Attachment B - CCFEC-Bid-Docs-Drwgs-02-Civil.pdf
PDF 30 MB Posted
- Solicitation number
- S-C01010-00007195
- Issued by
- Clackamas County, Canyonville City, Oregon
About this file
Attachment B - CCFEC-Bid-Docs-Drwgs-02-Civil.pdf is a document related to Bid #2023-54 Clackamas County Fairgrounds Multiuse Building Project, which is a solicitation issued by Clackamas County, Oregon through its Board of County Commissioners. The project involves the construction of a multiuse building at the Clackamas County Fairgrounds. Sealed bids are due by July 13, 2023, at 2:00 PM Pacific Time, and the solicitation is open to all interested parties. The contract term and any renewal options are not specified in the provided information.
The pricing terms, set-asides, incumbent, current environment, funding requirements and sources, and other salient information are not included in the provided document. The document appears to focus on the technical specifications and drawings related to the civil engineering aspects of the project.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N.I.C.
WAIT
PARK
CLACKAMAS
COUNTY
FAIRGROUND
MAPLE
STREET
PARK
FIRE
STA.
POLICE
STA.
IV
Y
ST
FOURTH AVE.
JU
N
IP
ER
ST
. SPRUCE ST.
17TH
M
AN
ZA
N
IT
A
ST
H
AW
TH
O
R N
E
ST
15TH
12TH
AVE.
JU
N
IP
ER
PL
18TH
AVE.
SPRUCE CT.
EIGHTH
PL.
AVE.
M
AP
LE
ST
PO
N
D
ER
O
SA
ST
AVE. TE
NTH
PL.
15TH
AVE. PL
U M
C T.
CAITLYN
PL. 14TH AVE.
16TH AVE.
M
AP
LE
L
N
H
AW
TH
O
R N
E C
T.
12TH WY.
14TH PL.
SECOND
AVE.
18TH
PL.
11TH AVE.
13TH PL.
13TH
AVE.
NINTH PL.
11TH PL.
FAIRWAY LN.
JU
N
IP
ER
C T.
KN
O
TT
ST
M O
LA
LL
A R D
13TH
CIR.
R
ED
W O
O D
ST
TERRITORIAL RD.
PI
N
E
ST
G
RANT
ST.
HO
LLY
ST.
TENTH AVE. TENTH AVE.
THIRD AVE.
PACIFIC
HWY. 081WILLIAM
KNIGHT
CHURCH
SCHOOL
FO
R
ES
T CLACKAMAS
HALL
ELY ARENA
ROSEBROOK
COVERED
ARENA
MAINTENANCE
BUILDING
MAINTENANCE
BUILDING
BARN
BARN
BARN
BARN
MAIN LAWN
COMPLEX
4-H HALL
HORNING HALL
MAIN PAVILLION/ OFFICE
STALLS
BUILDING
SHED
SHED
112.4' BUILDING
SHED
BUILDING
MULTI
PURPOSE
BUILDING
(PROPOSED)
SHED
BUILDING
GARAGE
HOUSE
SHED
BUILDING
M A Y 8 , 2 0 18
L A U R A E L I Z A B E T H O X S EN
89566PE
EXPIRES: 12/31/24
OREGON
ENGINEER
RE
GIS
TERED PROFESSIONAL
CL
AC
KA
M
AS
C
O
UN
TY
F
AI
RG
RO
UN
DS
M
UL
TI
-P
UR
PO
SE
B
UI
LD
IN
G
CA
N
BY
, O R
CL
AC
KA
M
AS
C
O U
N
TY
F
AI
RG
RO
U N
D S
5/5/2023
BID SET
22799
LEO, SMT
AJM, LEO
100, 700
P:
\2
-C
LA
C
KA
M
AS
C O
U N
TY
F
AI
R
G R
O U
N D
-M U
LT
I P
U R
PO
SE
B U
IL
D
IN
G
\C
AD
\S H
EE
TS
\2
-C
O
VE
R S
H
EE
T.
D
W G
3J PROJECT #
LAND USE #
DESIGNED BY
CHECKED BY
TAX LOT(S)
REVISIONS
PUBLISH DATE
ISSUED FOR
SHEET NUMBER
PROJECT INFORMATION
CI
VI
L
EN
G
IN
EE
RI
N G
W
AT
ER
R
ES
O
U
RC
ES
CO
M M
U N
IT
Y
PL
AN
N
IN
G
S W
N
IM
BU
S
AV
E.
, S U
IT
E
0;
B
EA
VE
RT
O N
, O R
PRELIM
IN
ARY
SITE INFORMATION
SITE ADDRESS FLOOD HAZARD
694 NE 4TH AVENUE
CANBY, OR 97013
MAP NUMBER: 41005C0264D & 41005C0268D
ZONE X (UNSHADED)
JURISDICTION TAX LOT
CITY OF CANBY
222 NE 2ND AVENUE / P.O. BOX 930
CANBY, OR 97013
MAP 31E33
TAX LOT 00100
ZONING LOCATION
LOW DENSITY RESIDENTIAL (R-1) S.E. 1/4 N.W. 1.4 OF SECTION 33, T.3S., R.1E.,
W.M., CLACKAMAS COUNTY, OR
LOT AREA
38.76 ACRES
UTILITIES & SERVICES
STORM WATER SANITARY SEWER
CITY OF CANBY PUBLIC WORKS
DEPARTMENT STORMWATER
1480 NE TERRITORIAL ROAD
CANBY, OR 97013
PHONE: (503) 266-1248
CITY OF CANBY PUBLIC WORKS
DEPARTMENT WASTEWATER
1480 NE TERRITORIAL ROAD, P.O. BOX 930
CANBY, OR 97013
PHONE: (503) 266-1248
WATER POWER
CANBY UTILITY
1265 SE 3RD AVENUE
CANBY, OR 97013
PHONE: (503) 266-1156
CANBY UTILITY
1265 SE 3RD AVENUE
CANBY, OR 97013
PHONE: (503) 266-1156
POLICE FIRE
CANBY POLICE
1175 NW 3RD AVENUE,
CANBY, OR 97013
PHONE: (503) 266-1104
CANBY FIRE DISTRICT 62
221 S PINE STREET,
CANBY, OR 97013
PHONE: (503) 266-5851
CITY INSPECTIONS ROADS
CITY OF CANBY FACILITIES MAINTENANCE
CONTACT: DUSTIN BREESE
PHONE: (503) 266-0698
EMAIL: breesed@canbyoregon.gov
CITY OF CANBY PUBLIC WORKS
DEPARTMENT STREETS
1470 NE TERRITORIAL ROAD, P.O. BOX 930
CANBY, OR 97013
PHONE: (503) 266-0798
Knowwhat's below.
Callbefore you dig.
VICINITY MAP
NOT TO SCALE
SITE MAPN
EW
S
BID SET
FOR
PREPARED FOR
CLACKAMAS COUNTY FAIRGROUNDS
MULTI-PURPOSE BUILDING
CLACKAMAS COUNTY FAIRGROUNDS
PROJECT TEAM
OWNER CIVIL ENGINEER
CLACKAMAS COUNTY FAIRGROUNDS &
EVENT CENTER
694 NE 4TH AVENUE
CANBY, OR 97013
CONTACT: BRIAN CROW
PHONE: (503) 266-1136
3J CONSULTING, INC.
