This is a set of architectural construction documents for a boiler replacement project at the Durham VA Medical Center (VAMC) in Durham, North Carolina.
The project involves the replacement of steam boilers in Buildings 7 and 24, with construction documents prepared at 100% completion for an Invitation for Bid (IFB). The primary scope includes demolition of existing piping and infrastructure, installation of three new fire-tube steam boilers (20,000 lb/hr each) in Building 7, and temporary boiler installations in Building 24 to maintain operations during construction. Key mechanical systems scheduled include three boiler economizer heat exchangers, multiple steam unit heaters, steam pressure reducing valves, steam traps, fuel oil tanks (25,000 and 30,000-gallon capacities), fuel oil pumps, and exhaust fans. The project site is located at 508 Fulton Street, Durham, NC 27705, with project number 558-22-152. The documents include detailed floor plans, reflected ceiling plans, equipment schedules, door and frame details, finish schedules, and enlarged plans for the control rooms in both buildings. Special construction requirements include temporary roof patches during piping demolition, coordination with existing structural steel, new window and door openings, propane storage enclosure construction in Building 7, and provisions for permanent platforms and stairs to ensure safe equipment access without portable ladders. The architectural and engineering consultant is Valhalla Engineering, located in Englewood, Colorado.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EQ4' - 0"EQ
A. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL FOR
ADDITIONAL DEMOLITION AND PHASING INFORMATION.
B. TEMPORARY ROOF PATCHES WILL BE REQUIRED BETWEEN DEMOLITION OF
EXISTING PIPING AND INSTALLATION OF NEW PIPING.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
BLDG 7
BLDG 24
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
A ut od es k D oc s:
//2 2.
_D ur ha m _N
C _B oi le rs _R
/2
2.
_A R
C H
.r vt
5/
/2
:0 0:
A
M
AD113
DEMOLITION PLANS - BUILDING 24 REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
MVP GDD
100% CONSTRUCTION
DOCUMENTS IFB
VEG 22.04
1/4" = 1'-0"
DEMOLITION PLAN - LEVEL 1 - BUILDING 24
F6
1/4" = 1'-0"
DEMOLITION PLAN - MEZZANINE
F4
1/4" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN
F1
1. REMOVE GYPSUM BOARD WALLS AND FRAMING
2. REMOVE PLYWOOD WALL AND FRAMING
3. REMOVE LEVEL 2 PLATFORM SUPPORTS, TYP
4. REMOVE RAISED PLATFORM, ACCESS LADDER, AND HANDRAILS
5. REMOVE SUSPENDED CEILING TILE AND GRID
6. REMOVE EXISTING EXHAUST FAN; MECHANICAL CURB TO REMAIN
7. CUT OPENIING FOR NEW BOILER STACK; COORDINATE WITH BOILER
MANUFACTURER AND BUILDING 24 EXISTING STRUCTURE
8. EXISTING STEEL ROOF SUPPORT STRUCTURE, TYP
9. CUT OPENING FOR NEW WINDOW
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 12/29/2023
A 100% CONSTRUCTION DOCUMENTS - ADDENDUM A 12/18/2025
A3 100% CONSTRUCTION DOCUMENTS - ADDENDUM C 06/28/2026
A. REFER TO SHEETS GI002 AND A-001 FOR ADDITIONAL NOTES,
ABBREVIATIONS, AND SYMBOLS.
B. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.
C. INSTALLATION OF STEEL STAIRS AND ELEVATED PLATFORMS SHALL OCCUR
AFTER INSTALLATION OF BOILERS.
D. PAINT VERTICAL FACE OF HOUSEKEEPING PADS AND ON TOP 3" FROM EDGE.
E. PATCH ROOF PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.
24-02
CONTROL CENTER
AE113
F4
AE201
B7
AE201B5
1' - 0"
VIF
5' - 4 1/2"
2' - 1" 1' - 0"
1'
2'
V
IF
2'
/4
V
IF
1'
1/ 4" 7
24-02
CONTROL CENTER
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
BLDG 7
BLDG 24
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
A ut od es k D oc s:
//2 2.
_D ur ha m _N
C _B oi le rs _R
/2
2.
_A R
C H
.r vt
5/
/2
3:
:4
P
M
AE113
FLOOR PLAN - LEVEL 1 - BUILDING
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
MVP GDD
100% CONSTRUCTION
DOCUMENTS IFB
VEG 22.04
1/4" = 1'-0"
FLOOR PLAN - LEVEL 1 - BUILDING 24
F6
1. APPROXIMATE LOCATION OF TEMPORARY BOILERS
2. PLASTIC LAMINATE COUNTERTOP AND SUPPORTS; RE: F7/AE201
3. WALL-MOUNTED TELEVISION
4. DDC WORKSTATION RELOCATED FROM BUILDING 7
5. STATIC BOILER READOUTS
6. SCADA WORKSTATION
7. 3-5/8" METAL STUD WALL WITH 5/8" GYPSUM BOARD ON BOTH SIDES AND
TOP; 40" HIGH AFF
8. NEW 48"W x 56"H FIXED WINDOW; HOLLOW METAL FRAME; 1/4" LAMINATED
CLEAR GLAZING; SILL HEIGHT @ 3'-4" AFF
3/8" = 1'-0"
ENLARGED PLAN - CONTROL ROOM 24-02
F4
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 12/29/2023
D5
AE201
F5
AE201
2' - 0"7' - 0"2' - 0"1"
VIF
13' - 3"
4" 2'
0"
3' - 6"3' - 6"
AE201
F7
F7
AE201
3'
4" 2'
0"
F5
AE201
MIN
10"1' - 3"
VIF
6' - 6 1/2"
F7
AE201
WALL IS
SKEWED
IN VIEW
A. REFER TO SHEETS GI002 AND A-001 FOR ADDITIONAL NOTES,
ABBREVIATIONS, AND SYMBOLS.
B. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.
C. INSTALLATION OF STEEL STAIRS AND ELEVATED PLATFORMS SHALL OCCUR
AFTER INSTALLATION OF BOILERS.
D. PAINT VERTICAL FACE OF HOUSEKEEPING PADS AND ON TOP 3" FROM EDGE.
E. PATCH ROOF PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.
4"
4"
061000-D
123600-A
123600-B
V A
R
IE
S 1/
2"
/8
1/
2"
3/
1/
2"
123200-G
123200-A
061000-C
2' - 0" 1"
2'
0"
123200-G
2'
0"
123600-A
061000-D
123600-C
096513-A
061000-C
2' - 1" 079200-A
123600-B
4"
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
XXXXXX-Y
GENERAL NOTES
REFERENCE KEYNOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
A ut od es k D oc s:
//2 2.
_D ur ha m _N
C _B oi le rs _R
/2
2.
_A R
C H
.r vt
5/
/2
2:
:0
P
M
AE201
ELEVATIONS - INTERIOR REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
07, 24
GDD AW
100% CONSTRUCTION
DOCUMENTS IFB
VEG 22.04
3/8" = 1'-0"
CONTROL ROOM ELEVATION - BUILDING 7
D7
3/8" = 1'-0"
SECTION THRU COUNTER - BUILDING 7
D5
3/8" = 1'-0"
CONTROL ROOM NORTH ELEVATION - BUILDING 24
B7
3/8" = 1'-0"
CONTROL ROOM WEST ELEVATION - BUILDING 24
B5
1 1/2" = 1'-0"
BASE CABINET DETAIL SECTION
F5
1 1/2" = 1'-0"
COUNTERTOP SUPPORT
F7
061000-C WOOD BLOCKING
061000-D PLYWOOD
079200-A JOINT SEALANT
096513-A RESILIENT BASE, RE FINISH SCHEDULE
123200-A PLASTIC LAMINATE CASEWORK
123200-G PULL
123600-A COUNTERTOP, RE FINISH SCHEDULE
123600-B BACKSPLASH, RE FINISH SCHEDULE
123600-C COUNTER BRACKET
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 12/29/2023
5'
5'
3' - 4" 1' - 4"
PROPANE
ENCLOSURE
108B
108A
3' - 4" 1' - 4" 9"2' - 8"1' - 8" 1' - 0"
6' - 0" 6' - 0"
1'
18' - 6"
Sim
AE411
F2
Sim
AE411
E2
10' - 0"
1' - 0 1/2"
6" 10' - 0" 6"
PROPANE
ENCLOSURE
A. REFER TO SHEETS GI002 AND A-001 FOR ADDITIONAL NOTES,
ABBREVIATIONS, AND SYMBOLS.
B. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.
C. INSTALLATION OF STEEL STAIRS AND ELEVATED PLATFORMS SHALL OCCUR
AFTER INSTALLATION OF BOILERS.
D. PAINT VERTICAL FACE OF HOUSEKEEPING PADS AND ON TOP 3" FROM EDGE.
E. PATCH ROOF PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.
D
F7
AE311
F3
AE311
Sim
AE411
F4
3'
4"
(HINGE)
4"
(JAMB)
SCHEDULED DOOR
NON-FIRE-RESISTANT
RATED (NON-FRR)
PARTITION AS SCHEDULED
SEALANT AT PERIMETER
OF FRAME (BOTH SIDES)
INTERSECTING WALL LINE
WHERE OCCURS UNO
EXISTING MASONRY WALL
(HINGE)
4"
(JAMB)
SCHEDULED DOOR
NON-FIRE-RESISTANT RATED
(NON-FRR) PARTITION AS
SCHEDULED
SEALANT AT PERIMETER
OF FRAME (BOTH SIDES)
INTERSECTING WALL LINE
WHERE OCCURS UNO
SCHEDULED DOOR
SEALANT AT PERIMETER
OF FRAME (BOTH SIDES)
NON-FIRE-RESISTANT RATED
(NON-FRR) PARTITION AS
SCHEDULED
"J" MOLD
MORTAR JOINT
6"
3'
M A
X
NARROW LITE
4"
3'
P E
R S
C H
E D
U
LE
PER SCHED
MASONRY DOOR FRAME
4"
2" PER SCHED 2"
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
KEY PLAN
GENERAL NOTES
SHEET KEYNOTES
P la n N or th
True North
BLDG 7
BLDG 24
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
A ut od es k D oc s:
//2 2.
_D ur ha m _N
C _B oi le rs _R
/2
2.
_A R
C H
.r vt
5/
/2
1:
:4
P
M
AE411
ENLARGED PLANS, DOOR DETAILS,
AND SCHEDULES
REPLACE BOILERS
508 FULTON ST, DURHAM, NC 27705
558-22-152
MVP GDD
100% CONSTRUCTION
DOCUMENTS IFB
VEG 22.04
1/2" = 1'-0"
FLOOR PLAN - LEVEL 1 - BUILDING 7 PROPANE ENCLOSURE
F6
1/2" = 1'-0"
REFLECTED CEILING PLAN - LEVEL 1 - BUILDING 7 PROPANE ENCLOSURE
D6
1. MAXIMUM (3) PROPANE TANKS AND STORAGE RACK
2. APPROXIMATE LOCATION OF EXISTING PROPANE PIPE WALL PENETRATION
3. INTAKE LOUVER; RE: MECH
4. CONCRETE FILLED STEEL TUBE BOLLARDS, PAINTED YELLOW, TYP
5. EXISTING EMERGENCY PHONE
6. SLOPED ROOF DECK ABOVE; GYPSUM BOARD ATTACHED TO BOTTOM OF
STRUCTURE
7. ALIGN EXTERIOR FACE OF NEW PROPANE ENCLOSURE MASONRY WALL
WITH THE INSIDE FACE OF THE EXISTING LOUVER OPENING
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 12/29/2023
A 100% CONSTRUCTION DOCUMENTS - ADDENDUM A 12/18/2025
A3 100% CONSTRUCTION DOCUMENTS - ADDENDUM C 06/28/2026
1/2" = 1'-0"
FLOOR PLAN - LEVEL 2 - BUILDING 7 - CATWALK ACCESS
B6
FINISH SCHEDULE
NUMBER NAME
FLOORS WALLS
CEILING
WALL
PROTECTION
REMARKS
FLOOR BASE NORTH EAST SOUTH WEST
24-02 CONTROL CENTER EX RB-1 PT-1 PT-1 PT-1 PT-1 EX -- STEAM CLEAN EXISTING FLOOR
ENGINEERING CONTROL
CENTER
EX EX PT-1 PT-1 EX EX EX --
STEAM CLEAN EXISTING FLOOR, REPLACE WALL BASE AT NORTH AND
EAST WALLS, MATCH EXISTING
108 PROPANE ENCLOSURE SC-1 SC-1 PT-1 PT-1 PT-1 PT-1 GYP WP-1
FINISH LEGEND
SYMBOL MATERIAL MANUFACTURER TYPE COLOR COMMENTS
FLOOR FINISH
SC SEALED CONCRETE TBD CONCRETE SEALER CLEAR
WALL BASE
RB-1 RESILIENT BASE (RUBBER OR VINYL) EX RESILIENT RUBBER BASE MATCH EXISTING CONTROL ROOM 107
WALL FINISH
PNT-1 PAINT SHERWIN WILLIAMS INTERIOR LATEX MATCH EXISTING CONTROL ROOM 107
PNT-2 PAINT SHERWIN WILLIAMS INTERIOR LATEX MATCH EXISTING HANDRAILS (BLUE) NEW HANDRAILS AND STEEL FABRICATIONS
PNT-3 PAINT SHERWIN WILLIAMS EXTERIOR LATEX
MATCH EXISTING DOORS AND FRAMES
(DARK BRONZE)
NEW DOORS AND FRAMES
SPECIALTY
WP-1 WALL PROTECTION TBD DIAMOND PLATE NATURAL FINISH
ALUMINUM (1.6MM) OR STAINLESS STEEL
(18GA) OR CARBON STEEL (14GA) WAINSCOT
AS SHOWN
CASEWORK
PLAM-1 PLASTIC LAMINATE WILSONART HIGH PRESSURE LAMINATE LAPIS BLUE (D417)
SS-1 SOLID SURFACE WILSONART
1/2" SOLID SURFACE COUNTERTOP AND
BACKSPLASH
CASHMERE MIRAGE (9135MG)
CEILING FINISH
ACT-1 ACOUSTICAL CEILING TILE EX EX EX EXISTING CEILING TO REMAIN
GYP PAINTED GYPSUM BOARD SHERWIN WILLIAMS INTERIOR LATEX - SATIN CEILING WHITE NEW CEILING
HARDWARE SET: HW-EXT
DOOR: #108B
3 Hinge (A8112) US26D 1 Electric Power Transfer 630 1 Fail Secure Lock (F07, E01, E06) 626 1 Interchangeable Core (E09241) 26 1 Cylinder 626 1 Surface Closer (C02021-PT4G) 689 1 Kick Plate (J102) US32D 1 Adhesive Gasketing (ROY154) -- 1 Rain Guard (ROY976) -- 1 Door Sweep (ROY416) -- 1 Threshold-Outswing (J36130) -- 1 Frame Harness -- 1 Door Harness -- 1 Card Reader -- 1 Power Supply -- 1 Latch Protector US32D
NOTES:
120VAC, power, conduit, and wiring by Division 26.
Card Reader by Division 28.
Door normally closed and locked.
Entrance by presenting a valid card to card-reader.
Egress allowed at all times.
Loss of power maintains security from lock side, entrance by mechanical key only.
DOOR SCHEDULE
NUMBER ROOM NAME
DOOR FRAME
RATING
DETAIL
LOCKSET REMARKS
SIZE TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILL
108A PROPANE ENCLOSURE 36" x 84" 1 HM - I PT-3 MAS HM PT-3 -- E1/AE411 E1/AE411 HW-INT GYPSUM BOARD WALL
108B PROPANE ENCLOSURE 36" x 84" 1 HM - I PT-3 MAS HM PT-3 -- F1/AE411 F1/AE411 HW-EXT MASONRY VENEER WALL
203 STORAGE 36" x 84" 1 HM - I PT-3 MAS HM PT-3 -- F3/AE411 F3/AE411 HW-INT CMU BLOCK WALL
3" = 1'-0"
FRAME DETAIL - DOUBLE RABBET, INSET (MASONRY PARTITION)
F4
3" = 1'-0"
FRAME DETAIL - DOUBLE RABBET, WRAP AROUND (NON-FRR GB PARTITION)
E2
3" = 1'-0"
FRAME DETAIL - DOUBLE RABBET, INSET (EXTERIOR)
F2
NTS
DOOR TYPE - 1
NTS
FRAME TYPE - MAS
HARDWARE SET: HW-INT
DOOR: #108A, 203
3 Hinge (A8112) US26D 1 Passage Lockset (F01) 626 1 Interchangeable Core (E09241) 26 1 Cylinder 626 1 Surface Closer (C02021-PT4G) 689 1 Kick Plate (J102) US32D 3 Door Silencer (L03011) -- 1 Door Sweep (ROY416) -- 1 Threshold (J32100) -- 1 Wall Stop (L02101) US26D
DOOR SCHEDULE LEGEND
HM HOLLOW METAL
HM-I HOLLOW METAL - INSULATED
HW-EXT HARDWARE - EXTERIOR
HW-INT HARDWARE - INTERIOR
MAS MASONRY
PT PAINT
A. PROVIDE SCHEDULED BASIS OF DESIGN OR APPROVED EQUAL. REFER TO
SPECIFICATIONS 01 33 23 AND 23 05 10 FOR FURTHER REQUIREMENTS.
B. SELECT EQUIPMENT FOR SCHEDULED PERFORMANCE AT 400 FT ELEVATION.
C. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING,
SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY
ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON
PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS.
