Washakie SOI.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- UNITED STATES FOREST SERVICE, ROCKY MOUNTAIN REGION 2, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
- Solicitation number
- 1240LU25R0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items (SOI) spreadsheet for road construction work in the Washakie Ranger District of the Shoshone National Forest. The SOI outlines eight pay items including mobilization, construction survey and staking, soil erosion and pollution control, removal of existing culverts (12"-24"), aggregate surface course installation, roadway reconditioning for 33.9 miles of Level 3 roads, installation of 168 linear feet of 18-inch corrugated metal pipe, and maintenance of culverts, catch basins, and drainage dips.
The SOI is part of solicitation 1240LU25R0008, which is a Multiple Award Task Order Contract (MATOC) for the USFS Rocky Mountain Region 2. This is a small business set-aside IDIQ contract with a $50M shared ceiling, individual task orders ranging from $2,000 to $3M, and a period of performance including a 2-year base period plus three 1-year options. The government intends to award a minimum of 10 contracts under NAICS code 237310 (size standard $45M).
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Region 2 |
| Shoshone National Forest |
| Washakie Ranger District |
| Washakie Road Work 2024 |
| Schedule of Items | |||||
| Pay Item No. | Description | Quantity | Unit | Unit Price | |
| ($) | Total Price |
| 15101 | Mobilization, including to project area and between sites | 1 | LS | ||
| 15201 | Construction Survey and Staking, Conventional Survey Methods | 1 | LS | ||
| 15713 | Soil Erosion & Pollution Control | 1 | LS | ||
| 20301A* | Removal of Existing Culverts, 12”-24”, Disposal Method “a”, Remove from Project | 3 | EA | ||
| 30101C* | Aggregate Surface Course, Gradation U, Compaction Method "B" | 558 | Ton | ||
| 30302* | Roadway Reconditioning, Level 3 Roads, (b) Compaction Method 2 | 33.9 | MILE | ||
| 60201A* | 18-inch Diameter 16-Gauge Corrugated Metal Pipe, Compaction Method “f” | 168 | LF | ||
| 80501A* | Culvert and Catch Basin Cleaning, under 24" | 28 | EA | ||
| 80502A* | Drainage Dip Maintenance | 2 | EA | ||
| * Designates contract quantity pay item | TOTAL : | $0.00 |
Sheet2
File details come from the government source that posted it. Updated .