C05h SOV 1240LT26Q0137.xlsx

XLSX spreadsheet 89 KB Posted

Attached to
Lucky Peak Nursery New Greenhouse
Solicitation number
1240LT26Q0137
Issued by

About this file

This is a Statement of Values (SOV) pricing template for construction of a new headhouse building, new greenhouse building, post-fire repairs to an existing greenhouse building, and site support work at the Lucky Peak Nursery in Boise, Idaho under solicitation 1240LT26Q0137. The template provides itemized material and labor cost breakdowns organized by Construction Specifications Institute (CSI) divisions, including General Requirements, Concrete, Masonry, Metals, Wood/Plastics/Composites, Thermal & Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Utilities (Water/Sewer and Electrical), Transportation, Waterway & Marine, Material Processing & Handling, and Pollution Control Equipment. The template includes sample line items with unit costs and labor rates; for example, CSI Division 4 (Masonry) lists cultured stone veneer options, Division 5 (Metals) includes anchor bolts and pipe railings, and Division 14 (Conveying Equipment) identifies wheelchair lift requirements at $22,000 for equipment and $7,000 for installation and overhead.

The document serves as a cost estimating tool for contractors responding to the RFQ issued by the Department of Agriculture Forest Service for this small business set-aside acquisition. As reflected in the solicitation amendment dated 9/4/26, contractors must submit pricing for all items to be considered responsive, with the extended response deadline of 9/25/26. This is a Firm Fixed Price Contract procurement. The template demonstrates the comprehensive scope of work required, spanning structural systems, mechanical systems, accessibility features, and site improvements necessary for the complete nursery facility renovation and construction project.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

000501

ITEMIZED MATERIAL AND LABOR COSTS FOR LUMP SUM ITEMS 00050(#) SUMMARY

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project09/01/26
QuoterBuilding
CSISPECIFICATION SECTIONSHEETMATERIALSLABOR & OHTOTAL
No.
1General Requirements$ - 0
1aAnticipated Tarriff
2Existing Conditions$ - 0
3Concrete$ - 0
4Masonry$ - 0
5Metals$ - 0
6Wood, Plastics & Composites$ - 0
7Thermal & Moisture Protection$ - 0
8Openings$ - 0
9Finishes$ - 0
10Specialties$ - 0
11Equipment$ - 0
12Furnishings$ - 0
13Special Construction$ - 0
14Conveying Equipment$ - 0
21Fire Suppression$ - 0
22**Plumbing$ - 0
23**HVAC$ - 0
26**Electrical$ - 0
27**Communications$ - 0
28**Electronic Safety & Security$ - 0

SUBTOTAL LUMP SUM $ - 0 $ - 0 $ - 0

Page &P

000502

ITEMIZED MATERIAL AND LABOR COSTS FOR LUMP SUM ITEMS 00050(#) SUMMARY

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project09/01/26
QuoterBuilding
CSISPECIFICATION SECTIONSHEETMATERIALSLABOR & OHTOTAL
No.
1General Requirements$ - 0
1aAnticipated Tarriff
2Existing Conditions$ - 0
3Concrete$ - 0
4Masonry$ - 0
5Metals$ - 0
6Wood, Plastics & Composites$ - 0
7Thermal & Moisture Protection$ - 0
8Openings$ - 0
9Finishes$ - 0
10Specialties$ - 0
11Equipment$ - 0
12Furnishings$ - 0
13Special Construction$ - 0
14Conveying Equipment$ - 0
21Fire Suppression$ - 0
22**Plumbing$ - 0
23**HVAC$ - 0
26**Electrical$ - 0
27**Communications$ - 0
28**Electronic Safety & Security$ - 0

SUBTOTAL LUMP SUM $ - 0 $ - 0 $ - 0

Page &P

000503

ITEMIZED MATERIAL AND LABOR COSTS FOR LUMP SUM ITEMS 00050(#) SUMMARY

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project09/01/26
QuoterBuilding
CSISPECIFICATION SECTIONSHEETMATERIALSLABOR & OHTOTAL
No.
1General Requirements$ - 0
1aAnticipated Tarriff
2Existing Conditions$ - 0
3Concrete$ - 0
4Masonry$ - 0
5Metals$ - 0
6Wood, Plastics & Composites$ - 0
7Thermal & Moisture Protection$ - 0
8Openings$ - 0
9Finishes$ - 0
10Specialties$ - 0
11Equipment$ - 0
12Furnishings$ - 0
13Special Construction$ - 0
14Conveying Equipment$ - 0
21Fire Suppression$ - 0
22**Plumbing$ - 0
23**HVAC$ - 0
26**Electrical$ - 0
27**Communications$ - 0
28**Electronic Safety & Security$ - 0

SUBTOTAL LUMP SUM $ - 0 $ - 0 $ - 0

Page &P

000504

ITEMIZED MATERIAL AND LABOR COSTS FOR LUMP SUM ITEMS 00050(#) SUMMARY

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project09/01/26
QuoterBuilding
CSISPECIFICATION SECTIONSHEETMATERIALSLABOR & OHTOTAL
No.
1General Requirements$ - 0
1aAnticipated Tarriff
2Existing Conditions$ - 0
3Concrete$ - 0
4Masonry$ - 0
5Metals$ - 0
6Wood, Plastics & Composites$ - 0
7Thermal & Moisture Protection$ - 0
8Openings$ - 0
9Finishes$ - 0
10Specialties$ - 0
11Equipment$ - 0
12Furnishings$ - 0
13Special Construction$ - 0
14Conveying Equipment$ - 0
21Fire Suppression$ - 0
22**Plumbing$ - 0
23**HVAC$ - 0
26**Electrical$ - 0
27**Communications$ - 0
28**Electronic Safety & Security$ - 0

SUBTOTAL LUMP SUM $ - 0 $ - 0 $ - 0

Building_Cost_Estimate.xls

Page &P

DIV4

ITEMIZED MATERIAL AND LABOR COSTS OPINION

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project9/1/26
ESTIMATORBuilding
0.000$0
4 MASONRY
Mean's IDDESCRIPTION OF ITEMQTY.UNITMATERIALSLABOR & OHTOTAL
No.$/UnitItem cost$/UnitItem cost
04 72 20.10Cultured Stone Veneer (closest to thin stone veneer)0ea$ - 0$ - 0$ - 0$ - 0$ - 0
130on wd. Frame & sheath.; random sized flats, corner stones0vlf$ 9.35$ - 0$ 36.65$ - 0$ - 0
140on wd. Frame & sheath.; Field stones0sf$ 7.55$ - 0$ 18.45$ - 0$ - 0
260on conc.; random sized flats, corner stones (cols.)0vlf$ 8.70$ - 0$ 36.30$ - 0$ - 0
270on conc.; Field stones (cols.)0sf$ 7.20$ - 0$ 18.80$ - 0$ - 0
360Cult. Stone veneer: #15 felt (2 layers)0sq$ 5.20$ - 0$ 0.30$ - 0$ - 0
370Exp. Mlt. Lath0sy$ 2.85$ - 0$ 5.80$ - 0$ - 0
390Window Sill, 18" long0ea.$ 8.50$ - 0$ 7.65$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal 4 MASONRY$ - 0$ - 0$ - 0
`

DIV5

ITEMIZED MATERIAL AND LABOR COSTS OPINION

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project9/1/26
ESTIMATORBuilding
0.000$0
5 METALS
Mean's IDDESCRIPTION OF ITEMQTY.UNITMATERIALSLABOR & OHTOTAL
No.$/UnitItem cost$/UnitItem cost
50523.05Anchor Bolts
50Simpson SSTB160ea$ 2.95$ - 0$ 4.40$ - 0$ - 0
Bolts $ Nuts
21001/2" Dia x 16"0ea$ 3.50$ - 0$ 7.15$ - 0$ - 0
Fabrications
Col. Bases0ea$ 100.00$ - 0$ 150.00$ - 0$ - 0
Miscellaenous
Miscellaneous Mtl. Framing0job$ 1,000.00$ - 0$ 1,000.00$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
05 52 13.50Pipe Railings
5201 1/2" diam. Steel railing (guard rail + hand rails @ entry)0lf$ 23.00$ - 0$ 20.50$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
VESTIBULE0ea$ - 0$ - 0$ - 0$ - 0$ - 0
50523.05Anchor Bolts0
50Simpson SSTB160ea$ 2.95$ - 0$ 4.40$ - 0$ - 0
Bolts $ Nuts0
21001/2" Dia x 16"0ea$ 3.50$ - 0$ 7.15$ - 0$ - 0
Fabrications0
Col. Bases0ea$ 100.00$ - 0$ 150.00$ - 0$ - 0
Miscellaenous0
Miscellaneous Mtl. Framing0job$ 500.00$ - 0$ 250.00$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0

Subtotal 5 METALS $ - 0 $ - 0 $ - 0

DIV13

ITEMIZED MATERIAL AND LABOR COSTS OPINION

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project5/20/02
ESTIMATORBuilding
Todd Michael
13 SPECIAL CONSTRUCTION
Mean's IDDESCRIPTION OF ITEMQTY.UNITMATERIALSLABOR & OHTOTAL
No.$/UnitItem cost$/UnitItem cost
00 00 00.000ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0

Subtotal 13 SPECIAL CONSTRUCTION $ - 0 $ - 0 $ - 0

DIV14

ITEMIZED MATERIAL AND LABOR COSTS OPINION

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project9/1/26
ESTIMATORBuilding
0.000$0
14 CONVEYING EQUIPMENT
Mean's IDDESCRIPTION OF ITEMQTY.UNITMATERIALSLABOR & OHTOTAL
No.$/UnitItem cost$/UnitItem cost
Wheelchair Lifts
14 42 16.10Vertical wheelchair lift-max. (Cost based off Means maximum + information from Gunnison H&S's cost for similar lift: $22k equip; $3k install; $7k OH, tax, etc.)0ea$ 22,000.00$ - 0$ 7,000.00$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0

Subtotal 14 CONVEYING EQUIPMENT $ - 0 $ - 0 $ - 0

DIV21

ITEMIZED MATERIAL AND LABOR COSTS OPINION

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project9/1/26
ESTIMATORBuilding
Todd MichaelBBI #6
21 FIRE SUPPRESSION
Mean's IDDESCRIPTION OF ITEMQTY.UNITMATERIALSLABOR & OHTOTAL
No.$/UnitItem cost$/UnitItem cost
00 00 00.000ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0

Subtotal 21 FIRE SUPPRESSION $ - 0 $ - 0 $ - 0

DIV33WS

ITEMIZED MATERIAL AND LABOR COSTS OPINION

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project9/1/26
ESTIMATORBuilding
L.DeedsBBI #6
33 UTILITIES (Water/sewer)
Mean's IDDESCRIPTION OF ITEMQTY.UNITMATERIALSLABOR & OHTOTAL
No.$/UnitItem cost$/UnitItem cost
00 00 00.000ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0
0ea$0$ - 0$ - 0$ - 0$ - 0

Subtotal 33 UTILITIES (Water/Sewer) $ - 0 $ - 0 $ - 0

DIV33E

ITEMIZED MATERIAL AND LABOR COSTS OPINION

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project5/20/02
ESTIMATORBuilding
0.00
33 UTILITIES (ELEC)
Mean's IDDESCRIPTION OF ITEMQTY.UNITMATERIALSLABOR & OHTOTAL
No.$/UnitItem cost$/UnitItem cost
$ - 0$ - 0$ - 0
00 00 00.000ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0

Subtotal 33 UTILITIES $ - 0 $ - 0 $ - 0

DIV34

ITEMIZED MATERIAL AND LABOR COSTS OPINION

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project5/20/02
ESTIMATORBuilding
0.00
34 TRANSPORTATION
Mean's IDDESCRIPTION OF ITEMQTY.UNITMATERIALSLABOR & OHTOTAL
No.$/UnitItem cost$/UnitItem cost
00 00 00.000ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
0ea$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Subtotal 34 TRANSPORTATION$ - 0$ - 0$ - 0

DIV35

ITEMIZED MATERIAL AND LABOR COSTS OPINION

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project5/20/02
ESTIMATORBuilding
0.00
35 WATERWAY & MARINE
Mean's IDDESCRIPTION OF ITEMQTY.UNITMATERIALSLABOR & OHTOTAL
No.$/UnitItem cost$/UnitItem cost
$ - 0$ - 0$ - 0
00 00 00.000ea$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0

Subtotal 35 WATERWAY & MARINE $ - 0 $ - 0 $ - 0

DIV41

ITEMIZED MATERIAL AND LABOR COSTS OPINION

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project5/20/02
ESTIMATORBuilding
0.00
41 MATERIAL PROCESSING & HANDLING EQUIPMENT
Mean's IDDESCRIPTION OF ITEMQTY.UNITMATERIALSLABOR & OHTOTAL
No.$/UnitItem cost$/UnitItem cost
$ - 0$ - 0$ - 0
00 00 00.00$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Subtotal 41 MATERIAL PROCESSING & HANDLING$ - 0$ - 0$ - 0

DIV44

ITEMIZED MATERIAL AND LABOR COSTS OPINION

PROJECT NUMBERPROJECT TITLEDATE
Lucky Peak Headhouse and Greenhouse Project5/20/02
ESTIMATORBuilding
0.00
44 POLLUTION CONTROL EQUIPMENT
Mean's IDDESCRIPTION OF ITEMQTY.UNITMATERIALSLABOR & OHTOTAL
No.$/UnitItem cost$/UnitItem cost
$ - 0$ - 0$ - 0
00 00 00.00$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0

Subtotal 44 POLLUTION CONTROL EQUIPMENT $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .