Bidder Response 2- Allstate Towers, Inc.pdf

PDF 26 MB Posted

Attached to
LED Red/White Obstruction Lighting System for Communication Towers
Solicitation number
123282 OR
Issued by
Platte County, Nebraska

About this file

The document is a Bidder Response from Allstate Towers, Inc. for Invitation to Bid (ITB) #123282 OR, issued by the State of Nebraska's Department of Administrative Services Materiel Division State Purchasing Bureau. The solicitation seeks a comprehensive LED red/white obstruction lighting system installation for communication towers at six locations: Holdrege, Sutherland, Chadron, Beatrice, Max, and Culbertson. Tower heights range from 85.0 to 308.4 meters, and the project requires complete installation, system testing, and operational training for Nebraska Educational Telecommunications Commission (NETC) personnel. All installations must comply with FAA Advisory Circular 70/7460-1L standards, with a project completion deadline of July 1, 2026. The bid response is due on October 10, 2025, at 2:00 PM Central Time.

The bidder's response includes detailed cost sheets for each transmitter site, with pricing breakdowns for materials and labor, including beacons, beacon power supplies, AOL beacons, photocells, controllers, rack equipment, and installation labor. The total pricing varies by site, with light kit prices ranging from $12,938 to $144,223 and installation labor costs between $41,973 and $137,070. The solicitation includes preferences for Nebraska-based vendors, particularly disabled veterans and businesses in enterprise zones. The contract is structured as a one-time purchase with no explicit renewal options, and payment will follow the State of Nebraska Prompt Payment Act. Funding is subject to legislative appropriation, with the State reserving the right to reject any or all bids. Vendors must maintain comprehensive insurance coverage and demonstrate technical expertise in LED obstruction lighting systems and FAA compliance.

View the file

Other files

File Type Posted
123282 OR LED obstruction lighting system- Final.docx DOCX document
Bidder Responses 4-Precision Communications, LLC.pdf PDF
INTENT TO AWARD.docx DOCX document
123282 OR Awarded Bid Tab.xlsx XLSX spreadsheet
123282 OR LED obstruction lighting system Cost Sheet- Final.xlsx XLSX spreadsheet
SOLICITATION ADDENDUM NUMBER TWO- Q&A.docx DOCX document
SOLICITATION LIST OF RESPONDENTS.docx DOCX document
Bidder Responses 1- Strobe Tech, LLC.pdf PDF
Bidder Responses 3- Anco Wireless.pdf PDF
Bidder Responses 5- Vikor.pdf PDF
SOLICITATION ADDENDUM THREE.docx DOCX document
123282 OR LED obstruction lighting system Cost Sheet- Final.xlsx XLSX spreadsheet
123282 OR LED obstruction lighting system- Final.docx DOCX document
SOLICITATION ADDENDUM NUMBER TWO- Q&A.docx DOCX document
SOLICITATION ADDENDUM THREE.docx DOCX document
123282 OR LED obstruction lighting system Cost Sheet- Final.xlsx XLSX spreadsheet
123282 OR LED obstruction lighting system- Final.docx DOCX document
SOLICITATION ADDENDUM ONE.docx DOCX document
SOLICITATION ADDENDUM NUMBER TWO- Q&A.docx DOCX document
123282 OR LED obstruction lighting system- Final.docx DOCX document
123282 OR LED obstruction lighting system Cost Sheet- Final.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Quantity Price Amount Beacons

Beacon Power Supplies

AOL Beacon

AOL Beacon Power Supply

Photocell(s)

Controller(s)

Rack Equipment Power Supplies

Equipment Rack(s)

Conduit

Ice Shields

Total Price of Light Kit $144,098.00

Labor Hours Price Amount Installation Labor $134,906.00

Material Quantity Price Amount Beacons Beacon Power Supplies AOL Beacon AOL Beacon Power Supply Photocell(s)

Controller(s) Rack Equipment Power Supplies Equipment Rack(s) Conduit Ice Shields Total Price of Light Kit $144,223.00 Labor Hours Price Amount Installation Labor $137,070.00

Material Quantity Price Amount

Cost Sheet

ITB-#123282 OR

KLNE Transmitter Site: 72821 J Road, Holdrege, NE 68949

KPNE Transmitter Site: 12392 S. Hwy 25, Sutherland, NE 69165

KCNE Transmitter Site: 1740 South Maple, Chadron NE 69337

Beacons Beacon Power Supplies AOL Beacon AOL Beacon Power Supply Photocell(s) Controller(s) Rack Equipment Power Supplies Equipment Rack(s) Conduit Ice Shields

Other Total Price of Light Kit $12,938.00 Labor Hours Price Amount Installation Labor $45,580.00

Material Quantity Price Amount Beacons Beacon Power Supplies AOL Beacon AOL Beacon Power Supply Photocell(s) Controller(s) Rack Equipment Power Supplies Equipment Rack(s) Conduit Ice Shields Total Price of Light Kit $28,813.00 Labor Hours Price Amount Installation Labor $50,067.00

Material Quantity Price Amount Beacons Beacon Power Supplies AOL Beacon AOL Beacon Power Supply Photocell(s) Controller(s) Rack Equipment Power Supplies

K23AA Transmitter Site: 30708 SW 142nd Road, Beatrice, NE 68310

K33FO Transmitter Site: East of 707 Rd & 345 Ave. Intersection, Max NE 69037

Equipment Rack(s) Conduit Ice Shields Other Total Price of Light Kit $12,938.00 Labor Hours Price Amount Installation Labor $41,973.00

Material Quantity Price Amount Beacons Beacon Power Supplies AOL Beacon AOL Beacon Power Supply Photocell(s) Controller(s) Rack Equipment Power Supplies Equipment Rack(s) Conduit Ice Shields Other Total Price of Light Kit $12,938.00 Labor Hours Price Amount Installation Labor $41,973.00

KNNE Transmitter Site: 71991 Old Highway 17, Culbertson, NE 69024

123282 OR Allstate Tower, Inc. File 2 of 2.pdf
123282 OR Allstate Tower, Inc. File 1 of 2.pdf

File details come from the government source that posted it. Updated .