This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under Contract Number CN229, assigning Task 29 to WGI, Inc., an engineering consulting firm. The assignment authorizes WGI to provide professional services for the Geiger Trail to Big Coppitt Trail Connections project located at Florida Keys Overseas Heritage Trail. FDEP's Bureau of Design and Construction oversees the project, with Garland Sandel serving as the FDEP Project Manager and Vu Nguyen as the Contract Manager. Brett Oldford, PE, represents WGI as the Consultant Representative.
The task encompasses two primary subtasks: Subtask 1 involves development of 100% construction documents including incorporation of FDEP and FDOT requirements, final improvement and repair construction documents, and a probable construction cost opinion, with a fixed price cost of $19,163.76 and 90-day duration; Subtask 2 addresses environmental permitting and field work services, including desktop analysis, site visits, wetland delineation, and permit application preparation, with a fixed price cost of $16,268.04 plus reimbursable costs of $4,385.60 and 240-day duration. The overall task amount is $39,817.40, comprising $35,431.80 due upon execution and $4,385.60 due by the completion date of May 11, 2026. Reimbursable costs include SFWMD/FDEP Individual ERP fees ($3,500), USACE Section 10/404 permit fees ($100), travel expenses, and mileage at $0.445 per mile. Payment is made upon FDEP approval of deliverables for each subtask.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN229 29 FDEP 61436C
Geiger Trail to Big Coppitt Trail Connections
WGI, Inc.
Brett Oldford, PE (561) 839-1715 Brett.Oldford@wginc.com
Vu Nguyen (850) 245-2630 vu.nguyen@floridadep.gov
This is for the installation of an asphalt walkway to connect the existing trail from the east adjacent to the existing boat ramp and to the west at Big Coppitt Key for a total trail length of 0.20-miles per attached proposal dated 7/28/25.
Garland Sandel
Upon Execution $ 35,431.80 5/11/26 $ 4,385.60
$ 39,817.40
Tamika Bass
Garland Sandel
Vu Nguyen
Brett Oldford, PE
Michael W. Foster Jr., P.E.
61436C 37505000263 080039/23 000286 U3200 131500 AD $ 39,817.40
$ 39,817.40