This document is an architectural drawing sheet containing interior wall sections and details for Building 7 boiler replacement at 508 Fulton Street, Durham, North Carolina. The drawing set (AE311) is part of 100% Construction Documents issued for an Invitation for Bid (IFB) under project number 558-22-152, with revisions dated December 29, 2023 and December 18, 2025.
The sheet depicts multiple sectional views and details at scales of 1/4" = 1'-0" and 1" = 1'-0", illustrating elevated maintenance platforms, new stairs, and interior wall assemblies for the boiler room installation. Key construction elements specified include concrete foundation, face brick Type 1, steel joists, cold-formed structural studs at 16" on center, metal roof and soffit panels, standing seam roofing, sheet waterproofing with drainage board, polyisocyanurate board insulation, gypsum board, and metal flashing systems. General notes reference additional information on sheets GI002 and A-001, specify that steel stairs and elevated platforms shall be installed after boiler installation, require painting of housekeeping pads, and mandate roof penetration patching per manufacturer instructions. The drawing includes reference keynotes for material specifications and a key plan showing the location within the building complex. The work is under the U.S. Department of Veterans Affairs with architectural/engineering services provided by Valhalla Engineering.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEVEL 1
0"
LEVEL 2
9' - 0"
STORAGE
BREAK
ROOM
BOILER
ROOM
F3
AE311
LEVEL 1
0"
E D
LEVEL 2
9' - 0"
F7
AE311
F4
AE301
3'
3'
6' - 8"
3'
5' - 5"
3T @ 10"
2' - 6"
D5
AE311
D3
AE311
4R
2'
A. REFER TO SHEETS GI002 AND A-001 FOR ADDITIONAL NOTES,
ABBREVIATIONS, AND SYMBOLS.
B. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.
C. INSTALLATION OF STEEL STAIRS AND ELEVATED PLATFORMS SHALL OCCUR
AFTER INSTALLATION OF BOILERS.
D. PAINT VERTICAL FACE OF HOUSEKEEPING PADS AND ON TOP 3" FROM EDGE.
E. PATCH ROOF PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.
LEVEL 1
0"
ED
LEVEL 2
9' - 0"
F4
AE301
LEVEL 1
0"
LEVEL 2
9' - 0"
D7
AE311
8'
/2
2' - 0"
LEVEL 1
0"
3 2
LEVEL 2
9' - 0"
D7
AE311
AE311
C7
SIM
AE311
C7 OPP
LEVEL 1
0"
LEVEL 2
9' - 0"
D5
AE311
D3
AE311
5'
"2
LEVEL 1
0"
LEVEL 2
9' - 0"
042000-C
071300-A
061000-D
072113-E
092900-A
054000-A
051200-E
2"
033000-C
076000-A
042000-E
042000-J
042000-H
074000-H
077100-C
074000-A
072113-D
052100-A
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
XXXXXX-Y
KEY PLAN
GENERAL NOTES
REFERENCE KEYNOTES
P la n N or th
True North
BLDG 7
BLDG 24
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
A ut od es k D oc s:
//2 2.
_D ur ha m _N
C _B oi le rs _R
/2
2.
_A R
C H
.r vt
6/ 9/
:0
9:
P M
AE311
SECTIONS - INTERIOR - BUILDING 7 REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
MVP GDD
100% CONSTRUCTION
DOCUMENTS IFB
VEG 22.04
1/4" = 1'-0"
INTERIOR WALL SECTION - ELEVATED MAINTENANCE PLATFORM AND DOOR
F71/4" = 1'-0"
ELEVATED PLATFORM SECTION
F3 1/4" = 1'-0"
INTERIOR WALL SECTION - EXISTING ELEVATED PLATFORM AND NEW STAIRS
F5
1/4" = 1'-0"
EAST-WEST SECTION FACING NORTH
D5 1/4" = 1'-0"
NORTH-SOUTH SECTION FACING WEST
D71/4" = 1'-0"
EAST-WEST SECTION FACING SOUTH
D3
1" = 1'-0"
EAST-WEST SECTION FACING SOUTH
C7
033000-C CONCRETE FOUNDATION, RE STRUCTURAL
042000-C FACE BRICK - TYPE 1
042000-E AIR GAP
042000-H TIES AND ANCHORS
042000-J WEEP VENTS @ 24-INCH OC
051200-E STEEL PLATE WAINSCOT
052100-A STEEL JOIST
054000-A LOAD-BEARING METAL STUDS
061000-D PLYWOOD
071300-A SHEET WATERPROOFING WITH DRAINAGE BOARD PANEL
072113-D FOIL-FACED POLYISOCYANURATE BOARD INSULATION WITH TAPED
AND SEALED SEAMS
072113-E BATT INSULATION
074000-A METAL ROOF PANELS
074000-H METAL SOFFIT PANELS
076000-A THROUGH-WALL METAL FLASHING
077100-C PREFINISHED ROOF-EDGE FLASHING & CONTINUOUS CLEAT
092900-A GYPSUM BOARD
1. DIAMOND PLATE WAINSCOT
2. MAXIMUM (3) PROPANE TANKS AND STORAGE RACK
3. 16 GA. COLD-FORMED STRUCTURAL STUDS @ 16" O.C., 1/2" SHEATHING,
AND STANDING SEAM ROOF
SHEET KEYNOTES
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 12/29/2023
A 100% CONSTRUCTION DOCUMENTS - ADDENDUM A 12/18/2025
16 GA. COLD-FORMED STRUCTURAL STUDS @ 16" O.C.4.
LEVEL 2
| Sheets |
| AE311 - SECTIONS - INTERIOR - BUILDING 7 |
File details come from the government source that posted it. Updated .