CN-370000-CN217-TA26.pdf
PDF 673 KB Posted
- Contract number
- CN217
- Issued by
- Florida
About this file
This document is a Task Assignment Notification Form (Task Assignment No. 26) issued by the Florida Department of Environmental Protection (FDEP) to JGP Structural Group Inc., a structural engineering firm based in Tallahassee, Florida. The contract is designated as CN217 and relates to Project No. 61321C at Bahia Honda State Park. The primary contact for FDEP is Alyssa Skehan, Contract Manager, while Jeffrey G. Parzych, P.E., serves as the consultant representative for JGP Structural Group Inc.
The task assignment requires JGP Structural Group Inc. to provide construction documents, permitting services, and construction administration for the Concession Area ADA Access improvement project at Bahia Honda State Park, based on a proposal dated March 8, 2021. The scope of work is divided into six subtasks: (1) 30% design documents ($3,725.00 fixed price plus $240.07 reimbursable); (2) survey services ($1,935.00 fixed price); (3) 60% design documents ($3,725.00 fixed price plus $240.07 reimbursable); (4) final design documents ($4,750.00 fixed price plus $18.00 reimbursable); (5) bidding and permitting support ($700.00 fixed price); and (6) construction administration services ($3,835.00 fixed price plus $480.14 reimbursable). The total contract value is $19,648.28, comprising $18,670.00 in fixed price costs and $978.28 in cost reimbursement. The project start date was upon execution of the task assignment, with a completion date of December 31, 2022. Payment is contingent upon FDEP approval of deliverables for each subtask.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Required Signatures: Adobe Signature
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
FDEP Contract No.:
CN217
Task Assignment No.:
Owner’s Name:
FDEP
Project No.:
61321C
Project Location:
Bahia Honda State Park
Project Name:
Concession Area ADA Access
Consultant Name:
JGP Structural Group Inc.
Consultant Representative:
Jeffrey G. Parzych, P.E.
Phone:
850-2888
Email:
jeff@jgpstructural.com
FDEP Contract Manager:
Alyssa Skehan or successor
Phone:
850-245-2781
Email:
Alyssa Skehan@FloridaDEP.gov
Description of Task:
Provide construction documents, permitting, and construction administration for the Bahia Honda Concession Area ADA Access per proposal dated 3/8/2021.
Project Manager: Laura Ross or successor
Schedule Start Date: Upon execution Fixed Price Cost: $18,670.00
Completion Date: 12/31/2022 Cost Reimbursement not to exceed: $978.28 Total Task Amount: $ 19,648.28
Approval Signatures:
Greg Turral Budget Representative, FDEP
Laura Ross
Signature Date
Project Manager, FDEP
Alyssa Skehan
Signature Date
Contract Manager, FDEP
Jeffrey G. Parzych
Signature Date
Consultant
Michael W. Foster Jr.
Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total: $
Gregory Turral Digitally signed by Gregory Turral Date: 2021.03.29 13:11:47 -04'00'
Laura S. Ross Digitally signed by Laura S. Ross Date: 2021.03.29 13:15:12 -04'00'
Alyssa Skehan Digitally signed by Alyssa Skehan Date: 2021.03.29 13:44:39 -04'00'
Jeffrey Parzych Digitally signed by Jeffrey Parzych Date: 2021.03.31 09:29:19 -04'00'
Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2021.04.05 13:32:22 -04'00'
20,148.28
20,148.28
20,148.28
19,170
Wiman_A Cross-Out
Wiman_A Cross-Out
Wiman_A Cross-Out
Wiman_A Cross-Out
Wiman_A Sticky Note TACO needs to move an extra $500 onto CN217 TA26 in order to cover associated costs of subtasks 6c and 6d ll�I J
II JGP STRUCTURAL GROUP, INC.
March 8, 2021
Mr. Laura Ross, AIA
Project Manager
Bureau of Design and Construction
Florida Department of Environmental Protection
3900 Commonwealth Boulevard, MS 520
Tallahassee, FL 32399
RE: CN217, TA #26
Bahia Honda State Park - Concessions Building ADA Ramps
Dear Mrs. Ross;
Engineering Solutions
For your review, JGP Structural Group, Inc., has provided a proposal summary and man-hour documentation for the services and tasks identified in the attached sheets.
Please review the attached Proposal Summary and deliverables.
Sincerely, JGP Structural Group, Inc.
di?- J e ff re y G. Parzych, PE
President
1221 W. Tharpe Street, Tallahassee, Florida 32303 1
Phone: 850-574-2888, Fax: 850-574-2788
E-mail: contact@jgpstructural.com
Subtask 1: 30% Documents
Concessions Building ADA Ramps
Bahia Honda State Park
CN217, TA #26
Description: JGP Structural Group, Inc. will perform the following:
• JGP will perform on-site field verification of the current existing conditions and the information obtained during this visit will allow formulation of drawings for design of new ADA ramp structures providing access from the concessions building elevated deck at the rear to the concrete walk extending along the marina and along the west elevation from the rear to the existing walk at the front of the building. Documents for this task will be based on the data collected during the field observation trip. It is anticipated that the new piles, beams, joists, railings and decking will be designed using PT wood. It is assumed the existing elevated deck is structurally sound.
• It is assumed the layout will be provided/approved by BOC.
• When determining areas of work and repair, due to the observation techniques used, only visible conditions can be noted. Additionally, it must be understood that the drawings do not attempt to identify hidden conditions and defects relative structural elements that are to remain. Additional work could be required beyond what is noted on the drawings. The extents of some conditions may not be known until removal/demolition of the structure is performed during construction.
• Engineering design, analysis and code verification of elements outside of the scope of work described above is not included.
• Areas found to require extensive rebuilding due to unsound material and deficiencies beyond what has been observed or known to exist where the new ramp intersects the existing elevated deck are not included.
• The work will be performed with the degree of skill and the standard of care common to the profession. No warranty is expressed or implied by this agreement.
• The 30% design documents shall be formatted to the BDC 24"x36" standard and include the standard BOC border. Each individual sheet shall be clearly labeled and dated.
• The 30% technical specifications shall be placed on the drawings or formatted to the BDC 8- 1/2"x11" standard. The specification sections will be clearly labeled and dated.
• The 30% doc's shall be submitted to BDC via electronic file in PDF format.
Deliverable: 30% Documents in pdf format will be provided to BOC for review within three (3) weeks after receipt of execution of the Task Assignment. It is assumed that one (1) week will be allocated for
DEP review and comments for the 30% documents.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
JGP Structural Group, Inc. Principal Engineer $160.00 2 $320.00
Project Engineer $95.00 24 $2,280.00
CADD Des/Tech $60.00 18 $1,080.00 Clerical $45.00 1 $45.00
Reimbursable Cost:
Mileage(@ $0.445 per mile) 526 mi @ $0.445/mi per trip=$234.07
Tolls $6.00 per trip
Reimbursable Cost $240.07
Total for Subtask 1: $3,725.00+$240.07=$3,965.07
Subtask 2: Survey
Description:
• JGP shall coordinate the survey that will be performed for the project and provide engineering layouts for the surveyor.
• Provide Surveying services for the project, this includes a site survey of the project (spot elevations, tie-in with the existing deck and walkways, etc.).
Deliverable: A signed and sealed Survey will be provided to BDC for review. This information will be provided in PDF format within six (6) weeks after receipt of execution of the Task Assignment. A CAD drawing of the survey will also be provided.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Firm Name Position Classification
JGP Structural Group, Inc. Principal Engineer
Project Engineer
Fixed Price Cost:
Firm Name Classification
FL Keys Land Surveying Prof. Surveyor and Mapper Fieldwork Crew (3 crew) Autocad Drafting
Total
Total for Subtask 2: = $445.00 + $1,490.00 = $1,935.00
Subtask 3: 60% Documents
Hourly Rate Hours Total Fixed Price Cost
$160.00 1 $160.00
$95.00 3 $285.00
Unit Cost Units Total Fixed Price Cost
$200.00/hr 1 $200.00 $210.00/hr 4 $840.00
$150.00/hr 3 $450.00 $1,490.00
Description: In addition to the description of items listed under subtask 1, JGP Structural Group, Inc. will provide the following:
• Provide the 60% design documents for the new ADA Ramp system.
