This is Amendment 0003 to Solicitation 36C24626B0020, issued by the Department of Veterans Affairs Network Contracting Office 6 on May 29, 2026, containing responses to bidder questions and revisions to project documents.
The amendment provides updated responses to 207 bidder questions regarding a boiler plant replacement and upgrade project at a VA facility. Key technical clarifications include: existing deaerator, surge tank, and condensate receiver controls will be retained with SCADA integration via existing controllers; temporary boiler plants must meet VA safety requirements with upgrades beyond NFPA 85 minimums; boiler manufacturers listed in MQ601 are basis of design but not exclusive of other manufacturers meeting performance specifications; the permanent boiler plant master control panel should match the control system of boiler plant control panels, with scope determined by the general contractor; economizer controls can be performed by the boiler PLC controller; and modern SCADA workstation hardware with current Windows operating systems, laser printers instead of dot-matrix, and ethernet/VPN remote access instead of modems are acceptable alternatives to legacy specifications. The project includes three permanent 600 BHP boilers with N+1 redundancy (1,200 HP operating capacity), temporary boiler equipment provided by the contractor, new underground fuel oil storage tanks totaling 55,000 gallons nominal capacity at 6-7 feet burial depth, new fire sprinkler systems, structural modifications, and mechanical/electrical/controls integration with existing systems. The amendment clarifies that all drawings are 100% construction documents; asbestos containment is not anticipated; structural analysis has been completed; contractor is responsible for temporary and permanent flashing/patches with warranty; temporary boiler fuel infrastructure is contractor-provided; emissions permitting is contractor responsibility; and the contractor must develop a phasing plan establishing a fully operational temporary boiler facility before decommissioning existing boilers. Geotechnical reports, door/hardware specifications, finish schedules, and additional structural details are to be provided in upcoming addenda.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 22
0003 05-29-2026 558-22-152
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
To all Offerors/Bidders 36C24626B0020
X
X X
The purpose of this modification is to provide updated responses to bidder questions.
Not all questions hae been answered. Another posting will be made when responses are available.
This modification includes revisions to select drawings and specifications.
It also includes a geotech report and interim life safety measures information referenced in RFI responses.
ID Request for Information Request for Information Response Date Completed
1 AE-311 keynotes ref Specs Amendment issued 5/29/2026
2 AE-411 Keynotes - no spec Telecom, Metal Doors and Hardware, Bollards Specs, keynotes and drawing updates to be provided via Addendum 1 5/29/2026
3 AE-201 Keynotes Div 12 specs, Finish schedule Refer to Sheet AE411 for Finish Schedule. 5/29/2026
RFI A-1: Drawing MI601 states "Existing Deaerator Controls shall be reused/replaced/upgraded to allow for integration into MCP." Sequence of Control item D states "The deaerator is controlled by the existing factory provided PLC." Please clarify: (a) Is the existing DA tank PLC retained with the new MCP supervisory only (read-only via BACnet/Modbus), OR (b) Is the new MCP replacing the existing DA tank
PLC entirely, taking over control logic using the existing field devices?
(c) If existing PLC is retained, what protocol is required for MCP interface?
The intent is to reuse existing controller, and to extend control alarms/read only points to SCADA system. Selected boiler plant controls contractor will be required to verify protocols.
5/29/2026
RFI A-2: Drawing MI601 has identical "reused/replaced/upgraded" language for the existing Surge Tank Controls, Condensate Receiver
Tank Controls, and Soft Water Make-Up Tank Controls. Same clarification requested as A-1 for each: existing PLC retained with MCP supervisory only, or new MCP replaces existing PLC?
Same as response 4. 5/29/2026
RFI A-3: If existing instrumentation on the DA tank, Surge tank, Condensate Receiver, and Soft Water Make-Up tank is being reused, please provide a complete I/O point list — analog inputs, digital inputs, analog outputs, digital outputs — with signal types (4-20 mA, 0-10V, dry contact, RTD type). Required to size MCP I/O cards. If new instrumentation is required, please provide the new instrument list with model-grade requirements.
Utilize points list as basis for bid. See response to RFI 4. 5/29/2026
RFI B-1: Drawing MI102 Sequence of Control item E states the gas boilers are "factory provided with its own PLC controller which controls the entire boiler process… The gas boiler manufacturer is to determine all the features necessary for their boiler." For the temporary (rental) boilers: Rental boilers are sourced from the rental fleet at time of deployment. The fleet includes units from multiple manufacturers with varied controls platforms — typically packaged flame safeguard controllers (Honeywell RM7800, Fireye BurnerLogix, or similar) meeting
NFPA 85 minimums, but specific controls vary unit-by-unit. Bidders cannot guarantee uniform PLC-based controls across all rental units; this is standard rental industry practice. Please confirm standard rental-fleet packaged flame safeguard controllers are acceptable on the temporary boilers.
VA requires temporary boilers installed in the temporary boiler plant be upgraded to meet safety requirements. Outside temporary trailered boiler can have NFPA 85 minimum requirements.
5/29/2026
RFI B-2: Drawing MQ602 Control Panel Schedule includes a remark stating "Boiler plant master control panel shall be of same manufacturer as the boiler control panel. Control shall be provided by the same skid manufacturer and shall be mounted on skid. Refer to 23 10 00." However, Spec §23 09 11 §2.3 describes the BPMCP as a free-standing NEMA 4 panel with PLC controllers, master steam pressure controller, submaster stations, touch screens, annunciator, etc. Additionally, the reference to Section 23 10 00 appears to be a typo — Section 23 10 00 is "Facility
Fuel Systems" and does not govern boiler controls; the correct reference is likely Section 23 09 11. (a) For the new permanent plant (7-
BPMCP-1): Is the BPMCP furnished by the boiler manufacturer or by the Controls Contractor? If by the boiler manufacturer, is it mounted on a boiler skid or free-standing in the control room? (b) For the temporary plant (24-BPMCP-1): Rental boilers do not come
These notes are incorporated into the control panel schedule using the remarks column. The 23 10 00 reference is only applicable to remark 4 which is only applied to the fuel oil pump control panel.
a. Skid mounting is only applicable to number 4 which is not referenced for 7-BPMCP-1. The intent for the boiler plant master control panel is to match the same control system as the boiler plant control panels. Buyout and determination of subcontractor scope is the responsibility of the general contractor.
b. The intent for the temporary boiler plant master control panel is to match the same control system as the rental boiler control panels.
Buyout and determination of subcontractor scope is the responsibility of the general contractor.
5/29/2026 with a master plant control panel — each rental boiler has its own local control panel only. Please confirm 24-BPMCP-1 is NOT in the rental boiler supplier's scope.
RFI B-3: Drawing MQ601 Boiler Economizer Schedule shows 3 economizers (7-BEHX-1/2/3) at 645,000 BTU each, 210°F→247.9°F feedwater, 13.6 gal water volume, 0.5 in WG gas-side pressure drop, 275 psig relief setting. Please confirm Cleaver-Brooks economizers are acceptable as part of the Cleaver-Brooks boiler package. Note: A single-stage economizer of the type scheduled does not require its own PLC.
Standard integration is: economizer-mounted I&C transmitters (inlet/outlet feedwater temperatures, inlet/outlet flue gas temperatures, water pressure) wired back to the boiler PLC controller, which communicates upstream to the Master Panel and SCADA. Please confirm this integration is acceptable (Sequence of Control item F implies a separate economizer PLC, which is not applicable to single-stage units).
the product will need to be submitted against the specification governing the economizer. 5/29/2026
RFI C-1: Drawing MQ601 Steam Vent Silencer Schedule names "M EVO 24-121-181" at 25,000 lb/hr, 85 dBA at 1 ft, 8" outlet. Please confirm Cleaver-Brooks vent silencer is acceptable as part of the Cleaver-
Brooks boiler package.
the product will need to be submitted against the specification governing the vent silencer. Basis of design does not reliquish the contractor of ensuring products meet specification requirements.
5/29/2026
RFI C-2: Drawing MQ601 Blowoff/Blowdown Tank Schedule names Bryan B07-6080-600-E55 at 572 gal. Please confirm Cleaver-Brooks blowoff tank is acceptable as part of the Cleaver-Brooks boiler package.
the product will need to be submitted against the specification governing the blowdown tank. Basis of design does not reliquish the contractor of ensuring products meet specification requirements.
RFI D-1: Drawing MP301 Boiler Plant Sections shows the new boiler plant control room layout with a SCADA workstation and three (3) static readout displays (Boiler 1, 2, 3). Please confirm Cleaver-Brooks SCADA is acceptable as part of the Cleaver-Brooks boiler package. Sub-question: Please confirm the "SCADA Mirror" notation refers to mirroring new SCADA data to the existing DDC terminals (read-only via BACnet per Spec §23 09 11 §2.2.H), and that the SCADA's
BACnet interface to the existing DDC system is the required scope (not a duplicate SCADA workstation).
the product will need to be submitted against the specification governing the SCADA system. Basis of design does not reliquish the contractor of ensuring products meet specification requirements.
Intention for "SCADA MIRROR" is the station operators will use to access the SCADA system.
5/29/2026
RFI D-2: Drawing MQ602 Control Panel Schedule shows two separate Boiler Plant Master Control Panels (7-BPMCP-1 and 24-BPMCP-1) at
208V/3ph/15A. (a) Power supply. The Cleaver-Brooks master panel is supplied at 120V/1ph/60Hz, not 208V/3ph as shown in the schedule. Please confirm 120V/1ph is acceptable, or clarify why 208V/3ph was specified. (b) 24-BPMCP-1 scope. Rental boilers do not come with a master plant control panel — each rental boiler has its own local control panel only. Please confirm 24-BPMCP-1 is NOT in the rental boiler supplier's scope.
a. This would be acceptable, ensure electrical contractor is aware of the power requirement.
B. refer to RFI 8.
5/29/2026
RFI D-3: Spec §23 09 11 §2.5.B.2 specifies legacy workstation hardware (Intel Xeon, DDR2 SDRAM, Nvidia QUADROFX4400, parallel/serial ports).
Confirm current-generation workstation hardware running latest Microsoft Windows is acceptable.
This would be acceptable. 5/29/2026
RFI D-4: Spec §23 09 11 specifies two communication/output requirements that are no longer supported by current Cleaver-Brooks HMI/SCADA platforms: (a) Alarm printer (§2.5.B.6): Spec requires a
9-pin dot-matrix tractor-feed impact alarm printer with 2000 sheets of paper. Current-generation HMI software (including Cleaver- Brooks') no longer supports printing alarm logs to dot-matrix printers. The current standard is a laser printer that allows users to print the alarm log on demand. Please confirm a laser printer is acceptable in lieu of the specified dot-matrix printer. (b) Modem interface (§2.2.H): Spec requires a modem interface as part of the
SCADA communication. Modern SCADA platforms (including Cleaver-Brooks') no longer include modem interfaces; remote-
This would be acceptable. 5/29/2026 access functions are handled via Ethernet/IP, VPN, or similar modern methods. Please confirm a modem interface is no longer required, or clarify the intent of this requirement.
RFI E-1: Drawing MQ601 Temporary Steam Boiler Schedule shows: • SB-TEMP-1: BLDG 24, 800 BHP — BOD: Cleaver-Brooks SBS3-GA-01
• SB-TEMP-2: BLDG 24, 800 BHP — BOD: Cleaver-Brooks SBS3-GA-
• SB-TEMP-3: OUTSIDE, 1,000 BHP — BOD: Victory Trailer F2-OB-
25(L-1000X-S2) 12.5X48-SC 50-RB-M Total: 2,600 HP installed, vs.
the permanent plant of (3) × 600 HP = 1,800 HP installed / 1,200
HP operating (N+1 per Spec §1.8.B). For the rental boiler proposal, please clarify:
(a) Total temporary plant capacity vs. permanent plant load. Why is the temporary plant sized at 2,600 HP installed when the permanent plant operating demand is only 1,200 HP? This is more than 2× the actual plant load. Will the engineer accept equivalent N+1 capacity in different sizing — specifically, (3) × 800 HP rental boilers from the standard rental fleet, providing N+1 redundancy with significantly higher fleet availability and lower cost?
(b) Multi-manufacturer rental basis-of-design. Drawing MQ601 names Cleaver-Brooks as the basis of design for SB-TEMP-1 and SB- TEMP-2, but Victory Trailer (a different manufacturer) as the basis of design for SB-TEMP-3. Please confirm:
• (i) The Victory Trailer designation for SB-TEMP-3 is a basis-of-design reference only, and bidders may source from any manufacturer with rental units of equivalent capacity, OR
• (ii) Victory Trailer is the required manufacturer for the 1,000 HP unit, in which case bidders must coordinate sourcing with Victory directly.
• (iii) For SB-TEMP-1 and SB-TEMP-2, confirm bidders may source from any manufacturer with rental units of equivalent capacity.
a. 800 BHP would be allowed, however, 1000 BHP was selected as a maximum option to allow for additional temporary plant needs. Refer to M-001 phasing narrative B as the trailered boiler is only installed if one of the boilers fail. Basis of design does not limit other manufacturers from providing equivelent products that meet specification requirements. Trailered boiler is an enclosed boiler trailer.
RFI E-2: The specification and drawing sequences imply the temporary (rental) boilers will be integrated into a full SCADA monitoring system with detailed I/O points, network communication, and operator workstation visibility (per Sequence of Control items I, J and Spec §23 05
10 §2.8.J). This is well beyond standard rental boiler industry practice.
Standard rental boilers are designed for plug-and-play standalone operation with local controls, dry-contact run/fault status, and packaged alarm panels — they are NOT typically built for integration into customer SCADA systems with detailed Modbus/BACnet point lists.
Please clarify the intended level of temporary boiler integration:
• (a) Full SCADA integration matching the permanent boiler I/O list (would require custom-built rentals, significantly higher cost, longer lead time, and limited availability), OR
• (b) Standard rental boiler local controls with dry-contact run/fault/alarm signals to a contractor-furnished panel (industry-standard rental boiler integration), OR
• (c) Some intermediate level with a defined limited point list.
It is likely acceptable, however the product will need to be submitted against the specification governing the economizer.
It is allowable for the economizer controls to be performed by the boiler PLC controller.
5/29/2026
RFI F-1: Spec §23 52 39 §1.5.B requires three previous installation references for the burner manufacturer on similar-size firetube boilers.
Confirm a reference list of similar firetube boiler installations with comparable burner combinations is acceptable, and provide a maximum project age (e.g., last 5 years).
Submittal will be reviewed in accordance with the specification.
Distinction between similar and comparable will be evaluated during the review. Maximum project age 5 years.
5/29/2026
RFI F-2: Spec §23 52 39 §3.5 requires 16 hours of manufacturer's technical representative training per VA personnel. Spec §23 08 11 §3.6 specifies 32 hours boiler/burner/controls + 16 hours computer workstation + 8 hours pumps/DA + 32 hours temporary plant. Please confirm total manufacturer-supplied factory representative training hours expected.
23 08 11 is the total requirement, 23 52 39 would be a minimum requirement from just the boiler manufacturer for the permenant equipment. In cases where the boiler manufacturer is providing multiple components, each component would add per individual the specification requirements.
5/29/2026
RFI F-3: Please confirm the equipment scope is being procured as: a) Purchase order (supply only, FOB factory, with factory representative startup), OR
• (b) Subcontract with installation. Note: Standard equipment supplier scope is supply only with factory representative startup;
installation, rigging, piping, electrical, instrumentation wiring, and
This solicitation has no separate equipment procurement requirements. All equipment shown on the drawings for a complete and operable system to be provided per the solicitation.
chemical treatment are by others.
22 Are there any brand name justification & approvals for this project? No brand name justifications were provided with the procurement package. 5/29/2026
30 Will the Government provide the 3-D REVIT Design model in native file format for the creation of coordination drawings and use by contractor? The government will provide .dwg files to the awarded contractor. 5/29/2026
The project scope is widespread across the building and performed in and around numerous existing building systems that will need coordination. How many site visits do owner consultants have for MEP and systems coordination with GC, and will the VA have a designated
MEP representative available on site?
Site visits will be reqeusted at VA discretion based on the AE's contract. 5/29/2026
36 Has the facility Operation & Maintenance team reviewed the Contract Documents for operability to avoid change orders?
The VA periodically coordinates with facility stakeholders, including Operations & Maintenance personnel, during development of requirements to help ensure that the resulting documents reflect current facility conditions and operational considerations. While this coordination aims to reduce the potential for future change orders, it does not guarantee that all issues or conditions have been identified.
Offerors are encouraged to review all solicitation documents carefully and raise any questions or concerns during the solicitation period.
5/29/2026
Please clarify roofing responsibility, including temporary roof patches, final permanent patches, flashing, warranty requirements, and whether any full reroofing or only localized patching is required at new/removed penetrations.
Contractor responsible for temporary and permanent flashing/patches and permanent flashing/patch warranty 5/29/2026
48 Please confirm acceptable boiler manufacturers for this project. refer to MQ601. this list is not exclusive of other manufacturers that can meet the performance specification requirements. 5/29/2026
49 Please confirm there is no asbestos or lead abatement required on this project No asbestos containing materials are anticipated 5/29/2026
Can you please provide the extent of the drywall scope on this project?
Please include quantities or marked-up drawings/schedules indicating the scope.
Refer to drawings for areas requiring drywall. There are sufficient dimensions on the drawings to calculate quantities. 5/29/2026
Can you please provide the extent of the painting scope on this project?
Please include quantities or marked-up drawings/schedules indicating the scope.
The following rooms will require paint: 107A, 108, 24-02 Refer to plans and interior elevations to calculate quantities.
Refer to Sheet AE411 for Finish Schedule.
5/29/2026
Would the Government consider scheduling an additional site visit/job walk for interested bidders and subcontractors? Several subcontractors across multiple trades were either unaware of the original walkthrough until after it occurred or were unable to attend due to scheduling conflicts. Given the size, complexity, and phased nature of the work within an active healthcare facility, many subcontractors are hesitant to provide complete pricing without visiting the site and reviewing existing conditions firsthand. An additional walkthrough would help improve subcontractor participation, bid coverage, and overall pricing accuracy while reducing assumptions and future clarification requests.
no further site visits are anticipated 5/29/2026
55 Please confirm there is no fire alarm, PACs, or CCTV required on this project. If it is required, please provide the respective specifications. Refer to Telecom Plan ET111 and Division 27 of the Specifications. 5/29/2026
56 Who currently is responsible for the HVAC controls at this campus? Siemens provides software system and technical support 5/29/2026
Is seismic bracing required on this project? If so, please provide specifications and any other additional information and/or drawings for this.
Refer to Sheet S-001 Structural Notes A.6 "Basic Seismic Force Resisting System". 5/29/2026
60 Does the VA intend to salvage any of the existing equipment? If so, what are the decommissioning requirements of that equipment?
Requirements for decommisioning per applicable regulations, codes, specifications and standards. Salvage and reuse as per applicable drawings and specifications.
5/29/2026
On drawing CU101, Keynote 1 identifies the underground storage tank as 25,000 gallons, while Keynote 14 identifies the same tank as 30,000 gallons. Since both keynotes appear to reference the same tank, please clarify the required tank size.
Required nominal capacity of the combined tank is 55,000 gallons.
KN14 points to a longer tank. The keynotes are for two different tanks. 5/29/2026
67 Can you please provide the finish schedule? Refer to response #51. 5/29/2026
68 Can you please confirm that all drawings are 100% construction documents? Yes. All drawings are the 100% Construction Documents. 5/29/2026
74 Please clarify if Offerors are only required to list bid amount in line 17 of the SF1442, as there were no other pricing forms included. See previous responses regarding deductions. 5/29/2026
76 Please provide depth of granular base required for interior slab on grade and boiler pads. Provide 6" granular fill per Specification 31 20 00 Earthwork (3.5.F) 5/29/2026
Sheet AE311 wall section C7 has concrete, steel, & cold-formed framing callouts that say "RE STRUCTURAL". No structural plans/details were provided for the propane storage addition, please provide.
