CN-370000-CN229-T26.pdf
PDF 2 MB Posted
- Contract number
- CN229
- Issued by
- Florida
About this file
Summary
This document is a Task Assignment Notification Form under FDEP Contract Number CN229 between the Florida Department of Environmental Protection (FDEP) and WGI, Inc. for design, permitting, and construction services related to culvert repair at Dr. Von D. Mizell-Eula Johnson State Park located in Dania Beach, Broward County, Florida. The contract was originally executed on May 11, 2016, with Amendment Number 1 dated February 4, 2021. Brett Oldford, PE, serves as the consultant representative, while Ralph Perkins is the FDEP contract manager. Garland Sandel is designated as the project manager.
The task encompasses seven subtasks totaling $66,724.08, with a fixed price cost of $62,224.08 and cost reimbursement not to exceed $4,500.00. Subtasks include: topographic survey ($7,289.40); conceptual engineering plans A & B ($2,483.52); 90% design development permit drawings ($15,691.50); 100% construction drawings ($4,505.52); natural resource assessment ($5,465.43); environmental permitting and mitigation ($23,535.03 fixed plus $4,500.00 reimbursable); and representation and coordination ($3,253.68). The project schedule spans 256 calendar days from execution through May 11, 2026. Payment is contingent upon FDEP approval of deliverables for each subtask. All work is to be performed in accordance with Florida surveying standards, the Standards of Practice for Land Surveying in Florida, and applicable federal and state environmental regulations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN229 26 FDEP 61579
Culvert Repair
WGI, Inc.
Brett Oldford, PE (561) 839-1715 Brett.Oldford@wginc.com
Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
This consists of design, permitting, and construction for the Culvert repair. Per the attached proposal dated 10/27/2024
Garland Sandel or successor
Upon Execution $ 62,224.08 5/11/26 $ 4,500.00
$ 66,724.08
Tamika Bass
Garland Sandel
Ralph Perkins
Brett Oldford, PE
Michael W. Foster Jr., P.E.
61579 37505000107 100718/00 675005 U1500 134000 X2 $ 66,724.08
$ 66,724.08
File details come from the government source that posted it. Updated .