BID 2023-54 Clarifying Questions 5.pdf

PDF 159 KB Posted

Attached to
Bid #2023-54 Clackamas County Fairgrounds Multiuse Building
Solicitation number
S-C01010-00007195
Issued by
Clackamas County, Canyonville City, Oregon

About this file

This document is a response to clarifying questions submitted by interested firms regarding Invitation to Bid #2023-54 for the Clackamas County Fair Grounds Multiuse Building Project. The project consists of two construction phases, with Phase 1 scheduled to be completed by June 30, 2024, and Phase 2 to begin on September 1, 2024, after a two-month pause for the County Fair, with proposed final completion by June 30, 2025. The contractor will be responsible for securing and safeguarding the site during the fair's duration, and the County will work with the contractor to obtain a temporary occupancy permit if required.

Pricing terms, set-asides, incumbents, funding requirements, and other salient information were not provided in the document. The document primarily focuses on clarifying the project's phasing, timeline, and site management requirements during the County Fair.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID #2023-54

Clackamas County Fair Grounds Multiuse Building (“BID”)

RESPONSE TO CLARIFYING QUESTIONS

July 15, 2023

Note that these are questions submitted by interested firms to the above referenced solicitation.

The below answers are for clarification purposes only and in no way alter or amend the BID as published.

1. We’ve noticed a conflict in the Phasing/Completion Dates in the specifications…

1) SS 011100 – Summary of Work – Article 1.5. Work Phasing - essentially states that the Stage 1 construction is scheduled for about 12 months, completing on August 1, 2024. Then the schedule indicates we are to have a 1-month shutdown (vacation?) before Stage 2 construction is to start back up on September 1, 2024, and then complete in 11 months, by August 1, 2025.

2) CC Contract Form B-11 (1/2017), titled, ”Clackamas County Public Improvement Contract Project Information, Plans, Specifications and Drawings,” states “Key Dates:” This first phase must be completed no later than 30 June, 2024. The second phase……may start on 1 September, 2024, with a completion date no later than 30 June, 2025. This second schedule conflicts with the first one, as it indicates we have 11 months to complete Stage 1, followed by a 2-month shutdown, followed by a Stage 2 duration of only 10 months.

Please clarify what this “shutdown period” is to look like…do we have to remove/relocate the temporary fence, trailers, remaining Stage 2 building materials in the staging areas, etc… to allow the fair to operate? Will our superintendent be required to remain on the site? Will the County approve a temporary occupancy permit without conditions? Please clarify these items which impact our costs of building this project.

Answer: Phase 1 completion date no later than June 30, 2024; Initiate Phase 2 on September 1, 2024; (Two month pause for County Fair) with proposed final completion on or before June 30, 2025. Specific dates and durations to be discussed with selected contractor.

2. Please clarify what this “shutdown period” is to look like…do we have to remove/relocate the temporary fence, trailers, remaining Stage 2 building materials in the staging areas, etc… to allow the fair to operate? Will our superintendent be required to remain on the site? Will the County approve a temporary occupancy permit without conditions? Please clarify these items which impact our costs of building this project.

Answer: The GC will need to secure and safe the site before suspending operations for the fair(s) duration. The Fair intends to utilize the construction site to erect a temporary shelter for the duration of the 2024 fair. The County will work with the Contractor to obtain a temporary occupancy of the site (if required) for this use. Means and methods of this work are the responsibility of the contractor, however, minimum public protection will consist of locked, secured fencing around perimeter of any equipment or materials stored on site.

End of Clarifying Questions #5