• Incorporate the information for the provided survey into the documents.
• The 60% design documents shall be formatted to the BOC 24"x36" standard and include the standard BOC border. Each individual sheet shall be clearly labeled and dated.
• The 60% technical specifications shall be placed on the drawings or formatted to the BOC 8-
1 /2"x11" standard. The specification sections will be clearly labeled and dated.
• The 60% documents shall be submitted to the BDC project manager via electronic file transfer in
PDF format.
Deliverable: 60% Documents (Drawings and OPC) in pdf format will be provided to BDC for review within three (3) weeks after receipt of the 30% DEP review comments. It is assumed that one (1) week will be allocated for DEP review and comments for the 60% documents.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Firm Name Position Classification Hourly Rate
JGP Structural Group, Inc. Principal Engineer $160.00 Project Engineer $95.00
CADD Des/Tech $60.00 Clerical $45.00
Reimbursable Cost:
Mileage(@ $0.445 per mile) 526 mi @ $0.445/mi per trip=$234.07
Tolls $6.00 per trip Reimbursable Cost $240.07 Total for Subtask 3: $3,725.00 + $240.07 = $3,965.07
Subtask 4: Final Documents
Hours Total Fixed Price Cost
2 $360.00 24 $2,280.00
18 $1,080.00 1 $45.00
Description: In addition to the description of items listed under subtask 2, JGP Structural Group, Inc. will provide the following:
• Provide the final design for the new ADA ramp system.
• Incorporate the information for the provided survey into the documents.
• The Final design documents shall be formatted to the BOC 24"x36" standard and include the standard BDC border. Each individual sheet shall be clearly labeled and dated.
• The Final technical specifications shall be placed on the drawings or formatted to the BOC 8-
1 /2"x11" standard. The specification sections will be clearly labeled and dated.
• The Final documents shall be submitted to the BOC project manager via electronic file transfer in
PDF and AutoCad format. An opinion of probable cost {OPC) in pdf format will also be provided.
Deliverable: Final Design Documents will be provided in electronic and hard copy format to BDC for review. These documents will be provided within three (3) weeks after receipt of the 60% review comments.
• JGP will provide Final Design Documents-(3) sets, 24x36 dwgs, signed & sealed hard copies and pdfs of the final documents shall be sent to BDC. Final CAD drawings will also be provided. The
OPC will be provided in pdf format. Signed and sealed plans are to be submitted after final review comments are incorporated in the plans (as applicable).
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost· .
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
JGP Structural Group, Inc. Principal Engineer $160.00 2 $320.00 Project Engineer $95.00 28 $2,660.00 CADD Des/Tech $60.00 28 $1,680.00 Clerical $45.00 2 $90.00
Wiman_A Cross-Out
Wiman_A Sticky Note According to FACTS, the total here remains correct
Reimbursable Cost:
Printing 5 shts @ $1.20/sht x 3 sets=$18.00 Reimbursable Total Cost $18.00 Total for Subtask 4: $4,750.00+$18.00=$4,768.00
Subtask 5: Bidding and Permitting
Description: JGP Structural Group, Inc. will provide support during this phase of the project. Written clarifications and responses to the various bidder's questions for items related to the project will be provided.
• Support provided by JGP Structural Group, Inc.
Deliverable:
• SA - Written clarifications and responses to the various bidder's questions for items related to the project will be provided in pdf format to BDC within 3 days after receipt for distribution.
• SB - Written clarifications will be provided as necessary during the permitting process by the contractor to obtain a building permit.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
SA
Fixed Price Cost:
Firm Name Position Classification
JGP Structural Group, Inc. Principal Engineer Project Engineer
Total for Subtask SA: $160.00+190.00=$350.00
SB
Fixed Price Cost· .
