C04b SOI 1240LT26Q0137.pdf
PDF 136 KB Posted
- Attached to
- Lucky Peak Nursery New Greenhouse
- Solicitation number
- 1240LT26Q0137
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Schedule of Items for the Lucky Peak Headhouse and Greenhouses Project issued by the USDA Forest Service, dated final 7/8/26.
The schedule of items includes 24 base line items and 3 option items, covering construction and site work for a headhouse, greenhouse repair and construction, warehouse facility, and associated site infrastructure. Base items include mobilization, site demolition, construction staking, sedimentation and erosion control, building construction (headhouse, repair greenhouse #1, new greenhouse #2, warehouse facility), removal and disposal of existing structures, concrete waterway and sidewalk work, drainage and septic systems, electrical site work, site preparation and grading, embankment construction, aggregate base courses, asphalt pavement, pavement markings, and rip rap. Quantities vary by item, with measurements in lump sum (LS), linear feet (LF), square feet (SF), each (EA), cubic yards (CY), and tons. Option items include additional hot mix asphalt pavement (34 LS) and a quality control on-site manager position, with a note that option items may be awarded up to 60 days after initial award based on available funding. Contractors must provide their name and Unique Entity Identifier (UEI) with their pricing submission.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Forest Service
ITEM
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANT. PRICE TOTAL
011900 Mobilization LSQ LS 1
017320-1 Site Demolition LSQ LS 1
010250 Construction Staking LSQ LS 1
023701 Sedimentation and Errosion Control LSQ LS 1
000501 Headhouse LSQ LS 1
000502 Repair Greenhouse #1 LSQ LS 1
000503 New Greenhouse #2 LSQ LS 1
024102 Removal and Disposal of Existing Structures LSQ LS 1
033445-1 6 ft Concrete Waterway DQ LF 400
033445-2 Concrete Sidewalks and slabs DQ SF 2,195
221300-1 Exterior Drainline for Trench Drains - Gravity, 6" HDPE, 160 PSI, Including Trench and Cleanouts DQ LF 459
221300-2 Sanitary Sewer - Gravity, 4" HDPE, 160 PSI, Including Trench and Cleanouts DQ LF 80
221300-3 Drainfield LSQ LS 1
221300-4 Septic Tank - 750 Gallon (Concrete) with Internal Baffle AQ EA 1
260500-1 Electrical: Site LSQ LS 1
312100-1 Project Site Preparation and Grading (Excludes All Work within 5' of the Building Roof Line) LSQ LS 1
312225 Embankment Construction - Greenhouse #2 DQ CY 10,277
321204-1 Crushed Aggregate Base Course - Grading "D" (12" For Under Greenhouse #2) DQ CY 1,257
321204-2 Crushed Aggregate Base Course - Grading "D" (For Under Asphalt Parking) DQ CY 517
321204-2 6" New Crushed Aggregate Surface Course - Grading "G" (For Roadway and Parking) DQ CY 179
321204-3 12" Class 1 Rip Rap (Armour Drainage Swale Embankment Fill Slope) DQ CY 10
321200-1 Hot Mix Asphalt Pavement DQ Ton 385
322640-1 Pavement Markings - Accessible Parking Symbol and Line Striping LSQ LS 1
000504 Warehouse facilty LSQ LS 1
321204-2 Crushed Aggregate Base Course - Grading "C" (For Under Asphalt Parking) DQ CY 52
SCHEDULE OF ITEMS
Lucky Peak Headhouse and Greenhouses Project
FINAL 7/8/26
Total Base
Base Items
OPTION ITEMS
USDA Forest Service
ITEM
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANT. PRICE TOTAL
SCHEDULE OF ITEMS
Lucky Peak Headhouse and Greenhouses Project
FINAL 7/8/26
321200-1 Hot Mix Asphalt Pavement LSQ LS 34
014150 Quality Control On-Site Manager LSQ LS 1
Total Options
Total Base + Option Items
Contractor Name: ______________________________________
Contractor UEI:_________________________________________
Option items may be awarded up to 60 days after initial award based on available funding.
Schedule of Items
File details come from the government source that posted it. Updated .