This file contains engineering design drawings and specifications for the South Cottonwood Creek Bridge Replacement project (#344-3.04) in the Pike-San Isabel National Forest, Salida Ranger District, managed by the U.S. Forest Service Rocky Mountain Region (R-2).
The drawings detail bridge deck construction, approach rails, traffic control plans, and temporary bridge construction during replacement. Key specifications include epoxy-coated reinforcement for the deck and abutment diaphragms, weathering steel posts and W-beam guardrails, and specific requirements for conduit installation. The bridge design features a 31'-6" typical section with 2% cross slope, #6 transverse bars spaced at 8" intervals, and detailed bearing assemblies. The temporary bypass bridge utilizes precast concrete blocks (8'x3'6"x3') available from the Lake George Work Center, with contractor responsibility for transport and installation. Traffic control plans include detailed signage requirements and barrier placement following MUTCD 2009 standards. The drawings were designed by HDR Engineering in November 2015 and include professional engineer stamps.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cf.CONDUIT
Cl in
' Cl I in
--t-
15'-9"
(SEE NOTE 3)
< J/4" ,,: .
GROOVE (i~~ ct GIRDER (j)
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
ct BEARING
ABUT. 1
#6 TRASVERSE BARS TOP & BOTTOM
54 SPA. @ 8" = 36'-0"
EDGE OF DECK
0 ------------------ - ~ + N
DECK PLAN
ct BRIDGE ct ROAD
I 2% 2 1/2"
CLEAR
ct GIRDER CZ) ct GIRDER a, TYPICAL SECTION
Forest
15' -9 "
VARIES
10" (MAX.)
(TYP.)
l, ..
CLEAR
B' - 9"
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
#6 TRASVERSE BARS TOP & BOTTOM
28 SPA. @ 8 " = 18'-8" (TYP.)
LENGTHS VARY FROM
B" 3' - 6 "" TO 30' -1"
---- ----- I
_____ _L
I
I I I
TRIM OR R.Q.TATE
LAST TWO <.:!!) BARS
REBAR LAYOUT NOTES
5'-6"
@ BARS ARE #5 AS FOLLOWS : :::::;'===-;;--::llin
NOTES
1. THE DECK AND ABUTMENT DIAPHRAGM CONCRETE SHALL BE PLACED IN ONE OPERATION.
2. ALL REINFORCEMENT IN THE END DIAPHRAGMS AND DECK SHALL BE EPOXY COATED.
3. CONDUIT FIELD LOCATIONS SHALL BE APPROVED BY THE CO PRIOR TO INSTALLATION. SEE
SHEET 13 FOR ADDITIONAL LAYOUT INFORMATION.
4. SPACE X & Y BARS WITH #4 DECK REINFORCING.
5. THE MATERIAL USED TO CREATE THE FORM GAP FOR
THE END DIAPHRAGM OVERHANG SHALL BE REMOVED
WHEN THE OTHER FORMS ARE REMOVED.
DETAIL C
X i BEARING
• 2'-3"
@ BARS ARE #6 AS FOLLOWS :
(SEE NOTE 4)
:,,,I r-=a· DECK REINFORCING (3)-H6
PARALLEL TO
END OF BRIDGE
I
er) 8ARS ARE #6 AS FOLLOWS :
(SEE NOTE 4)
@ BARS ARE #6 AS FOLLOWS :
WEATHERING STEEL
POST AND W-BEAM.
SEE SHEET 14 FOR
CONNECTION TO DECK.
(w)BARS 't;(JNDLED WITH #6 @ 8" z
0 ~ I
°N @5 ...J ...J
! 2'-7 1/2"
,, . 45·
~ o· 4•
1 1/2"
REINFORCING NOT SHOWN
LOW DENSITY
POLYSTYRENE
• PLACE BAR THROUGH HOLE IN GIRDER.
(2) - #4
4" GEOTEXTILE
SEE CLASS 1,
NOTE 5 TYPE A
(TYP.) • DIMENSIONS ARE PERPENDICULAR TO CENTERLINE OF BEARING.
ct GIRDER@ EMERGENCY TRANSVERSE •• APPROXIMATE LOCATION (SHOWN FOR INFORMATION ONLY)
CONSTRUCTION JOINT SECTION A-A
Design: LAS
Drawn: LLF
Checked: JAR Date: NOV, 2015
HOR Inc.
f' Sheet Title: ~ ~ Sub Sheet: ~ ~ Submittal :
DECK DETAILS S6
PS&E
Sheet I
S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04 11 OF 19
~ A ~ A ~ I
A e .
L a)
( BEARING
c�� --�4�-------3
I /8" £X1'ER i'l.-.l.
THICKNESS
l 1/2" INTERNAL THJCl(NESS L -
I ! J --- - __L_ - --- - -- <->'
PIPE HANGER
CONNECTION
SEE NOTE 5
L... A
PLAN
6" 6" '--- REINFORCED i------+----1 ELASTOMER IC
16" BEARING PAD
SECTION A-A
BEARING DETAILS
SET SPACING BASED
ON PIPE STRAP
DECK CONNECTION SHOWN
(ABUTMENT CONNECTION SIMILAR)
(SEE NOTE 6)
CONDUIT SUPPORT DETAIL
EDGE OF
PROPOSED
ROAD (TYP,)
VARIES
SEE SHEET 4
4" AGGREGATE
SURFACE
COURSE
iROAD
VARIES
SEE SHEET 4
PROPOSED
GRADE 0
l ROAD
EMBANKMENT
MATERIAL
8"
2 7 /B"x 8"x 16" REll'/FORCEO ELASTOMERJC BEARING PAD CONSISTING OF (!:>)- 1/8"x 7 3/4"x 15 3/4"
STEU SHIMS (CENTERED)
SECTION B-8
VARIES
SEE SHEET 4
4" AGGREGATE
SURFACE
COURSE
r iROAO
VARIES
SEE SHEET 4
SEE CROSS
- SLOPE Pl.AN -
PROPOSED
GRADE 0
(f_ ROAD
1 (V)'2(H) SLOPE
(TYP.)
I (V):2(H) SLOPE
(TYP.)
TYPICAL NEW ROADWAY SECTION
STA. 10+ 70 TO BRIDGE
NOT TO SCALE
• SEE CROSS SLOPE PLAN
U.S. DEPARTMENT OF AG RIC UL TURE
FOREST SERVICE
SEE NOTE 2
TYPICAL NEW ROADWAY SECTION
STA. BRIDGE TO 13+47.07
NOT TO SCALE
• SEE CROSS SLOPE PLAN
Design: LAS
Drawn: LLF
Checked: JAR
DQ\e, I/ Sheet Title:
NOTES
1. SCARIFY /\ND COMPACT SLOPES TO 6 INCH DEPTH PRIOR TO PLACING NEW EMBANKMENT.
2. BENCH INTO EX1snNG SLOPES AS REQUIRED TO PROVIDE ADEQUATE WIDTH FOR COMPACTION EOUIPMENT.
BLEND EXISTING MATERIAL WITH ThE MA.TERIAJ.. f'OR THE NEW EMBANKMENT. THE co� FOR BENCHING SHALL NOT BE PAID FOR SEPARATUY, BIJl SHALL 8£. INCLUDED IN ITEM 20455.
4. REINFORCED BEARING NOTES:
mE BARS AND STEEl. SHIMS SHALL CONFORM TO AASHTO M270 GRADE J6 (ASTM A.36).
00 NOT PAINT STEEL SURFACE'.S IN CONTACT WITH El.ASTOMERIC SURFA.CE.
GRADE J ELASTOMER SHALL BE USED. HIGHER G�E ELASTOMER MAY BE SUBSTITUTED FOR GRADE J.
DESIGN SHEAR MODULUS G=lJ0-200 PSI O 7J'F.
HARDNESS .., 60 DUROMETER (SHORE A).
ELASTOMERIC PAO ANO ALL MISCELLANEOUS HARDWARE SHALL BE INCLUDED IN THE COST FOR ITEM :'>6401.
BEARINGS SHALL BE TESTED IN ACCORDANCE WITH f!-iE REQUIREMENTS OF ARTICL£ 14.6.4 OF AASHTO LRFO
CURRENT EDITION AND INCLUDING ALL INTERIMS.
S. THE PIPE STRAP SHALL BE CONNECTED TO THE CONCRffi DEC!< WITH A PIP£ HANGER CONNECTION CAPABLE OF DEVELOPING A MINIMUM PULL-OUT STRENGTH or 200 LBS. CONTRACTOR SHALL SUBMIT MANUFACTURERS INFORMATION OR OTHER INFORMATION THAT PROVIOES PULL OUT STRENGTH INFORMATION FOR THE CHOSEN PIPE HANGER CONNECTION. Tt,E COST OF THE CONDUIT, THE PIPE STRAP, TI-iE HANGER CONNECTION AND BOLTS
SHALL BE INCLUDED IN ITEM 6365D.
6. Tl1E 2" STEEL CONDUIT PIPE (WATER WNE AND COMMUNICATION LINE) SHALL AlSO BE ATTACHEO TO THE ABUTMEJ\IT AND WINGWALL FACES WITH THE SAME METHOD SHOWN ON THIS SHEET. SEE SHEET 1J FOR CONDUJT LOCATIONS.
CROSS SLOPE PLAN
"11 #' Sub Sh88t: � 17 Submittal:
MISCELLANEOUS
S8
PS&E
DETAILS Sheet I R-2
ROCKY MOUNTAIN REGION
ForeSt
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
HOR Inc. � S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04 A 12 OF 19
� A � I A
3. RESERVED
I I
--< \ f \ / / I I / I \ \ 1 \ I
--I' I I I I I / \ I I/ \ >< " ) I ,,-" I / \ /
- --r I // ✓ I I /
PERPENDICULAR TO ABUTMENT
PERPENDICULAR TO ABUTMENT
I I I I I
RIPRAP, ROCK, AND CONDUIT PLAN
7'-6 "
2'-0"
EV.\9557.6
PROPOSED
ROAD SURFACE
- STRUCTURE
EXCAVATION
(TYP.)
PROPOSED
BRIDGE
STRUCTURAL
BACKFILL (TYP.)
I I
SIGN
NOTES
1. ALL UTILITY SERVICE SHALL NOT BE INTERRUPTED DURING CONSTRUCTION UNLESS APPROVED BY THE CO PRIOR
TO OUTAGE. SEE SHEET 2 FOR UTILITY CONTACT INFORMATION.
2 CONTRACTOR SHALL COORDINATE CONSTRUCTION SCHEDULE AND ACTIVITIES RELATED TO THE BRIDGE AND ROAD CONSTRUCTION WITH THE UTILITY COMPANIES. THE UTILITY COMPANY WILL CONSTRUCT ALL LINES LEADING TO THE
NEW BRIDGE.
3. STEEL CONDUITS SHALL BE INSTALLED ACROSS THE BRIDGE AND NORTH ABUTMENT AT THE APPROXIMATE LOCATIONS SHOWN ON THIS SHEET. A DRAIN VALVE IN THE WATER LINE CONDUIT SHALL BE INSTALLED AT THE NORTH ABUTMENT. (ALONG WITH A ''T" PIPE CONNECTOR AS REQUIRED.) THE COMMUNICATION CONDUIT CONNECTS THE DOWNSTREAM GAGE TO AN INSTRUMENT ON THE UPSTREAM DAM. FINAL LOCATIONS OF WATER CONDUIT/DRAIN VALVE AND COMMUNICATION CONDUIT SHALL BE ESTABLISHED IN COORDINATION WITH THE ENTITIES LISTED ON SHEET 2 AND AS APPROVED BY THE CO. AN ADDITIONAL 1 00-FEET OF WATER LINE CONDUIT HAS BEEN INCLUDED IN THE QUANTITY TABULATION TO ALLOW FOR INSTALLATION OF APPROACHES TO THE NEW BRIDGE. SEE SPECIAL CONTRACT
REQUIREMENT 611.
4. FOR RIPRAP REQUIREMENTS, SEE STANDARD SPECIFICATION AND SPECIAL CONTRACT REQUIREMENT 251.
5 . VERTICAL STRUCTURAL EXCAVATION SLOPES SHALL BE USED TO ESTABLISH THE QUANTITY FOR PAYMENT. ACTUAL
SLOPES MAY BE FLATTER, BUT NO ADJUSTMENT IN CONTRACT PRICE SHALL BE MADE.
6. SIGN PANELS SHALL BE ATTACHED TO POSTS WITH 3/8" ill MACHINE BOLTS THROUGH 1 /2" ill HOLES Pl.ACED ALONG Cf. OF POST. FIBER WASHERS SHALL BE Pl.ACED BETWEEN THE BOLT HEAD AND THE FACE OF THE SIGN PANEL. 2" ill CUT STEEL WASHERS SHALL BE PLACED UNDER THE NUT ON THE BACK OF THE STEEL POSTS.
POINT
3 1/B"±
CLASS I PANEL
NOTE
POINT DATA
NO. NORTHING EASTING ELEVATION
1346245.2761 2778462.9593 955B.8
1346227.8599 2778465.4B41 9553.9 134621 B.9906 2778404.3013 9554.8
1346236.3164 2778401.7897 9561 .5
1346214.7149 2778504.1638 9554.0
1346197.3891 2778506.6754 9560.0
1346188.4294 2778445.5058 9560.1
1346205.8456 2778442.9610 9554.5
NORTHINGS, EASTINGS, AND ELEVATIONS ARE
FOR ESTIMATING PURPOSES ONLY.
TYPICAL U-2 POST SECTION
EMBANKMENT
I IT
(7l
11, ·---SEE NOTE 6 .
10'-Q" U-2 POST -
®~ "1 z o I I -:q.
TOP OF ROAD
1,0 3/4"
BACKFACE ABUTMENT
® THE CONTRACTOR SHALL ADJUST POST LENGTH AS REQUIRED TO OBTAIN
PROPER HEIGHT OF SIGN RELATIVE TO THE SURFACE OF THE ROAD.
TYPICAL RIPRAP SECTION EXCAVATION AND BACKFILL PAYMENT DETAIL OBJECT MARKER
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
Forest
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
Design:
Drawn:
Checked:
Date:
HOR
RST
LLF
IJ' Sheet Title:
MISCELLANEOUS
JAR DETAILS
%.. S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04
~ 17 Sub Sheet: ~ IT Submittal :
S9
PS&E
Sh.eet I
A /, %.. I
A
1 3/4" (TYP.)
_I
SPACER
I I I I I I
I I
BRIDGE RAIL
POST
<f. 3/4" Ill
BOLT HOLES
SPACER BLOCK
3 1/2"
N
I
I
W6x20 t POST
I N
BLOCK DETAIL
SPACER BLOCK
W6x20 x 1'-1"
W6X20
3/4"X1 1/4"
VERTICAL
SLOTS
WEST RAIL ELEVATION
<f. POST, BASE PL.
AND ANCHOR --- 5/8"111 BOLT, (A307), HEX
------ NUT, HARDENED WASHER,
AND LOCK WASHER.
2-NESTED W-BEAMS
(12 GAGE)
t.\."t--- REFLECTOR TAB AT EACH POST.
ON BRIDGE. (SEE SHEET 16.)
3/4"111 X fl' SLOTTED
HOLES IN EACH RAIL
ELEMENT (TYP.)
W6X20
I N
'--~II- 3/4"X1 1/4"
VERTICAL
SLOTS
EAST RAIL ELEVATION
POST DETAIL
N~ 1 1/2"
:t a, 1"
10"
7' I I
I I
I -4 I I
1 1/2"
TRAFFIC FACE
OF POST
3/4" X 1 1/4" f
VERTICAL SLOT
REQUIRED AT
EA. POST.
I_.._! ___ I, -1"111 HOLES
~ W6X20 I
AND BASE PL •
PLAN
r-- 1 /16" (2 MIL) THICK PLASTIC f SHEET, FULL LENGTH AND
J---,---------..----1,---""""--- WIDTH OF EXPANSION JOINT. =
2" 2"
BETWEEN SETS OF NESTED
W-BEAMS.
5/B"III SPLICE BOLTS,
NUTS AND FLAT WASHERS.
SNUG, DO NOT TIGHTEN.
PEEN THREAD.
TROWEL GROOVED
EXP'N. DEVICE (W-BEAM)
FINISH FINISH
~ji B'' LONG 7 /8" DIA., 11,..At:!=::::::::=!tL_~:_ _ _j ASTM A307 BOLT, HEX f
NUT, AND LOCK WASHER.
PROVIDE 3" OF THREAD
LENGTH. (TYP.)
SEE NOTE 7
FOR REINFORCING
SEE SHEET 11
SECTION
in
BAR 2" X 3/8" X 9"
1"111 HOLES
ANCHOR DETAIL
W-BEAM RAIL, SPLICE
AS REQUIRED. SEE
SHEET 1 6 FOR DETAIL.
LIMITS OF
34"
1 34•
LENGTH
FOR POST SPACING SEE SHEET 3.
NOTES
1. ALL POSTS AND BASE PLATES SHALL BE FABRICATED FROM
ASTM A-588 STEEL. THE W-BEAM SHALL BE WEATHERING
STEEL. CONCRETE, REINFORCING STEEL, AND STRUCTURAL
STEEL ELEMENTS SHALL CONFORM TO THE REQUIREMENTS
OF SECTION 552, 554 AND 555, RESPECTIVELY.
2. POST ANCHORS ENCASED IN CONCRETE SHALL BE ASTM
A709 GR 50 STEEL. ANCHOR BOLTS SHALL BE ASTM A307.
THE POST ANCHORS AND ANCHOR BOLTS SHALL BE GALVANIZED
IN ACCORDANCE WITH MSHTO M111 (ASTM A123).
3 . POSTS, SPACER BLOCKS, POST ANCHORS, BASE PLATES, ANCHOR
BOLTS, MISCELLANEOUS BOLTS, NUTS, ALL WASHERS, W-BEAM
AND W-BEAM EXPANSION DEVICES, SHALL BE INCLUDED IN
ITEM NO. 55601.
4. NESTED W-BEAMS SHALL BE CONTINUOUS OVER NOT LESS
THAN TWO POSTS. NO WELDED BUTT SPLICES SHALL BE
ALLOWED IN THE W-BEAM SECTIONS.
5. POSTS SHALL BE VERTICAL AND PERPENDICULAR TO THE
LONGITUDINAL B~IDGE CENTERLINE.
6. PRIOR TO FABRICATION OF THE BRIDGE RAIL COMPONENTS,
THREE SETS OF SHOP DRAWINGS SHALL BE SUBMITTED TO
THE CO FOR REVIEW AND ACCEPTANCE.
7. POST ANCHORS SHALL BE INSTALLED PRIOR TO PLACEMENT OF
CONCRETE.
STRUCTURAL STEEL:
AASHTO M 270 GR 50 OR ASTM A-572 GR 50 OR ASTM A709 GR50
fy=50,000 psi
3'-1f
·1 t W-BEAM EXP. DEVICE
__ 1_• __ 6_. _ _,j (TYP. ALL FOUR CORNERS)
I I I !
V
AT BRIDGE ELEVATION BRIDGE & APPROACH RAIL
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2 ~ ROCKY MOUNTAIN REGION
Forest
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
Design: ...:R..,,,S::.:.T ____ _
Drawn: _,L==L'-F ____ _
Checked: ..,J::,.,A,.,_R ____ _
Date: NOV 2015
HOR Engrieemg, Inc.
Sheet ntle:
BRIDGE RAIL
DETAILS
S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04
Sub Sheet:
S10 Submittal:
PS&E
Sheet
BRIDGE RAIL
PAY LIMIT
SEE
SHEET 3
APPROACH RAIL
FOR LOCATION ANO
LAYOUT, SEE SHEET J
PLAN
21'-10 1 't' NW & SE CORNERS b I
2'-6" NW CORNER
12'-8" NE CORNER
17'-7" SW CORNER
1 '-t' SE CORNER
Ill" • SCliEOULE 40
WEATHERING STEEL
PIPE, 1 ;S' LONG
1 2 GAGE TERMINAL
SECTION (CONNECTOR)
TWO 1" NUTS AND
WASHER (SEE NOTE 5)
ATTACH W-BEAM TO PIPE WITH 5/ff' DIA. x 2"
BUTTON HEAD BOLT AND RECESS NUT WITH
NO WASHER (NO CONNECTION TO POST)
34'-4 1 't' SW & NE CORNERS WOOD BREAKAWAY POST (TYP .)
