These are construction drawings for the Boiler Replacement project (Project Number 558-22-152) at Durham VA Health Care System in Durham, North Carolina. The drawings establish the design intent and dimensional relationships for replacing boilers at the facility, which includes work in Building 7 (Boiler Plant), Building 9 (Chiller Plant), Building 24 (Temporary Boiler Plant), and surrounding parking lot and loading dock areas. The work will be phased to minimize disruption to the occupied 24-hour healthcare facility. Key project components include demolition of existing structures and utilities, installation of two 25,000-gallon underground storage tanks for fuel oil, sanitary sewer modifications with new structures and piping, fuel oil supply and return piping connections, concrete and asphalt pavement work, electrical conduit installation, and erosion and sediment control measures. The drawings specify contractor responsibilities including obtaining all necessary permits and approvals, verifying existing utility locations through test pits, complying with OSHA and applicable federal, state, and local regulations, providing adequately trained personnel, and protecting worker safety and public access. The project includes phased construction sequences (Phase 1, 2, and 3) with detailed erosion control, temporary facilities (including a temporary above-ground fuel storage tank and temporary steam boilers), and final site stabilization. The contract involves coordination with the VA Contracting Officer Representative, compliance with North Carolina Department of Environmental Quality requirements for underground storage tank installation, and adherence to industry standards including API 1615, PEI RP100, and NFPA 30.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N or th
N or th
BUILDING 7
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
NOT FOR
CONSTRUCTION
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C :\R ev it
\2 2.
_A
R C
H _R
_g de nt
9T P
JY
.r vt 8/
/2
3:
:0
P M
GI001
COVER SHEET REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GDD MVP
35% SUBMISSION
VEG 22.04
DURHAM VA HEALTH CARE SYSTEM
508 FULTON ST, DURHAM, NC 27705
VAMC PROJECT #: 558-22-152
REPLACE BOILERS
09/01/2022
SHEET NUMBER SHEET NAME
GENERAL
GI001 COVER SHEET
GI002 GENERAL ABBREVIATIONS, NOTES, & SYMBOLS
GENERAL
CD101 DEMOLITION PLAN
ARCHITECTURAL
AD111 DEMOLITION PLAN - LEVEL 1
AD113 DEMOLITION PLAN - LEVEL 3
AE111 FLOOR PLAN - LEVEL 1
AE113 FLOOR PLAN - LEVEL 3
MECHANICAL
M-001 MECHANICAL ABBREVIATIONS & NOTES
M-002 MECHANICAL SYMBOLS
M-003 BOILER PLANT PIPING LEVELS
MQ601 EQUIPMENT & DEVICE SCHEDULES
MQ602 TEMPORARY EQUIPMENT
MD101A SITE DEMOLITION PLAN - PHASE A
MD111A DEMOLITION PLAN - LEVEL 1 - PHASE A
MD111B DEMOLITION PLAN - LEVEL 1 - PHASE B
MD112A DEMOLITION PLAN - LEVEL 2 - PHASE A
MD112B DEMOLITION PLAN - LEVEL 2 - PHASE B
MD113A DEMOLITION PLAN - LEVEL 3 - PHASE A
MD113B DEMOLITION PLAN - LEVEL 3 - PHASE B
MD114A DEMOLITION PLAN - ROOF - PHASE A
MD114B DEMOLITION PLAN - ROOF - PHASE B
MP101A BOILER PLANT PIPING PLAN - SITE - PHASE A
MP111A BOILER PLANT PIPING PLAN - LEVEL 1 - PHASE A
MP111B BOILER PLANT PIPING PLAN - LEVEL 1 - PHASE B
MP112A BOILER PLANT PIPING PLAN - LEVEL 2 - PHASE A
MP112B BOILER PLANT PIPING PLAN - LEVEL 2 - PHASE B
MP113A BOILER PLANT PIPING PLAN - LEVEL 3 - PHASE A
MP113B BOILER PLANT PIPING PLAN - LEVEL 3 - PHASE B
MP114A BOILER PLANT PIPING PLAN - ROOF - PHASE A
MP114B BOILER PLANT PIPING PLAN - ROOF - PHASE B
MP301 BOILER PLANT SECTIONS
MK501 TYPICAL DETAILS
ELECTRICAL
E-001 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES
E-002 ELECTRICAL SYMBOLS
ED111 DEMOLITION PLAN - LEVEL 1
EP111 POWER PLAN - LEVEL 1
EP601 POWER ONE-LINE DIAGRAM
EP602 PANEL SCHEDULES
EK501 TYPICAL DETAILS
SHEET INDEXRENDERED IMAGEVICINITY MAP
AREA OF WORK
09/19/202311/20/2023
11/20/2023
03/05/2026
GENERAL CIVIL NOTES
1. THESE DRAWINGS ESTABLISH THE DESIGN INTENT AND DIMENSIONAL RELATIONSHIPS. DO NOT SCALE THE
DRAWINGS, FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION. ANY
OMISSION, DISCREPANCY, OR CONFLICT MUST BE REPORTED TO THE VA COR IMMEDIATELY.
2. ALL WORK PERFORMED MUST BE IN CONFORMANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND ORDINANCES OF THE AUTHORITIES HAVING JURISDICTION. ALL WORK MUST BE IN ACCORDANCE WITH
OSHA. THE CONTRACTOR MUST PROCURE ANY AND ALL NECESSARY PERMITS AND INSPECTIONS.
CONTRACTORS WORKING ON U.S. GOVERNMENT PROPERTY ARE REQUIRED TO COMPLY WITH ALL
APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS, TO INCLUDE APPLICABLE
ENVIRONMENTAL AND SAFETY LAWS AND REGULATIONS, REGARDLESS OF CONTRACT LANGUAGE.
COMPLIANCE WITH THE REQUIREMENTS BY SUBCONTRACTORS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
3. THE CONTRACTOR SHALL PROVIDE ADEQUATELY TRAINED PERSONNEL, IN ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE SAFETY AND ENVIRONMENTAL REGULATIONS, FOR JOBS INVOLVING
SPECIFIC ENVIRONMENTAL RISKS.
4. THE CONTRACTOR SHALL ESTABLISH AND MAINTAIN A PROGRAM TO PROTECT THE SAFETY AND HEALTH OF ALL PERSONS ON THE WORKSITE TO INCLUDE EMPLOYEES, EMPLOYEES OR OTHER CONTRACTORS OR SUBCONTRACTORS, VISITORS AND THE PUBLIC WHEN WORKING ON THE HEADQUARTERS COMPOUND.
5. THE CONTRACTOR IS REQUIRED TO FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS TO COMPLETE THE PROJECT AS DESCRIBED OR IMPLIED BY THE CONTRACT DOCUMENTS (INCLUDING THE SPECIFICATIONS).
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISTRIBUTION OF DRAWINGS, THE PROJECT MANUAL AND SPECIFICATIONS TO ALL TRADES UNDER THEIR JURISDICTION. COORDINATE ALL SCHEDULING WITH VA
COR.
7. THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK THAT CHANGES THE DESIGN INTENT CONTAINED WITHIN THE CONTRACT DOCUMENTS (INCLUDING THE SPECIFICATIONS) UNLESS THEY RECEIVE WRITTEN AUTHORIZATION FROM THE VA COR. FAILURE TO OBTAIN SUCH AUTHORIZATION SHALL INVALIDATE ANY CLAIM FOR ADDITIONAL COMPENSATION AND MAY MAKE THE CONTRACTOR LIABLE FOR RECONSTRUCTION
AT THE CONTRACTOR'S EXPENSE.
8. INFORM VA COR IMMEDIATELY UPON THE DISCOVERY OF UNDOCUMENTED EXISTING CONDITIONS, SUCH AS THE PRESENCE OF ASBESTOS OR ASBESTOS CONTAINING MATERIALS, RADIOACTIVE MATERIALS, RADON GAS, TOXIC WASTE OR OTHER SIMILAR HAZARDOUS MATERIALS.
9. NO WORK DEFECTIVE IN WORKMANSHIP, QUALITY OR DEFICIENT IN REQUIREMENTS OF CONTRACT DOCUMENTS WILL BE ACCEPTABLE DESPITE THE VA COR'S FAILURE TO DISCOVER OR POINT OUT DEFECTS OR DEFICIENCIES DURING CONSTRUCTION OR PUNCH. DEFECTIVE WORK REVEALED WITHIN THE TIME COVERED BY THE GUARANTEES AND WARRANTIES SHALL BE REPLACED BY THE CONTRACTOR WITH WORK IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. NO PAYMENT, EITHER PARTIAL OR FINAL SHALL BE
CONSTRUED AS ACCEPTANCE OF DEFECTIVE WORK OR IMPROPER MATERIALS.
OBTAIN ALL PERMITS AND APPROVALS FOR ALL DEMOLITION AND NEW DEFECTIVE WORK OR IMPROPER
MATERIALS.
10. OBTAIN ALL PERMITS AND APPROVALS FOR ALL DEMOLITION AND NEW WORK IN ACCORDANCE WITH THE GOVERNMENT REGULATIONS AND REQUIREMENTS. REFER TO UNDERGROUND STORAGE TANK NOTES.
11. PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR SHALL VERIFY THAT THEY ARE IN POSSESSION
OF THE LATEST ISSUANCE OF THE CONTRACT DOCUMENTS.
12. REQUESTS FOR SUBSTITUTIONS, REVISIONS, OR CHANGES SHALL BE SUBMITTED TO THE VA COR FOR
REVIEW AND APPROVAL PRIOR TO PURCHASE, FABRICATION, INSTALLATION AND ONSET OF
CONSTRUCTION. SUCH REQUESTS SHALL BE MADE IN WRITING. ONLY SUBSTITUTIONS THAT ARE OF EQUAL OR BETTER QUALITY/PERFORMANCE AND HAVE MORE ADVANTAGEOUS DELIVERY TIME FRAMES WILL BE CONSIDERED. SUBSTITUTIONS DUE TO LACK OF PLANNING ON THE PART OF THE CONTRACTOR WILL NOT
BE CONSIDERED.
13. THE CONTRACTOR MUST MAKE NOTE OF ALL LONG-LEAD TIME ITEMS THAT MAY ADVERSELY AFFECT THE
PROJECT SCHEDULE TO INSURE THE PROJECT CRITICAL PATH IS NOT IMPACTED.
14. BETWEEN THE HOURS OF 6AM AND 9PM, ALL WORKERS SHALL REQUEST AND OBTAIN APPROVAL FROM CONTRACTOR AND VA COR FOR SPECIFIC TASKS IF ANY NOISE RESULTING FROM THE WORK REGISTERS
ABOVE 60 DECIBELS OR CAN BE HEARD OUTSIDE THE IMMEDIATE WORK AREA.
15. ALL EXISTING UNDERGROUND UTILITY LOCATIONS AS SHOWN ON THESE PLANS ARE APPROXIMATE AND MAY NOT REPRESENT ALL UNDERGROUND UTILITIES OR SERVICE LINES. CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXACT LOCATION, DEPTH, SIZE, AND TYPE OF UTILITIES SHOWN AND NOTIFYING ENGINEER OF DISCREPANCIES. CONTRACTOR IS SOLELY RESPONSIBLE FOR DAMAGE TO PROPERTY, UTILITIES, OR
PHYSICAL IMPROVEMENTS.
16. NO TITLE REPORT FURNISHED. ALL UNDERLYING TITLE LINES, EASEMENTS, SERVITUDES AND OTHER MATTERS OF TITLE MAY NOT BE SHOWN HEREON. THIS DOCUMENT DOES NOT REPRESENT A CURRENT
BOUNDARY SURVEY.
17. NO CERTIFICATION HAS BEEN MADE AS TO THE LOCATIONS OF UNDERGROUND UTILITIES SUCH AS, BUT
NOT LIMITED TO ELECTRIC, GAS, TELEPHONE, CATV, WATER, SANITARY AND STORM SEWERS.
UNDERGROUND STORAGE TANK (UST) NOTES
LEGEND
EXISTING
EXISTING IRON PIPE
UTILITY POLE
LIGHT POLE
ELECTRIC BOX
ELECTRIC MANHOLE
HVAC EQUIPMENT
UTILITY HANDHOLE
GAS VALVE
WATER VALVE
WATER METER
WATER MANHOLE
POST INDICATOR
FIRE HYDRANT
DRAINAGE MANHOLE
DROP INLET
SANITARY SEWER MANHOLE
SANITARY CLEANOUT
MONITORING WELL
SIGN
TREE
FENCE LINE
UNDERGROUND ELECTRIC LINE
UNDERGROUND GAS LINE
UNDERGROUND WATER LINE
STORM DRAINAGE PIPE
SANITARY SEWER PIPE
HANDRAIL
E
AC
E
C
W
EX SSMH 1
RIM: 369.56'
(SE) 8" DIP INV IN: 363.60'
(W) 8" DIP INV OUT: 363.45'
EX SSMH 2
RIM: 371.89'
EX SSMH 3
RIM: 369.49'
(SE) 10" PVC INV IN: 365.48'
(W) 10" PVC INV OUT: 365.37'
EX SSMH 4
RIM: 368.48'
(S) 8" CLAY INV IN: 360.63'
(S) 8" CLAY INV IN: 353.09'
(NE) 12" DIP INV IN: 352.16'
(SW) 12" DIP INV OUT: 352.04'
EX SSMH 5
RIM: 368.30'
(SW) 6" DIP INV IN: 361.68'
(NE) 12" DIP INV IN: 351.13'
(NW) 12" DIP INV OUT: 350.99'
EX SSMH 6
RIM: 372.75'
(E) 8" DIP INV IN: 365.62'
(E) 8" DIP INV IN: 362.39'
(W) 8" DIP INV OUT: 361.88'
EX DI 1
DROP INLET
RIM: -
(S) 8" DIP INV IN: 364.80'
(NW) 12" DIP INV OUT: 364.40'
EX DI 2
DROP INLET
RIM: -
(SE) 8" DIP INV IN: 365.83'
8" DIP INV OUT: 365.75'
EX DI 3
DROP INLET
RIM: 367.78'
(NW) 8" DIP INV OUT: 366.12'
EX DI 4
3' x 2' DROP INLET
RIM: 378.22'
(E) 12" RCP INV IN: 374.30'
(SW) 12" RCP INV OUT: 372.09'
EX DI 5
3' x 2' DROP INLET
RIM: 369.49'
(E) 4" DIP INV IN: 368.48' [RD]
(S) 4" DIP INV IN: 366.58' [RD]
(SW) 4" DIP INV IN: 365.97' [RD]
(SE) 6" DIP INV IN: 365.95' [RD]
NO OUTLET PIPE OBSERVED
EX DMH 1
RIM: 372.46'
(N) 4" DIP INV IN: 368.18' [RD]
(NE) 15" RCP INV IN: 368.13'
15" DIP INV OUT: 367.67'
EX DMH 2
RIM: 372.36'
(N) 8" PVC INV IN: 367.88' [RD]
(E) 15" DIP INV IN: 367.38'
15" DIP INV OUT: 365.80'
EX SSMH 7
RIM: 377.56'
(E) 8" DIP INV IN: 367.90'
(SE) 8" DIP INV IN: 366.74'
(W) 8" DIP INV OUT: 366.61'
EX SSMH 8
RIM: 382.87'
EX SSMH 9
RIM: 383.72'
(SE) 3" DIP INV IN: 382.58'
(N) 8" DIP INV IN: 376.06'
(NW) 4" DIP INV IN: 375.88'
(NW) 8" DIP INV IN: 369.66'
(N) 8" DIP INV IN: 369.42'
(S) 8" DIP INV IN: 369.16'
(W) 8" DIP INV OUT: 368.95'
EX SSMH 10
RIM: 383.14'
(N) 4" DIP INV IN: 379.62'
(E) 8" DIP INV IN: 378.86'
8" DIP INV OUT: 378.51'
EX SSMH 11
RIM: -
(S) 6" DIP INV IN: 364.86'
(SE) 6" DIP INV IN: 364.85'
(NW) 6" DIP INV OUT: 364.80'
EX SSMH 12
RIM: 370.67'
EX DI 7
2' x 2' DROP INLET
RIM: 368.65'
(NW) 12" CMP INV OUT: 365.53'
EX DI 8
4' x 4' DROP INLET
RIM: 369.89'
(W) 4" PVC INV IN: 368.62' [RD]
(S) 6" PVC INV OUT: 368.45'
GENERAL INSTALLATION GUIDELINES
1. CONTACT THE LOCAL FIRE MARSHAL, BUILDING INSPECTOR AND UST INSPECTOR;
2. REFER TO 15A NCAC 2N "CRITERIA AND STANDARDS APPLICABLE TO USTs".
3. REFER TO THE MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR EQUIPMENT SPECIFIC INSTALLATION
REQUIREMENTS;
4. REFER TO THE MOST RECENT VERSIONS OF THE FOLLOWING INDUSTRY CODES FOR ADDITIONAL TANK AND
PIPING INSTALLATION REQUIREMENTS:
4.1. AMERICAN PETROLEUM INSTITUTE PUBLICATION 1615 "INSTALLATION OF UNDERGROUND PETROLEUM
SYSTEMS",
4.2. PETROLEUM EQUIPMENT INSTITUTE (PEI) PUBLICATION RP100 "RECOMMENDED PRACTICES FOR
INSTALLATION OF UNDERGROUND LIQUID STORAGE SYSTEMS",
4.3. NATIONAL FIRE PROTECTION ASSOCIATION 30 "FLAMMABLE AND CONBUSTIBLE LIQUIDS CODE",
4.4. OTHER APPLICABLE INDUSTRY CODES INCLUDING NORTH CAROLINA STATE BUILDING CODE CHAPTER 13, AND NORTH CAROLINA FIRE PROTECTION CODE.
CERTIFIED INSTALLERS
1. IF REQUIRED BY THE EQUIPMENT MANUFACTURER, PERSONS INSTALLING, REPLACING OR REPAIRING UST
SYSTEMS OR UST SYSTEM COMPONENTS MUST BE TRAINED AND CERTIFIED BY THE EQUIPMENT
MANUFACTURER OR ITS AUTHORIZED REPRESENTATIVE. THE DOCUMENTS VERIFYING THAT SUCH TRAINING HAS TAKEN PLACE SHOULD BE AVAILABLE AT THE INSTALLATION INSPECTION FOR THE INSPECTOR'S REVIEW
INSPECTIONS
UST SECTION PERSONNEL CONDUCT TWO INSPECTIONS DURING INSTALLATION OF UST SYSTEMS:
1. TANKS: BEFORE A TANK IS PLACED INTO AN EXCAVATION, THE INSPECTOR VISUALLY INSPECTS THE EXTERIOR
SURFACE OF THE TANK AND OBSERVES TANK INTEGRITY TESTING.