To be provided in upcoming Addendum 5/29/2026
Sheet AE113 shows new concrete pads for temporary boilers at Building
24 and refers to structural, but no plans/details were provided for Building 24. Please provide missing plans/details.
New housekeeping pads will not be required in Building 24. 5/29/2026
Please confirm that the use of trench boxes for excavation of the underground storage tanks will be acceptable and no additional OSHA sloped excavation will be required due to the tank depth (~18 foot depth).
Per general note 1 and keynote 1 on sheet CG103, contractor must provide temporary stabilization of excavation to install the tanks within the limits of disturbance. Design of temporary stabilization must be stamped by a licenced professional engineer.
5/29/2026
Please clarify size and thickness of proposed concrete pad for underground storage tanks, and if they should bear on aggregate base or native soils.
Refer to CU101 Keynote #2. 5/29/2026
Keynote 3 on CS102 indicates a new retaining wall to replace the retaining wall removed for utility work, and refers to the structural drawings. No structural plans/details were provided, please provide.
To be provided in upcoming Addendum 5/29/2026
82 For bidding purposes, please provide known/estimated size of the existing UST to be removed and quantity of liquid contents.
Current tank capacity is 20,000 gallons. Contractor should expect tank to contain near-max capacity fuel level 5/29/2026
Civil sheet CS101 indicates both underground storage tanks to be 25,000 gallon. Mechanical schedule on MQ601 indicates one tank to be 25,000 gallon and the other to be 30,000. Please clarify what the correct sizing is for the tanks.
CS101, dated 3.5.26, is incorrect. Refer to Sheet CU101 which indentifies the two tanks with Keynotes 1 and 14. See response to RFI
66.
5/29/2026
Is there sprinkler piping already serving the existing boiler room to be modified/supplemented, or is a new fire protection service being provided as part of this project?
Provide a new fire sprinkler system per FX001, FX111, FX112, and
FX113. 5/29/2026
Structural Note D.1 on S-001 indicates that a geotechnical report has not been received, is the AOR/VA anticipating having this report available prior to the bid date?
Provided in Addendum 5/29/2026
86 Please provide finish schedule indicating wall/floor/ceiling finishes. Refer to response #51. 5/29/2026
87 Will new catwalk steel need to be painted safety yellow? No. Paint new catwalk and handrails to match existing. 5/29/2026
88 Please provide specifications and schedule for doors, frames, & hardware. Refer to Addendum Sheet AE411. 5/29/2026
89 Please provide specifications for metal standing seam roofing & soffit panels.
Specification 07 40 00 ROOFING AND SIDING PANELS has been provided, includes Standing Seam Metal Roof. 5/29/2026
93 What is the current BAS manufacturer and associated vendor? Please provide contact information.
DA and Condensate tanks controlled by Siemens Insight. Contact information provided upon award. 5/29/2026
Please clarify if the number & size of conduits/feeders required for the rerouted electrical utility shown, and indicate if a concrete ductbank is required. Please provide concrete details if required.
Project does not require rerouting of electrical utility. Extent of work limited to new feeders and branch circuits. Refer to Specification 26 05
33 for raceway installation requirements including concrete encasement.
5/29/2026
Specifications were provided for Uninterruptible Power Supply, however no new work is shown. Please clarify if this specification can be omitted, or if there is any work associated with a UPS.
The specification can be omitted. 5/29/2026
Please clarify if expansion joints & covers are required at the new propane storage addition. Specifications were provided, but not identified in the drawings.
To be provided in upcoming Addendum 5/29/2026
97 What is the roof structure for the propane storage addition? Refer to Addendum Sheet AE411. 5/29/2026
Specification 23 10 00 includes aboveground temporary steel tanks, please clarify if these are needed. If so, please indicate size, location, and responsibility for fuel supply.
Refer to CG102 KN 1. The VA provides the fuel. 5/29/2026
99 Please confirm that all exterior underground fuel piping shall have secondary containment as specified. Confirmed 5/29/2026
100 Details B2, B4, & B6 have conflicting thickness for Asphalt, Asphalt Base, & Concrete Pavement Base. Please clarify correct thicknesses.
Assuming that the question relates to CS501:
Refer to legends on CS101 and CS102 for clarification.
Each detail is a different transition in a different area.
5/29/2026
109 Please confirm the current design documents meet current VA TIL guidelines.
The Construction Documents meet the VA TIL Guidelines that were current at the time of design. 5/29/2026
The drawings and specifications indicate existing utility locations and existing conditions are approximate and require contractor verification.
Please clarify:
• What existing utility investigation information is available to bidders?
• Will existing utility conflicts or undocumented conditions discovered during construction be treated as differing site conditions?
• Are existing BIM/Revit models available for contractor reference?
Refer to General Note 3 on sheet CU101 5/29/2026
The project references Building 24 as a temporary boiler plant location.