(SEE DETAIL THIS SHEET)
5 SPACES O 3"-1 1/'t' = 15'-7 1/'t'
(WITH RECTANGULAR WASHER UNDER BOLT HEADS)
1 SPACE O 6'-3" = 6°-:r NE & SW CORNERS DIMENSIONS
MEASURED AT
J SPACES O 6'-:l" = 18'-9" NW & SE CORNERS BACK OF RAIL
WOODEN BREAKAWAY POST
IN STEEL FOUNDATION TUBE
I
11" RADIUS TERMINAL SECTION
(BUFFER) 12 GAGE (SEE NOTE 8)
BREAKAWAY
END POST
DIAPHRAGMS PERMITTED
BUT NOT REQUIRED.
S/ff' DIA. x 1 1/2" HEX HEAD BOLT
AND NUT WITH RECTANGULAR WASHER
UNDER BOTH HEAD AND NUT
TWO 10d
GALV. NAILS
T• T• T•
-......,,;;;;t;i'l!ffi;~=========lr==:::::::i\f',~:a::E:j:=l::;Pi•-i._--TWo 1" NUTS AND
WASHER (SEE NOTE 5)
TWO NESTED W-BEAM 12 GAGE
APPROACH RAIL 1YPE JK
PAY LIMITS PAY LIMITS
OM-BT
DECAL
SEE SHEET 16
SOIL PLATE
(SEE DETAIL THIS SHEET)
IX J/4" CABLE CLIPS,
TIGHTEN NUTS ON U-BOLT
3/,;' DIA. x 9'-Cf
WITH ONE SWAGED E
J/ 4" DIA. x ff' BOLT, NUT AND 2
WASHERS (2 REQUIRED PER POST)
LOW SPEED TERMINAL
5:5" x 2" ~ PIPE SLEEVE IN 2 1 /'i' HOLE.
DIA. x 1 (f' BOLT, NUT, WASHERS (EACH POST)
CURE POST IN TUBE
TUBE (SEE DETAIL THIS SHEET)
WELDED CONNECTION OPTION
FOR SOIL PLAlE-ST€£L TUBE
CONNECTIONS (SEE NOTE 4)
TYPE 3K
• INSTALL REFLECTOR TAB
SEE SHEET 16 APPROACH RAIL ELEVATION 1"- 4" LONG HEX NUT FOR
5/15' DIA. BOLT
ff' fj
7 /ff' DIA. BOLT
HOLE
2 1/2"0IA. HOLE
7 /ff' DIA. HOLE l Y-7 5/8"
7 /8" DIA. HOLE l 1·-6t2·l
TWO HEX NUTS AND
WASHER FOR 1• DIA.
STUD (SEE NOTE 9)
F-35-76---~
4"
(FPA01)
RE-71-79
ANCHOR PLATE DETAIL
(W-BEAM RAIL NOT SHOWN)
STEEL TUBE WOOD BREAKAWAY POST
2· - rt lg"16"19"1
007 7 1'-fj u
TWO 7/
BOLT HOLES 1/4" STEEL PLATE
SOIL PLATE
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2
1 1/16" DIA. HOLE
STEEL TUBE
(SEE DETAIL
THIS SHEET)
1" DIA. x •i:° STUD
THREAD FULL LENGTH
2 1/'i' X 2 1/2" X 1/4" X ff'
STRUCTURAL STEEL TUBE (GALVANIZED)
TACK WELD 2 1/2" x 2 1/2" x 1/4"
STEEL PLATE WITH 1 1/16'' DIA. HOLE
TO STEEL TUBE.
BEARING PLATE ANCHOR DETAIL
FOR STEEL POSTS
Forest
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
Design: _R_S~T'-------
Drown: ~LL_F _____ _
Checked: _J""A""'R'-------
3/16'' THICK
STEEL PLATE 5/ff' DIA. MACHINE BOLT
(8 REQUIRED) AND CUT
WASHER ON FRONT
FACE OF RAIL
ANCHOR PLATE DETAIL
(END PLATE NOT SHOWN) ,· !Tc~ VARIES
2'-S' l'-9 7/rf
7'-r:f'POST~
NORMAL ROADSIDE
INSTALLATION
~ Sheet Title:
APPROACH RAIL
DETAILS
NOTES
1. GRADING AND WEARING SURFACE FOR THE 3K SHALL MATCH THE
GRADING AND WEARING SURFACE DF THE ATTACHED GUARDRAIL.
2. THE 3/4" GALVANIZED WIRE ROPE {CABLE) SHALL CONFORM
TO THE REQUIREMENTS OF AASHTO M 30 TYPE II.
3. PLATES SHALL CONFORM TO ASTM A 36, STRUCTURAL TUBING
TO ASTM A 500, AND THEY SHALL BE GALVANIZED ACCORDING
. TO AASHTO M111 (ASTM A123) . WELDING SHALL MEET ALL
REQUIREMENTS OF THE AMERICAN WELDING SOCIETY.
4. WHEN THE SOIL PLATE WELDED OPTION IS SELECTED, SOIL
PLATE CONNECTION BOLT HOLES ARE NOT REQUIRED.
5. OUTSIDE NUT SHALL BE TORQUED AGAINST INSIDE NUT WITH THE
CABLE INSTALLED TAUT BETWEEN THE ANCHOR PLATE AND FIRST
POST.
6. ALL CURVED GUARDRAIL SHALL BE SHOP BENT.
7 . THE STEEL TUBE MAY BE DRIVEN WITH WOOD POST INSERTED
IF NO DAMAGE OCCURS TO THE POST OR BOLTS.
B. THE NOSE MAY EITHER BE A SINGLE PIECE, OR IT MAY
CONSIST OF A TERMINAL SECTION (BUFFER). RE-7-79 ANO
A TERMINAL SECTION (CONNECTOR). RE-8-79.
9. TIGHTEN CABLE ASSEMBLY TO A TAUT CONDITION ON INITIAL
INSTALLATION. FINAL TENSION CHECK REQUIRED ANO TAUT
CONDITION RESTORED IF NECESSARY. 30 DAYS AFTER
INSTALLATION OR BEFORE COMPLETION OF PROJECT THE
OUTSIDE NUT SHALL BE TORQUED SECURELY AGAINST THE
INSIDE NUT.
10. WORK THIS SHEET WITH SHEETS 3 & 16.
FOUR 1"
DIA. HOLES
(RWE02b) RE-B (CLASS 8, TYPE 4)-79 (CORR. RESIST-)
TERMINAL SECTION
(CONNECTOR)
2'-6 3 ff
EIGHT 29/32" x 1 1 /15' (i
SLOTS, MUST MATCH \"
8 OUTER RAIL
SPLICE SLOTS
Lt 8 1/'Z'
[ oot1Z'Jllllllll1 (RWE06a) RE-7 (24", CLASS A, TYPE 4)-79 (CORR. RESIST.)
TERMINAL SECTION
(BUFFER)
Sub Sheet: Submittal :
S11
PS&E
Sheet I ROCKY MOUNTAIN REGION SALIDA RANGER DISTRICT Dote: NOV 2015 tl)R Engineemg, .-ic. ~ S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04 _--d ~ A
~ 15 OF
I
.A
19 1 4•
3 1/4"
S/f OJA. •
1~ BOU
16·
IN J/4• HOLE
5/8" DIA. x 18"
BUTTON HEAD BOLT
(PDB01 & PDE01)
WOOD POST & BLOCK
(DIMENSIONS SHOWN ARE FOR NOMINAL
6" x 8" POSTS AND BLOCKS)
5/B" HEX NUT
AND WASHER
7' WOOD POST
PART
W-BEAM RAIL &
TERMINAL SECTIONS
BASE PLATE
NUTS, BOLTS &
STUDS FOR
GENERAL USE
HIGH STRENGTH
BOLTS & NUTS
HIGH STRENGTH
STUDS & NUTS
ROUND STEEL
WASHERS
RECTANGULAR
WASHERS
OTHER FITTINGS
MATERIAL
SPEC.
AASHTO M 180,
CLASS A OR B
ASTM A 36
ASTM A 307
ASTM A 325
ASTM A 449
ASTM F 436
AASHTO M 180
ASTM A 36
GALVANIZING CORROSION-
RESISTANT SPEC. SPEC.
~ AASHTO M 180,
lYPE 4
AASHTO M 111 N.A.
AASHTO M 232,
CLASS C
OR
ASTM
B 695
CLASS 50
AASHTO M 111
THE GUARDRAIL SHALL BE FABRICATED FROM CORROSION - RESISTANT STEEL.
TRAFFIC DIRECTION FOR -
THE SPLICE LAP SHOWN
J/ 4" 0~. HOLE
IHRU CTR. OF
TIMBER POST
& BLOCK OR
GLULAM RAIL
3/16°
(0.164° MIN)
{FWR03)
RECTANGULAR WASHER
(TO BE USED ONLY WHERE SPECIFIED.)
2• 4 112·
{RWM02a)
W-BEAM RAIL SECTION
15/1s177\'J6R
(+1/16"-1/64") ~ 1 7/ 15"
5/8" DIA.
BUTTON HEAD BOLT
WITH OVAL SHOULDER
D~METER LENGTH THREAD
& lYPE L LENGTH
(INCHES) (INCHES) (INCHES)
5/8 I 1/4 fULL (I 1/32
BUTTON
HEAD
INTENDED USE
ALL RAIL SPLICES
r ~...1. I J/4• 11/ 16°
LT
-ll-9/64°
WASHER
OVAL 18 MIN. 2 1/2 SINGLE BLOCK & POST (TIMBER)
* WASHERS NOT USED AT RAIL SPLICES
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
8 1/2"
12 1/2"
RAIL SPLICE
HEX NUT
AASHTO-AGC-ARTBA NO. BOLTS, NUTS
STANDARD NUMBER & WASHERS
STANDARD NUMBER & WASHERS
* FBBOI 8 PER SPLICE
FBB04 1 PER POST
Forest
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
Design: RST
Drown: LLF
Checked: JAR
SALIDA RANGER DISTRICT , Date: NOV, 2015 ~ HOR Enqineerin q, OM-BT DECAL DETAIL r 5• XW:l::0-1~
"' . 2 3/4° > MOUNTING
POSITION
REFLECTOR TABS SHALL BE MANUFACTURED FROM 12 TO 14
GAUGE STEEL. REFLECTIVE SHEETING SHALL CONFORM
TO ASTM D4956 lYPE Ill.
REFLECTOR TAB
'iii ~ Sheet Title :
APPROACH RAIL
DETAILS
NOTES
1. ALL W-BEAM SPLICES, AND SPLICES OF TERMINAL CONNECTORS TO W-BEAM SHALL
BE LAPPED IN THE DIRECTION OF TRAFFIC UNLESS OTHERWISE NOTED. DIRECTION
OF TRAFFIC IS DEFINED AS THE DIRECTION OF THE RIGHT SIDE OF A FORWARD
MOVING VEHICLE.
2. MATERIAL TYPE AND SHAPE OF POSTS AND BLOCKS SHALL BE THE SAME
THROUGHOUT THE PROJECT EXCEPT WHEN SPECIFIC POSTS AND BLOCKS ARE
SPECIFIED SUCH AS AT END ANCHORAGES.
3. STANDARD GALVANIZED ROUND STEEL WASHERS SHALL BE USED UNDER ALL NUTS
IN CONTACT WITH WOOD POSTS.
4. REFLECTOR TABS WILL NOT BE PAID FOR SEPARATELY BUT SHALL BE INCLUDED
IN THE COST OF THE BRIDGE RAIL. THE TABS SHALL BE MOUNTED SO THAT THE
BOLT SLOT FACES AWAY FROM THE DIRECTION OF TRAFFIC. BOTH SIDES OF THE
TABS SHALL BE REFLECTORIZED SO THAT DELINEATION IS PROVIDED FOR BOTH
DIRECTIONS OF TRAVEL. REFLECTORIZATION COLOR SHALL BE AMBER. TABS SHALL
BE PLACED ON BRIDGE RAIL POSTS AND APPROACH RAIL POSTS MARKED WITH A "T"
ON SHEET 15.
5. AT THE TIME A POST OR BLOCK IS INSTALLED, NO SEASONING CHECK SHALL BE
PERMITTED WHICH EXCEEDS 1 / 4" IN WIDTH WHEN THE CHECK EXTENDS THE FULL
LENGTH OF THE PIECE.
6. WOOD BLOCKS SHALL BE CUT FROM THE SAME CROSS-SECTION, SPECIES, AND
GRADE AND SHALL RECEIVE THE SAME PRESERVATIVE TREATMENT AS THE POSTS
WHEN WOOD POSTS ARE USED.
7. REFERENCES SUCH AS " PD801", "PDE01", AND "PWEOl'' IN THIS STANDARD
SPECIFY HARDWARE DETAILS ARE FROM "A GUIDE TO STANDARDIZED HIGHWAY
BARRIER HARDWARE" PREPARED BY THE AASHTO-AGC-ARTBA JOINT COOPERATIVE
COMMITTEE. REFERENCES SUCH AS "P-10-79", "F- 3{2")-76", AND "RE-3- 73" IN
THIS STANDARD SPECIFY HARDWARE DETAILS FORM "A GUIDE TO STANDARDIZED
HIGHWAY BARRIER RAIL HARDWARE" PREPARED BY THE AASHTO-AGC- ARTBA JOINT
COOPERATIVE COMMITTEE.
8. WOOD POSTS SHALL BE MAOE OF DOUGLAS FIR-LARCH NO. 1 GRADE, OR WESTERN
HEMLOCK, SELECT STRUCTURAL GRADE IN ACCORDANCE WITH THE CURRENT
SPEaFICATION OF THE WEST COAST LUMBER INSPECTION BUREAU. THE DESIGNATED EXTREME FIBER STRESS IN BENDING SHALL BE 1160 psi (MINIMUM). TIMBER FOR
POSTS SHALL BE EITHER ROUGH SAWN {UNPLANEO) OR S4S {SURFACED FOUR
SIDES) WITH NOMINAL DIMENSlONS INDICATED. ONLY ONE TYPE OF SURFACE FINISH
SHALL BE USED FOR POSTS AND BLOCKOVTS IN ANY ONE CONTINUOUS LENGTH OF
RAILING.
9. PRESSURE TREATMENT OF SAWN LUMBER AND GLULAM POSTS, RAILS, ANO BLOCKS
SHALL BE IN ACCORDANCE WITH AASHTO M 1 JJ EXCEPT THAT BLOCKS NEED NOT
BE INCISED. PRESERVATION ASSAY RETENTION REPORTS SHALL BE FORWARDED TO
THE CO. THE CONTRACTOR SHALL CERTIFY THE SPECIES AND GRADE MEET THE
REQUIREMENTS OF THE CONTRACT.
10. THREE WEEKS PRIOR TO FABRICATION OF THIS ITEM, THREE SETS OF SHOP
DRAWINGS FOR ALL RAILING ELEMENTS SHALL BE SUBMITTED TO THE CO FOR
APPROVAL. ALL RAILING ELEMENTS SHALL COMPLY WITH THE REQUIREMENTS OF THE
STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON
FlEDERAL HIGHWAY PROJECTS (FP-14) SECTIONS 556 AND 617.
11. COMPACTION OF SOIL WITHIN A J FOOT RADIUS OF EACH POST SHALL BE COMPLETED
ACCORDING TO SECTIONS 617.04 AND 209.09 OF THE STANDARD SPECIFICATIONS.
12. WORK THIS SHEET WITH SHEET 15.
~ ,r Sub Sheet: ~ 9' Submittal :
PS&E
S12 Sheet I
S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04 ~ 16 OF 19 A Inc. A ~ A ~ A I
200' ------~ \ 1000'
1/4 MILE ,,
------'B \
1 MILE /\
------/G·.
~z~-,~:1-~ / ___ :a _!________, SEE NOTE 4
BEGIN (t BYPASS STA. 1 0+00.00 (t ROAD OF SET .oo' IGHT
STA. 20+00.00
N 1346317.6452 E = 2778301.5539 s
STA. 20+12.95
OFFSET 7.0' RT.
SILT FENCE (TYP.)
r:::=1_ ___ .r==u 30' 15' 0
STA. 21+11.59
OFFSET 7.0' RT.
v.c. = 60 oo·
BYPASS
PC STA. 20+33.60
N = 1346301.6969 E = 2778331.1308
PLAN
V C = 60 00'
/ / , >RE}y\OVE
. ( "EX[STING .~~:~;,\< \
/ STA,:-,22+54. 7
/ OFFSET 7,0' . (
BYPASS
PT STA. +
N 1346139.9808 E = 2778401.2482
/ //' · .. -},~ ·/ / / / /,. / i //,/ //-~/
,-// I (,-/ ,-,-/ // y r,_,,<,,+- / //' // /
;----- /?~r::,00 (j~ ~://:/ ;:/.·,' />/ ~~--;-· , 0~
//~ , ,, x I fi~9( /0f/w~T~R
, G /' /,;/, / ,, /
...c·
S· /_,_ //~,.~~/,, f/ ··1\ //x ,- ,- / ,, f-'1
"" 11D & '1:7><:,/, / . // /:l;;~ \:\<),///
/-00/,,,..
\ / / / / •.. · 6.
~//t:t;;···
Ii I .f ,\ I .'J' I ; L_ \
I I I_;
NOTES:
CURVE NO. R
3 50.00'
4 40.00'
I I I
1. REGRADE AND WIDEN INTERSECTION AS NEEDED
FOR ACCESS DURING CONSTRUCTION AND AS
APPROVED BY THE CO.
2. INSTALL CLASS 1 RIPRAP AT THE OUTLET OF THE
TEMPORARY CULVERT. THE RIPRAP SHALL BE 18
SQUARE INCHES IN PLAN AREA AND
STA. 22+22.02 APPOXIMATELY 8 INCHES IN THICKNESS OR AS
o gf------------------J ~ ~ OFFSET 10.7' RT. DIRECTED BY THE CO. THE C0
ST OF THIS RIPRAP
o '.._t. ~ ;i. o N O o N o INV. ELEV. 9561 SHALL BE INCLUDED IN ITEM 0258. ~~ +": 8 et:00 o. ffilf)r') o.
+ ~ o st · ;i. m st' u-:i ::I: u-:i ~ 3. FOR TEMPORARY BRIDGE DETAILS, SEE SHEET 19. 0lf) N<O S st W+ st. w st O ·
END (t BYPASS STA. 13+41 .05 (t ROAD
STA. 24+34.56
N 1346184.9236 E = 2778592.1368 le, T
65'41 '22.73" 32.23'
107' 16'20.29" 54.33'
(0
lf) co st' N 9580 (/)r') .,.;
(f) + (0 <{ st lf) o_ N
Ol fn II II i ~ ~ ri / EXISTING ~ ~ ~ N ~ ig ~ ~ ~ ~ 4· ~~~~iETJtJ ;;1
1r\c52tto~1
1~Hs6i%s lNNDTHIS > w §; d GROUND ~ II_ C <i. <'.\ Ti C <i. ~ _,II. SHEET.
-3%§or:----~~:::~-:r1:-=(::._-=;;;.;a,==r=--:::---~o_:rci~-(~~~~~~==~§;:;cii=~~~~----i-----:::-===-=-=-:=-=~>J:w~=-=:--=:o~=-==-==-=====-===-====-=====-===-====-=c==~==-==-=~gJ~==-=-=c==-c=-=-==-=-====-c=-=-==---~~~~~---.'.:::'.....~ 0.70% (f)o ~ - 0.00% ,_
(f) O <Jl PROPOSED I\ - ~ cf.8 '° GRADE o ,,_ I I 12 I -~~--- - --o ~--
_j w w fn6 ~ -10% 0 '.._t. -------LJ --'\:-I::..: ~ ;i. 12" CULVERT
~~ ri ~ ~ Q2 ELEV~-:,-~56!\ ~ ~ WQ.._j ~~ N~ m> w 11 11 II II
>w >w v.c. = 50.00'
20+00 21+00 22+00 23+00 24+00
PROFILE
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
Forest
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
Design: .... R~S~T'------
Drawn: _L=L=F _____ _
Checked: -'J~A"-R'------
Sheet Title:
TRAFFIC CONTROL AND
PHASING PLANS
S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04
Sub Sheet:
C4 Submittal:
PS&E
w t-------- AS REQUIRED------t
ROAD
CLOSED
MUTCD PANEL
Rl 1-2
~ -==-==-i-------~ l ....,.._,,...__, ________ 5'-0"
MIN.