2. PIPING: PRIOR TO BACKFILLING THE PIPING, THE INSPECTOR OBSERVES TESTING OF ALL PIPING, FITTINGS
AND CONTAINMENT SUMPS.
CONTRACTOR IS REQUIRED TO CONTACT THE APPROPRIATE INSPECTOR FOR THE COUNTY WHERE THE USTs ARE BEING INSTALLED AT LEAST BUSINESS DAYS PRIOR TO THE DESIRED DATE OF THE ACTIVITY COMMENCING TO
SCHEDULE THESE INSPECTIONS.
TANK INSTALLATION
TANKS SHOULD BE TESTED FOR TIGHTNESS BEFORE AND AFTER INSTALLATION IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN GUIDELINES AND INSTRUCTIONS FOUND IN THE UST-6 PACKET. IF A TANK FAILS A TIGHTNESS TEST, TANK INSTALLATION SHOULD BE SUSPENDED UNTIL THE TANK IS REPLACED OR REPAIRED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. FOLLOWING REPAIR, TANK TIGHTNESS MUST BE RE-TESTED. AN UST-6E FORM SHOULD BE USED TO DOCUMENT PRE AND POST-INSTALLATION TESTING FOR A TANK.
PIPING INSTALLATION
BOTH THE PRIMARY CONTAINMENT AND INTERSTITIAL SPACES OF PIPING MUST BE TESTED IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN GUIDELINES, PEI/RP100, AND THE INSTRUCTIONS FOUND IN THE UST-6 PACKET.
OTHER UST SYSTEM COMPONENT INSTALLATIONS
THE INSTRUCTIONS FOUND IN THE UST-6 PACKET INCLUDE NORTH CAROLINA'S REQUIREMENTS FOR INSTALLATION AND TESTING OF SUMPS, SPILL BUCKETS, AND OTHER UST SYSTEM COMPONENTS. CONTAINMENT SUMPS AND SPILL BUCKETS MUST BE TESTED FOR TIGHTNESS AFTER CONSTRUCTION, BUT BEFORE BACKFILLING IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES AND PEI/RP100. THE TESTING FOR SUMPS MUST BE RECORDED ON THE UST-6F
FORM AND RESULTS FOR SPILL BUCKETS ON THE UST-6D FORM.
OBTAINING AN OPERATING PERMIT
ALONG WITH AN UST-6 FORM, OTHER SPECIFIC DOCUMENTATION MUST BE SUBMITTED TO THE UST SECTION ONCE THE UST SYSTEM(S) HAVE BEEN INSTALLED AND BEFORE AN OPERATING PERMIT FOR THE FACILITY CAN BE ISSUED.
THE REQUIRED DOCUMENTATION IS LISTED IN THE UST-6 PACKET INSTRUCTIONS AND INCLUDES ANNUAL OPERATING FEES, OWNERSHIP AND FINANCIAL RESPONSIBILITY DOCUMENTS, MANUFACTURER WARRANTIES AND CHECKLISTS, THE FINAL UST SYSTEM DESIGN AND DOCUMENTATION (UST-6D, E, F, AND G FORMS AS APPLICABLE) OF THE FINAL TESTING OF THE UST SYSTEM. IN ACCORDANCE WITH NCGS 143-215.94U A FACILITY CANNOT RECEIVE PETROLEUM PRODUCTS WITHOUT AN OPERATING PERMIT ISSUED IN THE CURRENT TANK OWNER'S NAME FOR THE NEWLY
INSTALLED UST SYSTEM.
UST FORMS AND ADDITIONAL INFORMATION
THE UST SECTION'S WEBSITE AT http://www.wastenotnc.or/web/wm/ust/ustmain HAS ELECTRONIC VERSIONS OF THE UST FORMS AS WELL AS A LIST OF FREQUENTLY ASKED QUESTIONS ABOUT NORTH CAROLINA'S SECONDARY CONTAINMENT STANDARDS. PERMIT AND INSPECTION BRANCH CAN BE REACHED AT (919) 707-7181 FOR MORE
INFORMATION.
NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY UST PERMIT PROCESS OVERVIEW:
1. ALL UNDERGROUND STORAGE TANK (UST) SYSTEMS IN NORTH CAROLINA MUST COMPLY WITH 15A NCAC
2N "CRITERIA AND STANDARDS APPLICABLE TO USTs" WHEN INSTALLING OR REPLACING UST SYSTEMS.
2. INSTALLATIONS OF USTs AND/OR PIPING REQUIRE APPROVAL BY THE NCDEQ UST SECTION. THE
FOLLOWING IS AN OVERVIEW OF THE UST SECTION'S APPROVAL PROCESS:
2.1. OBTAIN THE UST-6 "APPLICATION TO INSTALL OR REPLACE UST SYSTEM"
2.2. SUBMIT THE UST-6 FORM "APPLICATION TO INSTALL OR REPLACE UST SYSTEMS" (PRE-INSTALLATION)
WITH ATTACHMENTS TO THE UST SECTION.
2.3. AFTER RECEIVING APPROVAL OF UST-6, SCHEDULE AN INSTALLATION INSPECTION WITH UST SECTION
PERSONNEL.
2.4. SUBMIT THE UST-6 FORM "APPLICATION TO INSTALL OR REPLACE UST SYSTEMS" (POST-INSTALLATION)
WITH ATTACHMENTS TO THE UST SECTION.
EXISTING STORM AND SANITARY SEWER DATA
EX DI 6
3' x 2' DROP INLET
RIM: 367.85'
(E) 10" PVC INV IN: 364.92'
(W) 4" DIP INV IN: 364.87' [RD]
(S) 8" CLAY INV IN: 363.84' [RD]
(E) 6" CLAY INV IN: 363.32' [RD]
(SE) 4" CLAY INV IN: 363.29' [RD]
(S) 12" RCP INV IN: 359.90'
(NE) 56" RCP INV IN: 353.03'
(SW) 56" RCP INV OUT: 352.96'
I I I
III
I I I
I I I
PROPOSED
ASPHALT PAVEMENT
CONCRETE PAVEMENT
SANITARY SEWER MANHOLE
ELECTRICAL HANDHOLE
SANITARY SEWER PIPE
UNDERGROUND ELECTRICAL
FUEL OIL SUPPLY PIPE
FUEL OIL RETURN PIPE
SIGN
6-INCH BOLLARD
PUBLIC WORKS SPECIAL CONDITIONS:
1. THE DESIGNING PROFESSIONAL (a NCPE, NCPLS or NCRLA - AS REQUIRED) SHALL SUBMIT THREE (3) SETS OF CONSTRUCTION DRAWINGS TO THE PUBLIC WORKS DEPARTMENT - DEVELOPMENT REVIEW FOR REVIEW AND APPROVAL. CONSTRUCTION DRAWING APPROVAL IS REQUIRED PRIOR TO COMMENCING CONSTRUCTION (SEE CONSTRUCTION PLAN APPROVAL PROCESS). THE APPROVAL OF CONSTRUCTION DRAWINGS IS SEPARATE FROM SITE PLAN APPROVAL. CITY OFFICIALS SHALL REVIEW ALL SIZES, MATERIALS, SLOPES, LOCATIONS, EXTENSIONS AND DEPTHS FOR ALL PROPOSED UTILITIES (WATERLINES, SANITARY SEWER LINES AND STORM DRAINAGE CONVEYANCE SYSTEMS) FOR COMPLIANCE WITH ALL APPLICABLE REGULATORY STANDARDS, SPECIFICATIONS, AND BEST MANAGEMENT PRACTICES.
2. THE DESIGNING PROFESSIONAL (a NCPE, NCPLS or NCRLA - AS REQUIRED) SHALL SUBMIT ONE (1) SET OF AS-BUILT DRAWINGS TO THE PUBLIC WORKS DEPARTMENT - DEVELOPMENT REVIEW FOR REVIEW AND APPROVAL. AS-BUILT DRAWING APPROVAL IS REQUIRED PRIOR TO WATER METER INSTALLATION AND/OR SANITARY SEWER SERVICE CONNECTION AND PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY.
3. SEWER PERMIT IS REQUIRED AFTER CONSTRUCTION DRAWING APPROVAL AND PRIOR TO COMMENCING
SANITARY SEWER MAIN INSTALLATION.
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\U se rs\ mr oh all \D oc um en ts\
.04
_A
RC
H_ R2
3_ mr oh all va lha lla en gin ee rin g.c om
.rv t
1/4 /20
9:
:28
A M
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GKT BWB
CONSTRUCTION
DRAWINGS
VEG 22.04 09/19/2023
127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
(434) 947-1901
WWW.WILEYWILSON.COM
GENERAL NOTES AND LEGEND
GI002
11/20/2023
PROJECT SITE
ERWIN ROAD
ERWIN ROAD
FU
LT
ON
S
TR
EE
T
DO
UG
LA
S
ST
RE
ET
PRATT STREET
CREST STREET
CONTRACTOR
ACCESS ROUTECONTRACTOR
ACCESS ROUTE
Pl an
N or th Tr ue N or th
BLDG 7
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\U se rs\ mr oh all \D oc um en ts\
.04
_A
RC
H_ R2
3_ mr oh all va lha lla en gin ee rin g.c om
.rv t
1/4 /20
9:
:28
A M
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GKT BWB
CONSTRUCTION
DRAWINGS
VEG 22.04 09/19/2023
127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
(434) 947-1901
WWW.WILEYWILSON.COM
0 100' 200'
SCALE: 1" = 100'
CONTRACTOR SITE ACCESS MAP
GI101
1. CONTRACTOR MUST UTILIZE DOUGLAS STREET TO PRATT STREET
FOR ACCESS TO THE SITE.