Please clarify:
• Is temporary boiler equipment Government furnished or contractor furnished?
• Is fuel supply infrastructure existing or temporary?
• Is temporary plant startup/testing included in base bid?
• Are emissions permits required and, if so, who is responsible for obtaining them?
Building 24 is not currently a boiler plant, though it was the temporary plant at original building construciton. Temporary equipment is contractor provided. Fuel infrastructure is temporary. Start up is in base bid. Emission permitting by contractor.
The solicitation references phased construction activities to minimize disruption to medical center operations. Please clarify:
• Is a mandatory phasing sequence required?
• Are multiple boiler outages permitted simultaneously?
• Must all existing systems remain fully operational during each phase?
• Are interim tie-ins or temporary bypass piping anticipated?
Per Spec 01 00 00 - 1.7.H, a phasing plan Submittal is required. The assumed required phasing sequence includes establishing a fully operational temporary boiler facility before decommissioning any existing boiler. Temporary Facility will provide total supply to the Facility. Proposed outages must minimize impact to the facility.
5/29/2026
Please clarify whether existing structural systems supporting:
• new boilers, piping, rooftop equipment, and temporary systems have been evaluated for new loading conditions.
• If structural modifications are required beyond those shown in the drawings, will such work be addressed by Government modification?
Structure has been analyzed. Refer to 23 21 11 for specific pipe support calculations, submttals and products required by contractor. 5/29/2026
Please provide:
• Available arc flash studies,
• Existing electrical coordination studies,
• Existing panel schedules,
• Available spare capacity information for new boiler equipment and controls.
• Please clarify contractor responsibility if existing electrical infrastructure upgrades become necessary to support new equipment loads.
VA to provide arc flash studies and coordination studies, post award.
Existing panel schedules are included for panels within project scope. 5/29/2026
The drawings indicate underground utility locations are approximate.
Please clarify:
• Has subsurface utility engineering (SUE) been performed?
• Are potholing requirements anticipated?
• Will Government provide utility locates prior to excavation?
• Are geotechnical reports available?
Refer to General Note 3 on sheet CU101 and Survey Note 9 on sheet VU101. GeoTech report provided with Addendum. 5/29/2026
Please confirm if the code requirements for mechanical piping installation and testing are subject to ASME B31.9 Building Services Piping, and will the mechanical installation contractor be required to hold an ASME U, S, H or R stamp?
Refer to 23 05 10 and 23 21 11 and other specifications for requirements. Typicaly 31.1 is the requirement. 5/29/2026
Please confirm if the code requirements for mechanical piping installation and testing are subject to B31.1 Power Piping and will the mechanical installation contractor be required to hold an ASME U, S, H or R stamp?
Refer to response #122 5/29/2026
131 Will the mechanical contractor be responsible for clash detection and reporting during the coordination process?
Refer to 23 05 10 and 23 21 11 and other specifications for requirements. X-ray testing is required 5/29/2026
136 On all underground utility work please confirm if excavated material is acceptable for re-use as backfill?
Provided pipe bedding/backfill per the specifications. Existing material is acceptable for re-use. 5/29/2026
138 Please advise if the site contains any contaminated soil that needs to be removed.
There are no known contaminated soils on site. However, Contractor should assume possible contamination of the soil surrounding the existing storage tank and price accordingly. If soils uncontaminated, Contractor to provide VA with a credit.
5/29/2026
140 What are the requirements by the site contractor for the storage of contaminated soil on site?
Material must be removed and disposed of at a suitable receiving facility. 5/29/2026
146 Please provide any applicable architectural, structural, mechanical, electrical, plumbing, technology drawings as they apply to this project. Refer to contract drawings. 5/29/2026
147 Are all underground utilities shown complete and verified, or should potholing be anticipated prior to excavation?
Refer to contract drawings. In addition, contractor responsible for 811.
Additional information may be provided post award if available. 5/29/2026
148 Please provide existing structural load capacities for boiler room floors and roof framing where new equipment will be supported. Refer to S-001 5/29/2026
149 Please confirm the basis of design heating load and redundancy criteria for the replacement boilers. 1000 BHP 5/29/2026
150 What turndown ratio is required for the boiler system? Refer to MQ601. 5/29/2026
151 Please clarify capacity and system requirements for temporary boilers. Refer to MQ601. 5/29/2026
152 Please clarify if chemical treatment systems are existing-to-remain or replaced. Refer to MP111 5/29/2026
153 Please provide controls points lists for all new boiler equipment and ancillary systems. Refer to MI101-MI603 5/29/2026
154 Please confirm Sequence of Operations for boiler systems. Confirmed. 5/29/2026
159 To allow sufficient time to review responses and prepare our bid we kindly request that you please extend the bid date.
Bid date is not currently being extended. Publically available information on bid date is available on sam.gov 5/29/2026
163 4. Please provide a list of special inspector inspections/Statement of special inspections required for each feature of work. Refer to Special Inspections specification section 01 45 35 5/29/2026
167 There are two iterations of Specifications section 02 65 00, one dated 01-01-21 and the other dated 08-01-16. Please identify which to follow 1/1/2021 5/29/2026
168 1. Is there a GeoTech available where the new fuel oil tanks are to be installed? Provided in Addendum 5/29/2026
169 2. Is there a GeoTech available where trenching is to be performed? Provided in Addendum 5/29/2026
3. Does the government assume any of the 100 CY of soil to be removed to be contaminated soil? Should the unit price requested assume contamination?
There are no known contaminated soils on site. However, Contractor should assume possible contamination of the soil surrounding the existing storage tank and price accordingly. If soils uncontaminated, Contractor to provide VA with a credit.
5/29/2026
1. Can Victory Energy Operations LLC’s, one of the largest boiler manufacturers in the United States, based out of Tulsa Oklahoma, 4-pass wetback design be considered for status as an approved equal permanent boiler manufacturer? See attached drawing for dimensions.
Shell Length: 266” Skid Width: 94”
Weight: estimated 50,000 lbs Safety Valve Height: 138.5”
Victory Energy Operations is not specifically removed from consideration. Coordination shop drawings are required prior to construction with confirmation from contractor that their equipment will fit, including clearances for equipment pull. Specific coordination is required by contractor based on equipment selections.
5/29/2026
1. Can the dimensions be clarified on the Steam boiler schedule, per
Cleaver Brooks the CBLE 4W at 600 HP capacity and 150 psi design boiler has an overall width of 124.75”” and a weight of 39,580 lbs.
200 PSI design is the requirement per specifciations. 5/29/2026
3. Please define who is responsible for providing the temporary steam, the Prime or the government; define if the Prime prepares a space to receive the temporary steam provided by the government or if the Prime is to “turnkey” this scope for project duration.
Refer to drawings and specifications to outline contract responsibility for scope. Prime provides temporary supply and receives condensate return through existing VA water treatment. 200 PSI design is the requirement per specifciations.
175 4. Please provide the boiler system basis of design. 200 PSI design is the requirement per specifciations. 5/29/2026
1. Has consideration been taken for damage that will happen to the tree root system with the removal of the old fuel oil tank and installation of the new fuel oil tanks. As a rule of thumb, tree root systems extend to at least the edge of the tree canopy. The existing tree canopies extend well into the intended area of the new fuel oil tanks.
Contractor to trim roots as required to remove/install tanks. If root removal impacts the stability of the tree, it may be removed in accordance with applicable regulations.
5/29/2026
1. Drawing CU101 shows the FOS and FOR from each fuel oil tank combining into a single FOS/FOR before it enters the building. When there are multiple tanks feeding into single FOS/FOR lines there must be control valves, so the system returns to the same tank it is pulling from to prevent from overfilling the other tank. This will require actuated or motorized selector valves and some type of controls system. Please provide more information on how this will be controlled.
That is not what is shown on CU101. Additionally, refer to MK504. 5/29/2026
1. Is cathodic protection a firm requirement? If new steel tanks are jacketed with protective material so there is not bare steel exposure, this shouldn’t be required.
Refer to Specification 23 10 00. This has been previously approved. 5/29/2026
179 2. Will the fuel for the fuel oil system be billed as #2 fuel oil or diesel fuel? This matters with regard to NCDEQ permitting and regulation.
#2 fuel oil provided by VA. Contractor to provide temporary storage tank and infrastructure. 5/29/2026
180 3. Please provide the Automatic tank gauge basis of design. Meet performance specification. 5/29/2026
4. When the new boilers are installed is the intent to reuse the existing interior fuel oil piping of will it be removed and replaced with all new interior piping?
Existing fuel interior fuel oil iping to be replaced 5/29/2026
5. For the temporary fuel oil system, please provide direction/more information on the exterior and interior FOS/FOR piping and how fuel is supplied and returned?
Refer to construction drawings 5/29/2026
183 6. There is no transition sump where the current FOS/FOR piping enters the building. Will this be required for the new install? This is required per 23 10 00 2.7.G 5/29/2026
7. CU202 show the fuel oil tanks to be buried 6-7ft below grade. This is not typical and may require additional engineering for the tank install.
Is this correct, or are we to follow manufacturer directions? Will a manufacture tank be rejected if it cannot meet this depth of bury?
Depth of tanks to remain per contract drawings. 5/29/2026
185 8. Please provide fuel systems tanks basis of design. Refer to MQ601 5/29/2026
9. Please specify where the leak detection system/tank fluid level system for the fuel oils tanks and piping is to be installed (sump locations?).
This is required per 23 10 00 2.7.G. 5/29/2026
188 11. Is there a matrix of how the fuel system communicates and signal with the existing BAS? Refer to MI602 5/29/2026
189 1. Please confirm NCDEQ code requirements for fuel system installation is to be recognized and incorporated into the project. Confirmed 5/29/2026
2. The specification for underground double wall fuel pipe provides two options; steel and FRP. As underground steel piping is not allowed in NCDEQ North Carolina code (Title 15A North Carolina Administrative
Code, Subchapter 02N .0904 - UL 971 or UL971A only), is this option excluded? Are thermos plastic flexible piping or semi-ridged fused piping an approved system option for systems that meets UL971 or
Follow specifications within current code requirements. Identify specific options and breakdowns as part of bid documents 5/29/2026
UL971A product such as OmegaFlex DoubleTrac approved as options?
191 3. Gov calls for full UST ballast pads, can deadmen be quoted as an alternative?
Alternates quoted required to be specific and with accompanying cost breakdowns 5/29/2026
192 Please provide specifications and complete schedule for required doors and hardware. See response #88. 5/29/2026
193 Please provide the room finish schedule for each area in contract noted as specification Section 09 06 00, SCHEDULE FOR FINISHES. See response #51. 5/29/2026
2. In lieu of branded casework, will the facility accept hand build solid wood lower cabinet bases and laminate counter tops fabricated locally or on site by Prime? (If I build it by hand, it’s American made/ material type submittal only)
Casework may be constructed by Prime, but must still meet the requirements of Specification 06 20 00 FINISH CARPENTRY.
(Shop Drawings, Hardware Samples, Qualifications, etc.)
Countertops are to be a solid surface product per Sheet AE201.
Specification 12 36 00 COUNTERTOPS provided.
5/29/2026
197 2. Please clarify the objectives and key deliverables of each phase before progressing. See GI002 Phasing Requirements A 5/29/2026
198 1. Are any temporary systems required to connect and communicate with the existing BAS? Not required, local control only for temporary plant air conditioning 5/29/2026
200 3. Are there manufacture limitations to BAS communications equipment, modules ect. For basis of equipment provided? Refer to RFI 93 5/29/2026
2. Comparing Index of Drawings to the Plans in the Plan Set Itself, plan CG-105 - Civil Erosion and Sediment Control Plan - Phase 2 is missing.
Can this missing plan please be addressed in a future amendment?
Sheet CG105 was added to the Construction Documents as part of previous Addendum. 5/29/2026
3. Comparing Table of Contents to the Specs in the Spec Book Itself, the
Spec Section 01-00-02 - ILSM Evaluation is missing. Can this missing specs section please be addressed in a future amendment?
ILSM Form will be provided as required. 5/29/2026
4. Comparing Table of Contents to the Specs in the Spec Book Itself, the Spec Section 33-08-00 - Commissioning of Site Utility Systems is missing. Can this missing specs section please be addressed in a future amendment?
To be provided in upcoming Addendum 5/29/2026
5. On Sheet AE-211 from the Plan Set in the Reference Keynotes refers to Specs 071300-A, 072113-D, 072113-E, 074000-H, 077100-C, SSMR - Standing Seam Metal Roof, TWMF - Through Wall Metal Flashing. Only the 072113 is in the Spec Book and Specs Table of Contents. Can the missing specs please get added to the Spec Book ? There is also a reference to Diamond Plate Wainscot with no specs for that. Also, there were a whole lot of Division 31 & 33 Specs in the revised spec book that were not on the table of contents.
The correct sheet reference is AE311.
Specification 07 13 00 SHEET WATERPROOFING has been provided.
Specification 07 40 00 ROOFING AND SIDING PANELS has been provided, includes Standing Seam Metal Roof.
Specification 07 71 00 ROOF SPECIALTIES has been provided.
Refer to Specification 10 26 00 WALL AND DOOR PROTECTION (2.1) for Diamond Plate requirements.
The Supplemental Specifications provided are from The City of Durham Public Works. They are relevent to the project and have been added to the Table of Contents.
5/29/2026
6. On Sheet AE-411 from the Plan Set in the Reference Keynotes refers to Steel Bollards and Metal Door and Frame and hardware and a Card Reader RE: TELECOM (108B). There are no Division 8 Specs for Metal
Doors and Hardware in the spec book. There are no Division 27 Specs for Telecommunications in the spec book. And there is no Division 31 / 32 / 33 Specs for Steel Bollards in the spec book. Can the missing specs please get added to the Spec Book ?
Refer to response #88 for doors and hardware.
Refer to Telecom Sheet ET111, General Note E for Card Reader.
Refer to Specification 055000 METAL FABRICATIONS (2.21) and B4/CS502 for Bollard Detail.
No additional Division 31, 32, or 33 specifications will be provided beyond the Supplemental Specifications provided by the City of Durham, Public Works. These sections have been added to the
Table of Contents and are located at the end of the specifications
7. On Sheet AE-201 from the Plan Set in the Reference Keynotes refers to 123200-A - Plastic Laminate Casework, 123200-G - Pull, 123600-A -
Countertop, RE Finish Schedule, 123600-B - Backsplash, RE Finish Schedule, 123600-C - Counter Bracket, the 123600 A & B Say RE Finish
Schedule. There are no pages in the Index of Drawings that have a finish schedule, and there is no Division 12 Specs in the Spec Book. Can those missing specs please get added to the Spec Book ?
Refer to response #51 for Finish Schedule.
Specification 12 32 00 MANUFACTURED WOOD CASEWORK has been provided.
Specification 12 36 00 COUNTERTOPS has been provided.