AD113_AE113_AE201_AE411_MQ601_ADDENDUM C.pdf

PDF 3 MB Posted

Attached to
Z1NB--Boiler replacement
Solicitation number
36C24626B0020_1
Issued by

About this file

This is a set of architectural construction documents for a boiler replacement project at the Durham VA Medical Center (VAMC) in Durham, North Carolina.

The project involves the replacement of steam boilers in Buildings 7 and 24, with construction documents prepared at 100% completion for an Invitation for Bid (IFB). The primary scope includes demolition of existing piping and infrastructure, installation of three new fire-tube steam boilers (20,000 lb/hr each) in Building 7, and temporary boiler installations in Building 24 to maintain operations during construction. Key mechanical systems scheduled include three boiler economizer heat exchangers, multiple steam unit heaters, steam pressure reducing valves, steam traps, fuel oil tanks (25,000 and 30,000-gallon capacities), fuel oil pumps, and exhaust fans. The project site is located at 508 Fulton Street, Durham, NC 27705, with project number 558-22-152. The documents include detailed floor plans, reflected ceiling plans, equipment schedules, door and frame details, finish schedules, and enlarged plans for the control rooms in both buildings. Special construction requirements include temporary roof patches during piping demolition, coordination with existing structural steel, new window and door openings, propane storage enclosure construction in Building 7, and provisions for permanent platforms and stairs to ensure safe equipment access without portable ladders. The architectural and engineering consultant is Valhalla Engineering, located in Englewood, Colorado.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EQ4' - 0"EQ

A. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL FOR

ADDITIONAL DEMOLITION AND PHASING INFORMATION.

B. TEMPORARY ROOF PATCHES WILL BE REQUIRED BETWEEN DEMOLITION OF

EXISTING PIPING AND INSTALLATION OF NEW PIPING.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

True North

BLDG 7

BLDG 24

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

SEE REVISION

SCHEDULE

R E

V

IS

IO

N

S C

H E

D U

L E

A ut od es k D oc s:

//2 2.

_D ur ha m _N

C _B oi le rs _R

/2

2.

_A R

C H

.r vt

5/

/2

:0 0:

A

M

AD113

DEMOLITION PLANS - BUILDING 24 REPLACE BOILERS

508 FULTON ST, DURHAM, NC 27705

558-22-152

MVP GDD

100% CONSTRUCTION

DOCUMENTS IFB

VEG 22.04

1/4" = 1'-0"

DEMOLITION PLAN - LEVEL 1 - BUILDING 24

F6

1/4" = 1'-0"

DEMOLITION PLAN - MEZZANINE

F4

1/4" = 1'-0"

DEMOLITION REFLECTED CEILING PLAN

F1

1. REMOVE GYPSUM BOARD WALLS AND FRAMING

2. REMOVE PLYWOOD WALL AND FRAMING

3. REMOVE LEVEL 2 PLATFORM SUPPORTS, TYP

4. REMOVE RAISED PLATFORM, ACCESS LADDER, AND HANDRAILS

5. REMOVE SUSPENDED CEILING TILE AND GRID

6. REMOVE EXISTING EXHAUST FAN; MECHANICAL CURB TO REMAIN

7. CUT OPENIING FOR NEW BOILER STACK; COORDINATE WITH BOILER

MANUFACTURER AND BUILDING 24 EXISTING STRUCTURE

8. EXISTING STEEL ROOF SUPPORT STRUCTURE, TYP

9. CUT OPENING FOR NEW WINDOW

Number: Revision: Date:

0 100% CONSTRUCTION DOCUMENTS 12/29/2023

A 100% CONSTRUCTION DOCUMENTS - ADDENDUM A 12/18/2025

A3 100% CONSTRUCTION DOCUMENTS - ADDENDUM C 06/28/2026

A. REFER TO SHEETS GI002 AND A-001 FOR ADDITIONAL NOTES,

ABBREVIATIONS, AND SYMBOLS.

B. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

C. INSTALLATION OF STEEL STAIRS AND ELEVATED PLATFORMS SHALL OCCUR

AFTER INSTALLATION OF BOILERS.

D. PAINT VERTICAL FACE OF HOUSEKEEPING PADS AND ON TOP 3" FROM EDGE.

E. PATCH ROOF PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.

24-02

CONTROL CENTER

AE113

F4

AE201

B7

AE201B5

1' - 0"

VIF

5' - 4 1/2"

2' - 1" 1' - 0"

1'

2'

V

IF

2'

/4

V

IF

1'

1/ 4" 7

24-02

CONTROL CENTER

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

True North

BLDG 7

BLDG 24

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

SEE REVISION

SCHEDULE

R E

V

IS

IO

N

S C

H E

D U

L E

A ut od es k D oc s:

//2 2.

_D ur ha m _N

C _B oi le rs _R

/2

2.

_A R

C H

.r vt

5/

/2

3:

:4

P

M

AE113

FLOOR PLAN - LEVEL 1 - BUILDING

REPLACE BOILERS

508 FULTON ST, DURHAM, NC 27705

558-22-152

MVP GDD

100% CONSTRUCTION

DOCUMENTS IFB

VEG 22.04

1/4" = 1'-0"

FLOOR PLAN - LEVEL 1 - BUILDING 24

F6

1. APPROXIMATE LOCATION OF TEMPORARY BOILERS

2. PLASTIC LAMINATE COUNTERTOP AND SUPPORTS; RE: F7/AE201

3. WALL-MOUNTED TELEVISION

4. DDC WORKSTATION RELOCATED FROM BUILDING 7

5. STATIC BOILER READOUTS

6. SCADA WORKSTATION

7. 3-5/8" METAL STUD WALL WITH 5/8" GYPSUM BOARD ON BOTH SIDES AND

TOP; 40" HIGH AFF

8. NEW 48"W x 56"H FIXED WINDOW; HOLLOW METAL FRAME; 1/4" LAMINATED

CLEAR GLAZING; SILL HEIGHT @ 3'-4" AFF

3/8" = 1'-0"

ENLARGED PLAN - CONTROL ROOM 24-02

F4

Number: Revision: Date:

0 100% CONSTRUCTION DOCUMENTS 12/29/2023

D5

AE201

F5

AE201

2' - 0"7' - 0"2' - 0"1"

VIF

13' - 3"

4" 2'

0"

3' - 6"3' - 6"

AE201

F7

F7

AE201

3'

4" 2'

0"

F5

AE201

MIN

10"1' - 3"

VIF

6' - 6 1/2"

F7

AE201

WALL IS

SKEWED

IN VIEW

A. REFER TO SHEETS GI002 AND A-001 FOR ADDITIONAL NOTES,

ABBREVIATIONS, AND SYMBOLS.

B. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

C. INSTALLATION OF STEEL STAIRS AND ELEVATED PLATFORMS SHALL OCCUR

AFTER INSTALLATION OF BOILERS.

D. PAINT VERTICAL FACE OF HOUSEKEEPING PADS AND ON TOP 3" FROM EDGE.

E. PATCH ROOF PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.

4"

4"

061000-D

123600-A

123600-B

V A

R

IE

S 1/

2"

/8

1/

2"

3/

1/

2"

123200-G

123200-A

061000-C

2' - 0" 1"

2'

0"

123200-G

2'

0"

123600-A

061000-D

123600-C

096513-A

061000-C

2' - 1" 079200-A

123600-B

4"

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

XXXXXX-Y

GENERAL NOTES

REFERENCE KEYNOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

SEE REVISION

SCHEDULE

R E

V

IS

IO

N

S C

H E

D U

L E

A ut od es k D oc s:

//2 2.

_D ur ha m _N

C _B oi le rs _R

/2

2.

_A R

C H

.r vt

5/

/2

2:

:0

P

M

AE201

ELEVATIONS - INTERIOR REPLACE BOILERS

508 FULTON ST, DURHAM, NC 27705

558-22-152

07, 24

GDD AW

100% CONSTRUCTION

DOCUMENTS IFB

VEG 22.04

3/8" = 1'-0"

CONTROL ROOM ELEVATION - BUILDING 7

D7

3/8" = 1'-0"

SECTION THRU COUNTER - BUILDING 7

D5

3/8" = 1'-0"

CONTROL ROOM NORTH ELEVATION - BUILDING 24

B7

3/8" = 1'-0"

CONTROL ROOM WEST ELEVATION - BUILDING 24

B5

1 1/2" = 1'-0"

BASE CABINET DETAIL SECTION

F5

1 1/2" = 1'-0"

COUNTERTOP SUPPORT

F7

061000-C WOOD BLOCKING

061000-D PLYWOOD

079200-A JOINT SEALANT

096513-A RESILIENT BASE, RE FINISH SCHEDULE

123200-A PLASTIC LAMINATE CASEWORK

123200-G PULL

123600-A COUNTERTOP, RE FINISH SCHEDULE

123600-B BACKSPLASH, RE FINISH SCHEDULE

123600-C COUNTER BRACKET

Number: Revision: Date:

0 100% CONSTRUCTION DOCUMENTS 12/29/2023

5'

5'

3' - 4" 1' - 4"

PROPANE

ENCLOSURE

108B

108A

3' - 4" 1' - 4" 9"2' - 8"1' - 8" 1' - 0"

6' - 0" 6' - 0"

1'

18' - 6"

Sim

AE411

F2

Sim

AE411

E2

10' - 0"

1' - 0 1/2"

6" 10' - 0" 6"

PROPANE

ENCLOSURE

A. REFER TO SHEETS GI002 AND A-001 FOR ADDITIONAL NOTES,

ABBREVIATIONS, AND SYMBOLS.

B. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

C. INSTALLATION OF STEEL STAIRS AND ELEVATED PLATFORMS SHALL OCCUR

AFTER INSTALLATION OF BOILERS.

D. PAINT VERTICAL FACE OF HOUSEKEEPING PADS AND ON TOP 3" FROM EDGE.

E. PATCH ROOF PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.

D

F7

AE311

F3

AE311

Sim

AE411

F4

3'

4"

(HINGE)

4"

(JAMB)

SCHEDULED DOOR

NON-FIRE-RESISTANT

RATED (NON-FRR)

PARTITION AS SCHEDULED

SEALANT AT PERIMETER

OF FRAME (BOTH SIDES)

INTERSECTING WALL LINE

WHERE OCCURS UNO

EXISTING MASONRY WALL

(HINGE)

4"

(JAMB)

SCHEDULED DOOR

NON-FIRE-RESISTANT RATED

(NON-FRR) PARTITION AS

SCHEDULED

SEALANT AT PERIMETER

OF FRAME (BOTH SIDES)

INTERSECTING WALL LINE

WHERE OCCURS UNO

SCHEDULED DOOR

SEALANT AT PERIMETER

OF FRAME (BOTH SIDES)

NON-FIRE-RESISTANT RATED

(NON-FRR) PARTITION AS

SCHEDULED

"J" MOLD

MORTAR JOINT

6"

3'

M A

X

NARROW LITE

4"

3'

P E

R S

C H

E D

U

LE

PER SCHED

MASONRY DOOR FRAME

4"

2" PER SCHED 2"

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or th

True North

BLDG 7

BLDG 24

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

SEE REVISION

SCHEDULE

R E

V

IS

IO

N

S C

H E

D U

L E

A ut od es k D oc s:

//2 2.

_D ur ha m _N

C _B oi le rs _R

/2

2.

_A R

C H

.r vt

5/

/2

1:

:4

P

M

AE411

ENLARGED PLANS, DOOR DETAILS,

AND SCHEDULES

REPLACE BOILERS

508 FULTON ST, DURHAM, NC 27705

558-22-152

MVP GDD

100% CONSTRUCTION

DOCUMENTS IFB

VEG 22.04

1/2" = 1'-0"

FLOOR PLAN - LEVEL 1 - BUILDING 7 PROPANE ENCLOSURE

F6

1/2" = 1'-0"

REFLECTED CEILING PLAN - LEVEL 1 - BUILDING 7 PROPANE ENCLOSURE

D6

1. MAXIMUM (3) PROPANE TANKS AND STORAGE RACK

2. APPROXIMATE LOCATION OF EXISTING PROPANE PIPE WALL PENETRATION

3. INTAKE LOUVER; RE: MECH

4. CONCRETE FILLED STEEL TUBE BOLLARDS, PAINTED YELLOW, TYP

5. EXISTING EMERGENCY PHONE

6. SLOPED ROOF DECK ABOVE; GYPSUM BOARD ATTACHED TO BOTTOM OF

STRUCTURE

7. ALIGN EXTERIOR FACE OF NEW PROPANE ENCLOSURE MASONRY WALL

WITH THE INSIDE FACE OF THE EXISTING LOUVER OPENING

Number: Revision: Date:

0 100% CONSTRUCTION DOCUMENTS 12/29/2023

A 100% CONSTRUCTION DOCUMENTS - ADDENDUM A 12/18/2025

A3 100% CONSTRUCTION DOCUMENTS - ADDENDUM C 06/28/2026

1/2" = 1'-0"

FLOOR PLAN - LEVEL 2 - BUILDING 7 - CATWALK ACCESS

B6

FINISH SCHEDULE

NUMBER NAME

FLOORS WALLS

CEILING

WALL

PROTECTION

REMARKS

FLOOR BASE NORTH EAST SOUTH WEST

24-02 CONTROL CENTER EX RB-1 PT-1 PT-1 PT-1 PT-1 EX -- STEAM CLEAN EXISTING FLOOR

ENGINEERING CONTROL

CENTER

EX EX PT-1 PT-1 EX EX EX --

STEAM CLEAN EXISTING FLOOR, REPLACE WALL BASE AT NORTH AND

EAST WALLS, MATCH EXISTING

108 PROPANE ENCLOSURE SC-1 SC-1 PT-1 PT-1 PT-1 PT-1 GYP WP-1

FINISH LEGEND

SYMBOL MATERIAL MANUFACTURER TYPE COLOR COMMENTS

FLOOR FINISH

SC SEALED CONCRETE TBD CONCRETE SEALER CLEAR

WALL BASE

RB-1 RESILIENT BASE (RUBBER OR VINYL) EX RESILIENT RUBBER BASE MATCH EXISTING CONTROL ROOM 107

WALL FINISH

PNT-1 PAINT SHERWIN WILLIAMS INTERIOR LATEX MATCH EXISTING CONTROL ROOM 107

PNT-2 PAINT SHERWIN WILLIAMS INTERIOR LATEX MATCH EXISTING HANDRAILS (BLUE) NEW HANDRAILS AND STEEL FABRICATIONS

PNT-3 PAINT SHERWIN WILLIAMS EXTERIOR LATEX

MATCH EXISTING DOORS AND FRAMES

(DARK BRONZE)

NEW DOORS AND FRAMES

SPECIALTY

WP-1 WALL PROTECTION TBD DIAMOND PLATE NATURAL FINISH

ALUMINUM (1.6MM) OR STAINLESS STEEL

(18GA) OR CARBON STEEL (14GA) WAINSCOT

AS SHOWN

CASEWORK

PLAM-1 PLASTIC LAMINATE WILSONART HIGH PRESSURE LAMINATE LAPIS BLUE (D417)

SS-1 SOLID SURFACE WILSONART

1/2" SOLID SURFACE COUNTERTOP AND

BACKSPLASH

CASHMERE MIRAGE (9135MG)

CEILING FINISH

ACT-1 ACOUSTICAL CEILING TILE EX EX EX EXISTING CEILING TO REMAIN

GYP PAINTED GYPSUM BOARD SHERWIN WILLIAMS INTERIOR LATEX - SATIN CEILING WHITE NEW CEILING

HARDWARE SET: HW-EXT

DOOR: #108B

3 Hinge (A8112) US26D 1 Electric Power Transfer 630 1 Fail Secure Lock (F07, E01, E06) 626 1 Interchangeable Core (E09241) 26 1 Cylinder 626 1 Surface Closer (C02021-PT4G) 689 1 Kick Plate (J102) US32D 1 Adhesive Gasketing (ROY154) -- 1 Rain Guard (ROY976) -- 1 Door Sweep (ROY416) -- 1 Threshold-Outswing (J36130) -- 1 Frame Harness -- 1 Door Harness -- 1 Card Reader -- 1 Power Supply -- 1 Latch Protector US32D

NOTES:

120VAC, power, conduit, and wiring by Division 26.

Card Reader by Division 28.

Door normally closed and locked.

Entrance by presenting a valid card to card-reader.

Egress allowed at all times.

Loss of power maintains security from lock side, entrance by mechanical key only.

DOOR SCHEDULE

NUMBER ROOM NAME

DOOR FRAME

RATING

DETAIL

LOCKSET REMARKS

SIZE TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILL

108A PROPANE ENCLOSURE 36" x 84" 1 HM - I PT-3 MAS HM PT-3 -- E1/AE411 E1/AE411 HW-INT GYPSUM BOARD WALL

108B PROPANE ENCLOSURE 36" x 84" 1 HM - I PT-3 MAS HM PT-3 -- F1/AE411 F1/AE411 HW-EXT MASONRY VENEER WALL

203 STORAGE 36" x 84" 1 HM - I PT-3 MAS HM PT-3 -- F3/AE411 F3/AE411 HW-INT CMU BLOCK WALL

3" = 1'-0"

FRAME DETAIL - DOUBLE RABBET, INSET (MASONRY PARTITION)

F4

3" = 1'-0"

FRAME DETAIL - DOUBLE RABBET, WRAP AROUND (NON-FRR GB PARTITION)

E2

3" = 1'-0"

FRAME DETAIL - DOUBLE RABBET, INSET (EXTERIOR)

F2

NTS

DOOR TYPE - 1

NTS

FRAME TYPE - MAS

HARDWARE SET: HW-INT

DOOR: #108A, 203

3 Hinge (A8112) US26D 1 Passage Lockset (F01) 626 1 Interchangeable Core (E09241) 26 1 Cylinder 626 1 Surface Closer (C02021-PT4G) 689 1 Kick Plate (J102) US32D 3 Door Silencer (L03011) -- 1 Door Sweep (ROY416) -- 1 Threshold (J32100) -- 1 Wall Stop (L02101) US26D

DOOR SCHEDULE LEGEND

HM HOLLOW METAL

HM-I HOLLOW METAL - INSULATED

HW-EXT HARDWARE - EXTERIOR

HW-INT HARDWARE - INTERIOR

MAS MASONRY

PT PAINT

A. PROVIDE SCHEDULED BASIS OF DESIGN OR APPROVED EQUAL. REFER TO

SPECIFICATIONS 01 33 23 AND 23 05 10 FOR FURTHER REQUIREMENTS.

B. SELECT EQUIPMENT FOR SCHEDULED PERFORMANCE AT 400 FT ELEVATION.

C. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING,

SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY

ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON

PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS.

EXAMPLES OF THESE ITEMS INCLUDE BUT ARE NOT LIMITED TO ALL TYPES OF

VALVES, FILTERS AND STRAINERS, TRANSMITTERS, CONTROL DEVICES.

PRIOR TO COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN

THIS REQUIREMENT AND CONTRACT DOCUMENTS TO THE COR FOR

RESOLUTION. FAILURE OF THE CONTRACTOR TO RESOLVE OR POINT OUT

ANY ISSUES WILL RESULT IN THE CONTRACTOR CORRECTING AT NO

ADDITIONAL COST OR TIME TO THE GOVERNMENT.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 82 00.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 22 13.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 50 11.

REMARKS:

1. PROVIDE PUMP STRAINER.

2. PROVIDE AUTOMATIC DUPLEX PUMP

CONTROL.

3. PROVIDE CONTINUOUS DUTY

PUMPS.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 50 11. AND 23 10 00

REMARKS:

1. INCLUDE SECONDARY

CONTAINMENT TOP ENCLOSURE.

2. DOUBLE WALL CONSTRUCTION.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 50 11.

1. PROVIDE AFTERCOOLER PACKAGE.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 50 11.

REMARKS:

1. SCHEDULED MIN BTUH IS

EXCHANGED AT 100% LOAD ON

RESPECTIVE BOILER.

2. PROVIDED BY BOILER

MANUFACTURER.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 50 11.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 52 39.

REMARKS:

1. SINGLE POINT POWER CONNECTION

FOR INTEGRAL COMPONENTS (EG

BLOWERS, CONTROLS, ETC) PER

SPECIFICATIONS.

2. PROVIDE CLEAVER BROOKS

CBLE-4W OR APPROVED EQUAL.

SUPERIOR OR UNIILUX ARE

ACCEPTABLE ALTERNATIVES FOR

THE BUILDING FOOTPRINT.

3. BOILER MANUFACTURER SHALL

PROVIDE AN AIR COMPRESSOR PER

BOILER

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION 23

05 10.

REMARKS:

1. SINGLE POINT POWER CONNECTION

FOR INTEGRAL COMPONENTS (EG

BLOWERS, CONTROLS, ETC) PER

SPECIFICATIONS.

2. PROVIDE WITH INTEGRAL

ATOMIZING AIR COMPRESSOR FOR

BACKUP FUEL BURNER.

3. BOILER MANUFACTURER SHALL

PROVIDE AN AIR COMPRESSOR PER

BOILER

4. PROVIDE WITH WATER SOFTNENER,

AND TRANSFORMER.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 50 11.

REMARKS:

1. PUMPS SHALL OPERATE AS ONE

STATION. 1 PUMP IS SIZED FOR 2/3

BOILER PLANT LOAD. 2 PUMPS

TOGETHER SHALL OPERATE AS

SCHEDULED. ONE PUMP STANDBY

SEE SPECIFICATIONS FOR TEST

AND BALANCE REQUIREMENTS.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 50 11 AND 23 10 00.

REMARKS:

1. HEATER 115/1/60 POWER.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 22 13.

2. MAX WIDE OPEN VALVE FLOW AT

SET PRESSURE + 5 PSIG SHALL BE

LESS THAN ASSOCIATED SAFETY

RELIEF VALVE.

3. PROVIDE SAFETY RELIEF VALVE

SIZED FOR FULL CAPACITY OF

SELECTED PRV AT 80 PSIG IN.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 34 00.

1. PROVIDE WITH WALL SHUTTER.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

SEE REVISION

SCHEDULE

R E

V

IS

IO

N

S C

H E

D U

L E

A ut od es k D oc s:

//2 2.

