This is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) for Contract CN217, Task Assignment TA41. The consultant executing the services is JGP Structural Group, Inc., a structural engineering firm based in Tallahassee, Florida. The project involves the Boardwalk Replacement at Gasparilla Island State Park, located in Lee County, Florida. FDEP's Project Manager is John Goss, and the Contract Manager is Jeffrey Whitfield. The consultant's representative is Jeffrey Parzych, PE, Principal.
The task assignment requires JGP Structural Group, Inc. to provide bidding support and construction administration services (Subtasks 5 and 6) for the boardwalk replacement project. Subtask 5 (Bidding) is valued at $350.00 in fixed price costs, while Subtask 6 (Construction Administration Services) is valued at $2,440.00 in fixed price costs with reimbursable expenses of $163.30. The total task amount is $2,953.30, comprising a fixed price cost of $2,790.00 and cost reimbursement not to exceed $163.30. The task commenced upon execution and concludes on December 31, 2022. Payment will be made upon approval of deliverables for each subtask by FDEP. The project also encompasses four previously completed subtasks (Survey, 30% Documents, Final Documents, and Permitting Services) totaling $10,639.85 in fixed costs with $81.65 in completed reimbursable expenses.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN217 TA41 FDEP 61319C
Gasparilla Island State Park Boardwalk Replacement
JGP Structural Group, Inc
Jeffrey Parzych 850-574-2888 jeff@jgpstructural.com
Jeffrey Whitfield 850-245-2630 jeffrey.whitfield@floridadep.gov
Provide bidding support and construction administration services (subtasks 5 & 6)for the boardwalk replacement project at Gasparilla Island State Park. E-mail and supporting documents from JGP dated 4/18/2022 attached.
John Goss
Upon Execution $ 2,790.00 12/31/22 $ 163.30
$ 2,953.30
Diane Langston Diane Langston Digitally signed by Diane Langston Date: 2022.04.27 10:15:30 -04'00'
John Goss John Goss Digitally signed by John Goss Date: 2022.04.27 16:48:11 -04'00'
Jeffrey Whitfield Jeffrey Whitfield Digitally signed by Jeffrey Whitfield Date: 2022.04.27 17:05:53 -04'00'
Jeffrey Parzych Jeffrey Parzych Digitally signed by Jeffrey Parzych Date: 2022.05.02 09:05:25 -04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2022.05.06 16:04:42 -04'00'
61319C 37504003191 088130/21 675002 U3200 131500 XR $ 2,953.30
$ 2,953.30
From: Jeffrey Parzych To: Goss, John Subject: Gasparilla TA 23 CO Time Extension Date: Tuesday, April 19, 2022 11:24:57 AM Attachments: Gasp TA 23 ExtenLtr.pdf
Gasp TA 23 CO JGPProp.pdf
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
John, Attached is the revised proposal and the letter requesting a time extension. I assume you don't need the previously sent invoices. Also, let me know if you need this in a different format, we sent the proposal with the previous subtasks noted as "completed" and they are in italics. We just thought it might be better to show this but if you just want the proposal with the two subtasks to be billed let me know.
One other item, when we sent the previous invoice to Andrew Lippons there were two reimbursable expenses that we did not bill for since we did not have to send hard copy plans and expend money for the permit (this is shown in the breakdown).
As a side note, we designed this boardwalk three separate times and did not request a change order for additional services. We probably should have but we were trying to be a team player. This had to do with a storm that brought in more sand and changed the grade levels, thereby eliminating a portion of the needed ramp length.
Please call if you have any questions.
Respectfully, Jeffrey G. Parzych, PE Principal JGP Structural Group, Inc 1221 W. Tharpe Street Tallahassee, FL 32303 850.574.2888 850.445-0224 c
TALLAHASSEE/NAPLES-FT MYERS
mailto:jeff@jgpstructural.com mailto:John.Goss@FloridaDEP.gov ll�I J
II JGP STRUCTURAL GROUP, INC.
April 18, 2022
Mr. John Goss
Project Manager
Bureau of Design and Construction
Florida Department of Environmental Protection
3900 Commonwealth Boulevard, MS 520
Tallahassee, FL 32399
RE: CN217, TA 41 (CO Time Extension)
Gasparilla Island State Park - Boardwalk Replacement
Dear Mr. Goss;
Engineering Solutions
For your review, JGP Structural Group, Inc., has provided a proposal summary and man-hour documentation for the services and tasks identified in the attached sheets. A number of the items have been completed, however, we will be billing for the final two subtasks 5 and 6.
Please review the attached Proposal Summary and deliverables.
Sincerely, �Gr:lnc.
Jeffrey G. Parzych, PE
President
1221 W. Tharpe Street, Tallahassee, Florida 32303
Phone: 850-574-2888, Fax: 850-574-2788
1 E-mail: contact@jgpstructural.com
Boardwalk Replacement
Gasparilla Island State Park
CN217, TA 41
Subtask 1: Survey (Completed}
Description:
• JGP shall coordinate the survey that will be performed for the project and provide engineering layouts for the surveyor.
• Provide Surveying services for the project, this includes a site survey of the project (spot elevations, tie-in with the existing boardwalk, location of CCL line).
Deliverable: A signed and sealed Survey will be provided to BOC for review. This information will be provided in PDF format within three (3) weeks after receipt of execution of the Task Assignment. A CAD drawing of the survey will also be provided.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost· .
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
JGP Structural Group, Inc. Principal Engineer $160.00 1 $160.00 Project Engineer $95.00 3 $285.00
Fixed Price Cost:
Firm Name Classification Unit Cost Units Total Fixed Price Cost
Shremshock Surveying, Inc. Crew Chief $99.99/hr 6 $599.94 Rodman $49.99/hr 6 $299.94 Drafting $74.99/hr 3 $224.97 Clerical $45.00/hr 2 $90.00
Total $1,214.85
Total for Subtask 1: = $445.00 + $1,214.85 = $1,659.85
Subtask Z: 30% Documents(CompletedJ
Description: JGP Structural Group, Inc. will perform the following:
• JGP will perform on-site field verification of the current existing conditions and the information obtained during this visit will allow formulation of drawings for the new boardwalk structure.
Documents for this task will be based on the data collected during the field observation trip. The new proposed boardwalk extension will follow the alignment of the existing boardwalk, including placement of landings. It is assumed the existing remaining portion of boardwalk is structurally sound. The proposed length of the new boardwalk will be impacted by existing conditions, ie existing elevation of remaining portion of boardwalk and existing dune height.
• It is assumed the existing wood pile foundation supporting existing portions of boardwalk are structurally sound and adequate to support the imposed loads. JGP will visually observe the existing conditions of the piles, beams and joists. If damage is present DEP will be notified.