Task Assignment Notification and Scope of Work Summary

This document is a Task Assignment Notification Form and supporting Scope of Work issued by the Florida Department of Environmental Protection (FDEP), Bureau of Design and Construction (BDC). The assignment involves WGI, Inc. (Wantman Group, Inc.), a consulting firm based in West Palm Beach, Florida, with support from subcontractor Tierra, Inc. for geotechnical services. The project is designated as FDEP Contract No. CN229, Task Assignment No. TA08, and relates to the Mizell-Johnson State Park Boardwalk Replacement project in Tallahassee, Florida. The project manager is Theresa Carron, and the contract manager is Jack Brady. The consultant representative is Jeffrey Bergmann, P.E.

The scope of work encompasses survey, geotechnical investigations, engineering, permitting, and construction administration services for the repair and replacement of approximately 450 linear feet of elevated wooden boardwalk at Mizell-Johnson Preserve. The contract includes six major subtasks: (1) Preliminary Survey and Geotechnical Investigation ($5,246.40 fixed price for survey; $5,311.89 fixed price for geotechnical); (2) 60% design documents ($15,451.68 fixed price); (3) Permitting services for Suwannee River Water Management District and USACE permits ($3,059.04 and $2,419.74 fixed price respectively, plus $500.00 reimbursable); (4) 100% construction documents ($6,100.56 fixed price); and (5) Construction administration services including bidding assistance and phase services ($2,171.88 for bidding, $6,515.64 for construction phase services, plus field inspection subtasks). The total fixed price cost is $55,952.19 with reimbursable costs not to exceed $755.90, for an overall total task amount of $56,708.09. The project schedule spans from execution through September 20, 2021, with performance measured through departmental review of deliverables for completeness, accuracy, and timeliness.

View the file

Other files

File Type Posted
CN-370000-CN229-T1.pdf PDF
CN-370000-CN229-T10CO1.pdf PDF
CN-370000-CN229-T10CO2.pdf PDF
CN-370000-CN229-T10CO4.pdf PDF
CN-370000-CN229-T11.pdf PDF
CN-370000-CN229-T12.pdf PDF
CN-370000-CN229-T15CO2.pdf PDF
CN-370000-CN229-T17.pdf PDF
CN-370000-CN229-T17CO1.pdf PDF
CN-370000-CN229-T26.pdf PDF
CN-370000-CN229-T5.pdf PDF
CN-370000-CN229-TA12 CO2.pdf PDF
CN-370000-CN229-A1.pdf PDF
CN-370000-CN229-CMC1.pdf PDF
CN-370000-CN229-CMC4.pdf PDF
CN-370000-CN229-T10CO3.pdf PDF
CN-370000-CN229-T10CO5.pdf PDF
CN-370000-CN229-T12CO6.pdf PDF
CN-370000-CN229-T15CO1.pdf PDF
CN-370000-CN229-T15CO3.pdf PDF
CN-370000-CN229-T20.pdf PDF
CN-370000-CN229-T22CO1.pdf PDF
CN-370000-CN229-T29.pdf PDF
CN-370000-CN229-T31.pdf PDF
CN-370000-CN229-T9CO1.pdf PDF
CN-370000-CN229-TA8 CO3.pdf PDF
CN-370000-CN229-CMC3.pdf PDF
CN-370000-CN229-CMC5.pdf PDF
CN-370000-CN229-T10CO6.pdf PDF
CN-370000-CN229-T12CO5.pdf PDF
CN-370000-CN229-T15Co4.pdf PDF
CN-370000-CN229-T21.pdf PDF
CN-370000-CN229-T22.pdf PDF
CN-370000-CN229-T24.pdf PDF
CN-370000-CN229-T3.pdf PDF
CN-370000-CN229-T6.pdf PDF
CN-370000-CN229-T7.pdf PDF
CN-370000-CN229-T8CO1.pdf PDF
CN-370000-CN229-TA1 CO1.pdf PDF
CN-370000-CN229-CMC2.pdf PDF
CN-370000-CN229-T10.pdf PDF
CN-370000-CN229-T12CO1.pdf PDF
CN-370000-CN229-T12CO3.pdf PDF
CN-370000-CN229-T12CO4.pdf PDF
CN-370000-CN229-T13.pdf PDF
CN-370000-CN229-T15.pdf PDF
CN-370000-CN229-T16.pdf PDF
CN-370000-CN229-T18.pdf PDF
CN-370000-CN229-T2.pdf PDF
CN-370000-CN229-T20CO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .