This is a Contract Data Requirements List (CDRL) Form DD 1423-1 for an Engineering Change Proposal (ECP) data item under the Binocular Night Observation Device (BiNOD) contract. The CDRL requires the contractor to prepare and submit ECPs in accordance with EIA-649-1 and DI-SESS-80639E standards when changes to contractual baseline documents are needed.
The submission requirements specify that ECPs must be submitted on DD Form 1692 with contractor-proposed numbering methods approved by the Government. Deliverables must be in digital format via email or DoD SAFE (https://safe.apps.mil/) when exceeding 25mb, with Microsoft Word and Adobe Acrobat as preferred file formats. The Government has 30 days to review draft submissions, after which the contractor has 30 days to incorporate changes. Final submissions also have a 30-day Government review period. Distribution includes 3 final copies and no draft copies or reproductions. The form is dated 11/21/2024 and includes a note that the template requires tailoring before release to industry.
View the file
Other files for this federal contract opportunity
Show all 50
Binocular Night Observation Device (BiNOD) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| xtm: Off |
| 1_DATA_ITEM_NO: |
| 2_TITLE_OF_DATA_ITEM: Engineering Change Proposal (ECP) |
| 3_SUBTITLE: |
| 4_AUTHORITY_Data_Acquisit: DI-SESS-80639E |
| 5_CONTRACT_REFERENCE: |
| 6_REQUIRING_OFFICE: |
| 7_DID_250_REQ: |
| 8_APP_CODE: LT |
| DIST_STATEMENT: |
| 10_FREQUENCY: ASREQ |
| 11_AS_OF_DATE: ASREQ |
| 12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16 |
| addressee1: |
| draft1: 0 |
| reg1: 1 |
| repro1: 0 |
| addressee2: |
| draft2: 0 |
| reg2: 1 |
| repro2: 0 |
| addressee3: |
| draft3: 0 |
| reg3: 1 |
| repro3: 0 |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_repro: 0 |
| 16_REMARKS: Note to User: This template requires tailoring and is only meant to provide a basic set of recommendations/guidelines to consider. Delete this paragraph prior to releasing to industry. |
The contractor shall prepare and submit Engineering Change Proposal in accordance with EIA-649-1 and DI-SESS-80639E to propose engineering changes when a change to a contractual baseline document is deemed necessary.
BLOCK 9:
The following statement shall be included on the deliverable:
INSERT DISTRIBUTION STATEMENT HERE matching the letter code in block 9
The ECP shall be submitted in DD Form 1692, Engineering Change Proposal (ECP). The numbering method utilized for ECPs should allow for unique identification of the ECP. Numbering methods shall be as proposed by the contractor with Government concurrence. All deliveries shall be in digital format delivered via email or via DoD SAFE, https://safe.apps.mil/, when file size exceeds 25 mb. Alternative delivery media may be discussed with the Contracting Officer prior to delivery. The Government personnel listed in the distribution list shall receive a copy of the required submittals. See Attachment 00X for the name and electronic address of Government personnel for CDRL distribution addressee. Microsoft Word and Adobe Acrobat are the preferred file format for data furnished under this CDRL.
The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receipt of Government comments. The Government will have 30 days to review, accept, and/or comment on the final submission.
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: |
| H_DATE: 11/21/2024 |
| 1_APPROVED_BY: |
| J_DATE: |
| Page: |
| reg38t: 3 |
| A_CONTRACT_LINE_ITEM_NO: |
| B_EXHIBIT: |
| xTDP: Off |
| OTHER: |
| DSYSTEMITEM: BiNOD |
| E_CONTRACTPR_NO: |
| FCONTRACTOR: |
| of_pages: |
| Reset: |
File details come from the government source that posted it. Updated .