Task Assignment Notification Summary
This Task Assignment Notification Form (TA 13) is issued by the Florida Department of Environmental Protection (FDEP) under master contract CN200 with George F. Young, Inc., a civil and transportation engineering firm. The task assignment is for the Little Manatee River State Park Bathhouse Replacement Project (Project No. 60993) located in Florida. The contract manager is Philip Stone at FDEP, and the consultant representative is Jacob Nussel at George F. Young. The task was executed on September 17, 2020, with a completion date of March 31, 2021.
The scope of work consists of Subtask 6C, which covers construction administration services including final completion inspection by a civil engineer and project closeout coordination. The deliverable is a final completion inspection report in electronic PDF format provided within two weeks of the inspection. The contract is structured as a fixed price arrangement of $3,135.88 for 22 hours of civil engineer time billed at $142.54 per hour, plus reimbursable costs of $156.00 for travel expenses (350 miles at the state rate of $0.445 per mile). The total task amount is $3,291.88, with payment contingent upon FDEP's approval of deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN200 TA 13 BDC 60993
Little Manatee River State Park Bathhouse Replacement Project
George F Young
Jacob Nussel 352-378-1444 jnussel@georgefyoung.com
Philip Stone or successor 850-245-2570 philip.stone@FloridaDEP.gov
Construction Administration Services associated with the construction project closeout. Tasks are as described on the attached George F Young proposal dated September 17, 2020.
Andy Carrier 941 828-1700 andy.j.carrier@floridadep.gov
Upon execution $ 3,135.88 3/31/2021 $ 156.00
$ 3,291.88
Greg Turral Gregory Turral Digitally signed by Gregory Turral Date: 2020.09.17 12:16:50 -04'00' 9/17/20
Andrew Carrier Andrew J Carrier Digitally signed by Andrew J Carrier Date: 2020.09.21 08:06:17 -04'00'
9/21/20
Philip Stone P.T. Stone Digitally signed by P.T. Stone Date: 2020.09.21 08:26:54 -04'00' 9/21/20
Matt Walker Matt Walker Digitally signed by Matt Walker DN: C=US, E=mwalker@georgefyoung.com, O="George F. Young, Inc.", CN=Matt Walker Reason: I have reviewed this document Date: 2020.09.23 09:31:44-04'00'
9/23/20
Michael W. Foster Jr. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2020.09.28 11:44:46 -04'00'
60993 37504000115 080039/19 675002 U3200 131500 XR $ 3,291.88
$ 3,291.88
G A I N E S V I L L E ���� L A K E W O O D R A N C H ���� O R L A N D O ���� P A L M B E A C H ���� S T . P E T E R S B U R G ���� T A M P A
Passionately committed to Integrity, Quality & Service
1905 South Main Street Gainesville, Florida 32601-8429
Phone: (352) 378-1444 www.georgefyoung.com
George F. Young, Inc.
Turning Vision into Reality Since 1919
CIVIL & TRANSPORTATION ENGINEERING | ECOLOGY | GIS | LANDSCAPE ARCHITECTURE | PLANNING | SURVEYING | SUBSURFACE UTILITY ENGINEERING
September 17, 2020
Andy Carrier Construction Project Consultant II Bureau of Design and Construction Florida Department of Environmental Protection
RE: FDEP Agreement CN200 Task Assignment 13 Little Manatee River State Park
Bathhouse Replacement Project
Dear Andy:
As per our earlier discussions, due to the previous Task Assignment (TA) 8 being expired, a new TA is required. This TA 13 will include the remaining item, Subtask 6C, from the previous TA 8 with a slightly revised scope. The revised scope includes effort for transferring the project to a new GFY project manager and streamlining the transition from substantial completion to final completion stages. It also doesn’t include any final site inspection visits by the Architect or Structural, Mechanical, Electrical, Plumbing (SMEP) Engineer or any certification of the bathhouse building structure.
Please review the attached Proposal Summary and deliverables. If you have any questions, please feel free to contact me.
Sincerely, GEORGE F. YOUNG, INC.
Jacob T. Nussel, PE Project Engineer
FDEP Agreement CN200 Task Assignment 13 September 17, 2020
G A I N E S V I L L E ���� L A K E W O O D R A N C H ���� O R L A N D O ���� P A L M B E A C H ���� S T . P E T E R S B U R G ���� T A M P A
Passionately committed to Integrity, Quality & Service
Little Manatee River State Park Bathhouse Replacement Project
CN200, Task Assignment 13
Subtask 6: Construction Administration Services
Description: GFY will provide the Final Completion inspection by the Civil discipline, and project closeout coordination. This will not include any certification of the bathhouse building structure.
• 6C — Final Completion Inspection by the Civil Engineer (GFY). Perform the inspection and generate the inspection report indicating completed punchlist items. Coordination with BDC.
Also includes effort streamlining the transition from substantial completion to final completion stages.
Deliverable:
• 6C — Final Completion Inspection and Project Closeout — The report will be provided in electronic pdf format within two weeks of the inspection.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 6C – Construction Administration Services – Final Inspection & Closeout
Firm Name Position Classification Hourly Rate Hours Total Fixed Price Cost
George F. Young, Inc. Civil Engineer $142.54 22 $3,135.88
Subtotal = 22 $3,135.88
Project Schedule:
Activity Duration
(Calendar Days)
Subtask 6C: Construction Administration Services – Final Inspection & Closeout
As Required
Summary of Fees:
Subtask Subtask Fixed
Price Cost Subtask
Reimbursable Cost
Subtask 6C: Construction Administration Services - Final Inspection & Closeout
$3,135.88 $156.00
Overall Total Cost: $3,291.88
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
Little Manatee River TA 13 Reimbursible Fees
Travel
168 mi one way, total approx. 350 mi x 1 ppl
350 mi at $0.445 rate = $156 state rate contract amounts