requirement ensures that all costs associated with network infrastructure, control systems, cabling installation, main operations center facilities, assessment capabilities, and training facilities are individually identified and justified, allowing the procuring entity to evaluate both individual component pricing and overall project economics.
View the file
Other files
Show 40 more
Latest 50 of 148 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| Pricing Form | |||
| RFP Title | Vendor Name | Date Submitted | |
| FCEMHS EOC Upgrade Project | |||
| Area | Cost | Notes on specific area costs | |
| 1. Network Server | $ | ||
| 2. System Control | $ | ||
| 3. Network Cabling | $ | ||
| 4. EOC | $ | ||
| 5. Assessment Center | $ | ||
| 6. JIC/Training Room | $ |
| Total Cost | $ |
| *Itemized breakdown of costs per area should be listed in proposals |
File details come from the government source that posted it. Updated .