This document is a Schedule of Items for the Lucky Peak Headhouse and Greenhouses Project issued by the USDA Forest Service, dated final 7/8/26.

The schedule of items includes 24 base line items and 3 option items, covering construction and site work for a headhouse, greenhouse repair and construction, warehouse facility, and associated site infrastructure. Base items include mobilization, site demolition, construction staking, sedimentation and erosion control, building construction (headhouse, repair greenhouse #1, new greenhouse #2, warehouse facility), removal and disposal of existing structures, concrete waterway and sidewalk work, drainage and septic systems, electrical site work, site preparation and grading, embankment construction, aggregate base courses, asphalt pavement, pavement markings, and rip rap. Quantities vary by item, with measurements in lump sum (LS), linear feet (LF), square feet (SF), each (EA), cubic yards (CY), and tons. Option items include additional hot mix asphalt pavement (34 LS) and a quality control on-site manager position, with a note that option items may be awarded up to 60 days after initial award based on available funding. Contractors must provide their name and Unique Entity Identifier (UEI) with their pricing submission.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA Forest Service

ITEM

NUMBER DESCRIPTION

METHOD

OF MEAS UNIT QUANT. PRICE TOTAL

011900 Mobilization LSQ LS 1

017320-1 Site Demolition LSQ LS 1

010250 Construction Staking LSQ LS 1

023701 Sedimentation and Errosion Control LSQ LS 1

000501 Headhouse LSQ LS 1

000502 Repair Greenhouse #1 LSQ LS 1

000503 New Greenhouse #2 LSQ LS 1

024102 Removal and Disposal of Existing Structures LSQ LS 1

033445-1 6 ft Concrete Waterway DQ LF 400

033445-2 Concrete Sidewalks and slabs DQ SF 2,195

221300-1 Exterior Drainline for Trench Drains - Gravity, 6" HDPE, 160 PSI, Including Trench and Cleanouts DQ LF 459

221300-2 Sanitary Sewer - Gravity, 4" HDPE, 160 PSI, Including Trench and Cleanouts DQ LF 80

221300-3 Drainfield LSQ LS 1

221300-4 Septic Tank - 750 Gallon (Concrete) with Internal Baffle AQ EA 1

260500-1 Electrical: Site LSQ LS 1

312100-1 Project Site Preparation and Grading (Excludes All Work within 5' of the Building Roof Line) LSQ LS 1

312225 Embankment Construction - Greenhouse #2 DQ CY 10,277

321204-1 Crushed Aggregate Base Course - Grading "D" (12" For Under Greenhouse #2) DQ CY 1,257

321204-2 Crushed Aggregate Base Course - Grading "D" (For Under Asphalt Parking) DQ CY 517

321204-2 6" New Crushed Aggregate Surface Course - Grading "G" (For Roadway and Parking) DQ CY 179

321204-3 12" Class 1 Rip Rap (Armour Drainage Swale Embankment Fill Slope) DQ CY 10

321200-1 Hot Mix Asphalt Pavement DQ Ton 385

322640-1 Pavement Markings - Accessible Parking Symbol and Line Striping LSQ LS 1

000504 Warehouse facilty LSQ LS 1

321204-2 Crushed Aggregate Base Course - Grading "C" (For Under Asphalt Parking) DQ CY 52

SCHEDULE OF ITEMS

Lucky Peak Headhouse and Greenhouses Project

FINAL 7/8/26

Total Base

Base Items

OPTION ITEMS

USDA Forest Service

ITEM

NUMBER DESCRIPTION

METHOD

OF MEAS UNIT QUANT. PRICE TOTAL

SCHEDULE OF ITEMS

Lucky Peak Headhouse and Greenhouses Project

FINAL 7/8/26

321200-1 Hot Mix Asphalt Pavement LSQ LS 34

014150 Quality Control On-Site Manager LSQ LS 1

Total Options

Total Base + Option Items

Contractor Name: ______________________________________

Contractor UEI:_________________________________________

Option items may be awarded up to 60 days after initial award based on available funding.

Schedule of Items