This document is a Task Assignment Change Order Form (Change Order No. 01) issued by the Florida Department of Environmental Protection (FDEP) for FDEP Contract No. CN200, Task Assignment 14. The change order involves George F. Young, Inc., a consulting firm with offices in Gainesville, Florida, and modifies the scope of work for the Big Cypress Parking Improvements project located at Fakahatchee Strand Preserve State Park. The contract is managed by FDEP's Bureau of Design and Construction, Division of Recreation and Parks, with Jacob T. Nussel, PE serving as the consultant's project manager and Alyssa Skehan as the FDEP contract manager.
The change order adds three subtasks to the contract for a total increase of $171,520.71, extending the task end date from March 15, 2022 to March 15, 2023 (365-day extension). Subtask 2 consists of Collier County Site Development Plan inspection fees totaling $14,059.87 in reimbursable costs. Subtask 3 provides comprehensive construction administration services valued at $139,853.54, including site development plan reviews, requests for information processing, pre-construction meetings, monthly inspections with pay request reviews, biweekly status meetings, and building permit closeout coordination. Subtask 4 comprises six ecological site observation reports performed by the project ecologist totaling $17,607.30. The contract utilizes both fixed-price costs ($137,267.20 for labor) and reimbursable expenses ($2,586.34 for Subtask 3 and $923.82 for Subtask 4) for ecological observations. The change order was executed on March 9, 2021, with all required FDEP approvals obtained.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN200 14 01 60857C
Fakahatchee Strand Preserve State Park Big Cypress Parking Improvements
George F. Young, Inc.
Jacob T. Nussel, PE 352-378-1444 jnussel@georgefyoung.com
Alyssa Skehan or successor 850-245-2781 alyssa.skehan@floridadep.gov
Consultant will provide site development plan fees, CA services, and ecological site observations for the single phase construction of the Big Cypress Parking Improvements project.
$ 8,244.15 $ 8,244.15 $ 8,244.15 $ 8,244.15
$ 3,510.16 $ 168,010.55 $ 171,520.71 $ 3,510.16 $ 176,254.70 $ 179,764.86
12/18/2020
3/15/2022
3/15/2022
3/15/2023
Greg Turral Gregory Turral Digitally signed by Gregory Turral Date: 2021.02.19 12:25:05 -05'00'
Andy Carrier Andrew J Carrier Digitally signed by Andrew J Carrier Date: 2021.02.22 08:08:41 -05'00'
Alyssa Skehan Alyssa Skehan Digitally signed by Alyssa Skehan Date: 2021.02.22 08:48:27 -05'00'
Matt Walker, PE Matt Walker Digitally signed by Matt Walker DN: C=US, E=mwalker@georgefyoung.com, O="George F. Young, Inc.", CN=Matt Walker Reason: I have reviewed this document Date: 2021.02.22 13:31:25-05'00'
Bryan Bradner Bryan Bradner Digitally signed by Bryan Bradner Date: 2021.03.09 10:50:53 -05'00'
60857C 37504000114 088130/20 408001 U3200 131500 PF $ 153,949.49
60857C 37504000114 080039/21 675002 U3200 131500 XR $ 17,571.22
$ 171,520.71
G A I N E S V I L L E ���� L A K E W O O D R A N C H ���� O R L A N D O ���� P A L M B E A C H ���� S T . P E T E R S B U R G ���� T A M P A
Passionately committed to Integrity, Quality & Service
1905 South Main Street Gainesville, Florida 32601-8429
Phone: (352) 378-1444 www.georgefyoung.com
George F. Young, Inc.
Turning Vision into Reality Since 1919
CIVIL & TRANSPORTATION ENGINEERING | ECOLOGY | GIS | LANDSCAPE ARCHITECTURE | PLANNING | SURVEYING | SUBSURFACE UTILITY ENGINEERING
February 17, 2021
Andy Carrier Construction Project Consultant II Florida Department of Environmental Protection Bureau of Design and Construction, Division of Recreation and Parks Andy.J.Carrier@FloridaDEP.gov Office: 941 882-7201
RE: DEP Agreement CN200 TA14 CO1 Fakahatchee Strand Preserve State Park
Construction Administration Proposal
Dear Andy:
For your review, George F. Young has provided a proposal summary and man-hour documentation for the tasks identified below that will be added to Task Assignment 14 as Change Order 1:
• Subtask 2 – Collier County Site Development Plan (SDP) Inspection Fees.
• Subtask 3 – Construction Administrative services for Day Use Area, Boardwalk, and flood plain cross drains. This includes engineering, architectural, and environmental support. Also included in this Subtask is the building permit finalization and close out for the restroom and interpretive pavilion buildings.
• Subtask 4 – Ecological Site Observation Reports.
We propose to utilize McCarthy and Associates (Structural) and Mashayekhi Consultants (Electrical & Mechanical) for the construction administration effort required for the Restroom Building. For the Interpretive Pavilion we will utilize the design team of David Corban Architect, Jewitt Engineering, and Select Structural. The subconsultant entities are not currently on the FDEP lists, therefore their backup material is included in the attached proposal.
Environmental inspections and consultation will be provided by our ecologist, Jeff Churchill. His effort is represented in Subtasks 3 and 4.
Please review the attached Proposal Summary and deliverables. If you have any questions, please feel free to contact me.
Sincerely, GEORGE F. YOUNG, INC.
Jacob T. Nussel, PE Project Manager
DEP Agreement CN200 TA14 CO1 February 17, 2021
Fakahatchee Strand Preserve State Park CN200, Task Assignment 14, Change Order 1 (TA14 CO1)
Subtask 2: Collier County Site Development Plan (SDP) Inspection Fees Description: The remaining fees associated with the County SDP are the Utility Inspection Fee ($927.00) and the Construction Inspection Fee ($13,132.87) Deliverable: The inspection fees will be provided through the electronic payment process of the County.
Copies of the fee payment will be provided to BDC.
Performance Measure: Fee payments will be reviewed by BDC to confirm that they meet the expectations, are complete, and timely.
Fixed Price Cost: There are no fixed prices for this task.
Reimbursables: Inspection Fees of $14,059.87.
Summary of Fees:
Subtask Subtask Fixed Price Cost
Subtask Reimbursable
Subtask 2: County SDP Inspection Fees $0.00 $14,059.87
Totals: $0.00 $14,059.87
OVERALL SUBTASK 2 TOTAL: $14,059.87
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
Subtask 3: Construction Administration Services Engineering Effort: GFY will provide the basic Construction Administration Services to include the review and responses to Requests for Information (RFI), Shop Drawing submittals, pre-construction meetings, monthly inspections, biweekly status meetings, potential pay request review, Substantial Completion inspection and punchlist, Final Inspection, and project closeout coordination. Included are two inspections per month by GFY staff, as requested by the Client.
Ecological Consultation: It is anticipated that from time to time during the project that the project Engineer, Department, contractor, or regulatory agencies will have questions that need to be addressed by the project ecologist regarding compliance with permit conditions, intent of the design, clarification of BMPs, other issues affecting potential project impacts and/or permit compliance. The project ecologist will assist the Department in addressing these issues and provide a quarterly report (months 4, 8, and 12) summarizing the activities. These will be performed on request by the BDC.
• 3A – Requests For Information #1 (RFIs #1): Review and respond to RFIs. Coordination with
BDC at every stage. A total of 5 RFI submittals are included.
• 3B – Pre-Construction Meetings: The first meeting is to include the contractor(s), park management, FDEP BDC, and George F. Young representatives. This will be the first pre-con meeting. The second pre-con meeting will include all parties from the first meeting plus Collier County representatives and SFWMD representatives. These meetings will occur back-to-back on the same day, with a break in between. GFY will schedule and attend the meetings.
• 3C – Shop Drawings Reviews: The project specifications require the Contractor to submit Shop Drawings for review and approval. GFY will review and respond to the submitted Shop Drawings as presented by the Contractor for conformance with the project design plans. GFY will produce a shop drawing submittal log that will be maintained with each new submittal by the contractor.