Firm Name Position Classification
JGP Structural Group, Inc. Principal Engineer Project Engineer
Total for Subtask SB: $160.00+190.00=$350.00
Total for Subtask 5: $350.00+$350.00=$700.00
Subtask 6: Construction Administration Services
Hourly Rate Hours Total Fixed Price Cost
$160.00 1 $160.00 $95.00 2 $190.00
Hourly Rate Hours Total Fixed Price Cost
$160.00 1 $160.00 $95.00 2 $190.00
Description: JGP will provide limited construction administration for this project. This work will include responding to contractor's RFls, reviewing of the contractor's sumbittals and performing site visits. JGP will perform up to two (2) trips to review conditions during construction, one of these will be performed at the time of completion. Field observation reports for this task will be formulated based on information collected during our periodic site visits.
JGP will not be responsible for additional time and expenses that could be incurred due to contractor errors, delays, mistakes, etc. that would extend the project completion date. Additional time required to address any re-engineering, additional correspondence and re-inspection of any work will be submitted as an additional service to the project. These fees will be billed at our standard hourly rates.
Deliverable: Construction Administration services include the following:
• 6A - Review and respond to contractor RFl's (request for information) in pdf format within 3 days of each item.
• 6B - Review and provide responses/comments in pdf format on submitted shop drawings supplied by the contractor within 7 days of the receipt of each submittal.
• 6C & 6D - Provide two (2) site visits to the project during construction. An observation report of each visit will be provided in pdf format to BDC within 3 days of each visit.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
GA
Fixed Price Cost:
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
JGP Structural Group, Inc. Principal Engineer $160.00 1 $160.00 Project Engineer $95.00 3 $285.00
Total for Subtask GA: $445.00
Fixed Price Cost· .
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
JGP Structural Group, Inc. Principal Engineer $160.00 1 $160.00
Project Engineer $95.00 2 $190.00 Total for Subtask 68: $350.00
6C
Fixed Price Cost:
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
JGP Structural Group, Inc. Principal Engineer $160.00 1 $160.00 Project Engineer $95.00 16 $1,520.00 Clerical $45.00 2 $90.00
Reimbursable Cost:
Mileage(@ $0.445 per mile) 526 mi @ $0.445/mi per trip=$234.07
Tolls $6.00 per trip
Reimbursable Cost $240.07
Total for Subtask 6C: $1,520.00 + $240.07 = $1,760.07
2,010.071,770
Wiman_A Sticky Note The principal engineer and clerical cost were not included in project total for 6c and 6d.
Wiman_A Cross-Out
Wiman_A Cross-Out
6D
Fixed Price Cost:
Firm Name Position Classification Hourly Rate
JGP Structural Group, Inc. Principal Engineer $160.00
Project Engineer $95.00
Clerical $45.00
Reimbursable Cost:
Mileage(@ $0.445 per mile) 526 mi @ $0.445/mi per trip=$234.07
Tolls $6.00 per trip
Reimbursable Cost $240.07
Total for Subtask 60: $1,520.00 + $240.07 = $1,760.07
Total for Subtask 6: $445.00+350.00+$1,760.07+$1,760.07 = $4,315.14
Proiect Schedule:
Activity
Subtask 1: 30% Documents
Subtask 2: Survey
Subtask 3: 60% Documents
Subtask 4: Final Documents
Subtask 5: Bidding/Permitting
Subtask 6: CA
Summarv of Fees:
Duration (Calendar Days)
4 weeks- 28 days
6 weeks - 42 days
4 weeks- 28 days
4 weeks - 28 days
Hours Total Fixed Price Cost
1 $160.00
16 $1,520.00
2 $90.00
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 1: 30% Documents $3,725.00 $240.07
Subtask 2: Survey $1,935.00 -
Subtask 3: 60% Documents $3,725.00 $240.07
Subtask 4: Final Documents $4,750.00 $18.00
Subtask 5: Bidding/Permitting $700.00
Subtask 6: Const. Admin. Ser $3,835.00 $480.14
Total Fixed Price Cost: $18,670.00
Total Reimbursable Cost $978.28
Overall Total Cost: $19,648.28
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
2,010.07 + 2,010.07 = 4,815.14
1,770 2,010.07
4,335.00 19,170
20,148.28
Wiman_A Cross-Out
Wiman_A Cross-Out
Wiman_A Cross-Out
Wiman_A Cross-Out
Wiman_A Cross-Out
Wiman_A Cross-Out
Wiman_A Cross-Out
File details come from the government source that posted it. Updated .