This is a Task Assignment Notification Form from the Florida Department of Environmental Protection (FDEP) issued under indefinite delivery contract CN200 with George F. Young, Inc., a structural engineering firm. The task assignment (No. 27) was executed on April 22, 2024, and involves engineering services for Blue Spring State Park located in Orange City, Florida. The project manager is Terry McCullum, Jr., and the FDEP contract manager is Ralph Perkins. Jeremy Lunsford, P.E., serves as the consultant representative for George F. Young, Inc.
The scope of work consists of a structural pre-engineering assessment of a restroom building at Blue Spring State Park that exhibits signs of disrepair and internal cracking. Services include a site visit to evaluate the structural condition and delivery of a comprehensive pre-engineering assessment report in PDF format with photographs, findings, and conclusions. The fixed price cost for this task is $2,086.56, with no reimbursable expenses, representing 16 hours of work at an hourly rate of $130.41 for a Contract Manager/Structural Engineer of Record. The project is scheduled for completion within 7 calendar days from the start date. Payment will be made upon FDEP approval of deliverables. The work is funded through FDEP's budget allocation with a completion date of February 26, 2025.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN200 27 FDEP 61565C
Restroom Replacement
George F. Young, Inc.
Jeremy Lunsford (727) 822-4317 jlunsford@georgefyoung.com
Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
Engineering services to structurally assess the viability a restroom at Blue Spring State Park, per attached proposal dated April 18, 2024
Terry McCullum, Jr. or successor
Upon Execution $ 2,086.56 02/26/2025 $ 0.00
$ 2,086.56
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2024.04.19 10:59:49 -04'00'
Terry McCullum, Jr. Terry McCullum Jr Digitally signed by Terry McCullum Jr Date: 2024.04.19 11:07:37 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2024.04.19 16:36:56 -04'00'
Jeremy Lunsford, P.E. Jeremy P Lunsford PE84620
2024.04.22 10:12:29-04'00' 04/22/2024
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2024.04.22 14:57:28 -04'00'
61565C 37503000101 080039/21 675002 U3200 131500 XR $ 2,086.56
$ 2,086.56
Blue Spring State Park integrity | quality | service
April 18, 2024
Terry McCullum
Project Manager
Bureau of Design and Construction
Florida Department of Environmental Protection
3900 Commonwealth Boulevard, MS 520
Tallahassee, FL 32399
RE: CN200 – George F. Young TAXX
Restroom Building Pre-engineering Assessment – Blue Spring State Park
Dear Mr. McCullum, For your review, George F. Young Inc. has provided a proposal summary and man-hour documentation for professional engineering services for the Restroom Building Pre-engineering
Assessment project at the Blue Spring State Park.
This scope reflects our understanding of the project, our research efforts, and the information provided. We trust the information contained in the attached proposal is consistent with your understanding.
Please review the attached Proposal Summary. We appreciate the opportunity to be of service to you on this project and look forward to working with you. Please feel free to contact me if you should have any questions or require any changes.
Sincerely, Jeremy Lunsford, PE
Vice President, Structural Engineering integrity | quality | service
Restroom Building Pre-engineering Assessment
Blue Spring State Park
DEP Agreement Number CN200, Task Assignment Number XX
Subtask 1: Pre-engineering Assessment Description: Based on information provided by the Florida Department of Environmental Protection, a restroom building located at Blue Spring State Park in Orange City, Florida is in need of structural assessment. The façade of the building is showing signs of disrepair and cracks are forming on the internal finishes of the building.
The Structural Engineering services shall include a site visit to review the structural condition of the restroom building and a pre-engineering assessment will be provided upon completion.
Deliverable: A Pre-engineering Assessment will be provided in pdf format including pictures, site findings, and conclusions for FDEP review and comment.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 1: Pre-engineering Assessment
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost
George F. Young Contract Mgr. Structural EOR $130.41 16 $2,086.56
Fee $2,086.56
Total for Subtask 1: $2,086.56
Project Schedule:
Note, time frames are approximate and often depend on agency review timeframe for turnaround.
Activity Duration (Calendar Days from Start of Project)
Subtask 1: Pre-engineering
Assessment
7 days
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 1: Pre-engineering
Assessment
$2,086.56 $
Subtask 1: Pre-engineering Assessment Subtotal $2,086.56
Total Fixed Price Cost: $2,086.56
Total Reimbursable Cost: $0.00
Overall Total Cost: $2,086.56
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.