EXAMPLES OF THESE ITEMS INCLUDE BUT ARE NOT LIMITED TO ALL TYPES OF
VALVES, FILTERS AND STRAINERS, TRANSMITTERS, CONTROL DEVICES.
PRIOR TO COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN
THIS REQUIREMENT AND CONTRACT DOCUMENTS TO THE COR FOR
RESOLUTION. FAILURE OF THE CONTRACTOR TO RESOLVE OR POINT OUT
ANY ISSUES WILL RESULT IN THE CONTRACTOR CORRECTING AT NO
ADDITIONAL COST OR TIME TO THE GOVERNMENT.
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION
SECTION 23 82 00.
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION
SECTION 23 22 13.
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION
SECTION 23 50 11.
REMARKS:
1. PROVIDE PUMP STRAINER.
2. PROVIDE AUTOMATIC DUPLEX PUMP
CONTROL.
3. PROVIDE CONTINUOUS DUTY
PUMPS.
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION
SECTION 23 50 11. AND 23 10 00
REMARKS:
1. INCLUDE SECONDARY
CONTAINMENT TOP ENCLOSURE.
2. DOUBLE WALL CONSTRUCTION.
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION
SECTION 23 50 11.
1. PROVIDE AFTERCOOLER PACKAGE.
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION
SECTION 23 50 11.
REMARKS:
1. SCHEDULED MIN BTUH IS
EXCHANGED AT 100% LOAD ON
RESPECTIVE BOILER.
2. PROVIDED BY BOILER
MANUFACTURER.
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION
SECTION 23 50 11.
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION
SECTION 23 52 39.
REMARKS:
1. SINGLE POINT POWER CONNECTION
FOR INTEGRAL COMPONENTS (EG
BLOWERS, CONTROLS, ETC) PER
SPECIFICATIONS.
2. PROVIDE CLEAVER BROOKS
CBLE-4W OR APPROVED EQUAL.
SUPERIOR OR UNIILUX ARE
ACCEPTABLE ALTERNATIVES FOR
THE BUILDING FOOTPRINT.
3. BOILER MANUFACTURER SHALL
PROVIDE AN AIR COMPRESSOR PER
BOILER
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION 23
05 10.
REMARKS:
1. SINGLE POINT POWER CONNECTION
FOR INTEGRAL COMPONENTS (EG
BLOWERS, CONTROLS, ETC) PER
SPECIFICATIONS.
2. PROVIDE WITH INTEGRAL
ATOMIZING AIR COMPRESSOR FOR
BACKUP FUEL BURNER.
3. BOILER MANUFACTURER SHALL
PROVIDE AN AIR COMPRESSOR PER
BOILER
4. PROVIDE WITH WATER SOFTNENER,
AND TRANSFORMER.
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION
SECTION 23 50 11.
REMARKS:
1. PUMPS SHALL OPERATE AS ONE
STATION. 1 PUMP IS SIZED FOR 2/3
BOILER PLANT LOAD. 2 PUMPS
TOGETHER SHALL OPERATE AS
SCHEDULED. ONE PUMP STANDBY
SEE SPECIFICATIONS FOR TEST
AND BALANCE REQUIREMENTS.
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION
SECTION 23 50 11 AND 23 10 00.
REMARKS:
1. HEATER 115/1/60 POWER.
REMARKS:
1. REFER ALSO TO SPECIFICATION
SECTION 23 22 13.
2. MAX WIDE OPEN VALVE FLOW AT
SET PRESSURE + 5 PSIG SHALL BE
LESS THAN ASSOCIATED SAFETY
RELIEF VALVE.
3. PROVIDE SAFETY RELIEF VALVE
SIZED FOR FULL CAPACITY OF
SELECTED PRV AT 80 PSIG IN.
SCHEDULE GENERAL NOTES:
A. REFER ALSO TO SPECIFICATION
SECTION 23 34 00.
1. PROVIDE WITH WALL SHUTTER.
7' -6
5'
1"
5'
3/
8'
1/
1/
1"
0'
1"
0'
1"
0'
1"
0'
1"
0'
9" 6"
3"
3"
1' -6
1'
6"
1/
2"
2' 1'
6"
1"
3' 2'
1'
3/ 4"
4'
2' 1'
1/
2"
6' 4'
2'
3/ 8"
8'
4'
3/
8' 4'
2'
1/ 4"
8'
4'
1/ 8"
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
SEE REVISION
SCHEDULE
R E
V
IS
IO
N
S C
H E
D U
L E
A ut od es k D oc s:
//2 2.
_D ur ha m _N
C _B oi le rs _R
/2
2.