9600 SW NIMBUS AVE, SUITE 100
BEAVERTON, OR 97008
CONTACT: AARON MURPHY, P.E.
PHONE: (503) 946-9365 x218 EMAIL: aaron.murphy@3j-consulting.com
PLANNING CONSULTANT LAND SURVEYOR
3J CONSULTING, INC.
9600 SW NIMBUS AVE, SUITE 100
BEAVERTON, OR 97008
CONTACT: SAM HUCK
PHONE: (503) 946-9365 x251 EMAIL: sam.huck@3j-consulting.com
CENTERLINE CONCEPTS LAND
SURVEYING, INC.
19376 MOLALLA AVENUE, SUITE 120
OREGON CITY, OREGON 97045
CONTACT: TOBY G. BOLDEN, PLS, CFedS
PHONE: (503) 650-0188
EMAIL: tobyb@centerlineconcepts.com
VICINITY MAP
NOT TO SCALE
SITE MAP N
EW
S
PROJECT LOCATION
FT
SCALE: 1" = 150'
150 300
C000
CO
VE
R
SH
EE
T
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE
OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET
FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY
OBTAIN COPIES OF THESE RULES FROM THE CENTER BY CALLING
503-232-1987. IF YOU HAVE ANY QUESTIONS ABOUT THE RULES, YOU
MAY CONTACT THE CENTER. YOU MUST NOTIFY THE CENTER AT LEAST
TWO BUSINESS DAYS, BEFORE COMMENCING AN EXCAVATION. CALL
503-246-6699.
ATTENTION EXCAVATORS:
Sheet List Table Sheet Number Sheet Title
C000 COVER SHEET
C002 LEGENDS & SYMBOLS
C100 EXISTING CONDITIONS PLAN
C101 DEMOLITION PLAN
C110 ESCP COVER SHEET
C111 EXISTING CONDITIONS & DEMOLITION ESCP PHASE I
C112 GRADING ESCP PHASE II
C113 UTILITY INSTALLATION ESCP PHASE III
C114 VERTICAL CONSTRUCTION ESCP PHASE IV
C115 FINAL LANDSCAPING AND STABILIZATION ESCP PHASE V
C116 EROSION CONTROL DETAILS
C117 EROSION CONTROL DETAILS
C210 OVERALL SITE PLAN
C211 SITE PLAN I
C212 SITE PLAN II
C220 HORIZONTAL CONTROL PLAN I
C221 HORIZONTAL CONTROL PLAN II
C230 GRADING PLAN I
C231 GRADING PLAN II
C250 FIRE ACCESS PLAN
C300 COMPOSITE UTILITY PLAN
C400 STORM PLAN I
C401 STORM PLAN II
C500 SEWER PLAN I
C501 SEWER PLAN II
C502 SEWER PLAN III
C600 WATER PLAN
C901 PUBLIC UTILITY DETAILS
C910 SITE DETAILS
C911 SITE DETAILS
C920 UTILITY DETAILS
C921 UTILITY DETAILS
C922 UTILITY DETAILS
C923 UTILITY DETAILS
M A Y 8 , 2 0 18
L A U R A E L I Z A B E T H O X S EN
89566PE
EXPIRES: 12/31/24
OREGON
ENGINEER
RE
GIS
TERED PROFESSIONAL
CL
AC
KA
M
AS
C
O
UN
TY
F
AI
RG
RO
UN
DS
M
UL
TI
-P
UR
PO
SE
B
UI
LD
IN
G
CA
N
BY
, O R
CL
AC
KA
M
AS
C
O U
N
TY
F
AI
RG
RO
U N
D S
5/5/2023
BID SET
22799
LEO, SMT
AJM, LEO
100, 700
P:
\2
-C
LA
C
KA
M
AS
C O
U N
TY
F
AI
R
G R
O U
N D
-M U
LT
I P
U R
PO
SE
B U
IL
D
IN
G
\C
AD
\S H
EE
TS
\2
-L
EG
EN
D S
SY
M
BO
LS
.D
W G
3J PROJECT #
LAND USE #
DESIGNED BY
CHECKED BY
TAX LOT(S)
REVISIONS
PUBLISH DATE
ISSUED FOR
SHEET NUMBER
PROJECT INFORMATION
CI
VI
L
EN
G
IN
EE
RI
N G
W
AT
ER
R
ES
O
U
RC
ES
CO
M M
U N
IT
Y
PL
AN
N
IN
G
S W
N
IM
BU
S
AV
E.
, S U
IT
E
0;
B
EA
VE
RT
O N
, O R
PRELIM
IN
ARY
C002
LE
GE
N
DS
S
YM
BO
LS
EXISTING CONDITIONS LEGEND
EXISTING EDGE OF PAVEMENT
PROJECT BOUNDARY
EXISTING LOT/PARCEL LINE
EXISTING RIGHT OF WAY
EXISTING MINOR CONTOUR
EXISTING ASPHALT
EXISTING MAJOR CONTOUR
EXISTING SANITARY SEWER
EXISTING UNDERGROUND POWER
EXISTING UNDERGROUND COMM.
EXISTING WATER
EXISTING OVERHEAD LINE
EXISTING GAS
EXISTING GRAVEL
EXISTING TREE - DECIDUOUS
EXISTING FOUND MONUMENT
EXISTING SIGN
EXISTING LIGHT POLE
EXISTING UTILITY POLE
EXISTING TREE - CONIFEROUS
EXISTING WATER METER
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM CURB INLET
EXISTING WATER MANHOLE
EXISTING WATER VALVE
EXISTING IRRIGATION VALVE
REMOVE TREE
EXISTING CENTERLINE
EXISTING CURB
EXISTING STORM
EXISTING ELECTRIC BOX
EXISTING MAILBOX
EXISTING GAS METER
EXISTING GAS VALVE
EXISTING STORM MANHOLE
EXISTING STORM CATCH BASIN
EXISTING BUILDING
EXISTING FENCE
EXISTING CONCRETE
EXISTING GUY ANCHOR
EXISTING UTILITY RISER
EXISTING UTILITY BOX
EXISTING UTILITY MANHOLE
EXISTING UTILITY STUB
EXISTING ELECTRIC METER
EXISTING ELECTRIC RISER
EXISTING HEAT PUMP
EXISTING CABLE TV BOX
EXISTING CABLE TV RISER
EXISTING TRANSFORMER
EXISTING TELEPHONE MANHOLE
EXISTING TELEPHONE RISER
EXISTING GAS/FUEL PUMP
EXISTING BOLLARD
EXISTING GATE POST
EXISTING SANITARY CLEANOUT
EXISTING STORM AREA DRAIN
EXISTING STORM DITCH INLET
EXISTING FIRE HYDRANT
EXISTING WATER HOSE BIB
EXISTING STORM OUTFALL
EXISTING STORM DOWNSPOUT
EXISTING MONITORING WELL
EXISTING TEST PIT
PROPOSED STORM PIPE
PROPOSED SANITARY PIPE
PROPOSED WATER MAIN
PROPOSED WATER DOMESTIC SERVICE
PROPOSED EASEMENT LINE
PROPOSED ASPHALT
PROPOSED CONCRETE
PROPOSED BUILDING LINE
PROPOSED FENCE
PROPOSED STRAW WATTLE
PROPOSED SILT FENCING
PROPOSED CONSTRUCTION ENTRANCE
PROPOSED TREE PROTECTING FENCING
PROPOSED INLET PROTECTION
SURFACE RUN-OFF FLOW ARROW
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR108
PROPOSED WATER FIRE SERVICE
PROPOSED CATCH BASIN
PROPOSED HYDRANT
FIRE DPT. CONNECTION
PROPOSED SEWER MANHOLE
PROPOSED SEWER CLEANOUT
PIPE BEND, STORM / SANITARY
PROPOSED VEGETATION
PROPOSED SAWCUT
FIRE ACCESS
FIRE HYDRANT COVERAGE
LEGEND
PROPOSED FIRE DEPARTMENT CONNECTION SERVICE
PROJECT LIMITS
89566PE
EXPIRES: 12/31/24
OREGON
ENGINEER
RE
GIS
TERED PROFESSIONAL
CL
AC
KA
M
AS
C
O
UN
TY
F
AI
RG
RO
UN
DS
M
UL
TI
-P
UR
PO
SE
B
UI
LD
IN
G
CA
N
BY
, O R
CL
AC
KA
M
AS
C
O U
N
TY
F
AI
RG
RO
U N
D S
5/5/2023
BID SET
22799
LEO, SMT
AJM, LEO
100, 700
P:
\2
-C
LA
C
KA
M
AS
C O
U N
TY
F
AI
R
G R
O U
N D
-M U
LT
I P
U R
PO
SE
B U
IL
D
IN
G
\C
AD
\S H
EE
TS
\2
-E
XI
ST
IN
G
C O
N D
IT
IO
N S.
D W
G
3J PROJECT #
LAND USE #
DESIGNED BY
CHECKED BY
TAX LOT(S)
REVISIONS
PUBLISH DATE
ISSUED FOR
SHEET NUMBER
PROJECT INFORMATION
CI
VI
L
EN
G
IN
EE
RI
N G
W
AT
ER
R
ES
O
U
RC
ES
CO
M M
U N
IT
Y
PL
AN
N
IN
G
S W
N
IM
BU
S
AV
E.
, S U
IT
E
0;
B
EA
VE
RT
O N
, O R
PRELIM
IN
ARY
FT
SCALE: 1" = 60'
60' 120'
N
EW
S
THIS PLAN HAS BEEN PREPARED FOR INFORMATIVE PURPOSES ONLY. SITE
BACKGROUND INFORMATION AND FEATURES HAVE BEEN GENERATED FROM A
COMBINATION OF TOPOGRAPHIC SURVEY DATA PROVIDED BY CENTERLINE
CONCEPTS LAND SURVEYING INC. AND SITE ASSESSMENT / OBSERVATION. NO
WARRANTY OR GUARANTEE OF ACCURACY IS EXPRESSED OR IMPLIED.
CONTRACTOR SHALL VERIFY PRESENCE, LOCATION, AND DEPTH OF EXISTING
UTILITIES PRIOR TO COMMENCEMENT OF WORK. NOTIFY OWNER AND ENGINEER
FOR ANY CONFLICTS WITH PROPOSED DESIGN.
EXISTING CONDITIONS PLAN
FLOOD HAZARD NOTE
THE SITE IS LOCATED WITHIN ZONE X (UN-SHADED) PER FLOOD
INSURANCE RATE MAP (FIRM) COMMUNITY-PANEL NUMBER
FEMA'S DEFINITION OF ZONE X (UN-SHADED) IS AN AREA OF MINIMAL
FLOOD HAZARD, USUALLY DEPICTED ON FIRMS AS ABOVE THE
500-YEAR FLOOD LEVEL. ZONE X IS THE AREA DETERMINED TO BE
OUTSIDE THE 500-YEAR FLOOD AND PROTECTED BY LEVEE FROM
100-YEAR FLOOD. IN COMMUNITIES THAT PARTICIPATE IN THE NFIP,
FLOOD INSURANCE IS AVAILABLE TO ALL PROPERTY OWNERS AND
RENTERS IN THESE ZONES.
41005C0276D
UTILITY NOTES
1. THE UNDERGROUND UTILITIES AS SHOWN ON THIS MAP ARE SHOWN BASED ON A
COMBINATION OF INFORMATION, INCLUDING VISIBLE ABOVE GROUND STRUCTURES,
AVAILABLE AS BUILT AND GIS MAPPING FROM LOCAL JURISDICTIONS, AS WELL AS
SURFACE MARKINGS BY ONE CALL TICKET NUMBER 22135997 DATED MAY 25, 2022.
2. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES
SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR
ABANDONED.
3. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND
UTILITIES ARE IN THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY
THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION
AVAILABLE.
4. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES.
SUBSURFACE AND ENVIRONMENTAL CONDITIONS WERE NOT EXAMINED OR
CONSIDERED AS A PART OF THIS SURVEY. NO STATEMENT IS MADE CONCERNING
THE EXISTENCE OF UNDERGROUND OR OVERHEAD CONTAINERS OR FACILITIES
THAT MAY AFFECT THE USE OR DEVELOPMENT OF THIS TRACT. THIS SURVEY DOES
NOT CONSTITUTE A TITLE SEARCH BY SURVEYOR.
5. INVERT ELEVATIONS AND PIPE SIZES SHOWN ARE APPROXIMATE ONLY, BASED ON
FIELD OBSERVATIONS AS WELL AS AVAILABLE AS-BUILT DATA. ALL PIPE SIZES
SHALL BE FIELD VERIFIED BY THE OWNER, ENGINEER, CONTRACTOR, AND
GOVERNING AGENCY PRIOR TO ANY CONSTRUCTION ACTIVITY. SURVEYOR DOES
NOT WARRANT THE ACCURACY OF ANY PIPE SIZES SHOWN ON THIS SURVEY.
6. **NO UTILITY ASBUILTS WERE PROVIDED BY CLIENT OR CITY/COUNTY AGENCY.
ASBUILTS WERE REQUESTED WITH CITY OF CANBY, CITY OF CANBY HAS NOT
ASBUILTS AVAILABLE. UTILITIES SHOWN ARE APPROXIMATE BASED ON FOUND
ABOVE GROUND STRUCTURES AND LIMITED PRIVATE UTILITIES ON SITE. ANY
CONSTRUCTION OR DESIGN WILL NEED TO CONFIRM SIZES AND CONNECTIONS.
SURVEYOR'S NOTES
1. SURVEY AS SHOWN WAS PREPARED FROM A LEGAL DESCRIPTION AS CONTAINED IN
CHICAGO TITLE COMPANY OF OREGON PRELIMINARY TITLE REPORT ORDER NO.
472522003810, WITH AN EFFECTIVE DATE OF JULY 6, 2022.
2. SOME FEATURES SHOWN ON THIS PLAT MAY BE SHOWN OUT OF SCALE FOR CLARITY.
3. DIMENSIONS ON THIS PLAT ARE EXPRESSED IN FEET AND DECIMAL PARTS THEREOF
UNLESS OTHERWISE NOTED. BEARINGS ARE REFERRED TO AN ASSUMED MERIDIAN
AND ARE USED TO DENOTE ANGLES ONLY. MONUMENTS WERE FOUND AT POINTS
WHERE INDICATED.
4. MY BASIS OF BEARINGS IS NORTH 89°56'00" EAST ALONG THE SOUTH LINE OF NE 4TH
AVENUE PER PARTITION PLAT NO. 2018-084, CLACKAMAS COUNTY SURVEY RECORDS.
5. GROSS LAND AREA OF LEGAL DESCRIPTION TRACTS:
TRACT 1: 143, 736 SF OR 3.3 ACRES
TRACT 2: 119,714 SF OR 2.7 ACRES
TRACT 3: 19,365 SF OR 0.5 ACRES
TRACT 4: 10,267 SF OR 0.2 ACRES
TRACT 5: 39,169 SF OR 0.9 ACRES
TRACT 6: 40,377 SF OR 0.9 ACRES
TRACT 7: 71,355 SF OR 1.6 ACRES
TRACT 8: 6,047 SF OR 0.1 ACRES
TRACT 9: 1,687,829 SF OR 38.7 ACRES
TOTAL GROSS AREA OF ALL TRACTS: 2,137,859 SF OR 49.1 ACRES
6. ACCORDING TO THE US FISH AND WILDLIFE SERVICE "NATIONAL WETLAND INVENTORY"
WEBSITE, THERE ARE NO IDENTIFIED WETLANDS ON THE SUBJECT PROPERTY. AT THE
TIME OF THIS SURVEY, THERE WERE NO FIELD DELINEATION OF THE WETLANDS.
7. AT THE TIME OF THIS SURVEY, THERE WAS NO OFFSITE EASEMENTS OR SERVITUDES
DISCLOSED IN DOCUMENTS TO THE SURVEYOR.
8. AT THE TIME OF THIS SURVEY, THERE IS NO OBSERVED EVIDENCE OF RECENT STREET
OR SIDEWALK CONSTRUCTION OR REPAIRS. THERE IS NO INDICATION OF CHANGES IN
RIGHTS OF WAY.
9. AT THE TIME OF THIS SURVEY, THERE IS NO OBSERVED EVIDENCE OF SITE USE AS A
SOLID WASTE DUMP, SLUMP OR SANITARY LANDFILL.
BASIS OF BEARINGS
THE DATUM FOR THIS SURVEY IS BASED UPON A STATIC GPS OBSERVATION OF LOCAL
CONTROL POINTS, PROCESSED THROUGH OPUS. DATUM IS NAVD 88. FOR BASIS OF
BEARINGS, SURVEYOR HELD NORTH 89°56'00" EAST BETWEEN FOUND MONUMENTS 103
AND 121, PER PARTITION PLAT NO. 2018-084
C100
EX
IS
TI
N
G
CO
N
DI
TI
O
N S
PL
AN
Knowwhat's below.
Callbefore you dig.
5 6
2 2
M A Y 8 , 2 0 18
L A U R A E L I Z A B E T H O X S EN
89566PE
EXPIRES: 12/31/24
OREGON
ENGINEER
RE
GIS
TERED PROFESSIONAL
CL
AC
KA
M
AS
C
O
UN
TY
F
AI
RG
RO
UN
DS
M
UL
TI
-P
UR
PO
SE
B
UI
LD
IN
G
CA
N
BY
, O R
CL
AC
KA
M
AS
C
O U
N
TY
F
AI
RG
RO
U N
D S
5/5/2023
BID SET
22799
LEO, SMT
AJM, LEO
100, 700
P:
\2
-C
LA
C
KA
M
AS
C O
U N
TY
F
AI
R
G R
O U
N D
-M U
LT
I P
U R
PO
SE
B U
IL
D
IN
G
\C
AD
\S H
EE
TS
\2
-D
EM
O
LI
TI
O N
P
LA
N .D
W G
3J PROJECT #
LAND USE #
DESIGNED BY
CHECKED BY
TAX LOT(S)
REVISIONS
PUBLISH DATE
ISSUED FOR
SHEET NUMBER
PROJECT INFORMATION
CI
VI
L
EN
G
IN
EE
RI
N G
W
AT
ER
R
ES
O
U
RC
ES
CO
M M
U N
IT
Y
PL
AN
N
IN
G
S W
N
IM
BU
S
AV
E.
, S U
IT
E
0;
B
EA
VE
RT
O N
, O R
PRELIM
IN
ARY
C101
DE
M
O
LI
TI
O
N P
LA
N
Knowwhat's below.
Callbefore you dig.
FT
SCALE: 1" = 60'
60' 120'
N
EW
S
DEMOLITION GENERAL NOTES
1. PROTECT EXISTING PAVEMENT, UTILITIES, AND STRUCTURES ADJACENT TO
WORK LIMITS. REPAIR DAMAGE TO SATISFACTION OF OWNER, AT NO
EXPENSE TO OWNER.
2. DISPOSE OF ALL REMOVED MATERIALS OFFSITE, UNLESS OTHERWISE
DIRECTED BY OWNER. RETURN ANY MOUNTED SIGNS TO OWNER.
3. CONTRACTOR TO VERIFY PRESENCE, LOCATION, AND DEPTH OF EXISTING
UTILITIES PRIOR TO COMMENCING WORK. NOTIFY OWNER AND ENGINEER
FOR ANY CONFLICTS WITH PROPOSED DESIGN.
4. UTILITIES OR INTERFERING PORTIONS OF UTILITIES THAT ARE ABANDONED IN
PLACE SHALL BE REMOVED BY THE CONTRACTOR TO THE EXTENT
NECESSARY TO ACCOMPLISH THE WORK AND TO 24 INCHES MINIMUM BELOW
FINISH GRADE. CONTRACTOR SHALL SEAL AND CAP THE REMAINING
EXPOSED ABANDONED UTILITIES WITH AN END CAP, COUPLING, OR
CONCRETE PLUG WITH THICKNESS EQUAL TO PIPE DIAMETER.
DEMOLITION KEY NOTES
DEMOLISH EXISTING BUILDING STRUCTURE AND ALL ASSOCIATED
APPURTENANCES.
SAWCUT ASPHALT PAVEMENT AT LOCATION SHOWN TO FULL
EXISTING PAVEMENT DEPTH. PAVEMENT REMOVAL LIMITS TO BE
INSPECTED BY OWNER AND ENGINEER PRIOR TO REPAVING.
REMOVE EXISTING ASPHALT PAVEMENT TO LIMITS SHOWN AND
DISPOSE OF OFFSITE.
REMOVE EXISTING GRAVEL TO LIMITS SHOWN AND DISPOSE OF
OFFSITE.
REMOVE EXISTING WATER VALVE AND DISPOSE OF OFFSITE.
REMOVE EXISTING CATCH BASIN AND DISPOSE OF OFFSITE.
REMOVE EXISTING SIGN. COORDINATE WITH OWNER FOR
REMOVAL.
REMOVE EXISTING CURB AND DISPOSE OF OFFSITE.
REMOVE EXISTING UTILITY POLE AND DISPOSE OF OFFSITE.
REMOVE EXISTING UNDERGROUND STORM PIPE AND DISPOSE OF
OFFSITE.
REMOVE EXISTING UNDERGROUND POWER LINE AND DISPOSE OF
OFFSITE.
REMOVE EXISTING OVERHEAD POWER LINE AND DISPOSE OF
OFFSITE.