• 3D – Monthly Inspection 1, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3E – Monthly Inspection 2, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3F – Monthly Inspection 3, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3G – Monthly Inspection 4, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3H – Quarterly Ecologist Report 1: If requested by BDC, the Ecologist Report will be produced and will provide a summary of the environmental activities to the BDC.
• 3I – Monthly Inspection 5, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3J – Monthly Inspection 6, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3K – Requests For Information #2 (RFIs #2): Review and respond to RFIs. Coordination with BDC at every stage. A total of 5 RFI submittals are included.
• 3L – Monthly Inspection 7, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3M – Monthly Inspection 8, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3N – Quarterly Ecologist Report 2: If requested by BDC, the Ecologist Report will be produced and will provide a summary of the environmental activities to the BDC.
• 3O – Monthly Inspection 9, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3P – Monthly Inspection 10, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3Q – Monthly Inspection 11, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3R – Monthly Inspection 12, Pay Request Review, Status Meetings: GFY will receive the draft pay request, perform a site inspection to verify the completion value proposed, coordinate with the Contractor, generate an inspection report, and provide a recommendation to the BDC. Also included are construction status meetings that are to occur every other week, with GFY, BDC, and any other requested parties in attendance.
• 3S – Requests For Information #3 (RFIs #3): Review and respond to RFIs. Coordination with BDC at every stage. A total of 5 RFI submittals are included.
• 3T – Quarterly Ecologist Report 3: If requested by BDC, the Ecologist Report will be produced and will provide a summary of the environmental activities to the BDC.
• 3U – Substantial Completion Inspection and Punchlist: Coordinate and perform the substantial completion inspection and generate an inspection report with punchlist. Review and recommendation of the Substantial Completion pay request. Coordination with BDC.
• 3V – Final Completion Inspection: Coordinate and perform the final inspection to verify that all punchlist items have been completed. Review and recommendation of the Final Completion pay request. Coordination with BDC. GFY will assist with the close out processes for the environmental permits.
• 3W – Building Permits Close-out: Coordinate and perform the permitting steps required with Collier County to finalize the interpretive pavilion and restroom buildings construction. This will require receiving documentation from the County indicating that the building have been constructed appropriately and the building permits have been closed out.
Deliverables:
• 3A – Provide copies of all RFI responses to BDC in pdf format.
• 3B – Provide the sign-in sheets and meeting minutes from the Pre-Construction meetings to BDC in pdf format.
• 3C – Provide a copy of the Shop Drawings log to BDC in pdf format after the completion of each
Shop Drawing submittal.
• 3D – Provide a copy of the Inspection Report 1 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3E – Provide a copy of the Inspection Report 2 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3F – Provide a copy of the Inspection Report 3 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3G – Provide a copy of the Inspection Report 4 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3H – Provide a copy of the Ecologist Report to BDC in pdf format.
• 3I – Provide a copy of the Inspection Report 5 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3J – Provide a copy of the Inspection Report 6 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3K – Provide copies of all RFI responses to BDC in pdf format.
• 3L – Provide a copy of the Inspection Report 7 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3M – Provide a copy of the Inspection Report 8 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3N – Provide a copy of the Ecologist Report to BDC in pdf format.
• 3O – Provide a copy of the Inspection Report 9 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3P – Provide a copy of the Inspection Report 10 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3Q – Provide a copy of the Inspection Report 11 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3R – Provide a copy of the Inspection Report 12 to BDC in pdf format. If requested, provide recommendation to BDC for the Pay Request in e-mail with attached Draft Pay Request in pdf format. Provide every other weekly status meeting minutes to BDC in pdf format.
• 3S – Provide copies of all RFI responses to BDC in pdf format.
• 3T – Provide a copy of the Ecologist Report to BDC in pdf format.
• 3U – The Substantial Completion inspection report and punchlist recommendations will be provided in pdf format to BDC. If requested by BDC, a pay request recommendation will be provided to BDC in pdf format.