'A' (Rl 1-2 AND M4-9R (OR M4-9L) INSTALLED ON A lYPE Ill BARRICADE.)
~ LOCATE lYPE Ill BARRICADES AS SHOWN OR AS DIRECTED BY THE CO .
BARRIER DETAILS
NOTES
1. ALL SIGN AND BARRICADE INSTALLATION SHALL MEET THE STANDARDS ESTABLISHED IN THE
FEDERAL HIGHWAY ADMINISTRATION'S "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
(MUTCD)", 2009 EDITION .
2. LETTERS ON SIGNS SHALL HAVE A MINIMUM HEIGHT OF 4" AND MINIMUM WIDTH OF 2" .
3. WHERE TRAFFIC IS MAINTAINED THROUGH OR OVER ANY PART OF THE PROJECT, THE
CONTRACTOR SHALL BE REQUIRED TO MARK ALL HAZARDS WITHIN THE LIMITS OF THE
PROJECT (INCLUDING CONNECTING ROADS) WITH WELL-MAINTAINED SIGNS.
4. THE CONTRACTOR'S EQUIPMENT AND PARKING AREAS SHALL NOT INHIBIT THE VISIBILllY OF
PROJECT SIGNS AND BARRICADES.
5 . LOCATION AND INSTALLATION OF ALL TRAFFIC SIGNS, TRAFFIC CONTROL, AND BARRICADES SHALL
BE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND APPROVED BY THE CO.
SEE SHEET 17 FOR APPROXIMATE SIGN LOCATIONS.
6 . ALL SIGNS AND BARRICADES SHALL CONSIST OF A SMOOTH, RETROREFLECTIVE SURFACE
UNLESS OTHERWISE SPECIFIED ON THE PLANS. SIGNS SHALL HAVE A SCREEN PROCESSED
BLACK LEGEND AND BORDER ON ORANGE FLEXIBLE RETROREFLECTIVE SHEETING, NON-EXPOSED
LENS BACKGROUND.
7. SIGN PANELS FURNISHED BY THE CONTRACTOR FOR USE ONLY DURING CONSTRUCTION SHALL BE FABRICATED FROM PLYWOOD, ALUMINUM, STEEL OR OTHER SUITABLE MATERIAL, BUT SHALL
BE STABLE AND DURABLE ENOUGH TO MEET OTHER REQUIREMENTS OF THIS CONTRACT.
8 . ALL MATERIAL SHALL BE SOUND AND DURABLE. BARRICADES, SIGNS, SYMBOLS AND LETTERING
SHALL BE OF GOOD WORKMANSHIP. UNEVEN LETTERING SHALL NOT BE ACCEPTED.
9. ALTERNATE METHODS OF PROCESSING SIGNS OR THE SUBSTITUTION OF MATERIALS, SYMBOLS OR
OTHER REFLECTING ELEMENTS SHALL BE PERMITTED ONLY AFTER APPROVAL OF SUCH METHODS
OR MATERIALS BY THE CO IN WRITING.
6'-0"
10. SIGNS AND BARRICADES USED AS TRAFFIC CONTROLS FOR HIGHWAY CONSTRUCTION SHALL NOT
BE PAID FOR SEPARATELY, BUT SHALL BE INCLUDED IN ITEM 63501 .
11 . ALL CONSTRUCTION TRAFFIC CONTROL SIGNING AND BARRICADES SHALL BE COMPLETED AND APPROVED PRIOR TO THE BEGINNING OF CONSTRUCTION, AND ITEM 15101 MOBILIZATION, SHALL
NOT BE PAID UNTIL SIGNING IS APPROVED BY THE CO.
12. FURNISH, INSTALL AND MAINTAIN SIGN lYPES "/<.' THROUGH "K'', THE TEMPORARY OBJECT MARKERS AND DRUMS THROUGHOUT CONSTRUCTION. REMOVE SIGN lYPES "/<.' THROUGH "K'', THE
TEMPORARY OBJECT MARKERS AND DRUMS, ONCE THE NEW STRUCTURE IS OPEN. TO TRAFFIC.
13. SIGN PANELS SHALL BE ATTACHED TO POSTS WITH 3/8" Iii MACHINE BOLTS THROUGH 1/2" Iii HOLES PLACED ALONG l OF POST. FIBER WASHERS SHALL BE PLACED BETWEEN THE BOLT HEAD AND THE FACE OF THE SIGN PANEL. 2" Iii CUT STEEL WASHERS SHALL BE PLACED
UNDER THE NUT ON THE BACK OF THE TIMBER POSTS.
14. ALL TRAFFIC CONTROL DEVICES SHALL FOLLOW THE GUIDELINES ESTABLISHED IN THE REFERENCE TITLED "QUALllY GUIDELINES FOR WORK ZONE TRAFFIC CONTROL DEVICEs" PUBLISHED BY THE ROADWAY SAFElY TRAINING INSTITUTE AND THE AMERICAN TRAFFIC SAFETY SERVICE ASSOCIATION.
15. THE OBJECT MARKERS AND "ONE LANE BRIDGE" SIGNS ARE PERMANENT.
SIGN DIMENSIONS TABLE
SIGN A B C D
& 2•-0" 1 '-6" 10•-o" - & 2'-f,' 2·-0· 10'-6"
SIDES OF POST FDR SIGN'-"
W20-1 W20-2 W13-1 Wl-8 W20-4
6 ' -0" 3' - 0" lo
B
(MIN.)
I D
INSTALL PANEL BOTH ~
~~--b,--'- ___:1_ lI ~EE
W20-1
6'-0"
(f)VJ
REDUCED er
SPEED ROAD CLOSED 0
w
LOCAL TRAFFIC ONLY
AHEAD a w
R2-5A W1-3R R1-2 R1 1-3a
(OR W1-3L) (SEE NOTE 16)
DETOUR SIGNAGE
13.
TOP OF
ROAD
6'-0"
~ ~~ -.,. ric '<S'- ~ I .
a w
* 1"
'o I
I N
* THE CONTRACTOR SHALL ADJUST POST LENGTH AS REQUIRED TO OBTAIN
PROPER HEIGHT OF SIGN RELATIVE TO THE SURFACE OF THE ROAD.
SIGN INSTALLATION DETAILS
SIGN ffi
SEE NOTE 13.
13.
U.S. DEPARTMENT OF AGRICULTURE Forest
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION SALIDA RANGER DISTRICT
i er i
13. 0 w
TOP OF
ROAD
6' o" -a c§ er w a w
S'~-,~ ~ ~ -{),.~ .. ~ ~ . ... ;n ill" '
Design : ~R=S~T ____ _
Drawn: _.L=L,__F ____ _
Checked: _.J~A~R ____ _
Date: NOV 2015 tl)R En h:.
* b u I in
TOP OF b I
ROAD
b, NOTE 13.
