This document is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP) issued under Statewide Contract Number CN229. The task assignment engages WGI, Inc., a consulting engineering firm, to provide professional services for the Tom Harbor Trail Connect project, which is part of the Florida Keys Overseas Heritage Trail located in Monroe County, Florida. The project is managed by FDEP's Bureau of Design and Construction, Division of Recreation and Parks, with Garland Sandel serving as the project manager and Vu Nguyen as the FDEP contract manager. Brett Oldford, PE, serves as the consultant representative for WGI, Inc.
The scope of work encompasses the installation of an asphalt walkway to connect existing trails from Long Key to Toms Harbor Channel for a total trail length of 1.85 miles, including design of a 10-foot-wide asphalt paved path with potential retaining walls. The project consists of two subtasks: Subtask 1 involves 100% construction documents with a fixed price cost of $24,324.96, and Subtask 2 covers environmental field work and permitting services with a fixed price cost of $23,337.00 and reimbursable costs of $4,385.60. The overall total task amount is $52,047.56, with a project start date upon execution and a completion date of May 11, 2026. Payment will be made upon FDEP approval of deliverables for each subtask. The project schedule allocates 90 calendar days for construction documents and 240 calendar days for environmental services.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN229 30 FDEP 61520C
Tom Harbor Trail Connect
WGI, Inc.
Brett Oldford, PE (561) 839-1715 Brett.Oldford@wginc.com
Vu Nguyen (850) 245-2630 vu.nguyen@floridadep.gov
This is for the installation of an asphalt walkway to connect the existing trails from Long Key to Toms Harbor Channel for a total trail length of 1.85-miles, per the attached proposal dated 7/28/25.
Garland Sandel
Upon Execution $ 47,661.96 5/11/26 $ 4,385.60
$ 52,047.56
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2025.08.07 13:58:15 -04'00'
Garland Sandel Garland Sandel Digitally signed by Garland Sandel Date: 2025.08.07 14:47:30 -04'00'
Vu Nguyen Vu Nguyen Digitally signed by Vu Nguyen Date: 2025.08.13 10:01:31 -04'00'
Brett Oldford, PE Brett Oldford Digitally signed by Brett Oldford DN: C=US, E=brett.oldford@wginc.com, CN=Brett Oldford Date: 2025.08.14 09:02:15-04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2025.08.14 13:29:32 -04'00'
61520C 37505000263 080039/23 000286 U3200 131500 AD $ 52,047.56