This is a Contract Change Request form issued by the City of Carmel, Indiana, for use in requesting modifications to existing contracts. The form provides a structured template for documenting proposed changes to contract scope of work, including sections for identifying the specific changes requested, stating the reason for the modification, and estimating the cost impact. The form requires contractors to indicate whether additional time is needed to complete the scope changes and whether additional personnel will be required, including the specific trades, number of personnel, and duration of employment. The document also includes designated spaces for identifying supporting attachments and requires signatures from the preparer, reviewer, and reviewing engineer, with a section reserved for engineer comments and recommendations regarding the proposed change request.
This blank template document is directly associated with the City of Carmel's Raised Crosswalk Improvements project at Gray Road and Hazel Dell Roundabouts. The change request form would be utilized if the contractor or City identifies modifications necessary during the construction phase of the raised crosswalk installations scheduled for completion by September 10, 2026. The form is designed to facilitate formal documentation and authorization of any contract modifications, cost adjustments, schedule extensions, or resource reallocations that may be required as the project proceeds through its four phases across the six designated intersection locations in Carmel, Indiana.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: CONTRACT CHANGE REQUEST NO.:
DATE:
PROJECT NAME:
FROM:
IT IS REQUESTED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE
REFERENCED CONTRACT.
1. SCOPE OF WORK (USE ADDITIONAL PAGES IF REQUIRED. ALSO LIST OTHER
CONTRACTS INVOLVED.)
2. REASON FOR CHANGE:
3. APPROXIMATE COST CHANGE TO CONTRACT PRICE: _____________________
4. WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO _____ -(CALENDAR
DAYS)
5. WILL THE CONTRACTOR NEED ADDITIONAL PERSONNEL TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO
IF NO, TRADE(S): _____________________________________
NO. OF PERSONNEL: _________________________________
DURATION: ______________________________________
6. IDENTIFICATION OF ATTACHMENTS:
DATE: _______________________ DATE: ________________________
PREPARED
REVIEWED BY:____________ REVIEWED BY:____________________________
ENGINEER
Comments and Recommendation:
File details come from the government source that posted it. Updated .