This document is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for a historic structure repair project. The change order involves FDEP as the state agency, JGP Structural Group, Inc. as the primary consultant, and Professional Services Industries, Inc. (PSI) as a subcontractor. The project concerns the repair of the historic bandstand (gazebo) at Dade Battlefield State Park in Dade Battlefield, Florida. The change order is identified as Change Order No. 1 for Task Assignment No. 12 under FDEP Contract No. CN217, with Project No. 61254C.

The change order authorizes additional construction phase time and professional services for asbestos and lead-based paint surveying and reporting. Subtask 6 covers asbestos and lead paint testing at a fixed price cost of $2,783.58, comprised of JGP Structural Group coordination services ($790.00) and PSI testing services ($1,993.58). Subtask 7 covers roof strengthening design revisions by JGP Structural Group at a fixed price cost of $1,955.00. The total net increase for this change order is $4,738.58, bringing the cumulative task amount from $13,879.74 to $18,618.32. The original task end date of December 30, 2020 is extended by 150 calendar days to May 29, 2021. All deliverables are subject to FDEP review and approval before payment is authorized.

View the file

Other files

File Type Posted
CN-370000-CN210-TA7.pdf PDF
CN-370000-CN217-CMC1.pdf PDF
CN-370000-CN217-CMC4.pdf PDF
CN-370000-CN217-T15.pdf PDF
CN-370000-CN217-T18CO2.pdf PDF
CN-370000-CN217-T18CO3.pdf PDF
CN-370000-CN217-T18CO6.pdf PDF
CN-370000-CN217-T1CO2.pdf PDF
CN-370000-CN217-T29CO1.pdf PDF
CN-370000-CN217-T3.pdf PDF
CN-370000-CN217-T32.pdf PDF
CN-370000-CN217-T33.pdf PDF
CN-370000-CN217-T34CO3.pdf PDF
CN-370000-CN217-T34CO4.pdf PDF
CN-370000-CN217-T35.pdf PDF
CN-370000-CN217-T39CO1.pdf PDF
CN-370000-CN217-T40.pdf PDF
CN-370000-CN217-T41CO1.pdf PDF
CN-370000-CN217-T44.pdf PDF
CN-370000-CN217-T5.pdf PDF
CN-370000-CN217-T50.pdf PDF
CN-370000-CN217-T53.pdf PDF
CN-370000-CN217-T58.pdf PDF
CN-370000-CN217-T65.pdf PDF
CN-370000-CN217-T66.pdf PDF
CN-370000-CN217-TA29.pdf PDF
CN-370000-CN217-CMC2.pdf PDF
CN-370000-CN217-CMC5.pdf PDF
CN-370000-CN217-T10.pdf PDF
CN-370000-CN217-T11.pdf PDF
CN-370000-CN217-T13.pdf PDF
CN-370000-CN217-T14.pdf PDF
CN-370000-CN217-T14CO1.pdf PDF
CN-370000-CN217-T16.pdf PDF
CN-370000-CN217-T16CO4.pdf.crdownload CRDOWNLOAD file
CN-370000-CN217-T19.pdf PDF
CN-370000-CN217-T20CO2.pdf PDF
CN-370000-CN217-T28.pdf PDF
CN-370000-CN217-T29CO2.pdf PDF
CN-370000-CN217-T32CO1.pdf PDF
CN-370000-CN217-T34CO1.pdf PDF
CN-370000-CN217-T39.pdf PDF
CN-370000-CN217-T41.pdf PDF
CN-370000-CN217-T42.pdf PDF
CN-370000-CN217-T43.pdf PDF
CN-370000-CN217-T46.pdf PDF
CN-370000-CN217-T47.pdf PDF
CN-370000-CN217-T49.pdf PDF
CN-370000-CN217-T59.pdf PDF
CN-370000-CN217-T6.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

( ) Page 1 of 1

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description and Justification of Change:

Change in Task Amount:

Item Reimbursement Fixed Fee Total

Original Task Amount:

Task amount including all previous Change Orders:

Net increase/decrease in task amount for this Change Order:

Total Amounts with all Change Orders:

Change in Task Time:

Original Task Execution Date:

Original Task End Date:

Present Task End Date:

Net Change in Days:

New Task End Date:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 Digit FLAIR Code: Total:

CN217 12 1 61254C

Dade Battlefield Repair Historic Bandstand

JGP Structural Group, Inc.

Jeffrey G. Parzych, P.E. 850-574-2888 jeff@jgpstructural.com

Philip Stone 850-245-2570 Philip.Stone@FloridaDEP.gov

Additional construction phase time, and professional services with Asbestos and Lead-Based Paint survey and report per the attached proposal dated 7/30/2020.

$ 919.80 $ 12,959.94 $ 13,879.74 $ 919.80 $ 12,959.94 $ 13,879.74

$ 4,738.58 $ 4,738.58 $ 919.80 $ 17,698.52 $ 18,618.32

8/22/2019

12/30/2020

12/30/20

5/29/2021

Greg Turral Gregory Turral Digitally signed by Gregory Turral Date: 2020.08.10 17:34:31 -04'00'

Theresa Carron Theresa Carron Digitally signed by Theresa Carron Date: 2020.08.11 08:32:37 -04'00'

Philip Stone P.T. Stone Digitally signed by P.T. Stone Date: 2020.08.26 09:17:22 -04'00'

Jeffrey G. Parzych, P.E. Jeffrey Parzych Digitally signed by Jeffrey Parzych Date: 2020.08.26 14:35:31 -04'00'

Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2020.08.28 15:18:37 -04'00'

61254C 37504000018 080039/21 423001 U3200 131500 QK $ 4,738.58

$ 4,738.58