ABANDON EXISTING SEWER PIPE AND MANHOLE. CONTRACTOR IS
TO VIDEO STORM LINE TO CONFIRM NO ADDITIONAL SERVICES ARE
CONNECTED. AFTER CONFIRMING NO SERVICES ARE CONNECTED,
THE PIPE AND MANHOLE ARE TO BE CDF BACKFILLED TO ABANDON.
COORDINATE WITH ENGINEER IF CONNECTED LINES ARE FOUND.
N.I.C.
99E
WAIT
PARK
CLACKAMAS
COUNTY
FAIRGROUND
MAPLE
STREET
PARK
PARK
LOCUST
FIRE
STA.
POLICE
STA.
IV
Y
ST
FOURTH AVE.
EL
M
ST
JU
N
IP
ER
ST
LO
CUST
SPRUCE ST.
KNOTT
CT.
M
AN
ZA
N
IT
A
ST
H
AW
TH
O
R N
E
ST
15TH AVE.
12TH
AVE.
JU
N
IP
ER
PL
SECOND AVE.
11TH
PL. SPRUCE CT.
FIFTH
AVE.
EIGHTH
PL.
AVE.
14TH AVE.
M
AP
LE
ST
M
ANZANITA CT.
PO
N
D
ER
O
SA
NINTH AVE. TE
NTH
PL.
15TH
AVE.
DOUGLAS ST.
PL
U
M C
T.
CAITLYN
PL. 14TH AVE.
FIFTH AVE.
FI
R
ST
16TH AVE.
M
AP
LE
L
N
H
AW
TH
O
R N
E C
T.
12TH WY.
14TH PL.
SECOND
AVE.
11TH AVE.
13TH PL.
13TH
AVE.
NINTH PL.
11TH PL.
JU
N
IP
ER
C T.
EIGHTH PL.
AVE.
KN
O
TT
ST
M O
LA
LL
A R D
13TH
CIR.
R
ED
W O
O D
TERRITORIAL RD.
PI
N
E
ST
FOURTH
G
RANT
ST.
HO
LLY
ST.
TENTH AVE. TENTH AVE.
PI
N
E
ST
THIRD AVE.
FIRST AVE.
SEQUOIA PKWY.
D
EL
L W
Y.
PACIFIC
HWY. 081
HOWARD
ECCLES
ES
WILLIAM
KNIGHT
ES
FO
R
ES
T
HAZEL
N.I.C.
99E
WAIT
PARK
CLACKAMAS
COUNTY
FAIRGROUND
MAPLE
STREET
PARK
PARK
LOCUST
FIRE
STA.
POLICE
STA.
IV
Y
ST
FOURTH AVE.
EL
M
ST
JU
N
IP
ER
ST
LO
CUST
SPRUCE ST.
KNOTT
CT.
M
AN
ZA
N
IT
A
ST
H
AW
TH
O
R N
E
ST
15TH AVE.
12TH
AVE.
JU
N
IP
ER
PL
SECOND AVE.
11TH
PL. SPRUCE CT.
FIFTH
AVE.
EIGHTH
PL.
AVE.
14TH AVE.
M
AP
LE
ST
M
ANZANITA CT.
PO
N
D
ER
O
SA
NINTH AVE. TE
NTH
PL.
15TH
AVE.
DOUGLAS ST.
PL
U
M C
T.
CAITLYN
PL. 14TH AVE.
FIFTH AVE.
FI
R
ST
16TH AVE.
M
AP
LE
L
N
H
AW
TH
O
R N
E C
T.
12TH WY.
14TH PL.
SECOND
AVE.
11TH AVE.
13TH PL.
13TH
AVE.
NINTH PL.
11TH PL.
JU
N
IP
ER
C T.
EIGHTH PL.
AVE.
KN
O
TT
ST
M O
LA
LL
A R D
13TH
CIR.
R
ED
W O
O D
TERRITORIAL RD.
PI
N
E
ST
FOURTH
G
RANT
ST.
HO
LLY
ST.
TENTH AVE. TENTH AVE.
PI
N
E
ST
THIRD AVE.
FIRST AVE.
SEQUOIA PKWY.
D
EL
L W
Y.
PACIFIC
HWY. 081
HOWARD
ECCLES
ES
WILLIAM
KNIGHT
ES
FO
R
ES
T
HAZEL
N.I.C.
99E
WAIT
PARK
CLACKAMAS
COUNTY
FAIRGROUND
MAPLE
STREET
PARK
PARK
LOCUST
FIRE
STA.
POLICE
STA.
IV
Y
ST
FOURTH AVE.
EL
M
ST
JU
N
IP
ER
ST
LO
CUST
SPRUCE ST.
KNOTT
CT.
M
AN
ZA
N
IT
A
ST
H
AW
TH
O
R N
E
ST
15TH AVE.
12TH
AVE.
JU
N
IP
ER
PL
SECOND AVE.
11TH
PL. SPRUCE CT.
FIFTH
AVE.
EIGHTH
PL.
AVE.
14TH AVE.
M
AP
LE
ST
M
ANZANITA CT.
PO
N
D
ER
O
SA
NINTH AVE. TE
NTH
PL.
15TH
AVE.
DOUGLAS ST.
PL
U
M C
T.
CAITLYN
PL. 14TH AVE.
FIFTH AVE.
FI
R
ST
16TH AVE.
M
AP
LE
L
N
H
AW
TH
O
R N
E C
T.
12TH WY.
14TH PL.
SECOND
AVE.
11TH AVE.
13TH PL.
13TH
AVE.
NINTH PL.
11TH PL.
JU
N
IP
ER
C T.
EIGHTH PL.
AVE.
KN
O
TT
ST
M O
LA
LL
A R D
13TH
CIR.
R
ED
W O
O D
TERRITORIAL RD.
PI
N
E
ST
FOURTH
G
RANT
ST.
HO
LLY
ST.
TENTH AVE. TENTH AVE.
PI
N
E
ST
THIRD AVE.
FIRST AVE.
SEQUOIA PKWY.
D
EL
L W
Y.
PACIFIC
HWY. 081
HOWARD
ECCLES
ES
WILLIAM
KNIGHT
ES
FO
R
ES
T
HAZEL
SITE CONDITION MINIMUM FREQUENCY
1. ACTIVE PERIOD ON INITIAL DATE THAT LAND DISTURBANCE ACTIVITIES COMMENCE.
WITHIN 24 HOURS OF ANY STORM EVENT, INCLUDING RUNOFF FROM
SNOW MELT, THAT RESULTS IN DISCHARGE FROM THE SITE.
AT LEAST ONCE EVERY 14 DAYS, REGARDLESS OF WHETHER
STORMWATER RUNOFF IS OCCURRING.
2. INACTIVE PERIODS GREATER THAN
FOURTEEN (14) CONSECUTIVE
CALENDAR DAYS
THE INSPECTOR MAY REDUCE THE FREQUENCY OF INSPECTIONS IN
ANY AREA OF THE SITE WHERE THE STABILIZATION STEPS IN SECTION
2.2.20 HAVE BEEN COMPLETED TO TWICE PER MONTH FOR THE FIRST
MONTH, NO LESS THAN 14 CALENDAR DAYS APART, THEN ONCE PER
MONTH.
3. PERIODS DURING WHICH THE SITE IS
INACCESSIBLE DUE TO INCLEMENT
WEATHER
IF SAFE, ACCESSIBLE AND PRACTICAL, INSPECTIONS MUST OCCUR
DAILY AT A RELEVANT DISCHARGE POINT OR DOWNSTREAM
LOCATION OF THE RECEIVING WATERBODY.
4. PERIODS DURING WHICH
CONSTRUCTION ACTIVITIES ARE
SUSPENDED AND RUNOFF IS
UNLIKELY DUE TO FROZEN
CONDITIONS.
VISUAL MONITORING INSPECTIONS MAY BE TEMPORARILY
SUSPENDED. IMMEDIATELY RESUME MONITORING UPON THAWING,
OR WHEN WEATHER CONDITIONS MAKE DISCHARGES LIKELY.
5. PERIODS DURING WHICH
CONSTRUCTION ACTIVITIES ARE
CONDUCTED AND RUNOFF IS
UNLIKELY DURING FROZEN
CONDITIONS.
VISUAL MONITORING INSPECTIONS MAY BE REDUCED TO ONCE A
MONTH. IMMEDIATELY RESUME MONITORING UPON THAWING, OR
WHEN WEATHER CONDITIONS MAKE DISCHARGES LIKELY.
* VISUAL MONITORING MUST BE CONDUCTED BY A CERTIFIED INSPECTOR PER DEQ APPROVED
CERTIFICATIONS LIST. (SECTION 6.1.1-5)
* ALL INSPECTIONS MUST BE MADE IN ACCORDANCE WITH DEQ 1200-C PERMIT REQUIREMENTS.
* INSPECTION REPORT MUST BE KEPT IN ACCORDANCE WITH DEQ 1200-C PERMIT REQUIREMENTS.
* DEQ OR AGENT MUST HAVE ACCESS TO THE SITE AT ALL REASONABLE TIMES.
M A Y 8 , 2 0 18
L A U R A E L I Z A B E T H O X S EN
89566PE
EXPIRES: 12/31/24
OREGON
ENGINEER
RE
GIS
TERED PROFESSIONAL
CL
AC
KA
M
AS
C
O
UN
TY
F
AI
RG
RO
UN
DS
M
UL
TI
-P
UR
PO
SE
B
UI
LD
IN
G
CA
N
BY
, O R
CL
AC
KA
M
AS
C
O U
N
TY
F
AI
RG
RO
U N
D S
5/5/2023
BID SET
22799
LEO, SMT
AJM, LEO
100, 700
P:
\2
-C
LA
C
KA
M
AS
C O
U N
TY
F
AI
R
G R
O U
N D
-M U
LT
I P
U R
PO
SE
B U
IL
D
IN
G
\C
AD
\S H
EE
TS
\2
-1
0C
C O
VE
R
S H
EE
T.
D W
G
3J PROJECT #
LAND USE #
DESIGNED BY
CHECKED BY
TAX LOT(S)
REVISIONS
PUBLISH DATE
ISSUED FOR
SHEET NUMBER
PROJECT INFORMATION
CI
VI
L
EN
G
IN
EE
RI
N G
W
AT
ER
R
ES
O
U
RC
ES
CO
M M
U N
IT
Y
PL
AN
N
IN
G
S W
N
IM
BU
S
AV
E.
, S U
IT
E
0;
B
EA
VE
RT
O N
, O R
PRELIM
IN
ARY
VICINITY MAP
NOT TO SCALE
N
EW
S
VICINITY MAP
NOT TO SCALE
N
EW
S
PROJECT LOCATION
FT
SCALE: 1" = 100'
100 200
SITE MAP
C110
ES
CP
C O
VE
R
SH
EE
T
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THESE RULES FROM THE CENTER BY CALLING 503-232-1987. IF YOU HAVE ANY QUESTIONS ABOUT THE RULES, YOU MAY CONTACT THE CENTER. YOU MUST NOTIFY THE CENTER
AT LEAST TWO BUSINESS DAYS, BEFORE COMMENCING AN EXCAVATION. CALL 503-246-6699.
TAX LOT: 00100 (CLACKAMAS COUNTY TAX
MAP 31E33)
S.E. 1/4 N.W. 1.4 OF SECTION 33, T.3S.,
R.1E., W.M., CLACKAMAS COUNTY, OR
694 NE 4TH AVENUE
CANBY, OR 97013
CLACKAMAS COUNTY
LATITUDE = 46.2678, LONGITUDE = -122.6844
PROPERTY DESCRIPTIONPROJECT LOCATION
ATTENTION EXCAVATORS
1. IF VEGETATIVE SEED MIXES ARE SPECIFIED, SEEDING MUST TAKE PLACE NO LATER THAT
SEPTEMBER 1; THE TYPE AND PERCENTAGES OF SEED IN THE MIX MUST BE IDENTIFIED ON THE
PLANS.
2. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE DISCHARGED OVER AN UNDISTURBED,
PREFERABLY VEGETATED AREA, AND THROUGH A SEDIMENT CONTROL BMP I.E. (FILTER BAG).
3. ALL EXPOSED SOILS MUST BE COVERED DURING THE WET WEATHER PERIOD, OCTOBER 01 -
MAY 31.
LOCAL AGENCY-SPECIFIC EROSION CONTROL NOTES:
CLACKAMAS RIVER RAIN GAUGE
ESTACADA, OR 97022
NEAREST RAIN GAUGE
STANDARD EROSION AND SEDIMENT
CONTROL PLAN DRAWING NOTES
1. INCLUDE A LIST OF ALL PERSONNEL (BY NAME AND POSITION) THAT ARE RESPONSIBLE FOR THE
DESIGN, INSTALLATION AND MAINTENANCE OF STORMWATER CONTROL MEASURES (E.G. ESCP
DEVELOPER, BMP INSTALLER (SEE SECTION 4.10), AS WELL AS THEIR INDIVIDUAL RESPONSIBILITIES.
(SECTION 4.4.C.II)
2. VISUAL MONITORING INSPECTION REPORTS MUST BE MADE IN ACCORDANCE WITH DEQ 1200-C PERMIT
REQUIREMENTS. (SECTION 6.5)
3. INSPECTION LOGS MUST BE KEPT IN ACCORDANCE WITH DEQ'S 1200-C PERMIT REQUIREMENTS.
(SECTION 6.5.Q)
4. RETAIN A COPY OF THE ESCP AND ALL REVISIONS ON SITE AND MAKE IT AVAILABLE ON REQUEST TO
DEQ, AGENT, OR THE LOCAL MUNICIPALITY. (SECTION 4.7)
5. THE PERMIT REGISTRANT MUST IMPLEMENT THE ESCP. FAILURE TO IMPLEMENT ANY OF THE CONTROL MEASURES OR PRACTICES DESCRIBED IN THE ESCP IS A VIOLATION OF THE PERMIT. (SECTIONS 4 AND 4.11)
6. THE ESCP MUST BE ACCURATE AND REFLECT SITE CONDITIONS. (SECTION 4.8)
7. SUBMISSION OF ALL ESCP REVISIONS IS NOT REQUIRED. SUBMITTAL OF THE ESCP REVISIONS IS ONLY
UNDER SPECIFIC CONDITIONS. SUBMIT ALL NECESSARY REVISION TO DEQ OR AGENT WITHIN 10 DAYS.