_D ur ha m _N

C _B oi le rs _R

/2

2.

_M P

.r vt

5/

/2

2:

:2

P

M

MQ601

EQUIPMENT & DEVICE SCHEDULES REPLACE BOILERS

508 FULTON ST, DURHAM NC 27705

558-22-152

MR MB

100% CONSTRUCTION

DOCUMENTS

VEG 22.04

STEAM TRAP (ST) SCHEDULE

MARK LOCATION

SYSTEM AND/OR

SERVICE

CAPACITY AT

MIN DP

MIN DP

(PSIG)

MIN INLET

PRESSURE

(PSIG) TRAP TYPE REMARKS

ST-DS DRIP STATIONS

LPS,MPS,HPS AS

APPLICABLE

REF 23 22 13 REF 23 22 13 REF 23 22 13 IB -

ST-UH-1 BLDG 7 MPS 89 2 30 IB -

ST-UH-2

WATER

TREATMENT RM

MPS 19 2 30 IB -

ST-UH-3 BLDG 24 MPS 49 2 30 IB -

ST-UH-4 BLDG 7 MPS 89 0.25 25 IB -

ST-UH-5

WATER

TREATMENT RM

MPS 19 0.25 25 IB -

ST-UH-6 BLDG 24 MPS 49 0.25 25 IB -

FUEL OIL PUMP (FOP) SCHEDULE

MARK LOCATION SYSTEM GPM

DISCHARGE

PRESSURE

(PSIG) OIL GRADE

OIL

TEMP

(°F)

VISCOSITY

RANGE

(SSU)

SUCTION

LIFT

(IN HG)

ELECTRICAL/MOTOR

DATA BOD MFR AND

MODEL REMARKSHP VAC PH

7-FOP-1 BOILER ROOM FUEL OIL 7 100 NO. 2 D AMB. 32-1000 4.41 3/4 115 1

SIMPLEX® DUPLEX

BD SKS-30

1,2,3

FUEL OIL TANK (FOT) SCHEDULE

MARK LOCATION SYSTEM

FUEL OIL

TYPE

CAPACITY

(GAL)

MAX DIMENSIONS ALARM

SYSTEM

LEVEL

INDICATOR BOD MFR AND MODEL REMARKSH (IN) L (IN) W (IN)

7-FOT-1 OUTSIDE FUEL OIL NO. 2 D 25,000 127 471 127 YES YES GENERAL INDUSTRIES ACT-100U 1,2

7-FOT-2 OUTSIDE FUEL OIL NO. 2 D 30,000 127 471 127 YES YES GENERAL INDUSTRIES ACT-100U 1,2

BLOWOFF/BLOWDOWN TANK (BDT) SCHEDULE

MARK LOCATION SYSTEM QTY

CAPACITY

(GAL)

MAX DIMENSIONS BOD MFR AND

MODEL REMARKSH (IN) L (IN) D (IN)

7-BDT-1

WATER

TREATMENT RM

BBD 1 572 107 72 36

BRYAN

BDT-6080-600-E55

BOILER ECONOMIZER HEAT EXCHANGER (BEHX) SCHEDULE

SCHEDULE

CATEGORY MARK LOCATION SYSTEM MIN BTUH

FEED

WATER

EWT

(°F)

FEED

WATER

FLOW

(GPM)

FEED

WATER

VOLUME

(GAL)

MAX FEED

WATER

WPD

(PSIG)

FLUE

GAS PD

(IN WG)

LIQUID

RELIEF SET

POINT

(PSIG) REMARKS

BEHX 7-BEHX-1 BOILER 1 7-SB-1 FW 545,000 210 42.2 13.6 1 0.5 275 1,2

BEHX 7-BEHX-2 BOILER 2 7-SB-2 FW 545,000 210 42.2 13.6 1 0.5 275 1,2

BEHX 7-BEHX-3 BOILER 3 7-SB-3 FW 545,000 210 42.2 13.6 1 0.5 275 1,2

STEAM VENT SILENCER (SVS) SCHEDULE

MARK LOCATION SYSTEM

FLOW

(LB/HR) DBA @ 3 FT

OUTLET

SIZE

(IN)

BOD MFR AND

MODEL REMARKS

7-SVS-1

STEAM HEADER

TEST VENT

VENT 25,000 85 8"

IMI EVO

24-121-161

STEAM BOILER (SB) SCHEDULE

MARK LOCATION

STEAM

GENERATED

(LB/HR)

AREA AND/OR

BLDG SERVED TYPE

MIN

OUTPUT

CAPACITY

(BHP)

OPERATING

PRESS

(PSIG)

DESIGN

FEED

WATER

TEMP

(°F)

NATURAL GAS #2 FUEL OIL

RELIEF VALVE

SETTING

(PSIG)

FIRST

CUTOUT

SETTING

(PSIG)

SECOND

CUTOUT

SETTING

(PSIG)

ELECTRICAL DATA MAX PHYSICAL DATA

BOD MFR AND

MODEL REMARKS

MIN TURN

DOWN

AVAILABLE

PRESS

(PSIG)

INPUT

(MBH)

OUTPUT

(MBH)

MIN TURN

DOWN

AVAILABLE

PRESS

(PSIG)

INPUT

(MBH)

OUTPUT

(MBH) VAC PH MCA MOCP

LENGTH

(IN)

SHELL

DIAMETER

(IN)

HEIGHT

(IN)

WEIGHT

(LB)

7-SB-1 BLDG 7 20,000 DURHAM VAMC FIRE TUBE 600 80 210 10:1 10 24,500 20,100 8:1 100 24,500 20,100 110 AND 120 95 100 208 3 138 A 150 287 102 134 80,000 REMARK 2 1,2,3

7-SB-2 BLDG 7 20,000 DURHAM VAMC FIRE TUBE 600 80 210 10:1 10 24,500 20,100 8:1 100 24,500 20,100 110 AND 120 95 100 208 3 138 A 150 287 102 134 80,000 REMARK 2 1,2,3

7-SB-3 BLDG 7 20,000 DURHAM VAMC FIRE TUBE 600 80 210 10:1 10 24,500 20,100 8:1 100 24,500 20,100 110 AND 120 95 100 208 3 138 A 150 287 102 134 80,000 REMARK 2 1,2,3

FUEL TANK POLISHER (FTP) SCHEDULE

MARK LOCATION SYSTEM

FUEL OIL

TYPE GPM

MAX DIMENSIONS ALARM

SYSTEM

33% CYCLE

TIME

VISCOSITY

(SSU)

PRESSURE

(PSI)

ELECTRICAL DATA BOD MFR AND

MODEL

REMARKS

H (IN) L (IN) W (IN) MOTOR HP VOLTAGE PH

7-FTP-1 OUTSIDE FUEL OIL DIESEL 40 67 36 58 YES 6 HR 32 50 3 208 3

SIMPLEX ® SMART

FILTER SFG40

TEMPORARY STEAM BOILER (SB) SCHEDULE

MARK LOCATION

STEAM

GENERATED

(LB/HR)

AREA AND/OR

BLDG SERVED TYPE

MIN

OUTPUT

CAPACITY

(BHP)

OPERATING

PRESS

(PSIG)

DESIGN

FEED

WATER

TEMP

(°F)

MIN

TURN

DOWN

NATURAL GAS #2 FUEL OIL

RELIEF VALVE

SETTING

(PSIG)

FIRST

CUTOUT

SETTING

(PSIG)

SECOND

CUTOUT

SETTING

(PSIG)

ELECTRICAL DATA MAX PHYSICAL DATA

BOD MFR AND

MODEL REMARKS

AVAILABLE

PRESS

(PSIG)

INPUT

(MBH)

OUTPUT

(MBH)

AVAILABLE

PRESS

(PSIG)

INPUT

(MBH)

OUTPUT

(MBH) VAC PH MCA MOCP

LENGTH

(IN)

WIDTH

(IN)

HEIGHT

(IN)

WEIGHT

(LB)

SB-TEMP-1 BLDG 24 27,600 BOILER PLANT FIRE TUBE 800 80 212 8:1 10 33,500 26,080 100 41,050 26,080 110 AND 120 95 100 208 3 180 200 312 116 132 85000

CLEAVERBROOKS

SB53-GA-01

1,2,3

SB-TEMP-2 BLDG 24 27,600 BOILER PLANT FIRE TUBE 800 80 212 8:1 10 33,500 26,080 100 41,050 26,080 110 AND 120 95 100 208 3 180 200 312 116 132 85000

CLEAVERBROOKS

SB53-GA-01

1,2,3

SB-TEMP-3 OUTSIDE 34,500 BOILER PLANT FIRE TUBE 1000 80 - 6:1 10 - - 300 - - 110 AND 120 95 100 208 3 180 200 684 102 162 90000

VICTORY ENERGY

F2-DB-282L-1000X-S2

50-RB-M

1,2,3,4

BOILER SYSTEM PUMP SCHEDULE

MARK LOCATION

AREA AND/OR BLDG

SERVED

FLUID GPM

HEAD

(FT WG)

FLUID

TEMP

(°F)

MIN %

EFF

ELECTRICAL/MOTOR DATA

BOD MFR

AND MODEL

REMARKS

HP VAC PH

MAX

RPM

SPEED

CONTROL

FWP-1 BLDG 7

BOILER PLANT FEED

WATER

FEEDWATER 63 492 210 - 15 208 3 1750 VFD

GRUNDFOS

CR 15

FWP-2 BLDG 7

BOILER PLANT FEED

WATER

FEEDWATER 63 492 210 - 15 208 3 1750 VFD

GRUNDFOS

CR 15

FWP-3 BLDG 7

BOILER PLANT FEED

WATER

FEEDWATER 63 492 210 - 15 208 3 1750 VFD

GRUNDFOS

CR 15

STEAM PRESSURE REDUCING VALVE (SPRV) SCHEDULE

MARK LOCATION

SYSTEM AND/OR

SERVICE

MIN

CAPACITY

(LB/HR)

PRESSURE

IN

(PSIG)

PRESSURE

OUT

(PSIG) REMARKS

7-PRV-2

MEZZANINE

PRV

STATION

UNIT HEATERS 443 80 30 1,2,3

STEAM UNIT HEATER (SUH) SCHEDULE

MARK

AREA

SERVED

MIN. HEAT

(MBH)

STEAM

PRESSURE

(PSIG)

CONDENSATE

LOAD (LB/HR)

MIN. HEATING

(CFM)

HEATING COIL

EAT (°F)

HEATING COIL

LAT (°F) MOTOR HP VOLTAGE PHASE MOCP

BOD MFR AND

MODEL REMARKS

7-UH-1

BOILER

ROOM

87 30 89 1665 60 118 1/15 120 1 15

MODINE V95

SERIES

VERT

7-UH-2

BOILER

ROOM

87 30 89 1665 60 118 1/15 120 1 15

MODINE V95

SERIES

VERT

7-UH-3

BOILER

ROOM

87 30 89 1665 60 118 1/15 120 1 15

MODINE V95

SERIES

VERT

7-UH-4

BOILER

ROOM

87 30 89 1665 60 118 1/15 120 1 15

MODINE V95

SERIES

VERT

7-UH-5

WATER

TEST RM

18 30 19 340 60 107 1/60 120 1 15

MODINE HC18

SERIES

HORIZ

7-UH-6

WATER

SOFT. RM

18 30 19 340 60 107 1/60 120 1 15

MODINE HC18

SERIES

HORIZ

7-UH-7

PROPANE

STORAGE

18 30 19 120 60 107 1/60 120 1 15

MODINE HC18

SERIES

HORIZ

24-UH-1 BLDG 24 63 30 92 1120 60 119 1/12 120 1 15

MODINE HC47

SERIES

HORIZ

24-UH-2 BLDG 24 63 30 92 1120 60 119 1/12 120 1 15

MODINE HC47

SERIES

HORIZ

EXHAUST FAN (EF) SCHEDULE

MARK LOCATION AREA SERVED

AIRFLOW

(CFM)

ESP

(IN WG)

FAN MOTOR

BAS

CONTROLS BOD MFR AND MODEL REMARKSTYPE DRIVE

DUTY RPM

% OF MAX

ELECTRICAL SPEED

CONTROLHP VAC Φ MCA MOCP

24-EF-2 BLDG 24

TEMPORARY

CONTROL RM

120 0.5 PROPELLER DIRECT 80 1/4 208 1 2.6 15 EC - LOCAL

VARIABLE

SPEED

GREENHECK

AER-20-03-0605-VG

24-EF-1 BLDG 24

TEMPORARY BOILER

RM

4710 0.5

POWER ROOF

VENTILATOR -

DOWNBLAST

DIRECT 85 2 208 3 15.8 25 EC - LOCAL

VARIABLE

SPEED

GREENHECK RE2-36 --

7-EF-1 BLDG 07 PROPANE STORAGE 70 0.1 CENTRIFUGAL DIRECT 80 1/15 115 1 1.3 15 EC - LOCAL

VARIABLE

SPEED

GREENHECK G-070-VG

Number: Revision: Date:

0 100% CONSTRUCTION DOCUMENTS 12/29/2023

1 100% CONSTRUCTION DOCUMENTS ADDENDUM 1 12/18/2025

3 100% CONSTRUCTION DOCUMENTS ADDENDUM 3 05/28/2026

Sheets
AD113 - DEMOLITION PLANS - BUILDING 24

ADDENDUM 3 MECHANICAL

File details come from the government source that posted it. Updated .