Bidder Responses 1- Strobe Tech, LLC.pdf
PDF 7 MB Posted
- Solicitation number
- 123282 OR
- Issued by
- Platte County, Nebraska
About this file
This document is a solicitation (Solicitation #123282) from the State of Nebraska, proposed by Strobe Tech, LLC, for the procurement of FAA-compliant high and medium intensity LED obstruction lighting systems for multiple radio transmission tower sites. The solicitation seeks to install dual high-intensity LED obstruction lighting systems at five transmitter sites: KLNE (Holdrege), KPNE (Sutherland), KCNE (Chadron), K23AA (Beatrice), and K33FO/KNNE (Max/Culbertson). The project involves providing Drake Lighting equipment, including F3 High Intensity and E1/E2 Medium Intensity Lighting Kits, along with complete installation services. The lighting systems must meet FAA requirements, include ground-based components, feature SNMP monitoring, and be fully operational with manufacturer training provided.
The total project cost is structured across different site installations, with pricing broken down by equipment and labor. High-intensity lighting kits for KLNE and KPNE sites are priced at $137,163.00 each, with $4,150.00 in installation materials and $100,800.00 in installation labor per site. Medium-intensity lighting kits for other sites range from $11,400.00 to $26,460.00, with corresponding installation materials and labor costs. The solicitation requires the vendor to be an authorized dealer, comply with safety regulations, provide a trained installation crew, and coordinate closely with NETC representatives. Insurance requirements include comprehensive general liability coverage, workers' compensation, and other standard commercial insurance policies. The vendor must also attest to being a U.S. citizen and not owned by the Chinese Communist Party.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material !Quantity Price Amount Beacons
Beacon Power Supplies
AOL Beacon
AOL Beacon Power Supply
Photocell(s)
Controller(s)
Rack Equipment Power Supplies
Equipment Rack(s)
Conduit
Other - Drake Lighting F3 High Intensity Lighting Kit I $137.163.00 $137.163.00
Other - Installation Materials I $4,150.00 $4.150.00
Labor Hours Price Amount
Jnstallat1on Labor - Flat Rate/Lump Sum ·1otal $100,800.00
Material Quantity Price Amount Beacons
Beacon Power Supplies
AOL Beacon
AOL Beacon Power Supply
Photocell(s)
Controller(s)
Rack Equipment Power Supplies
Equipment Rack(s)
Conduit
Other - Drake Lighting F3 High Intensity Lighting Kit I $136.743.00 $136.743.00 Other - Installation Materials I $4,150.00 $4,150.00
Labor Hours Price Amount Installation Labor - Flat Rate/Lump Sum Total $100,800.00
Material Quantitv Price Amount Beacons
Beacon Power Supplies
AOL Beacon
AOL Beacon Power Supply
Photocell(s)
Controller(s)
Rack Equipment Power Supplies
Equipment Rack(s)
Conduit lee Shields
Other - Drake Lighting El Medium Intensity Lighting Kit 1 $11,400.00 $11,400.00
Other - Installation Materials I $1,250.00 $1,250.00
Labor Hours Price Amount Installation Labor - Flat Rate/Lump Sum Total $16,800.00
Material Ouantitv Price Beacons
Beacon Power Supplies
KLNE Transmitter Site: 72821 J Road, Holdrege, NE 68949
KPNE Transmitter Site: 12392 S. Hwy 25, Sutherland, NE 69165
KCNE Transmitter Site: 1740 South Maple, Chadron NE 69337
K23AA Transmitter Site: 30708 SW 142nd Road, Beatrice, NE 68310
Amount
AOL Beacon
AOL Beacon Power Supply
Photocell(s)
Controller(s)
Rack Equipment Power Supplies
Equipment Rack(s)
Conduit
Other - Drake Lighting E2 Medium Intensity Lighting Kit I $26,460.00
Other - Installation Materials I $2,000.00
Labor Hours Price Installation Labor - Flat Rate/Lump Sum Total
Material Ouaotitv Price Amount Beacons
Beacon Power Supplies
AOL Beacon
AOL Beacon Power Supply
Photocell(s)
Controller(s)
Rack Equipment Power Supplies
Equipment Rack(s)
Conduit
Ice Shields
Other - Drake Lighting EI Medium Intensity Lighting Kit I $11,400.00 $11,400.00 Other - Installation Materials I $1,250.00 $1,250.00
Labor Hours Price Amount Installation Labor - Flat Rate/Lump Sum Total $16,800.00
Material Quantity Price Amount Beacons
Beacon Power Supplies
AOL Beacon
AOL Beacon Power Supply
Photocell(s)
Controller(s)
Rack Equipment Power Supplies
Equipment Rack(s)
Conduit
Ice Shields
Other - Drake Lighting EI Medium Intensity Lighting Kit I $11,400.00 $11,400.00 Other - Installation Materials I $1,250.00 $1,250.00
Labor Hours Price Amount Installation Labor - Flat Rate/Lump Sum Total $16.800.00
$26,460.00
$2,000.00
Amount $29,400.00
K33FO Transmitter Site: East of 707 Rd & 345 Ave. Intersection, Max NE 69037
KNNE Transmitter Site: 71991 Old Highway 17, Culbertson, NE 69024
| #123282 - Strobe Tech LLC File 1 of 2.pdf |
| #123282 - Strobe Tech LLC File 2 of 2 with corrections.pdf |
File details come from the government source that posted it. Updated .