_M P
.r vt
5/
/2
2:
:2
P
M
MQ601
EQUIPMENT & DEVICE SCHEDULES REPLACE BOILERS
508 FULTON ST, DURHAM NC 27705
558-22-152
MR MB
100% CONSTRUCTION
DOCUMENTS
VEG 22.04
STEAM TRAP (ST) SCHEDULE
MARK LOCATION
SYSTEM AND/OR
SERVICE
CAPACITY AT
MIN DP
MIN DP
(PSIG)
MIN INLET
PRESSURE
(PSIG) TRAP TYPE REMARKS
ST-DS DRIP STATIONS
LPS,MPS,HPS AS
APPLICABLE
REF 23 22 13 REF 23 22 13 REF 23 22 13 IB -
ST-UH-1 BLDG 7 MPS 89 2 30 IB -
ST-UH-2
WATER
TREATMENT RM
MPS 19 2 30 IB -
ST-UH-3 BLDG 24 MPS 49 2 30 IB -
ST-UH-4 BLDG 7 MPS 89 0.25 25 IB -
ST-UH-5
WATER
TREATMENT RM
MPS 19 0.25 25 IB -
ST-UH-6 BLDG 24 MPS 49 0.25 25 IB -
FUEL OIL PUMP (FOP) SCHEDULE
MARK LOCATION SYSTEM GPM
DISCHARGE
PRESSURE
(PSIG) OIL GRADE
OIL
TEMP
(°F)
VISCOSITY
RANGE
(SSU)
SUCTION
LIFT
(IN HG)
ELECTRICAL/MOTOR
DATA BOD MFR AND
MODEL REMARKSHP VAC PH
7-FOP-1 BOILER ROOM FUEL OIL 7 100 NO. 2 D AMB. 32-1000 4.41 3/4 115 1
SIMPLEX® DUPLEX
BD SKS-30
1,2,3
FUEL OIL TANK (FOT) SCHEDULE
MARK LOCATION SYSTEM
FUEL OIL
TYPE
CAPACITY
(GAL)
MAX DIMENSIONS ALARM
SYSTEM
LEVEL
INDICATOR BOD MFR AND MODEL REMARKSH (IN) L (IN) W (IN)
7-FOT-1 OUTSIDE FUEL OIL NO. 2 D 25,000 127 471 127 YES YES GENERAL INDUSTRIES ACT-100U 1,2
7-FOT-2 OUTSIDE FUEL OIL NO. 2 D 30,000 127 471 127 YES YES GENERAL INDUSTRIES ACT-100U 1,2
BLOWOFF/BLOWDOWN TANK (BDT) SCHEDULE
MARK LOCATION SYSTEM QTY
CAPACITY
(GAL)
MAX DIMENSIONS BOD MFR AND
MODEL REMARKSH (IN) L (IN) D (IN)
7-BDT-1
WATER
TREATMENT RM
BBD 1 572 107 72 36
BRYAN
BDT-6080-600-E55
BOILER ECONOMIZER HEAT EXCHANGER (BEHX) SCHEDULE
SCHEDULE
CATEGORY MARK LOCATION SYSTEM MIN BTUH
FEED
WATER
EWT
(°F)
FEED
WATER
FLOW
(GPM)
FEED
WATER
VOLUME
(GAL)
MAX FEED
WATER
WPD
(PSIG)
FLUE
GAS PD
(IN WG)
LIQUID
RELIEF SET
POINT
(PSIG) REMARKS
BEHX 7-BEHX-1 BOILER 1 7-SB-1 FW 545,000 210 42.2 13.6 1 0.5 275 1,2
BEHX 7-BEHX-2 BOILER 2 7-SB-2 FW 545,000 210 42.2 13.6 1 0.5 275 1,2
BEHX 7-BEHX-3 BOILER 3 7-SB-3 FW 545,000 210 42.2 13.6 1 0.5 275 1,2
STEAM VENT SILENCER (SVS) SCHEDULE
MARK LOCATION SYSTEM
FLOW
(LB/HR) DBA @ 3 FT
OUTLET
SIZE
(IN)
BOD MFR AND
MODEL REMARKS
7-SVS-1
STEAM HEADER
TEST VENT
VENT 25,000 85 8"
IMI EVO
24-121-161
STEAM BOILER (SB) SCHEDULE
MARK LOCATION
STEAM
GENERATED
(LB/HR)
AREA AND/OR
BLDG SERVED TYPE
MIN
OUTPUT
CAPACITY
(BHP)
OPERATING
PRESS
(PSIG)
DESIGN
FEED
WATER
TEMP
(°F)
NATURAL GAS #2 FUEL OIL
RELIEF VALVE
