CN-370000-CN229-T8CO1.pdf
PDF 2 MB Posted
- Contract number
- CN229
- Issued by
- Florida
About this file
Document Summary
This is a Task Assignment Change Order Form for the Florida Department of Environmental Protection (FDEP) Contract Number CN229, Task Assignment Number 08, issued to Wantman Group, Inc. (WGI). The change order modifies the scope of work for the Mizell-Johnson State Park pier repair project (Project 61200C), with an original execution date of March 22, 2019, and a revised end date of September 20, 2021. The document outlines expanded professional services including design, permitting, and construction administration for the replacement of an approximately 1,000-foot concrete jetty walkway located in Mizell-Johnson Preserve.
WGI will provide survey, civil engineering, structural engineering, and permitting services across ten primary subtasks. The scope includes 60% conceptual drawings (Subtask 7: $8,970.48), FDEP and USACE permitting applications (Subtask 8A-8B: $4,374.30), 100% final construction drawings (Subtask 9: $7,718.76), construction administration and bidding services (Subtask 10A-10K: $26,872.60), and seven field inspection site visits during construction. The total fixed price cost is $47,975.52, with reimbursable costs of $960.62, bringing the overall change order amount to $48,936.14. Pricing is based on hourly labor rates ranging from $77.16 (CADD Technician) to $135.57 (Environmental Scientist), with specified hours allocated per position classification. Payment will be made upon FDEP approval of deliverables for each subtask.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .