This is a Task Assignment Notification Form (CN217, Task Assignment No. 58) issued by the Florida Department of Environmental Protection (FDEP) to assign work to JGP Structural Group, Inc., a structural engineering firm located in Tallahassee, Florida. The project involves the historical design renovation and permitting of the Santos Church located at 3810 SE 80th Street in Ocala, Florida, as part of the Marjorie Harris Carr Cross Florida Greenways Santos Trail initiative. The task is managed by FDEP project manager Uyles W. Keen Jr or successor, with Ralph Perkins serving as FDEP Contract Manager and Jeffrey G. Parzych, P.E. from JGP Structural Group serving as the consultant representative.
The task encompasses three subtasks: (1) Project Schedule development by Stevenson Architects and JGP; (2) 50% design documents prepared by multiple design firms including Stevenson Architects, JGP Structural Group, Applied Research and Design, and Winton Engineering; and (3) Final design documents incorporating feedback from the 50% review phase. The total fixed price cost is $42,919.22 with no cost reimbursement component, divided as follows: Subtask 1 ($2,399.96), Subtask 2 ($20,575.58), and Subtask 3 ($19,943.68). The task execution begins upon contract execution with a completion date of April 1, 2024. Funding is sourced from two FLAIR codes totaling $42,919.22, with $30,000.00 from grant code 088137/21 and $12,919.22 from grant code 080039/22.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN217 58 FDEP 3G157
Marjorie Harris Carr Cross Florida Greenways Santos Church Renovation
JGP Structural Group, Inc.
Jeffrey G. Parzych, P.E. (850) 574-2888 jeff@jgpstructural.com
Ralph Perkins (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
Historical design renovation and permitting of the Santos Church. See attached dated 3/10/23.
Uyles W. Keen Jr or successor
Upon Execution $ 42,919.22 4/1/24 $ 0.00
$ 42,919.22
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.04.03 16:19:14 -04'00'
Uyles W. Keen Jr Uyles W. Keen Jr Digitally signed by Uyles W. Keen Jr Date: 2023.04.04 08:56:35 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.04.04 13:38:56 -04'00'
Jeffrey Parzych, P.E. Jeffrey Parzych Digitally signed by Jeffrey Parzych Date: 2023.04.05 12:48:16 -04'00'
Michael W. Foster Jr. P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.04.07 10:19:09 -04'00'
3G157 3G157 37503000999 088137/21 339074 U1300 461009 MG $ 30,000.00
30756 37503000999 080039/22 423001 U1300 461009 QK $ 12,919.22
$ 42,919.22
| Design TA 58 Santos Church (002).pdf |
| Santos Church JGP Prop.pdf |