CN-370000-CN200-T4CO1.pdf
PDF 3 MB Posted
- Contract number
- CN200
- Issued by
- Florida
About this file
Document Summary
This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract CN200. The document represents Change Order No. 01 for Project No. 60964C, "Ranger Station/Fire Hydrant" at Rainbow Springs State Park. The contracting parties include FDEP, the consulting firm George F. Young, Inc. (headquartered in Gainesville, Florida), and the City of Dunnellon. The change order was executed in July 2016 and modifies the original task assignment by extending the project timeline and adjusting the scope of work related to fire hydrant design and installation.
The change order adds services focused on designing a fire hydrant to serve both the Rainbow Springs Ranger Station and Restroom Facility. The work is divided into five subtasks: Subtask 5 (Topographic Survey) at $974.13, Subtask 6 (100% Design Plans) at $649.49, Subtask 7A (Construction Administration Services – Shop Drawings) at $260.82, and Subtask 7B (Construction Administration Services – Inspection) at $285.08. The total fixed price cost for this change order is $2,169.52, representing a net increase of $2,169.52 to the original task amount. The project timeline was extended by 90 days, with the new task end date of October 31, 2016. Payment will be made upon FDEP's approval of deliverables for each subtask, with all work to be completed by George F. Young, Inc., a full-service engineering and architecture firm.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .