This is a Task Assignment Notification Form and associated proposal documentation for a contract between the Florida Department of Environmental Protection (FDEP) and JGP Structural Group, Inc. The contract, identified as CN217, Task Assignment No. 14, is administered through the Southeast Regional Office and covers design services for an entry ramp replacement project (RM2004) at the FDEP's Florida Coastal Office in Miami-Dade County. The contract was executed in November 2019 with Laura Ross serving as the FDEP Project Manager and Jeffrey G. Parzych representing JGP Structural Group, Inc.
Subtask 1 provides final design documents for the ramp replacement at a fixed price cost of $1,840.00, with labor allocated across a Principal Engineer (3 hours at $160.00/hour), Project Engineer (8 hours at $95.00/hour), and CADD Designer/Technician (10 hours at $60.00/hour). Deliverables include three signed and sealed 24"x36" design drawings (Note Sheet, Plan Sheet, and Detail Sheet) formatted to BDC standards and submitted in PDF and AutoCAD format within one week of task assignment execution. The completion date is July 1, 2020. Subtask 2, providing construction administration services, was not authorized at the time of this notification and remains contingent on future approval. The total fixed price cost authorized under this task assignment is $1,840.00, with no cost reimbursement beyond the fixed price specified.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .