Berry Creek SOI.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- UNITED STATES FOREST SERVICE, ROCKY MOUNTAIN REGION 2, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
- Solicitation number
- 1240LU25R0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items (SOI) spreadsheet for a Berry Creek Culvert Replacement project under the USFS Region 2 Road and Bridge Construction MATOC. The SOI contains 17 base items and 1 optional item, including access road improvements, mobilization, construction surveying, soil erosion control, clearing and grubbing, structure excavation, foundation fill, structural backfill, aggregate surface course, precast concrete footing, aluminum box culvert (11'11" span, 3'7" rise), seeding, object markers, traffic control, streambed simulation material, and streambed channel rock. The optional item is for rock excavation blasting.
The SOI is associated with a broader MATOC solicitation (1240LU25R0008) issued by the USFS Rocky Mountain Region as a small business set-aside under NAICS 237310 ($45M size standard). The MATOC will have a minimum of 10 awardees for a base period of 2 years plus three 1-year options, with task orders ranging from $2,000 to $3,000,000 and a total shared ceiling of $50,000,000. The geographic scope is limited to USFS Region 2 Forests and Grasslands.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| R2 RBC MATOC | ||||||
| White River National Forest | ||||||
| Holy Cross Ranger District | ||||||
| Berry Creek Culvert Replacement | ||||||
| Schedule of Items | ||||||
| CLIN | Pay Item No. | Description | Pay Unit | Estimated Quantity | Unit Price | Amount |
| BASE ITEMS | ||||||
| 001 | 15102 | Access Road Improvements | LS | 1 | $ | $ |
| 002 | 15101 | Mobilization | LS | 1 | $ | $ |
| 003 | 15201 | Construction Surveying & Staking, Method 1, Tolerance A | LS | 1 | $ | $ |
| 004 | 15713 | Soil Erosion and Pollution Control | LS | 1 | $ | $ |
| 005 | 20101 | Clearing and Grubbing | LS | 1 | $ | $ |
| 006 | 20305 | Removal of structures and Obstructions, Disposal Method A | LS | 1 | $ | $ |
| 007 | 20801 | Structure Excavation | CY* | 280 | $ | $ |
| 008 | 20802 | Foundation Fill | CY* | 22 | $ | $ |
| 009 | 20803 | Structural Backfill | CY* | 130 | $ | $ |
| 010 | 30115 | Aggregate Surface Course, Compaction D | TON | 65 | $ | $ |
| 011 | 59052 | Precast Concrete Footing, Class A(AE) concrete | LF | 81 | $ | $ |
| 012 | 60358 | 11-ft 11-in span, 3-ft 7-in rise, aluminum box, 1.4-ft min cover | LF | 40.5 | $ | $ |
| 013 | 62502 | Seeding, Gov't Furnished, Dry Method | SY* | 280 | $ | $ |
| 014 | 63306 | Object Markers, Type III | EA | 4 | $ | $ |
| 015 | 63501 | Temporary Traffic Control | LS | 1 | $ | $ |
| 016 | 64801 | Placed Streambed Simulation Material, Class A | CY* | 50 | $ | $ |
| 017 | 64802 | Placed Streambed Channel Rock, Class CR-2 & CR-3 | CY* | 72 | $ | $ |
| OPTIONAL ITEMS | ||||||
| 018 | 20501 | Rock Excavation Blasting (OPTIONAL ITEM) | LS | 1 | $ | $ |
| TOTAL PRICE: | ||||||
| NOTE: | * Designates item as a contract quantity. |
File details come from the government source that posted it. Updated .