CN-370000-CN217-T18CO2.pdf
PDF 7 MB Posted
- Contract number
- CN217
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form (Change Order No. 2) issued by the Florida Department of Environmental Protection (FDEP) for Contract No. CN217, Task Assignment No. 18. The project, titled "Boardwalk at Swim Area" at Blue Spring State Park, involves JGP Structural Group, Inc., a structural engineering firm represented by Jeffrey Parzych, P.E. The FDEP Contract Manager is Jeff Whitfield. The change order was approved on March 4, 2022, with signatures from all required FDEP representatives, the consultant, and the Contract Authority.
The change order authorizes structural analysis and engineering services for the piles at the swim platform, addressing severe damage and structural deficiencies of existing wood piles. Services include modifying final drawings to specify approximately 30 new piles, providing connection details, addressing turbidity barriers, and developing construction specifications. The total cost increase is $6,750.00, bringing the cumulative task amount from $84,620.37 to $91,370.37. This comprises $9,832.90 in reimbursable costs and $81,537.47 in fixed fees. The original task end date of December 31, 2021, is extended 182 days to July 1, 2023. Subtask 4(a) (Final Drawings Modification) costs $5,605.00, and Subtask 7(a) (Construction Administration Services) costs $1,145.00, with payment made upon FDEP approval of deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN217 18 2 61257C
Blue Spring State Park Boardwalk at Swim Area
JGP Structural Group, Inc.
Jeffrey Parzych P.E. 850-574-2888 jeff@jgpstructural.com
Jeff Whitfield or successor 850-245-26730 Jeffrey.Whitfield@FloridaDEP.gov
This is a change order to provide structural analysis and engineering for the piles at the swim platform. (See proposal dated 2/15/2022.)
$ 9,832.90 $ 74,787.47 $ 84,620.37 $ 9,832.90 $ 74,787.47 $ 84,620.37
$ 0.00 $ 6,750.00 $ 6,750.00 $ 9,832.90 $ 81,537.47 $ 91,370.37
7/21/2020
12/31/2021
12/31/2022
7/1/2023
Diane Langston A Diane Langston Digitally signed by A Diane Langston Date: 2022.03.01 14:08:24 -05'00'
Laura S. Ross Laura S. Ross Digitally signed by Laura S. Ross Date: 2022.03.02 15:38:24 -05'00'
Jeffrey Whitfield Jeffrey Whitfield Digitally signed by Jeffrey Whitfield Date: 2022.03.03 14:55:15 -05'00'
Jeffrey Parzych Jeffrey Parzych Digitally signed by Jeffrey Parzych Date: 2022.03.04 15:05:01 -05'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2022.03.04 15:57:07 -05'00'
61257C 37503000101 088130/20 408001 U3200 131500 PF $ 6,750.00
$ 6,750.00