CG105.pdf
PDF 981 KB Posted
- Attached to
- Z1NB--Boiler replacement
- Solicitation number
- 36C24626B0020_1
About this file
This document is a Construction Documents set for a boiler replacement project at a Veterans Affairs (VA) facility located at 508 Fulton Street, Durham, North Carolina 27705. The project is identified as Phase 2 civil work and specifically depicts the Civil Erosion and Sediment Control Plan.
The scope of work requires the contractor to implement temporary stabilization of excavation with a schematic-stamped Erosion and Sediment Control (ESC) plan prepared by a licensed professional engineer. Key construction activities include establishing temporary construction entrance, tree protection, inlet protection, and silt fence installations that must remain from Phase A into Phase B. The contractor must conduct test pits to identify the existing underground storage tank location, then excavate and demolish the existing tank with all excavated material and the tank itself hauled off-site to an approved solid waste management facility with no on-site stockpiling permitted. The work requires installation of two 25,000-gallon underground storage tanks with imported suitable material backfill and soil compaction per manufacturer requirements, with new tanks stored at an off-site contractor-provided location until installation. A fuel polisher must be installed. The temporary above-ground fuel storage tank from Phase A is to remain through Phase B, and the contractor must revise temporary construction fence layout from Phase A to Phase B configuration immediately following Phase A completion. The project is being managed by Valhalla Engineering Group, LLC and Wiley Wilson as the architect/engineers, with construction documents dated 100% completion as of December 29, 2023, Project Number 558-22-152.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AC
C
E
C
C
AC
C
E
G ELECTRIC CABINET
ELECTRIC TRANSFORMER
ELECTRIC HANDHOLE
GENERATOR
MULTI-STORY HOSPITAL BUILDING
METAL
BUILDING
METAL
BUILDING
METAL
SHED
GE
NE
RA
TO
R
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CO
NC
RE
TE
CONCRETE
CONCRETE
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONCRETE
CONCRETE
FENCELINE
GAS STATION
STAIRS FOR ROOF ACCESS
LOT 61
N/F
LINNETTE M. EBANKS
PIN# 0812-72-88-4160
PID# 104599
DB 4925, PG 584
PB 107, PG 162
SEWER PIPE TERMINUS
NOT FOUND
EX DI 6
EX DI 5
EX DI 7
EX DI 8
EX DMH 2
EX SSMH 11
EX SSMH 1
EX SSMH 3
EX SSMH 4
EX SSMH 5
EX DI 3EX DI 2
EX DI 1
CONCRETE
E
MONITORING
WELL (TYP.)
" V
CP
" R
CP
" R
CP
10" P
VC
8" CLAY
8" DIP
8" D
IP
" D
IP
8" CLAY
" V
CP
E
D
I
P
D
I
P
SSP1
SSP2
SS1
SS2
CE
TP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SF
SF
SF
IP
CONTRACTOR
STAGING AND
LAYDOWN AREA
Pl an
N or th Tr ue N or th
BLDG 7
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\U se rs\ mr oh all \D oc um en ts\
.04
_A
RC
H_ R2
3_ mr oh all va lha lla en gin ee rin g.c om
.rv t
1/4 /20
9:
:28
A M
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
GKT BWB
100% CONSTRUCTION
DOCUMENTS
VEG 22.04 12/29/2023
127 NATIONWIDE DRIVE
LYNCHBURG, VA 24502
(434) 947-1901
WWW.WILEYWILSON.COM
CONSTRUCTION ENTRANCE
TREE PROTECTION
INLET PROTECTION
SILT FENCE
6.06
1. TEMPORARY STABILIZATION OF EXCAVATION SHOWN IS SCHEMATIC IN
NATURE. CONTRACT MUST PROVIDE SOE PLAN STAMPED BY A
LICENCE PROFESSIONAL ENGINEER.
2. REFER TO SHEET GC501 FOR EROSION AND SEDIMENT CONTROL
DETAILS.
1 TEMPORARY STABILIZATION OF EXCAVATION (SOE).
2 TEMPORARY CONSTRUCTION FENCE
3 TEMPORARY CONSTRUCTION GATE
E4
CS501
CE
TP
IP
SF
6.05
6.51
6.62
E6
CS501
1. CONSTRUCTION ENTRANCE, TREE PROTECTION, AND SILT FENCE
INSTALLED IN PHASE A IS TO REMAIN IN PHASE B.
2. TEMPORARY ABOVE GROUND FUEL STORAGE TANK INSTALLED IN
PHASE A IS TO REMAIN IN PHASE B.
3. REVISE LAYOUT OF TEMPORARY CONSTRUCTION FENCE FROM PHASE
A CONFIGURATION TO PHASE B CONFIGURATION IMMEDIATELY
FOLLOWING THE COMPLETION OF PHASE A.
4. CONTRACTOR MUST PROVIDE TEST PITS TO IDENTIFY THE EXTENTS
OF THE EXISTING UNDERGROUND STORAGE TANK.
5. ONCE EXACT LOCATION OF EXISTING UNDERGROUND STORAGE TANK
HAS BEEN ESTABLISHED, INSTALL SOE AND BEGIN
EXCAVATION/DEMOLITION OF EXISTING TANK. SOIL EXCAVATED
DURING THE DEMOLITION OF THE EXISTING TANK AND THE EXISTING
TANK MUST BE HAULED OFF-SITE TO AN APPROVED SOLID WASTE
MANAGEMENT FACILITY. EXCAVATED MATERIAL MUST NOT BE
STOCKPILED ON-SITE.
6. INSTALL 2-25,000 GALLON UNDERGROUND STORAGE TANKS AND
BACKFILL WITH IMPORTED SUITABLE MATERIAL AND COMPACT SOIL IN
ACCORDANCE WITH MANUFACTURERS REQUIREMENTS. NEW
UNDERGROUND STORAGE TANKS MUST BE STORED AT AN OFF-SITE
STORAGE LOCATION PROVIDED BY THE CONTRACTOR UNTIL THE
TANKS ARE READY TO BE INSTALLED.
7. INSTALL FUEL POLISHER.
CIVIL EROSION AND SEDIMENT
CONTROL PLAN - PHASE 2
CG105
SEQUENCE OF CONSTRUCTION
LEGEND
0 5' 10' 20'
CIVIL EROSION AND SEDIMENT CONTROL PLAN - PHASE 2F1 SCALE: 1" =10'
File details come from the government source that posted it. Updated .