SETTING
(PSIG)
FIRST
CUTOUT
SETTING
(PSIG)
SECOND
CUTOUT
SETTING
(PSIG)
ELECTRICAL DATA MAX PHYSICAL DATA
BOD MFR AND
MODEL REMARKS
MIN TURN
DOWN
AVAILABLE
PRESS
(PSIG)
INPUT
(MBH)
OUTPUT
(MBH)
MIN TURN
DOWN
AVAILABLE
PRESS
(PSIG)
INPUT
(MBH)
OUTPUT
(MBH) VAC PH MCA MOCP
LENGTH
(IN)
SHELL
DIAMETER
(IN)
HEIGHT
(IN)
WEIGHT
(LB)
7-SB-1 BLDG 7 20,000 DURHAM VAMC FIRE TUBE 600 80 210 10:1 10 24,500 20,100 8:1 100 24,500 20,100 110 AND 120 95 100 208 3 138 A 150 287 102 134 80,000 REMARK 2 1,2,3
7-SB-2 BLDG 7 20,000 DURHAM VAMC FIRE TUBE 600 80 210 10:1 10 24,500 20,100 8:1 100 24,500 20,100 110 AND 120 95 100 208 3 138 A 150 287 102 134 80,000 REMARK 2 1,2,3
7-SB-3 BLDG 7 20,000 DURHAM VAMC FIRE TUBE 600 80 210 10:1 10 24,500 20,100 8:1 100 24,500 20,100 110 AND 120 95 100 208 3 138 A 150 287 102 134 80,000 REMARK 2 1,2,3
FUEL TANK POLISHER (FTP) SCHEDULE
MARK LOCATION SYSTEM
FUEL OIL
TYPE GPM
MAX DIMENSIONS ALARM
SYSTEM
33% CYCLE
TIME
VISCOSITY
(SSU)
PRESSURE
(PSI)
ELECTRICAL DATA BOD MFR AND
MODEL
REMARKS
H (IN) L (IN) W (IN) MOTOR HP VOLTAGE PH
7-FTP-1 OUTSIDE FUEL OIL DIESEL 40 67 36 58 YES 6 HR 32 50 3 208 3
SIMPLEX ® SMART
FILTER SFG40
TEMPORARY STEAM BOILER (SB) SCHEDULE
MARK LOCATION
STEAM
GENERATED
(LB/HR)
AREA AND/OR
BLDG SERVED TYPE
MIN
OUTPUT
CAPACITY
(BHP)
OPERATING
PRESS
(PSIG)
DESIGN
FEED
WATER
TEMP
(°F)
MIN
TURN
DOWN
NATURAL GAS #2 FUEL OIL
RELIEF VALVE
SETTING
(PSIG)
FIRST
CUTOUT
SETTING
(PSIG)
SECOND
CUTOUT
SETTING
(PSIG)
ELECTRICAL DATA MAX PHYSICAL DATA
BOD MFR AND
MODEL REMARKS
AVAILABLE
PRESS
(PSIG)
INPUT
(MBH)
OUTPUT
(MBH)
AVAILABLE
PRESS
(PSIG)
INPUT
(MBH)
OUTPUT
(MBH) VAC PH MCA MOCP
LENGTH
(IN)
WIDTH
(IN)
HEIGHT
(IN)
WEIGHT
(LB)
SB-TEMP-1 BLDG 24 27,600 BOILER PLANT FIRE TUBE 800 80 212 8:1 10 33,500 26,080 100 41,050 26,080 110 AND 120 95 100 208 3 180 200 312 116 132 85000
CLEAVERBROOKS
SB53-GA-01
1,2,3
SB-TEMP-2 BLDG 24 27,600 BOILER PLANT FIRE TUBE 800 80 212 8:1 10 33,500 26,080 100 41,050 26,080 110 AND 120 95 100 208 3 180 200 312 116 132 85000
CLEAVERBROOKS
SB53-GA-01
1,2,3
SB-TEMP-3 OUTSIDE 34,500 BOILER PLANT FIRE TUBE 1000 80 - 6:1 10 - - 300 - - 110 AND 120 95 100 208 3 180 200 684 102 162 90000
VICTORY ENERGY
F2-DB-282L-1000X-S2
50-RB-M
1,2,3,4
BOILER SYSTEM PUMP SCHEDULE
MARK LOCATION
AREA AND/OR BLDG
SERVED
FLUID GPM
HEAD
(FT WG)
FLUID
TEMP
(°F)
MIN %
EFF