11/20/2023
SEEDING SCHEDULE
TYPE SEED MIX COMMENTS
PLANTING
SEASON
LIME
lb/AC
FERTILIZER
(lb/AC OF 10-10-10)
STRAW
MULCH
(lb/AC) (B)
TOPDRESSING (A)
ANNUAL
FERTILIZER
MAINTENANCE
TEMPORARY
FALL
120 lb/AC RYE (grain) ---
AUG. 15 -
DEC. 30
2000 1000 4000 50 lb/AC OF
NITROGEN IN
MARCH
IF NECESSARY TO EXTEND TEMP. COVER
BEYOND JUNE 15, OVERSEED WITH 50 lb/AC OF
KOBE
TEMPORARY
WINTER
120 lb/AC RYE (grain), 50 lb/AC ANNUAL
LESPEDEZA (KOBE)
OMIT ANNUAL
LESPEDEZA WHEN
DURATION OF
TEMPORARY COVER
IS NOT TO EXTEND
BEYOND JUNE
DEC. 1 -
APRIL 15
2000 750 4000 ---
REFERTILIZE IF GROWTH IS NOT FULLY
ADEQUATE. RESEED, REFERTILIZE, AND MULCH
IMMEDIATELY FOLLOWING EROSION OR OTHER
DAMAGE
TEMPORARY
SUMMER
40 lb/AC GERMAN
MILLET
APRIL 15 -
AUG. 15
2000 750 4000 ---
REFERTILIZE IF GROWTH IS NOT FULLY
ADEQUATE. RESEED, REFERTILIZE, AND MULCH
IMMEDIATELY FOLLOWING EROSION OR OTHER
DAMAGE
A. SEEDING SCHEDULE DEVELOPED PER THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL RECOMMENDATIONS FOR THE COASTAL PLAINS REGION.
SWITCHGRASS (PANICUM VIRGATUM) HAS BEEN INCLUDED IN THE PERMANENT SEEDING MIX IN LIEU OF SERICEA LESPEDEZA PER THE RECOMMENDATIONS OF THE NC STATE
UNIVERSITY/NC A&T UNIVERSITY COOPERATIVE EXTENSION.
B. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL.
STATE EROSION AND SEDIMENT CONTROL
CONSTRUCTION SEQUENCE
1. INSTALL PERIMETER EROSION CONTROL MEASURES AS SHOWN ON
THE CONSTRUCTION DRAWINGS PRIOR TO STARTING
CONSTRUCTION, INCLUDING: TREE PROTECTION, CONSTRUCTION
ENTRANCE, INLET PROTECTION, AND SEDIMENT FENCING.
CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES MAY NOT BEGIN
UNTIL ALL EROSION CONTROL MEASURES HAVE BEEN INSTALLED
AROUND CONSTRUCTION AREAS. ONCE ALL TEMPORARY EROSION
CONTROL MEASURES HAVE BEEN INSTALLED LAND DISTURBANCE
ACTIVITIES MAY COMMENCE.
2. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH STANDARD
CONSTRUCTION TECHNIQUES. ANY EXCAVATION DEWATERING
FLOWS MUST PASS THROUGH SEDIMENT FILTERING DEVICE BEFORE
DISCHARGE (SEE DETAIL F ON SHEET CE-502).
3. TEMPORARY SEEDING MEASURES MUST BE EMPLOYED AS SOON AS
PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION
ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN
NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS
CEASED, EXCEPT WHERE STABILIZATION MEASURES WOULD BE
PRECLUDED BY SNOW OR FROZEN GROUND CONDITIONS OR
WHERE CONSTRUCTION ACTIVITY WILL BE RESUMED WITHIN 14
DAYS.
4. ONCE ALL EARTHWORK AND CONSTRUCTION ACTIVITIES ARE
COMPLETE, FINAL GRADING MAY BEGIN. UPON COMPLETION OF
FINAL GRADING, PERMANENT STABILIZATION MEASURES INCLUDING
SODDING MAY BE EMPLOYED. VEGETATIVE GROUND COVER MUST
BE ESTABLISHED ON ALL DISTURBED AREAS WITHIN 15 WORKING
DAYS OR 30 CALENDAR DAYS, WHICHEVER IS SHORTER. ALL
EROSION CONTROL MEASURES MUST REMAIN IN PLACE UNTIL THE
ENTIRE SITE HAS BEEN STABILIZED.
5. ONCE PERMANENT STABILIZATION HAS OCCURRED, TEMPORARY
SEDIMENT CONTROL MEASURES MAY BE REMOVED. ANY AREAS
DISTURBED BY THE REMOVAL OF THESE MEASURES MUST BE
RETURNED AS CLOSELY AS POSSIBLE TO ORIGINAL CONDITION.
6. NO MATERIALS CAN BE STORED OR STOCKPILED WITHIN A
ROADWAY RIGHT OF WAY OUTSIDE OF AN ACTIVE CONSTRUCTION
ZONE.
7. CONCRETE WASHOUT ON THE GROUND, INTO STORMWATER
PIPES, OR INTO SWALES, DITCHES, STREAMS, OR CREEKS WILL
NOT BE PERMITTED. IF CONCRETE WASHOUT IS NECESSARY,
CONTRACTOR MUST PROVIDE A PROPER WASHOUT LOCATION.
8. STOCKPILE OF SOIL WILL NOT BE PERMITTED ON SITE OTHER
THAN WHEN ACTIVE EXCAVATION AND BACKFILLING IS
OCCURRING. ANY EXCESS SOIL MUST BE REMOVED FROM THE
SITE AND DISPOSED OF AT AN APPROVED LOCATION.
SELF INSPECTION REQUIREMENTS
SELF INSPECTION IS REQUIRED PER G.S. 113A-54.1 THE
SELF-INSPECTION FORM CAN BE FOUND AT:
HTTPS://DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY-MINERAL-
LAND-RESOURCES/EROSION-SEDIMENT-CONTROL/FORMS
ANY QUESTIONS REGARDING THE EROSION AND SEDIMENT CONTROL
PLAN SHOULD BE DIRECTED TO:
EROSION AND SEDIMENT CONTROL
MAINTENANCE PLAN
ALL EROSION CONTROL MEASURES MUST BE INSPECTED WEEKLY AND
AFTER EACH RAINFALL EVENT OF 1/2 INCH IN 24 HOURS. ANY NEEDED
REPAIRS MUST BE MADE IMMEDIATELY TO PREVENT FURTHER DAMAGE
AND EROSION. STRUCTURES AND MEASURES THAT MUST BE
INSPECTED ARE OUTLINED IN THE FOLLOWING SECTIONS. THE PERSON
WHO PERFORMS THE INSPECTION MUST MAINTAIN AND MAKE
AVAILABLE A RECORD OF THE INSPECTION AT THE SITE OF THE LAND
DISTURBING ACTIVITY. THE RECORD MUST SET OUT ANY SIGNIFICANT
DEVIATION FROM THE APPROVED EROSION CONTROL PLAN, IDENTIFY
ANY MEASURES THAT MAY BE REQUIRED TO CORRECT DEVIATION, AND
DOCUMENT THE COMPLETION OF THOSE MEASURES. THE RECORD
MUST BE MAINTAINED UNTIL PERMANENT GROUND COVER HAS BEEN
ESTABLISHED AS REQUIRED BY THE APPROVED EROSION AND
SEDIMENTATION CONTROL PLAN.
SEEDING, FERTILIZING, AND MULCHING:
SEEDED AREAS MUST BE INSPECTED FOR FAILURE AND NECESSARY REPAIRS MUST BE MADE WITHIN
THE SAME SEASON, IF POSSIBLE.
DROP INLET PROTECTION:
REMOVE ANY ACCUMULATED SEDIMENT AND/OR DEBRIS. ANY STAKES AND/OR STAPLES THAT BECOME LOOSE OR DISPLACED MUST BE REPAIRED IMMEDIATELY. WHEN SEDIMENT ACCUMULATION REACHES 1/2 THE HEIGHT OF THE WASHED STONE, IT MUST BE REMOVED AND DISPOSED OF OFF-SITE BY THE
CONTRACTOR IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS.
SEDIMENT FILTER BAG:
ANY DAMAGE TO THE SEDIMENT FILER BAG MUST BE REPAIRED IMMEDIATELY.
TEMPORARY SEDIMENT FILTER BAGS MUST BE REPLACED WHEN 6 INCHES OF SEDIMENT HAS
ACCUMULATED OR IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
MONITOR SEDIMENT FILTER BAG REGULARLY FOR THE PRESENCE OF TURBID WATER BEING
DISCHARGED. ANY TURBID WATER BEING DISCHARGED FROM THE BAG MUST BE RESOLVED
IMMEDIATELY. IF TEMPORARY BLOCKAGES ARE NOT FOUND, ASSUME THE BAG IS AT SEDIMENT
CAPACITY AND REPLACE IMMEDIATELY.
SILT FENCE:
ANY FABRIC WHICH COLLAPSES, TEARS, DECOMPOSES, OR OTHERWISE BECOMES INEFFECTIVE MUST
BE REPLACED IMMEDIATELY.