<r'x4"x C * 4"
POST ROUGH
SAWN 4"
TOP OF
ROAD
THERE SHALL BE AT LEAST
TWO ORANGE AND TWO WH ITE
HORIZONTAL, CIRCUMFERENTIAL,
REFLECTIVE STRIPES ON EACH
DRUM. DRUMS SHALL BE
CONSTRUCTED OF LIGHT
WEIGHT DEFORMABLE MATERIAL.
DRUMS SHALL NOT BE WEIGHTED
BY ANY METHOD OR WITH ANY
MATERIAL THAT WOULD MAKE
THEM HAZARDOUS TO MOTORISTS.
SIGNS&& TYPICAL DRUM
5'- 0"
3'-0"
,,.,_v-to
I D
SIGN&
t/' Sheet Title:
ROAD
SURFACE
(lYP.)
TRAFFIC CONTROL AND
PHASING PLANS
1•-~"1 ,-?i
REINSTALL
EXISTING
POSTS -
'/,1/
0 -
RELOCATED
~ t/'
~ S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04 ..J ~
z b
~ I h t;;
(!) b z I tii ;...
x w
OBJECT
Sub Sheet:
C5 b, ___:1_
~ JI SEE
NOTE 13.
b, TOP OF
ROAD
MATCH
EXISTING
INSTALLATION
MARKER
~ t/' Submittal: ~
PS&E
Sheet I
A ~ I A alamp Line alamp Line
5 0 5 10
RESET EXISTING
BRIDGE AND SILL
I
�:ET EXISTING _J'
� OBJECT MARKERS (TYP.)
TEMPORARY
FOOTING
_ J�EE NOTE 2)
PLAN
TEMPORARY BYPASS BRIDGE
-------- APPROACH RAILS NOT REQUIRED -----
BRIDGE RAIL
NOT SHOWN
RESET EXISTING BRIDGE SUPERSTRUCTURE AND BRIDGE RAILS
SEE NOTE 6
02 EL.=9556.7 sz
IPRAP
CLASS 3
(TYP.)
ELEVATION
TEMPORARY BYPASS BRIDGE
U.S. DEPARTMENT OF AGRICULTURE
Forest
SOUTH COTTONWOOD CREEK
_____ __J_
SEE NOTE 7 (TYP.)
Design:
PROFILE GRADE
@ � DETOUR
BACKING PLANK (TYP.)
(SEE NOTE 1)
ELEV. 9553.95
RST
LLF FOREST SERVICE
R-2
PIKE-SAN !SABEL NATIONAL FOREST
Drawn:
Checked: JAR
ROCKY MOUNTAIN REGION SALIDA RANGER DISTRICT
Date: NOV, 2015
HOR En ineerin ' Inc.
Sheet Title:
NOTES
1. THE BACKING PLANKS ARE INTENDED TO RETAIN THE BYPASS FILL ABOVE THE TOP OF THE
TEMPORARY ABUTMENTS. THE BACK11,IG PLANKS FRm! THE EXISTING BRIDGE ABUTMENTS
MAY BE USED ON THE TEMPORARY BRIDGE. THE CONTRACTOR MAY RECOMMEND
ALTERNATIVE MATERIALS SUCH AS CORRUGATED METAL OR GABION BASKETS AS
APPROVED BY THE CO.
2. THE TEMPORARY ABUTMENTS AND WINGWALLS ARE 8'-o• x 3'-s• x 3'-o• PRECAST
CONCRETE BLOCKS. THESE BLOCKS ARE OWNED BY THE GOVERNMENT ANO AVAILABLE TO
THE CONTRACTOR. THE BLOCKS ARE STORED AT THE LAKE GEORGE WORK CENTER
LOCATED APPROXIMATELY 55 MILES EAST OF BUENA VISTA ON US HIGHWAY 24. THE
BEAMS OF THE EXISTING BRIDGE CAN BE PLACED DIRECTLY ON THE TOP CONCRETE
BLOCKS BETWEEN THE LIFTING LOOPS (SHIMS MAY BE REQUIRED). THE CONTRACTOR
SHALL TRANSPORT THE CONCRETE BLOCKS FROM THE WORK CENTER TO THE PROJECT
SITE AND RETURN THEM AT THE END OF THE PROJECT AS DIRECTED BY THE CO. THE
COST OF TRANSPORTING THE BLOCKS TO AND FROM THE PROJECT SITE AND ALL COSTS
ASSOCIATED WITH LOADING, UNLOADING, INSTALLING, MAINTAINING, AND REMOVING THE
BLOCKS ON THE BYPASS SHALL BE INCLUDED IN ITEM 20350
3. THE FIN AL LOCATION OF THE TEMPORARY BRIDGE MAY BE SHIFTED SLIGHTLY AS REQUIRED
AND SHALL BE AS APPROVED BY THE CO. THE CONTRACTOR SHALL VERIFY THE DEPTH
AND LENGTH OF THE EXISTING BRIDGE PRIOR TO PLACING THE TEMPORARY ABUTMENTS
AND RE-SETTING THE EXISTING BRIDGE SUPERSTRUCTURE.
4. THE RIPRAP FOR THE TEMPORARY BRIDGE MAY BE RELOCATED TO THE PERMANENT BRIDGE
UPON REMOVAL OF THE TElvlPORARY BYPASS
5. THE CENTER PIER UNDER THE EXISTING BRIDGE SHALL NOT BE RELOCATED TO THE
TEMPORARY BYPASS.
6. PLACE AND COMPACT STRUCTURAL BACKFILL MATERIAL BENEATH THE BOTTOM LAYER OF
PRECAST CONCRETE BLOCKS. THE COST FOR ALL MATERIAL. U,BOR, EQUIPMENT, AND
INCIDENTALS NESSESSARY TO CONSTRUCT THIS MATERIAL SHALL BE INCLUDED WITH ITEM
20350 REMOVE AND RESET EXISTING TIMBER BRIDGE SUPERSTRUCTURE.
7. PLACE AND COMPACT STRUCTURAL BACKFILL MATERIAL WITHIN THE VOIDS OF ALL PRECAST
CONCRETE BLOCKS. THE COST FOR ALL MATERIAL, LABOR, EQUIPMENT, AND INCIDENTALS
NESSESSARY TO CONSTRUCT AND REMOVE THIS MATERIAL SHALL BE INCLUDED WITH ITEM
20350 REMOVE AND RESET EXISTING TIMBER BRIDGE SUPERSTRUCTURE.
i DETOUR
VARIES I VARIES
(7' -O"MIN.) (7'-0"MIN.)
I PROFILE 4" AGGREGATE
GRADE SURFACE
2% LINE
_,======f====:::f:=,.,, 2.0 (TYP.)
------------�-------- 71
I EXISTING _;r---- --
GROUND
iYPICAL DETOUR SECTION
Sub Sheet· Submittal
TEMPORARY BRIDGE
DETAILS C6
PS&E
S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04 19 OF 19
File details come from the government source that posted it. Updated .