• 3V – The Final Completion Inspection and reviewed punchlist recommendations will be provided in pdf format to BDC. If requested by BDC, a pay request recommendation will be provided to BDC in pdf format. The ‘As-Built’ certifications will be provided to the agencies, with a pdf format copy to BDC. Documentation indicating that the environmental permits have been closed out will be provided to BDC in pdf format.
• 3W – The building permit close-out and finalization documentation will be provided to BDC in pdf format.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 3A – CA Services - RFIs #1
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
George F. Young, Inc. Civil Engineer $142.54 80 $11,403.20
David Corban Architect Project Architect $135.00 12 $1,620.00
Jewitt Engineering Mechanical Engineer $150.00 2 $300.00
Select Structural Structural Engineer $125.00 4 $500.00
McCarthy & Associates Project Manager $144.24 9 $1,298.16
Mashayekhi Consultants Project Engineer $140.25 6 $841.50
Subtotal = 113 $15,962.86
Subtask 3B – CA Services - Pre-Construction Meetings
George F. Young, Inc. Civil Engineer $142.54 18 $2,565.72
George F. Young, Inc. Principal Ecologist $126.39 20 $2,527.80
Subtotal = 38 $5,093.52
Subtask 3C – CA Services - Shop Drawings Reviews
George F. Young, Inc. Civil Engineer $142.54 50 $7,127.00
David Corban Architect Project Architect $135.00 12 $1,620.00
Jewitt Engineering Mechanical Engineer $150.00 4 $600.00
Select Structural Structural Engineer $125.00 5 $625.00
McCarthy & Associates Project Manager $144.24 12 $1,730.88
Mashayekhi Consultants Project Engineer $140.25 12 $1,683.00
Subtotal = 95 $13,385.88
Subtask 3D – CA Services - Monthly Inspection 1, Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Mashayekhi Consultants Project Engineer $140.25 2 $280.50
Subtotal = 24 $3,389.62
Subtask 3E – CA Services - Monthly Inspection 2, Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Subtask 3F – CA Services - Monthly Inspection 3, Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Subtask 3G – CA Services - Monthly Inspection 4, Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Subtask 3H – CA Services – Quarterly Ecologist Report 1
George F. Young, Inc. Principal Ecologist $126.39 10 $1,263.90
Subtotal = 10 $1,263.90
Subtask 3I – CA Services - Monthly Inspection 5, Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Subtask 3J – CA Services – Monthly Inspection 6, Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Subtask 3K – CA Services - RFIs #2
George F. Young, Inc. Civil Engineer $142.54 80 $11,403.20
David Corban Architect Project Architect $135.00 12 $1,620.00
Jewitt Engineering Mechanical Engineer $150.00 2 $300.00
Select Structural Structural Engineer $125.00 4 $500.00
McCarthy & Associates Project Manager $144.24 9 $1,298.16
Subtask 3L – CA Services - Monthly Inspection 7, Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Subtask 3M – CA Services - Monthly Inspection 8, Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Subtask 3N – CA Services – Quarterly Ecologist Report 2
Subtask 3O – CA Services - Monthly Inspection 9, Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Subtask 3P – CA Services - Monthly Inspection 10 Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Subtask 3Q – CA Services - Monthly Inspection 11, Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Subtask 3R – CA Services - Monthly Inspection 12, Pay Request Review, Status Meetings
George F. Young, Inc. Civil Engineer $142.54 16 $2,280.64
David Corban Architect Project Architect $135.00 4 $540.00
McCarthy & Associates Project Manager $144.24 2 $288.48
Subtask 3S – CA Services - RFIs #3
George F. Young, Inc. Civil Engineer $142.54 80 $11,403.20
David Corban Architect Project Architect $135.00 12 $1,620.00
Jewitt Engineering Mechanical Engineer $150.00 2 $300.00
Select Structural Structural Engineer $125.00 4 $500.00
McCarthy & Associates Project Manager $144.24 9 $1,298.16
Subtask 3T – CA Services – Quarterly Ecologist Report 3
Subtask 3U – CA Services - Substantial Completion Inspection & Punchlist
George F. Young, Inc. Civil Engineer $142.54 26 $3,706.04
David Corban Architect Project Architect $135.00 22 $2,970.00