TREE PROTECTION FENCE:
ANY FABRIC WHICH COLLAPSES, TEARS, DECOMPOSES, OR OTHERWISE BECOMES INEFFECTIVE MUST
BE REPLACED IMMEDIATELY.
CONSTRUCTION ENTRANCE
MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY.
IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC
ROADWAYS.
SEEDING AND STABILIZATION SCHEDULE
MATERIALS
A. TOPSOIL: FERTILE, AGRICULTURAL SOIL, TYPICAL FOR LOCALITY; CAPABLE OF
SUSTAINING VIGOROUS PLANT GROWTH, TAKEN FROM DRAINED SITE; FREE
OF SUBSOIL, CLAY, OR IMPURITIES, PLANTS, WEEDS, AND ROOTS; PH VALUE
OF MINIMUM 5.4 AND MAXIMUM OF 7.0.
B. LIME: GROUND DOLOMITIC AGRICULTURAL LIMESTONE, NOT LESS THAN 85
PERCENT TOTAL CARBONATES, GROUND SO THAT 50 PERCENT PASSES 10
MESH SIEVE AND 90 PERCENT PASSES 30 MESH SIEVE. COARSER MATERIAL
WILL BE ACCEPTABLE, PROVIDED THE SPECIFIED RATES OF APPLICATION ARE
INCREASED PROPORTIONATELY ON THE BASIS OF QUANTITIES PASSING NO.
100 MESH SIEVE.
C. FERTILIZER: MIXED, COMMERCIAL FERTILIZER CONTAINING 10-10-10
PERCENTAGES OF AVAILABLE NITROGEN, PHOSPHORIC ACID, AND POTASH
RESPECTIVELY, PLUS SUPERPHOSPATE WITH 20 PERCENT P2O5 CONTENT.
FERTILIZER MUST BE DRY, IN GRANULAR (PELLET) FORM, MUST BE DELIVERED
TO THE SITE IN THE MANUFACTURER'S ORIGINAL BAG OR CONTAINER WHICH
MUST BE PLAINLY MARKED AS TO FORMULA.
D. SEED: PROVIDE SEEDING PER THE SEEDING SCHEDULE.
EXECUTION
A. COMPLETE OPERATIONS IN THE AREA TO BE SEEDED AND PREPARE SUBSOIL TO
ELIMINATE UNEVEN AREAS AND LOW SPOTS. BRING SURFACE TO THE
APPROXIMATE DESIGN CONTOURS.
B. SCARIFY SUBSOIL TO A DEPTH OF 3 INCHES. REMOVE WEEDS, ROOTS, STONES
AND FOREIGN MATERIALS 1-1/2 INCHES IN DIAMETER AND LARGER.
C. PLACE TOPSOIL DURING DRY WEATHER AND ON DRY UNFROZEN SUBSOIL.
D. SPREAD TOPSOIL TO A MINIMUM DEPTH OF 4 INCHES. REMOVE VEGETABLE
MATTER AND FOREIGN NON-ORGANIC MATERIAL FROM TOPSOIL WHILE
SPREADING. GRADE SURFACE TO PROVIDE POSITIVE DRAINAGE AND PREVENT
WATER PONDING. LIGHTLY COMPACT TOPSOIL WITH AT LEAST ONE PASS OF A
CULTIPACKER OR SIMILAR EQUIPMENT
E. LIMING MUST BE DONE IMMEDIATELY AFTER GRADING HAS REACHED THE FINE
GRADING STAGE, EVEN THOUGH ACTUAL SEEDING MAY NOT BE DONE UNTIL
SEVERAL MONTHS LATER.
F. SPREAD LIME EVENLY BY MEANS OF A MECHANICAL DISTRIBUTOR.
G. INCORPORATE LIME IN THE TOP 2 TO 3 INCHES OF SOIL BY HARROWING,
DISKING, OR OTHER APPROVED MEANS.
H. SPREAD FERTILIZER NOT MORE THAN 2 WEEKS IN ADVANCE OF SEEDING.
I. PROVIDE MECHANICAL SPREADER FOR EVEN DISTRIBUTION AND SPREAD HALF
OF THE RATE IN ONE DIRECTION, AND THE OTHER HALF AT RIGHT ANGLES TO
THE FIRST. MIX THOROUGHLY INTO UPPER 2 TO 3 INCHES OF SOIL BY DISKING,
HARROWING OR OTHER APPROVED METHODS.
J. ACCOMPLISH SEEDING BY MEANS OF AN APPROVED POWER-DRAWN SEED
DRILL, COMBINATION CORRUGATED ROLLER-SEEDER, APPROVED HAND
OPERATED MECHANICAL SEEDER, OR OTHER APPROVED METHODS TO
PROVIDE EVEN DISTRIBUTION OF SEED.
K. DO NOT SEED WHEN GROUND IS EXCESSIVELY WET OR EXCESSIVELY DRY.
AFTER SEEDING, ROLL AREA WITH A ROLLER, NOT LESS THAN 18 INCHES IN
DIAMETER AND WEIGHING NOT MORE THAN 210 POUNDS PER FOOT OF WIDTH.
UPON COMPLETION OF ROLLING, WATER AREA WITH A FINE SPRAY.
L. IMMEDIATELY FOLLOWING SEEDING, APPLY MULCH AS LISTED BELOW. DO NOT
SEED AREAS IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DAY.
M. APPLY WATER WITH A FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN
MULCHED. SATURATE TO 4 INCHES OF SOIL DEPTH
N. APPLY MULCH AS REQUIRED TO RETAIN SOIL AND GRASS.
DUST CONTROL
DEFINITION
THE CONTROL OF DUST RESULTING FROM LAND-DISTURBING ACTIVITIES.
PURPOSE
TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM DISTURBED SOIL SURFACES THAT MAY CAUSE OFF-SITE DAMAGE, HEALTH
HAZARDS, AND TRAFFIC SAFETY PROBLEMS.
CONDITIONS AND CONSIDERATIONS
A. THIS PRACTICE IS APPLICABLE ON CONSTRUCTION ROUTES AND OTHER DISTURBED AREAS SUBJECT TO SURFACE DUST MOVEMENT, AND
DUST BLOWING WHERE OFF-SITE DAMAGE MAY OCCUR IF DUST IS NOT CONTROLLED.
B. IN PLANNING FOR DUST CONTROL, IT IS IMPORTANT TO SCHEDULE CONSTRUCTION OPERATIONS SO THAT THE LEAST AREA IS DISTURBED
AT ONE TIME.
C. LEAVE UNDISTURBED BUFFER AREAS BETWEEN GRADED AREAS WHEREVER POSSIBLE.
D. THE GREATEST DUST PROBLEMS OCCUR WHEN THE PROBABILITY OF RAINFALL EROSION IS LEAST. THEREFORE, DO NOT EXPOSE LARGE
AREAS OF SOIL, ESPECIALLY DURING DROUGHT CONDITIONS.
E. INSTALL TEMPORARY OR PERMANENT SURFACE STABILIZATION MEASURES IMMEDIATELY AFTER COMPLETING LAND GRADING.
F. MAINTAIN DUST CONTROL MEASURES THROUGH DRY WEATHER PERIODS UNTIL ALL DISTURBED AREAS HAVE BEEN STABILIZED.
METHOD AND MATERIALS
A. VEGETATIVE COVER—FOR DISTURBED AREAS NOT SUBJECT TO TRAFFIC, VEGETATION PROVIDES THE MOST PRACTICAL METHOD OF DUST
CONTROL (REFERENCES: SURFACE STABILIZATION).
B. MULCH (INCLUDING GRAVEL MULCH)—WHEN PROPERLY APPLIED, MULCH OFFERS A FAST, EFFECTIVE MEANS OF CONTROLLING DUST.
SPRAY-ON ADHESIVE—EXAMPLES OF SPRAY-ON ADHESIVES FOR USE ON MINERAL SOILS ARE PRESENTED IN TABLE 6.84A.
C. CALCIUM CHLORIDE MAY BE APPLIED BY MECHANICAL SPREADER AS LOOSE, DRY GRANULES OR FLAKES AT A RATE THAT KEEPS THE
SURFACE MOIST, BUT NOT SO HIGH AS TO CAUSE WATER POLLUTION OR PLANT DAMAGE. SPRINKLING—THE SITE MAY BE SPRINKLED
UNTIL THE SURFACE IS WET.
D. SPRINKLING IS ESPECIALLY EFFECTIVE FOR DUST CONTROL ON HAUL ROADS AND OTHER TRAFFIC ROUTES.
E. STONE USED TO STABILIZE CONSTRUCTION ROADS CAN ALSO BE EFFECTIVE FOR DUST CONTROL.
F. BARRIERS—A BOARD FENCE, WIND FENCE, SEDIMENT FENCE, OR SIMILAR BARRIER CAN CONTROL AIR CURRENTS AND BLOWING SOIL.
PLACE BARRIERS PERPENDICULAR TO PREVAILING AIR CURRENTS AT INTERVALS ABOUT 15 TIMES THE BARRIER HEIGHT. WHERE DUST IS A
KNOWN PROBLEM, PRESERVE WINDBREAK VEGETATION.
G. TILLAGE—DEEP PLOW LARGE OPEN UNDISTURBED AREAS AND BRING CLODS TO THE SURFACE. THIS IS A TEMPORARY EMERGENCY MEASURE THAT CAN BE USED AS SOON AS SOIL BLOWING STARTS. BEGIN PLOWING ON THE WINDWARD EDGE OF THE SITE.
SODDING SCHEDULE
COOL SEASON GRASSES WARM SEASON GRASSES VARIETIES
REGION OF
ADAPTION
- HYBRID BERMUDAGRASS
VAMONT, TIFWAY, TIFWAY II
AND TIFGREEN
PIEDMONT AND
COASTAL PLAIN
* A LARGE NUMBER OF VARIETIES EXIST. CONSULT SUPPLIERS AND YOUR LOCAL AGRICULTURAL EXTENSION OFFICE FOR RECOMMENDATIONS. EXACT TYPE AND SPECIES OF BERMUDAGRASS MUST BE APPROVED BY THE
OWNER PRIOR TO ORDERING.
TOTAL DISTURBED AREA (ACRE) =
EXISTING PERVIOUS
AREA
EXISTING IMPERVIOUS
AREA
PROPOSED PERVIOUS
AREA
PROPOSED IMPERVIOUS
AREA
0.0200 0.0800 0.0200 0.0800
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\U se rs\ mr oh all \D oc um en ts\
.04
_A
RC
H_ R2
3_ mr oh all va lha lla en gin ee rin g.c om
.rv t
1/4 /20
9:
:28
A M
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GKT BWB
CONSTRUCTION
DRAWINGS
VEG 22.04 09/19/2023
127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
(434) 947-1901
WWW.WILEYWILSON.COM
EROSION AND SEDIMENT CONTROL
GENERAL NOTES
GC001
11/20/2023
26"
OAK
C C
C
C
E
E
E
E
E
E
E
AC
W
C
E
C
C
E
AC
AC
AC
W
C
E
G ELECTRIC CABINET
ELECTRIC TRANSFORMER
ELECTRIC HANDHOLE
GENERATOR
MULTI-STORY HOSPITAL BUILDING
MULTI-STORY HOSPITAL BUILDING
MULTI-STORY HOSPITAL BUILDING
METAL
BUILDING
MULTI-STORY HOSPITAL BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
SHED
GE
NE
RA
TO
R
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CONCRETE
CONCRETE
CONCRETE
ASPHALT
ASPHALT
ASPHALT
ASPHALTASPHALT
CONCRETE
CONCRETE
FENCELINE
GAS STATION
STAIRS FOR ROOF ACCESS
LOT 62
N/F
GERALDINE M. MCGHEE
PIN# 0812-72-97-2643
PID# 104598
DB 2309, PG 829
PB 107, PG 162
LOT 61
N/F
LINNETTE M. EBANKS
PIN# 0812-72-88-4160
PID# 104599
DB 4925, PG 584
PB 107, PG 162
N/F
CITY OF DURHAM
PIN# 0812-72-57-9767
PID# 119681
DB 1115, PG 660
PB 117, PG 118
LOT 63
N/F
CREST ST COMMUNITY COUNCIL INC.
PIN# 0812-82-07-5721
PID# 104597
DB 1320, PG 926
PB 107, PG 162
U
N
I
T
E
D
S
T
A
T
O
F
A
M
E
R
I
C
A
P
I
N
P
I
B
P
G
PRATT STREET
50' PUBLIC R/W
PB 117, PG 118
STORM PIPE TERMINUS NOT FOUND
TRAVELS UNDER BUILDING PER DURHAM COUNTY GIS
STORM PIPE TERMINUS NOT FOUND
TRAVELS UNDER BUILDING PER DURHAM COUNTY GIS
SEWER PIPE TERMINUS
NOT FOUND
56" RCP
INV: 356.91'
EX SSMH 8
EX SSMH 12
EX SSMH 2
EX DI 6
EX DI 5
EX DI 7
EX DI 8
EX DMH 2
EX DMH 1
EX SSMH 6
EX SSMH 7
EX SSMH 9
EX SSMH 10
EX DI 4
EX SSMH 11
EX SSMH 1
EX SSMH 3
EX SSMH 4
EX SSMH 5
EX DI 3EX DI 2
EX DI 1
CONCRETE
ASPHALT
CONCRETE
CO
NC
RE
TE
CONCRETE
CONCRETE
CO
NC
RE
TE
CONCRETE
CONCRETE
CONCRETE
CO
NC
RE
TE
CONCRETECONCRETE
CONCRETE
E
RAISED WALKWAY
RAISED WALKWAY
MONITORING
WELL (TYP.)
25'
EXISTING 25' SANITARY SEWER EASEMENT
PB 18, PG 167
(PIPE APPEARS REALIGNED HOWEVER
NO FURTHER DOCUMENTS FOUND BY SURVEYOR)
APPROXIMATE PROPERTY LINE PER OBSERVED EVIDENCE.
BOUNDARY SURVEY NOT PERFORMED BY THIS OFFICE.
LIMITS OF TOPOGRAPHIC SURVEY BY
BALLENTINE ASSOCIATES, P.A. COMPLETED
ON SEPTEMBER 22, 2022.
Pl an
N or th Tr ue N or th
BLDG 7
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\U se rs\ mr oh all \D oc um en ts\
.04
_A
RC
H_ R2
3_ mr oh all va lha lla en gin ee rin g.c om
.rv t
1/4 /20
9:
:28
A M
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GKT BWB
CONSTRUCTION
DRAWINGS
VEG 22.04 09/19/2023
127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
(434) 947-1901
WWW.WILEYWILSON.COM
0 10' 20' 40'
SCALE: 1" = 20'
1. REFER TO SHEET GC001 FOR EXISTING CONDITIONS LEGEND.
2. REFER TO SHEET GC001 FOR EXISTING STORM AND SANITARY
DATA.
1. THIS IS AN EXISTING CONDITIONS SURVEY. THIS IS NOT A
BOUNDARY SURVEY. BOUNDARY EVIDENCE SHOWN HEREON HAS
NOT BEEN VERIFIED BY THE SURVEYOR.
2. BEARINGS FOR THIS SURVEY ARE BASED ON NORTH CAROLINA
STATE PLAN COORDINATE SYSTEM [NCSPCS] NAD83/2011.
3. NO NGS MONUMENTS WERE OBSERVED WITHIN 2,000 FEET OF THE
SITE.
4. DISTANCES SHOWN HEREON ARE GROUND DISTANCES, UNLESS
OTHERWISE NOTED.
5. THIS SURVEY WAS PERFORMED WITHOUT THE BENEFIT OF A TITLE
SEARCH, WHICH MAY REVEAL ADDITIONAL EASEMENTS AND/OR
ENCUMBRANCES OF RECORD NOT SHOWN.
6. THIS SITE IS NOT LOCATED IN A FEMA SPECIAL FLOOD HAZARD
AREA, AND IS LOCATED IN FLOOD ZONE "X" AS SHOWN ON FIRM
PANEL 3720081200K, AND DATED OCTOBER 19, 2018.
7. SURVEYOR HAS MADE NO INVESTIGATIONS AS TO IDENTIFICATION
OF JURISDICTIONAL WATERS OR WETLANDS ON OR NEAR THE SITE.
8. REFERENCES: DURHAM COUNTY REGISTRY:PLAT BOOK 18, PAGE
167; PB 28, PG 45; PB 107, PG162; PB 117, PG 118; PB 168, PG 349;
DEED BOOK 180, PAGE 185; DB 183, PG 145.
9. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN INDICATED
FROM FIELD SURVEY INFORMATION. THE SURVEYOR MAKES NO
GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN
COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER SERVICE OR
ABANDONED. THE SURVEYOR OR FURTHER DOES NOT WARRANT
THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT
LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY
ARE LOCATED AS ACCURATELY AS POSSIBLE FROM DATA
PROVIDED. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE
UNDERGROUND UTILITIES. SURVEYOR COMPLETED LEVEL B S.U.E.
SURVEY ON SEPTEMBER 20, 2022.
SURVEY NOTES
CIVIL SITE TOPOGRAPHICAL
SURVEY
VU101
11/20/2023
AC
C
E
C
C
AC
AC
C
E
G ELECTRIC CABINET
ELECTRIC TRANSFORMER
ELECTRIC HANDHOLE
GENERATOR
MULTI-STORY HOSPITAL BUILDING
MULTI-STORY HOSPITAL BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
SHED
GE
NE
RA
TO
R
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CONCRETE
CONCRETE
CONCRETE
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE
CONCRETE
FENCELINE
GAS STATION
STAIRS FOR ROOF ACCESS
LOT 61
N/F
LINNETTE M. EBANKS
PIN# 0812-72-88-4160
PID# 104599
DB 4925, PG 584
PB 107, PG 162
STORM PIPE TERMINUS NOT FOUND
TRAVELS UNDER BUILDING PER DURHAM COUNTY GIS
SEWER PIPE TERMINUS
NOT FOUND
EX SSMH 2
EX DI 6
EX DI 5
EX DI 7
EX DI 8
EX DMH 2
EX DMH 1
EX SSMH 11
EX SSMH 1
EX SSMH 3
EX SSMH 4
EX SSMH 5
EX DI 3EX DI 2
EX DI 1
CONCRETE
CONCRETE
E
MONITORING
WELL (TYP.)
12" VCP
" V
CP
" R
CP
" R
CP
10" P
VC
8" CLAY
8" DIP
8" D
IP
" D
IP
8" CLAY
" V
CP
Pl an
N or th Tr ue N or th
BLDG 7
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\U se rs\ mr oh all \D oc um en ts\
.04
_A
RC
H_ R2
3_ mr oh all va lha lla en gin ee rin g.c om
.rv t
1/4 /20
9:
:28
A M
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GKT BWB
CONSTRUCTION
DRAWINGS
VEG 22.04 09/19/2023
127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
(434) 947-1901
WWW.WILEYWILSON.COM
0 10' 20'
SCALE: 1" = 10'
1. REFER TO SHEET GC001 FOR EXISTING CONDITIONS LEGEND.
LEGEND
REMOVE EXISTING STRUCTURE
REMOVE ASPHALT PAVEMENT
REMOVE CONCRETE PAVEMENT
///// REMOVE EXISTING UTILITY
//// REMOVE EXISTING CURB
1. SAW-CUT AND REMOVE EXISTING PAVEMENT
2. REMOVE EXISTING UNDERGROUND FUEL STORAGE TANK
3. REMOVE EXISTING TREE
4. REMOVE AND SALVAGE EXISTING SIGNAGE
5. REMOVE EXISTING PAVEMENT MARKINGS
6. REMOVE EXISTING BOLLARDS AND PORTABLE FUELING STATION
7. REMOVE EXISTING PREFABRICATED METAL CARPORT
8. REMOVE EXISTING PREFABRICATED METAL STORAGE SHED
9. EXISTING MANHOLE TO REMAIN.
CIVIL DEMOLITION PLAN
CD101
11/20/2023
C
C
C
E
G ELECTRIC CABINET
ELECTRIC TRANSFORMER
ELECTRIC HANDHOLE
GENERATOR
MULTI-STORY HOSPITAL BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
SHED
GE
NE
RA
TO
R
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CONCRETE
CONCRETE
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE
CONCRETE
FENCELINE
GAS STATION
STAIRS FOR ROOF ACCESS
LOT 61
N/F
LINNETTE M. EBANKS
PIN# 0812-72-88-4160
PID# 104599
DB 4925, PG 584
PB 107, PG 162
EX SSMH 2
EX DI 6
EX DI 5
EX DI 7
EX DI 8
EX DMH 1
EX SSMH 11
EX SSMH 1
EX SSMH 3
EX SSMH 4
EX SSMH 5
EX DI 3EX DI 2
EX DI 1
CONCRETE
E
" V
CP
" R
CP
" R
CP
10" P
VC
8" CLAY
8" DIP
8" D
IP
" D
IP
8" CLAY
" V
CP
E
C
J
C
J
C
J
C
J
C
J
C
J
18.0'
9.0
(TYP.)
56.
0'
A
A
A
A
A A
R
R
R
R R A
A A
Z Z
Z Z
Z Z
Z
Z
Z
Z
Z E
A
A
C
7.0
50.8'
14.5'
14.5'
.6'
.6'
34.
2'
9.5
8.8'
14.
9'
24.
0'
10.
8'
9.5'
40.
2'
.9'
(TYP.)
Pl an
N or th Tr ue N or th
BLDG 7
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\U se rs\ mr oh all \D oc um en ts\
.04
_A
RC
H_ R2
3_ mr oh all va lha lla en gin ee rin g.c om
.rv t
1/4 /20
9:
:28
A M
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GKT BWB
CONSTRUCTION
DRAWINGS
VEG 22.04 09/19/2023
127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
(434) 947-1901
WWW.WILEYWILSON.COM
0 10' 20'
SCALE: 1" = 10'
LEGEND
CONCRETE PAVEMENT
ASPHALT PAVEMENT
REINFORCED SLAB (REFER TO CONCRETE PAVEMENT
NOTE 1 BELOW)
ASPHALT TO CONCRETE TRANSITION
PROVIDE TIE BAR PER CONCRETE PAVEMENT NOTE 3
BELOW
DOWELED CONTRACTION JOINT
DOWELED CONSTRUCTION JOINT
IIIIII
II I I I I
R
A
Z
C
E
1. REINFORCED CONCRETE SLABS SHALL BE REINFORCED WITH
NO.4 REBAR SPACED AT 12-INCHES CENTER TO CENTER WITH
MINIMUM COVER OF 3-INCHES FROM BOTTOM OF CONCRETE.
2. ALL CONSTRUCTION AND CONTRACTION JOINTS SHALL BE
SEALED PER DETAIL ON SHEET CS501.
3. ALL 'Z' DEPICT TIE-BARS THAT ARE #5 DEFORMED STEEL BARS,
30-INCHES LONG SPACED ON 30-INCH CENTERS, MID-DEPTH OF
SLAB.
4. CONSTRUCTION JOINTS SHALL BE DOWELED WITH 3/4" DOWELS,
18" LONG, SPACED AT 12 INCHES ON CENTER, MID-DEPTH OF
SLAB. EXTENDED 9" INTO SLAB, GREASED ON OTHER END.
B2
CS501
B4
CS501
B6
CS501
1. BOLLARD (6" DIAMETER)
2. 6-INCH WHITE PAVEMENT STRIPING
3. CONCRETE CURB
4. INSTALL EXISTING SIGN
5. FUEL POLISHER (REFER TO MECHANICAL)
6. EXISTING BUILDING FOUNDATION ZONE OF INFLUENCE
7. SANITARY SEWER MANHOLE
8. ELECTRICAL MANHOLE
9. 25,000 GALLON UNDERGROUND STORAGE TANK
B4
CS502
B2
CS502
B6
CS502
CIVIL SITE PLAN
CS101
CONCRETE PAVEMENT NOTES
1. REFER TO SHEET GI001 FOR GENERAL NOTES AND LEGEND.
2. REFER TO SHEET CD101 FOR CIVIL DEMOLITION PLAN.
3. REFER TO SHEET CU101 FOR CIVIL UTILITIES PLAN.
4. REFER TO SHEETS CS501 AND CS502 FOR CIVIL SITE DETAILS.
11/20/2023
E
C
C
AC
AC
C
E
G ELECTRIC CABINET
ELECTRIC TRANSFORMER
ELECTRIC HANDHOLE
GENERATOR
MULTI-STORY HOSPITAL BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
SHED
GE
NE
RA
TO
R
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CONCRETE
CONCRETE
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE
CONCRETE
FENCELINE
GAS STATION
EX SSMH 2
EX DI 6
EX DI 5
EX DI 7
EX DI 8
EX SSMH 11
EX SSMH 1
EX SSMH 3
EX SSMH 4
EX SSMH 5
EX DI 3EX DI 2
EX DI 1
CONCRETE
E
" V
CP
" R
CP
" R
CP
10" P
VC
8" CLAY
8" DIP
8" D
IP
" D
IP
8" CLAY
" V
CP
E
I
P
P
SSP1
SSP2
SS1
SS2
F O
R
F O
R
F O
S
F O
S
F
O
S
F
O
R
F
O
S
F
O
R
C
U
C U
Pl an
N or th Tr ue N or th
BLDG 7
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\U se rs\ mr oh all \D oc um en ts\
.04
_A
RC
H_ R2
3_ mr oh all va lha lla en gin ee rin g.c om
.rv t
1/4 /20
9:
:28
A M
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GKT BWB
CONSTRUCTION
DRAWINGS
VEG 22.04 09/19/2023
127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
(434) 947-1901
WWW.WILEYWILSON.COM
0 10' 20'
SCALE: 1" = 10'
FUEL OIL SUPPLY PIPE
FUEL OIL RETURN PIPE
ELECTRICAL CONDUIT (DIRECT BURIED, MIN COVER
18")
SANITARY SEWER PIPE
FOS
1. 25,000 GALLON UNDERGROUND STORAGE TANK (REFER TO MECHANICAL)
2. CONCRETE ANCHOR PAD FOR UNDERGROUND STORAGE TANK (REFER
TO STRUCTURAL)
3. FUEL OIL SUPPLY AND RETURN ALIGNMENT
4. CONNECT FOS & FOR PIPING TO BUILDING (REFER TO MECHANICAL)
5. FUEL POLISHER (REFER TO MECHANICAL)
6. CONNECT TO EXISTING SANITARY SEWER MANHOLE
7. ELECTRICAL MANHOLE (REFER TO ELECTRICAL)
8. RELOCATED ELECTRICAL CONDUIT
9. CONNECT ELECTRICAL CONDUIT TO EXISTING ELECTRICAL PANEL
10. FUEL OIL SUPPLY AND RETURN PIPING TO FUEL POLISHER
11. CONTRACTOR MUST PROVIDE TEST PIT TO LOCATE EXISTING UTILITY
CROSSINGS (SEE GENERAL NOTE 3 THIS SHEET)
12. DOGHOUSE MANHOLE DETAIL #732.05
13. PRECAST MANHOLE DETAIL #732.02
2" F
OS
2" F
OR
2" F
OS
2" F
OR 22" MIN. COVER
10" 10" 10" 36"
CU101
MECHANICAL TRENCH DETAIL
F
O R
F
O S
22" MIN. COVER
(REFER TO
PROFILE CU202)
24"
CU101
MECHANICAL TRENCH DETAIL
18"
FOR
1. REFER TO SHEETS CU201 AND CU202 FOR UTILITY PROFILES.
2. REFER TO SHEET CU501 AND CU502 FOR UTILITY DETAILS.
3. THE CONTRACTOR SHALL INVESTIGATE/PERFORM TEST PITS TO
DETERMINE ACTUAL LOCATIONS OF UTILITIES AT CONNECTION POINTS,
POTENTIAL AREAS OF CONFLICT WITH EXISTING UTILITIES, AND
ANYWHERE ELSE DEEMED NECESSARY. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO INVESTIGATE THE EXISTING UTILITIES TO THE LEVEL
REQUIRED TO SAFELY PERFORM THE WORK AND PROTECT THE EXISTING
INFRASTRUCTURE. THE CONTRACTOR SHALL ENSURE THAT UTILITIES
THAT ARE TO REMAIN IN PLACE WITHIN THE PROJECT AREA ARE NOT
IMPACTED DURING CONSTRUCTION.