ELECTRICAL/MOTOR DATA
BOD MFR
AND MODEL
REMARKS
HP VAC PH
MAX
RPM
SPEED
CONTROL
FWP-1 BLDG 7
BOILER PLANT FEED
WATER
FEEDWATER 63 492 210 - 15 208 3 1750 VFD
GRUNDFOS
CR 15
FWP-2 BLDG 7
BOILER PLANT FEED
WATER
FEEDWATER 63 492 210 - 15 208 3 1750 VFD
GRUNDFOS
CR 15
FWP-3 BLDG 7
BOILER PLANT FEED
WATER
FEEDWATER 63 492 210 - 15 208 3 1750 VFD
GRUNDFOS
CR 15
STEAM PRESSURE REDUCING VALVE (SPRV) SCHEDULE
MARK LOCATION
SYSTEM AND/OR
SERVICE
MIN
CAPACITY
(LB/HR)
PRESSURE
IN
(PSIG)
PRESSURE
OUT
(PSIG) REMARKS
7-PRV-2
MEZZANINE
PRV
STATION
UNIT HEATERS 443 80 30 1,2,3
STEAM UNIT HEATER (SUH) SCHEDULE
MARK
AREA
SERVED
MIN. HEAT
(MBH)
STEAM
PRESSURE
(PSIG)
CONDENSATE
LOAD (LB/HR)
MIN. HEATING
(CFM)
HEATING COIL
EAT (°F)
HEATING COIL
LAT (°F) MOTOR HP VOLTAGE PHASE MOCP
BOD MFR AND
MODEL REMARKS
7-UH-1
BOILER
ROOM
87 30 89 1665 60 118 1/15 120 1 15
MODINE V95
SERIES
VERT
7-UH-2
BOILER
ROOM
87 30 89 1665 60 118 1/15 120 1 15
MODINE V95
SERIES
VERT
7-UH-3
BOILER
ROOM
87 30 89 1665 60 118 1/15 120 1 15
MODINE V95
SERIES
VERT
7-UH-4
BOILER
ROOM
87 30 89 1665 60 118 1/15 120 1 15
MODINE V95
SERIES
VERT
7-UH-5
WATER
TEST RM
18 30 19 340 60 107 1/60 120 1 15
MODINE HC18
SERIES
HORIZ
7-UH-6
WATER
SOFT. RM
18 30 19 340 60 107 1/60 120 1 15
MODINE HC18
SERIES
HORIZ
7-UH-7
PROPANE
STORAGE
18 30 19 120 60 107 1/60 120 1 15
MODINE HC18
SERIES
HORIZ
24-UH-1 BLDG 24 63 30 92 1120 60 119 1/12 120 1 15
MODINE HC47
SERIES
HORIZ
24-UH-2 BLDG 24 63 30 92 1120 60 119 1/12 120 1 15
MODINE HC47
SERIES
HORIZ
EXHAUST FAN (EF) SCHEDULE
MARK LOCATION AREA SERVED
AIRFLOW
(CFM)
ESP
(IN WG)
FAN MOTOR
BAS
CONTROLS BOD MFR AND MODEL REMARKSTYPE DRIVE
DUTY RPM
% OF MAX
ELECTRICAL SPEED
CONTROLHP VAC Φ MCA MOCP
24-EF-2 BLDG 24
TEMPORARY
CONTROL RM
120 0.5 PROPELLER DIRECT 80 1/4 208 1 2.6 15 EC - LOCAL
VARIABLE
SPEED
GREENHECK
AER-20-03-0605-VG
24-EF-1 BLDG 24
TEMPORARY BOILER
RM
4710 0.5
POWER ROOF
VENTILATOR -
DOWNBLAST
DIRECT 85 2 208 3 15.8 25 EC - LOCAL
VARIABLE
SPEED
GREENHECK RE2-36 --
7-EF-1 BLDG 07 PROPANE STORAGE 70 0.1 CENTRIFUGAL DIRECT 80 1/15 115 1 1.3 15 EC - LOCAL
VARIABLE
SPEED
GREENHECK G-070-VG
Number: Revision: Date:
0 100% CONSTRUCTION DOCUMENTS 12/29/2023
1 100% CONSTRUCTION DOCUMENTS ADDENDUM 1 12/18/2025
3 100% CONSTRUCTION DOCUMENTS ADDENDUM 3 05/28/2026
| Sheets |
| AD113 - DEMOLITION PLANS - BUILDING 24 |
ADDENDUM 3 MECHANICAL