This is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP) issued to George F. Young, Inc., a consulting engineering firm. The document establishes Task Assignment No. 23 under FDEP Contract No. CN200 for work at Manatee Springs State Park located in Florida. The project is managed by FDEP's Bureau of Design and Construction, with Ralph Perkins serving as the FDEP Contract Manager and Jonathan Langston, PE, representing the consultant. The task was executed on February 8, 2024, with a completion date of December 26, 2024.
The scope of work involves a due diligence and feasibility study examining three alternatives to address wastewater treatment at Manatee Springs State Park: connecting to the municipal sewer system, upgrading the existing park system, or constructing an on-site small footprint wastewater treatment facility. The project is divided into two main subtasks: Subtask 1 encompasses AHJ coordination, site visits, and vendor meetings ($6,259.96), and Subtask 2 involves the preparation of a due diligence report ($6,110.96). The total fixed price cost is $12,370.92 with no reimbursable costs, for an overall contract value of $12,370.92. Payment will be made upon FDEP approval of deliverables for each subtask. The project schedule spans from February 2024 through December 2024, with preliminary activities beginning in late February and the final due diligence report due by late April 2024.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN200 23 FDEP/DRP 61476C
Manatee Springs State Park Connect to Municipal Sewer
George F. Young, Inc.
Jonathan Langston, PE (727) 503-6968 jlangston@georgefyoung.com
Ralph Perkins (850) 245-2460 Ralph.Perkins@Floridadep.gov
A due diligence and feasibility study with three options to connect to the municipal sewer system, to upgrade existing system in the park or an on site small footprint wastewater treatment facility per the attached dated 01/05/24.
Rafael De Leon
Upon Execution $ 12,370.92 12/26/24
$ 12,370.92
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2024.02.12 10:42:15 -05'00'
Rafael De Leon Rafael De Leon Digitally signed by Rafael De Leon Date: 2024.02.08 15:07:34 -05'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2024.02.12 11:49:00 -05'00'
Jonathan Langston, PE Jonathan C Langston Digitally signed by Jonathan C Langston DN: CN=Jonathan C Langston, dnQualifier=A01410D000001881F5B3ABB00021224, O=Florida, C=US Date: 2024.02.13 08:24:31-05'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2024.02.16 14:37:18 -05'00'
61476C 37502013053 080039/23 423001 U3200 131500 QK $ 12,370.92
$ 12,370.92
File details come from the government source that posted it. Updated .