CIVIL UTILITY PLAN
CU101
LEGEND
11/20/2023
E G
GENERATOR
MULTI-STORY HOSPITAL BUILDING
METAL
BUILDING
METAL
SHED
GE
NE
RA
TO
R
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CONCRETE
CONCRETE
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE
CONCRETE
FENCELINE
GAS STATION
EX DI 6
EX DI 5
EX SSMH 11
EX SSMH 3
EX SSMH 4
EX SSMH 5
EX DI 3EX DI 2
EX DI 1
" V
CP
" R
CP
" R
CP
10" P
VC
8" CLAY
8" DIP
8" D
IP
" D
IP
8" CLAY
" V
CP
E
C
J
C
J
C
J
C
J
C
J
C
J
369.00 (M.E.)
368.03 (M.E.)
368.05 (M.E.)
368.10 (M.E.)
368.27 (M.E.)
368.28 (M.E.)
368.59 (M.E.)
369.52 (M.E.)
369.67 (M.E.)
368.83 (M.E.)
368.38 (M.E.)368.43 (M.E.)
369.16 (E.P.)
368.94 (E.P.)
368.76 (E.P.)
368.67 (E.P.)
368.53 (E.P.)
369.12 (E.P.)
369.27 (M.E.)
368.80 (T.O.C.)
368.60 (T.O.C.)
368.95 (T.O.C.)
368.90 (T.O.C.)
368.67 (T.O.C.)
368.65 (T.O.C.)
368.70 (T.O.C.)
368.50 (T.O.C.)
368.35 (T.O.C.)
368.45 (T.O.C.)
368.33 (T.O.C.)
368.64 (T.O.C.)
368.72 (T.O.C.)
Pl an
N or th Tr ue N or th
BLDG 7
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\U se rs\ mr oh all \D oc um en ts\
.04
_A
RC
H_ R2
3_ mr oh all va lha lla en gin ee rin g.c om
.rv t
1/4 /20
9:
:28
A M
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GKT BWB
CONSTRUCTION
DRAWINGS
VEG 22.04 09/19/2023
127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
(434) 947-1901
WWW.WILEYWILSON.COM
0 10' 20'
SCALE: 1" = 10'
M.E. MATCH EXISTING
E.P. EDGE OF PAVEMENT
T.O.C. TOP OF CONCRETE
CIVIL GRADING PLAN
CG101
1. REFER TO SHEET GI001 FOR GENERAL NOTES AND LEGEND.
2. REFER TO SHEET CD101 FOR CIVIL DEMOLITION PLAN.
3. REFER TO SHEET CU101 FOR CIVIL UTILITIES PLAN.
4. REFER TO SHEETS CS501 AND CS502 FOR CIVIL SITE DETAILS.
ABBREVIATIONS
11/20/2023
E
C
C
AC
AC
W
C
E
G ELECTRIC CABINET
ELECTRIC TRANSFORMER
ELECTRIC HANDHOLE
GENERATOR
MULTI-STORY HOSPITAL BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
SHED
GE
NE
RA
TO
R
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CONCRETE
CONCRETE
CONCRETE
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE
CONCRETE
FENCELINE
GAS STATION
STAIRS FOR ROOF ACCESS
GERALDINE M. MCGHEE
PIN# 0812-72-97-2643
PID# 104598
DB 2309, PG 829
PB 107, PG 162
LOT 61
N/F
LINNETTE M. EBANKS
PIN# 0812-72-88-4160
PID# 104599
DB 4925, PG 584
PB 107, PG 162
SEWER PIPE TERMINUS
NOT FOUND
56" RCP
INV: 356.91'
EX SSMH 2
EX DI 6
EX DI 5
EX DI 7
EX DI 8
EX DMH 2
EX DMH 1
EX SSMH 11
EX SSMH 1
EX SSMH 3
EX SSMH 4
EX SSMH 5
EX DI 3EX DI 2
EX DI 1
CONCRETE
E
MONITORING
WELL (TYP.)
12" VCP
" V
CP
" R
CP
" R
CP
10" P
VC
8" CLAY
8" DIP
8" D
IP
" D
IP
8" CLAY
" V
CP
E
P
P
SSP1
SSP2
SS1
SS2
CE
TP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SF
SF
SF
IP
CONTRACTOR
STAGING AND
LAYDOWN AREA
Pl an
N or th Tr ue N or th
BLDG 7
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\U se rs\ mr oh all \D oc um en ts\
.04
_A
RC
H_ R2
3_ mr oh all va lha lla en gin ee rin g.c om
.rv t
1/4 /20
9:
:28
A M
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GKT BWB
CONSTRUCTION
DRAWINGS
VEG 22.04 09/19/2023
127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
(434) 947-1901
WWW.WILEYWILSON.COM
0 10' 20'
SCALE: 1" = 10'
CONSTRUCTION ENTRANCE
TREE PROTECTION
INLET PROTECTION
SILT FENCE
6.06
1. TEMPORARY 5,000 GALLON ABOVE GROUND FUEL STORAGE
TANK MUST BE UL 2085 RATED.
2. REFER TO SHEET GC501 FOR EROSION AND SEDIMENT
CONTROL DETAILS.
1 TEMPORARY 5,000 GALLON ABOVE GROUND FUEL
STORAGE TANK AND ABOVE GROUND PIPING (REFER TO
MECHANICAL)
2 INSTALL TEMPORARY STEAM BOILERS IN EXISTING
MECHANICAL BUILDING (REFER TO MECHANICAL)
3 TEMPORARY CONSTRUCTION FENCE
4 PATCH EXISTING ASPHALT PAVEMENT
5 TEMPORARY CONSTRUCTION GATE
E4
CS501
CE
TP
IP
SF
6.05
6.51
6.62
E6
CS501
1. INSTALL CONSTRUCTION ENTRANCE, TREE PROTECTION, AND
SILT FENCE.
2. INSTALL TEMPORARY CONSTRUCTION FENCE AND GATE.
CONTRACTOR IS REQUIRED TO PROVIDE ACCESS THROUGH SITE
AS REQUIRED BY OWNER.
3. INSTALL SANITARY SEWER STRUCTURE SS1 AND SS2 AND PIPES
SSP1 AND SSP2. REMOVE PORTION OF EXISTING SANITARY
SEWER PER DEMOLITION DRAWINGS. BACKFILL AND PATCH WITH
ASPHALT PAVEMENT PER UTILITY DETAILS. CONTRACTOR IS TO
MAKE EVERY EFFORT TO MINIMIZE THE DURATION SITE ACCESS
IS LIMITED DO TO SANITARY SEWER INSTALLATION.
LEGEND
SEQUENCE OF CONSTRUCTION
CIVIL EROSION AND SEDIMENT
CONTROL PLAN - PHASE 1
CG102
11/20/2023
E
C
C
AC
AC
C
E
G ELECTRIC CABINET
ELECTRIC TRANSFORMER
ELECTRIC HANDHOLE
GENERATOR
MULTI-STORY HOSPITAL BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
SHED
GE
NE
RA
TO
R
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CONCRETE
CONCRETE
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE
CONCRETE
FENCELINE
GAS STATION
STAIRS FOR ROOF ACCESS
LOT 61
N/F
LINNETTE M. EBANKS
PIN# 0812-72-88-4160
PID# 104599
DB 4925, PG 584
PB 107, PG 162
SEWER PIPE TERMINUS
NOT FOUND
EX SSMH 2
EX DI 6
EX DI 5
EX DI 7
EX DI 8
EX DMH 1
EX SSMH 11
EX SSMH 1
EX SSMH 3
EX SSMH 4
EX SSMH 5
EX DI 3EX DI 2
EX DI 1
CONCRETE
E
" V
CP
" R
CP
" R
CP
10" P
VC
8" CLAY
8" DIP
8" D
IP
" D
IP
8" CLAY
" V
CP
E
P
P
SSP1
SSP2
SS1
SS2
CE
TP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SF
SF
SF
IP
CONTRACTOR
STAGING AND
LAYDOWN AREA
Pl an
N or th Tr ue N or th
BLDG 7
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\U se rs\ mr oh all \D oc um en ts\
.04
_A
RC
H_ R2
3_ mr oh all va lha lla en gin ee rin g.c om
.rv t
1/4 /20
9:
:28
A M
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GKT BWB
CONSTRUCTION
DRAWINGS
VEG 22.04 09/19/2023
127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
(434) 947-1901
WWW.WILEYWILSON.COM
0 10' 20'
SCALE: 1" = 10'
CONSTRUCTION ENTRANCE
TREE PROTECTION
INLET PROTECTION
SILT FENCE
6.06
1. TEMPORARY STABILIZATION OF EXCAVATION SHOWN IS SCHEMATIC IN
NATURE. CONTRACT MUST PROVIDE SOE PLAN STAMPED BY A
LICENCE PROFESSIONAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .