This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under Contract No. CN217, Task Assignment No. 40. The contract involves FDEP as the owner, JGP Structural Group, Inc. as the consulting firm, and Winton Engineering, Inc. as a subconsultant. The project pertains to design and permitting services for a full roof replacement at Homosassa Springs State Park Visitor's Center, including all roof-mounted mechanical ductwork. The task assignment was executed on April 11, 2022, with a completion date of May 1, 2023.

The contract is structured as a fixed-price engagement with a total task amount of $42,834.50 and no cost reimbursement component. The work is divided into six subtasks: Subtask 1 covers existing roof assessment ($7,100.00); Subtask 2 addresses asbestos survey and lead paint testing ($2,830.00); Subtask 3 involves 30% design documents ($8,015.00); Subtask 4 includes final design documents ($15,566.00); Subtask 5 provides bidding support ($605.00); and Subtask 6 encompasses construction administration services ($8,718.50). Payment will be made upon FDEP approval of deliverables for each subtask. The project is funded through FDEP's budget with organization code 37502000218, fund code 423001, and object code 131500, with the full $42,834.50 allocated to the engagement.

View the file

Other files

File Type Posted
CN-370000-CN210-TA7.pdf PDF
CN-370000-CN217-CMC1.pdf PDF
CN-370000-CN217-CMC4.pdf PDF
CN-370000-CN217-T15.pdf PDF
CN-370000-CN217-T18CO2.pdf PDF
CN-370000-CN217-T18CO3.pdf PDF
CN-370000-CN217-T18CO6.pdf PDF
CN-370000-CN217-T1CO2.pdf PDF
CN-370000-CN217-T29CO1.pdf PDF
CN-370000-CN217-T3.pdf PDF
CN-370000-CN217-T32.pdf PDF
CN-370000-CN217-T33.pdf PDF
CN-370000-CN217-T34CO3.pdf PDF
CN-370000-CN217-T34CO4.pdf PDF
CN-370000-CN217-T35.pdf PDF
CN-370000-CN217-T39CO1.pdf PDF
CN-370000-CN217-T41CO1.pdf PDF
CN-370000-CN217-T44.pdf PDF
CN-370000-CN217-T5.pdf PDF
CN-370000-CN217-T50.pdf PDF
CN-370000-CN217-T53.pdf PDF
CN-370000-CN217-T58.pdf PDF
CN-370000-CN217-T65.pdf PDF
CN-370000-CN217-T66.pdf PDF
CN-370000-CN217-TA29.pdf PDF
CN-370000-CN217-A1.pdf PDF
CN-370000-CN217-T10CO1.pdf PDF
CN-370000-CN217-T12.pdf PDF
CN-370000-CN217-T16CO4.pdf PDF
CN-370000-CN217-T18.pdf PDF
CN-370000-CN217-T18CO4.pdf PDF
CN-370000-CN217-T2.pdf PDF
CN-370000-CN217-T20.pdf PDF
CN-370000-CN217-T20CO1.pdf PDF
CN-370000-CN217-T21.pdf PDF
CN-370000-CN217-T21CO1.pdf PDF
CN-370000-CN217-T22CO1.pdf PDF
CN-370000-CN217-T34CO2.pdf PDF
CN-370000-CN217-T36.pdf PDF
CN-370000-CN217-T37.pdf PDF
CN-370000-CN217-T38.pdf PDF
CN-370000-CN217-T4.pdf PDF
CN-370000-CN217-T45.pdf PDF
CN-370000-CN217-T48.pdf PDF
CN-370000-CN217-T49CO1.pdf PDF
CN-370000-CN217-T51.pdf PDF
CN-370000-CN217-T54.pdf PDF
CN-370000-CN217-T57.pdf PDF
CN-370000-CN217-T61.pdf PDF
CN-370000-CN217-T67.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN217 40 FDEP 61347C

Homosassa Springs State Park Roof Replacement

JGP

Jeff Parzych 850-574-2888 jeff@jgpstructural.com

Jeff Whitfield 850-245-2630 jeffrey.whitfield@floridadep.gov

Design and permitting services for a full roof replacement including all roof mounted mechanical ductwork. See agreement dated 4/11/22.

Richard J. Rowe or Successor

Upon agreement execution $ 42,834.50 5/1/2023 $ 0.00

$ 42,834.50

Diane Langston Diane Langston Digitally signed by Diane Langston Date: 2022.04.20 14:51:20 -04'00'

Richard J. Rowe Richard J. Rowe Digitally signed by Richard J.

Rowe Date: 2022.04.20 21:13:18 -04'00'

Jeff Whitfield Jeffrey Whitfield Digitally signed by Jeffrey Whitfield Date: 2022.04.21 11:36:31 -04'00'

Jeff Parzych Jeffrey Parzych Digitally signed by Jeffrey Parzych Date: 2022.04.25 11:45:32 -04'00'

Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2022.04.26 15:24:08 -04'00'

61347C 37502000218 080039/21 423001 U3200 131500 QK $ 42,834.50

$ 42,834.50 ll�IJII JGP STRUCTURAL GROUP, INC.

April 11, 2022

Mr. Richard J. Rowe

Project Manager

Bureau of Design and Construction

Florida Department of Environmental Protection

3900 Commonwealth Boulevard, MS 520

Tallahassee, FL 32399

RE:

Engineering Solutions

CN217 TA40

Homosassa Springs State Park Visitor's Center Reroof Project

Dear Richard, For your review, JGP Structural Group, Inc. has provided a proposal summary and man-hour documentation for the services and tasks identified in the attached sheets.

Please review the attached Proposal Summary and deliverables.

Sincerely, �•l::c.

Jeffrey G. Parzych, PE

President

1221 W. Tharpe Street, Tallahassee, Florida 32303 1

Phone: 850-574-2888, Fax: 850-574-2788

E-mail: contact@jgpstructural.com

Homosassa Springs State Park

Visitor's Center Reroof Project

CN217, TA 40

Subtask 1: Existing Roof Assessment

Description:

• JGP shall perform site visits to obtain information regarding the existing roof system and conditions. It is anticipated that 2 trips will be required for this task.

• It is anticipated up to four (4) roof cuts and pull-off tests will be performed on the existing roof to verify existing roof conditions. The cuts will consist of approximately 12" square cuts. If moisture is encountered it will be documented. The areas will be patched with roofing material and cement.

• Observations of the underside of the roof and supporting elements will be performed, if possible.

Information obtained from this task could modify the requirements of anticipated re-roofing system. If conditions are uncovered that will require the removal and replacement of existing roofing or structural elements, modifications to the project may be required.

Deliverable: A pdf of the CADD layout with the locations and cross-sections of the existing roof cut outs will be provided to BDC for review. The approximate layout of the structural elements will be noted. A summary of the existing roof system profile, including information of areas impacted by moisture intrusion will be provided for each cut out. Photographs of the cut-outs and information regarding the pull tests will be provided. This information will be provided within 4 weeks after receipt of execution of the Task Assignment.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Firm Name Position Classification

JGP Structural Group, Inc. Principal Engineer

Project Engineer CADD Des/Tech

Total for Subtask 1: $7,100.00

Subtask 2: Asbestos Survey and Lead Paint Testing

Description:

Hourly Rate Hours Total Fixed Price Cost

$160.00 10 $1,600.00

$95.00 44 $4,180.00 $60.00 22 $1,320.00

• 2A - JGP shall coordinate the asbestos survey and lead paint testing that will be performed for the project. CAD documents and information will be provided by JGP to the testing company for inclusion in their report.

• 28 - Southern Earth Sciences, SES, Inc. shall provide asbestos and lead paint testing for the project. This work includes sampling and testing of roof elements, ducts, sealants, painted building components including caulks, etc.

Deliverable: An Asbestos Survey and Lead Paint Testing Report for the structure will be provided to BDC for review. The survey proposed by SES is intended to be a full and comprehensive survey to meet the