Jewitt Engineering Mechanical Engineer $150.00 4 $600.00
Select Structural Structural Engineer $125.00 5 $625.00
McCarthy & Associates Project Manager $144.24 14 $2,019.36
Mashayekhi Consultants Project Engineer $140.25 14 $1,963.50
Subtotal = 72 $10,128.90
Subtask 3V – CA Services - Final Inspection, As-Built Certs, & Closeout
George F. Young, Inc. Civil Engineer $142.54 28 $3,991.12
Subtotal = 28 $3,991.12
Subtask 3W – CA Services - Building Permits Closeout
George F. Young, Inc. Civil Engineer $142.54 60 $8,552.40
David Corban Architect Project Architect $135.00 12 $1,620.00
McCarthy & Associates Project Manager $144.24 9 $1,298.16
87 $12,312.06
Total = 977 $137,267.20
Project Schedule:
Activity Duration
(Calendar Days)
Subtask 3A: CA Services - RFIs #1 As Required
Subtask 3B: CA Services - Pre-Construction Meetings As Required
Subtask 3C: CA Services - Shop Drawings As Required
Subtask 3D: CA Services - Monthly Inspection 1 As Required
Subtask 3E: CA Services - Monthly Inspection 2 As Required
Subtask 3F: CA Services - Monthly Inspection 3 As Required
Subtask 3G: CA Services - Monthly Inspection 4 As Required
Subtask 3H: CA Services - Ecologist Report 1 As Required
Subtask 3I: CA Services - Monthly Inspection 5 As Required
Subtask 3J: CA Services - Monthly Inspection 6 As Required
Subtask 3K: CA Services - RFIs #2 As Required
Subtask 3L: CA Services - Monthly Inspection 7 As Required
Subtask 3M: CA Services - Monthly Inspection 8 As Required
Subtask 3N: CA Services - Ecologist Report 2 As Required
Subtask 3O: CA Services - Monthly Inspection 9 As Required
Subtask 3P: CA Services - Monthly Inspection 10 As Required
Subtask 3Q: CA Services - Monthly Inspection 11 As Required
Subtask 3R: CA Services - Monthly Inspection 12 As Required
Subtask 3S: CA Services – RFIs #3 As Required
Subtask 3T: CA Services - Ecologist Report 3 As Required
Subtask 3U: CA Services - Substantial Completion As Required
Subtask 3V: CA Services - Final Completion As Required
Subtask 3W: CA Services - Building Permits Closeout As Required
Subtask Subtask Fixed Price Cost
Subtask Reimbursable
Subtask 3A: CA Services - RFIs #1 $15,962.86 $0.00
Subtask 3B: CA Services - Pre-Construction Meetings $5,093.52 $429.87
Subtask 3C: CA Services - Shop Drawings $13,385.88 $0.00
Subtask 3D: CA Services - Monthly Inspection 1 $3,389.62 $121.04
Subtask 3E: CA Services - Monthly Inspection 2 $3,389.62 $121.04
Subtask 3F: CA Services - Monthly Inspection 3 $3,389.62 $121.04
Subtask 3G: CA Services - Monthly Inspection 4 $3,389.62 $121.04
Subtask 3H: CA Services - Ecologist Report 1 $1,263.90 $153.97
Subtask 3I: CA Services - Monthly Inspection 5 $3,389.62 $121.04
Subtask 3J: CA Services - Monthly Inspection 6 $3,389.62 $121.04
Subtask 3K: CA Services - RFIs #2 $15,962.86 $0.00
Subtask 3L: CA Services - Monthly Inspection 7 $3,389.62 $121.04
Subtask 3M: CA Services - Monthly Inspection 8 $3,389.62 $121.04
Subtask 3N: CA Services - Ecologist Report 2 $1,263.90 $153.97
Subtask 3O: CA Services - Monthly Inspection 9 $3,389.62 $121.04
Subtask 3P: CA Services - Monthly Inspection 10 $3,389.62 $121.04
Subtask 3Q: CA Services - Monthly Inspection 11 $3,389.62 $121.04
Subtask 3R: CA Services - Monthly Inspection 12 $3,389.62 $121.04
Subtask 3S: CA Services - RFIs #3 $15,962.86 $0.00
Subtask 3T: CA Services - Ecologist Report 3 $1,263.90 $153.97
Subtask 3U: CA Services - Substantial Completion $10,658.90 $121.04
Subtask 3V: CA Services - Final Completion $3,991.12 $121.04
Subtask 3W: CA Services - Building Permits Closeout $12,312.06 $0.00
Totals: $137,267.20 $2,586.34
OVERALL SUBTASK 3 TOTAL: $139,853.54
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
Subtask 4: Ecological Observation Description: It is anticipated that during the course of the work it may be necessary from time to time for the project ecologist to visit the site to observe the work conditions. Logical times might be at the beginning/during the wetland fill operations and during the installation of the culverts along Jan’s Scenic Trail. Following each site visit a report will be prepared summarizing the observations and activities ongoing at the time of the site visit. It may also include recommendations for wetland impact reductions should they be warranted.
• 4A - Ecologist Site Visit and Observation Report 1
• 4B - Ecologist Site Visit and Observation Report 2
• 4C - Ecologist Site Visit and Observation Report 3
• 4D - Ecologist Site Visit and Observation Report 4
• 4E - Ecologist Site Visit and Observation Report 5
• 4F - Ecologist Site Visit and Observation Report 6
Deliverables:
• 4A - Provide an observation report about the corresponding site visit to BDC in pdf format.
• 4B - Provide an observation report about the corresponding site visit to BDC in pdf format.
• 4C - Provide an observation report about the corresponding site visit to BDC in pdf format.
• 4D - Provide an observation report about the corresponding site visit to BDC in pdf format.
• 4E - Provide an observation report about the corresponding site visit to BDC in pdf format.
• 4F - Provide an observation report about the corresponding site visit to BDC in pdf format.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 4A – Ecologist Site Visit and Observation Report 1
George F. Young, Inc. Principal Ecologist $126.39 22 $2,780.58
Subtask 4B – Ecologist Site Visit and Observation Report 2
Subtask 4C – Ecologist Site Visit and Observation Report 3
Subtask 4D – Ecologist Site Visit and Observation Report 4
Subtask 4E – Ecologist Site Visit and Observation Report 5
Subtask 4F – Ecologist Site Visit and Observation Report 6
Subtotal = 132 $16,683.48
Project Schedule:
Activity Duration (Calendar Days)
Subtask 4A - Ecologist Site Visit and Observation Report 1 As Required
Subtask 4B - Ecologist Site Visit and Observation Report 2 As Required
Subtask 4C - Ecologist Site Visit and Observation Report 3 As Required
Subtask 4D - Ecologist Site Visit and Observation Report 4 As Required
Subtask 4E - Ecologist Site Visit and Observation Report 5 As Required
Subtask 4F - Ecologist Site Visit and Observation Report 6 As Required
Subtask Subtask Fixed Price Cost
Subtask Reimbursable
Subtask 4A - Ecologist Site Visit and Observation Report 1 $2,780.58 $153.97
Subtask 4B - Ecologist Site Visit and Observation Report 2 $2,780.58 $153.97
Subtask 4C - Ecologist Site Visit and Observation Report 3 $2,780.58 $153.97
Subtask 4D - Ecologist Site Visit and Observation Report 4 $2,780.58 $153.97
Subtask 4E - Ecologist Site Visit and Observation Report 5 $2,780.58 $153.97
Subtask 4F - Ecologist Site Visit and Observation Report 6 $2,780.58 $153.97
Totals $16,683.48 $923.82
OVERALL SUBTASK 4 TOTAL: $17,607.30
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
GRAND TOTAL CN200 TA14 CO1
Subtask 2: County SDP Inspection Fees $14,059.87
Subtask 3: Construction Administration Services $139,853.54
Subtask 4: Ecological Observation $17,607.30
GRAND TOTAL $171,520.71