(SECTION 4.9)
8. SEQUENCE CLEARING AND GRADING TO THE MAXIMUM EXTENT PRACTICAL TO PREVENT EXPOSED
INACTIVE AREAS FROM BECOMING A SOURCE OF EROSION. (SECTION 2.2.2)
9. CREATE SMOOTH SURFACES BETWEEN SOIL SURFACE AND EROSION AND SEDIMENT CONTROLS TO
PREVENT STORMWATER FROM BYPASSING CONTROLS AND PONDING. (SECTION 2.2.3)
10. IDENTIFY, MARK, AND PROTECT (BY CONSTRUCTION FENCING OR OTHER MEANS) CRITICAL RIPARIAN
AREAS AND VEGETATION INCLUDING IMPORTANT TREES AND ASSOCIATED ROOTING ZONES, AND
VEGETATION AREAS TO BE PRESERVED. IDENTIFY VEGETATIVE BUFFER ZONES BETWEEN THE SITE AND SENSITIVE AREAS (E.G., WETLANDS), AND OTHER AREAS TO BE PRESERVED, ESPECIALLY IN
PERIMETER AREAS. (SECTION 2.2.1)
11. PRESERVE EXISTING VEGETATION WHEN PRACTICAL AND RE-VEGETATE OPEN AREAS. RE-VEGETATE OPEN AREAS WHEN PRACTICABLE BEFORE AND AFTER GRADING OR CONSTRUCTION. IDENTIFY THE
TYPE OF VEGETATIVE SEED MIX USED. (SECTION 2.2.5)
12. MAINTAIN AND DELINEATE ANY EXISTING NATURAL BUFFER WITHIN THE 50-FEET OF WATERS OF THE
STATE. (SECTION 2.2.4)
13. INSTALL PERIMETER SEDIMENT CONTROL, INCLUDING STORM DRAIN INLET PROTECTION AS WELL AS ALL SEDIMENT BASINS, TRAPS, AND BARRIERS PRIOR TO LAND DISTURBANCE. (SECTIONS 2.1.3)
14. CONTROL BOTH PEAK FLOW RATES AND TOTAL STORMWATER VOLUME, TO MINIMIZE EROSION AT
OUTLETS AND DOWNSTREAM CHANNELS AND STREAMBANKS. (SECTIONS 2.1.1. AND 2.2.16)
15. CONTROL SEDIMENT AS NEEDED ALONG THE SITE PERIMETER AND AT ALL OPERATIONAL INTERNAL STORM DRAIN INLETS AT ALL TIMES DURING CONSTRUCTION, BOTH INTERNALLY AND AT THE SITE
BOUNDARY. (SECTIONS 2.2.6 AND 2.2.13)
16. ESTABLISH CONCRETE TRUCK AND OTHER CONCRETE EQUIPMENT WASHOUT AREAS BEFORE
BEGINNING CONCRETE WORK. (SECTION 2.2.14)
17. APPLY TEMPORARY AND/OR PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY ON ALL
DISTURBED AREAS AS GRADING PROGRESSES. TEMPORARY OR PERMANENT STABILIZATIONS
MEASURES ARE NOT REQUIRED FOR AREAS THAT ARE INTENDED TO BE LEFT UNVEGETATED, SUCH AS
DIRT ACCESS ROADS OR UTILITY POLE PADS. (SECTIONS 2.2.20 AND 2.2.21)
18. ESTABLISH MATERIAL AND WASTE STORAGE AREAS, AND OTHER NON-STORMWATER CONTROLS.
(SECTION 2.3.7)
19. KEEP WASTE CONTAINER LIDS CLOSED WHEN NOT IN USE AND CLOSE LIDS AT THE END OF THE
BUSINESS DAY FOR THOSE CONTAINERS THAT ARE ACTIVELY USED THROUGHOUT THE DAY. FOR
WASTE CONTAINERS THAT DO NOT HAVE LIDS, PROVIDE EITHER (1) COVER (E.G., A TARP, PLASTIC SHEETING, TEMPORARY ROOF) TO PREVENT EXPOSURE OF WASTES TO PRECIPITATION, OR (2) A
SIMILARLY EFFECTIVE MEANS DESIGNED TO PREVENT THE DISCHARGE OF POLLUTANTS (E.G.,
SECONDARY CONTAINMENT). (SECTION 2.3.7)
20. PREVENT TRACKING OF SEDIMENT ONTO PUBLIC OR PRIVATE ROADS USING BMPS SUCH AS:
CONSTRUCTION ENTRANCE, GRAVELED (OR PAVED) EXITS AND PARKING AREAS, GRAVEL ALL
UNPAVED ROADS LOCATED ONSITE, OR USE AN EXIT TIRE WASH. THESE BMPS MUST BE IN PLACE
PRIOR TO LAND- DISTURBING ACTIVITIES. (SECTION 2.2.7)
21. WHEN TRUCKING SATURATED SOILS FROM THE SITE, EITHER USE WATER-TIGHT TRUCKS OR DRAIN
LOADS ON SITE. (SECTION 2.2.7.F)
22. CONTROL PROHIBITED DISCHARGES FROM LEAVING THE CONSTRUCTION SITE, I.E., CONCRETE WASH-OUT, WASTEWATER FROM CLEANOUT OF STUCCO, PAINT AND CURING COMPOUNDS. (SECTIONS
1.5 AND 2.3.9)
23. ENSURE THAT STEEP SLOPE AREAS WHERE CONSTRUCTION ACTIVITIES ARE NOT OCCURRING ARE
NOT DISTURBED. (SECTION 2.2.10)
24. PREVENT SOIL COMPACTION IN AREAS WHERE POST-CONSTRUCTION INFILTRATION FACILITIES ARE TO
BE INSTALLED. (SECTION 2.2.12)
25. USE BMPS TO PREVENT OR MINIMIZE STORMWATER EXPOSURE TO POLLUTANTS FROM SPILLS;
VEHICLE AND EQUIPMENT FUELING, MAINTENANCE, AND STORAGE; OTHER CLEANING AND
MAINTENANCE ACTIVITIES; AND WASTE HANDLING ACTIVITIES. THESE POLLUTANTS INCLUDE FUEL, HYDRAULIC FLUID, AND OTHER OILS FROM VEHICLES AND MACHINERY, AS WELL AS DEBRIS, FERTILIZER, PESTICIDES AND HERBICIDES, PAINTS, SOLVENTS, CURING COMPOUNDS AND ADHESIVES
FROM CONSTRUCTION OPERATIONS. (SECTIONS 2.2.15 AND 2.3)
26. PROVIDE PLANS FOR SEDIMENTATION BASINS THAT HAVE BEEN DESIGNED PER SECTION 2.2.17 AND
STAMPED BY AN OREGON PROFESSIONAL ENGINEER. (SEE SECTION 2.2.17.A)
27. IF ENGINEERED SOILS ARE USED ON SITE, A SEDIMENTATION BASIN/IMPOUNDMENT MUST BE
INSTALLED. (SEE SECTIONS 2.2.17 AND 2.2.18)
28. PROVIDE A DEWATERING PLAN FOR ACCUMULATED WATER FROM PRECIPITATION AND
UNCONTAMINATED GROUNDWATER SEEPAGE DUE TO SHALLOW EXCAVATION ACTIVITIES. (SEE
SECTION 2.4)
29. IMPLEMENT THE FOLLOWING BMPS WHEN APPLICABLE: WRITTEN SPILL PREVENTION AND RESPONSE PROCEDURES, EMPLOYEE TRAINING ON SPILL PREVENTION AND PROPER DISPOSAL PROCEDURES, SPILL KITS IN ALL VEHICLES, REGULAR MAINTENANCE SCHEDULE FOR VEHICLES AND MACHINERY, MATERIAL DELIVERY AND STORAGE CONTROLS, TRAINING AND SIGNAGE, AND COVERED STORAGE
AREAS FOR WASTE AND SUPPLIES. (SECTION 2.3)
30. USE WATER, SOIL-BINDING AGENT OR OTHER DUST CONTROL TECHNIQUE AS NEEDED TO AVOID
WIND-BLOWN SOIL. (SECTION 2.2.9)
31. THE APPLICATION RATE OF FERTILIZERS USED TO REESTABLISH VEGETATION MUST FOLLOW
MANUFACTURER'S RECOMMENDATIONS TO MINIMIZE NUTRIENT RELEASES TO SURFACE WATERS.
EXERCISE CAUTION WHEN USING TIME-RELEASE FERTILIZERS WITHIN ANY WATERWAY RIPARIAN ZONE.
(SECTION 2.3.5)
32. IF AN ACTIVE TREATMENT SYSTEM (FOR EXAMPLE, ELECTRO-COAGULATION, FLOCCULATION, FILTRATION, ETC.) FOR SEDIMENT OR OTHER POLLUTANT REMOVAL IS EMPLOYED, SUBMIT AN
OPERATION AND MAINTENANCE PLAN (INCLUDING SYSTEM SCHEMATIC, LOCATION OF SYSTEM,
LOCATION OF INLET, LOCATION OF DISCHARGE, DISCHARGE DISPERSION DEVICE DESIGN, AND A
SAMPLING PLAN AND FREQUENCY) BEFORE OPERATING THE TREATMENT SYSTEM. OBTAIN
ENVIRONMENTAL MANAGEMENT PLAN APPROVAL FROM DEQ BEFORE OPERATING THE TREATMENT
SYSTEM. OPERATE AND MAINTAIN THE TREATMENT SYSTEM ACCORDING TO MANUFACTURER'S
SPECIFICATIONS. (SECTION 1.2.9)
33. TEMPORARILY STABILIZE SOILS AT THE END OF THE SHIFT BEFORE HOLIDAYS AND WEEKENDS, IF NEEDED. THE REGISTRANT IS RESPONSIBLE FOR ENSURING THAT SOILS ARE STABLE DURING RAIN
EVENTS AT ALL TIMES OF THE YEAR. (SECTION 2.2)
34. AS NEEDED BASED ON WEATHER CONDITIONS, AT THE END OF EACH WORKDAY SOIL STOCKPILES
MUST BE STABILIZED OR COVERED, OR OTHER BMPS MUST BE IMPLEMENTED TO PREVENT
DISCHARGES TO SURFACE WATERS OR CONVEYANCE SYSTEMS LEADING TO SURFACE WATERS.
(SECTION 2.2.8)
35. SEDIMENT FENCE: REMOVE TRAPPED SEDIMENT BEFORE IT REACHES ONE THIRD OF THE ABOVE
GROUND FENCE HEIGHT AND BEFORE FENCE REMOVAL. (SECTION 2.1.5.B)
36. OTHER SEDIMENT BARRIERS (SUCH AS BIOBAGS): REMOVE SEDIMENT BEFORE IT REACHES TWO
INCHES DEPTH ABOVE GROUND HEIGHT AND BEFORE BMP REMOVAL. (SECTION 2.1.5.C)
37. CATCH BASINS: CLEAN BEFORE RETENTION CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT.
SEDIMENT BASINS AND SEDIMENT TRAPS: REMOVE TRAPPED SEDIMENTS BEFORE DESIGN CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT AND AT COMPLETION OF PROJECT. (SECTION 2.1.5.D)
38. WITHIN 24 HOURS, SIGNIFICANT SEDIMENT THAT HAS LEFT THE CONSTRUCTION SITE, MUST BE
REMEDIATED. INVESTIGATE THE CAUSE OF THE SEDIMENT RELEASE AND IMPLEMENT STEPS TO
PREVENT A RECURRENCE OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM CLEAN-UP
OF SEDIMENT SHALL BE PERFORMED ACCORDING TO THE OREGON DEPARTMENT OF STATE LANDS
REQUIRED TIMEFRAME. (SECTION 2.2.19.A)
39. THE INTENTIONAL WASHING OF SEDIMENT INTO STORM SEWERS OR DRAINAGE WAYS MUST NOT
OCCUR. VACUUMING OR DRY SWEEPING AND MATERIAL PICKUP MUST BE USED TO CLEANUP
RELEASED SEDIMENTS. (SECTION 2.2.19)
40. DOCUMENT ANY PORTION(S) OF THE SITE WHERE LAND DISTURBING ACTIVITIES HAVE PERMANENTLY CEASED OR WILL BE TEMPORARILY INACTIVE FOR 14 OR MORE CALENDAR DAYS. (SECTION 6.5.F.)
41. PROVIDE TEMPORARY STABILIZATION FOR THAT PORTION OF THE SITE WHERE CONSTRUCTION ACTIVITIES CEASE FOR 14 DAYS OR MORE WITH A COVERING OF BLOWN STRAW AND A TACKIFIER, LOOSE STRAW, OR AN ADEQUATE COVERING OF COMPOST MULCH UNTIL WORK RESUMES ON THAT
PORTION OF THE SITE. (SECTION 2.2.20)
42. DO NOT REMOVE TEMPORARY SEDIMENT CONTROL PRACTICES UNTIL PERMANENT VEGETATION OR OTHER COVER OF EXPOSED AREAS IS ESTABLISHED. ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED, ALL TEMPORARY EROSION CONTROLS AND RETAINED SOILS MUST BE REMOVED AND DISPOSED OF PROPERLY, UNLESS NEEDED FOR LONG TERM USE FOLLOWING TERMINATION OF
PERMIT COVERAGE. (SECTION 2.2.21)
CLACKAMAS COUNTY FAIRGROUNDS - MULTI-PURPOSE BUILDING
EROSION AND SEDIMENT CONTROL PLAN (ESCP) FOR SITES 1 TO 5 ACRES
REQUIRED INSPECTION TABLE:
CLACKAMAS COUNTY
FAIRGROUNDS & EVENT CENTER
694 NE 4TH AVENUE
CANBY, OR 97013
CONTACT: BRIAN CROW
PHONE: (503) 266-1136
3J CONSULTING, INC.
9600 SW NIMBUS AVE, SUITE 100
BEAVERTON, OR 97008
CONTACT: AARON MURPHY, P.E.
PHONE: (503) 946-9365 x218 EMAIL: aaron.murphy@3j-consulting.com
CENTERLINE CONCEPTS LAND
SURVEYING, INC.
19376 MOLALLA AVENUE, SUITE 120
OREGON CITY, OREGON 97045
CONTACT: TOBY G. BOLDEN, PLS, CFedS
PHONE: (503) 650-0188
EMAIL:
3J CONSULTING, INC.
9600 SW NIMBUS AVE, SUITE 100
BEAVERTON, OR 97008
CONTACT: SAM HUCK
PHONE: (503) 946-9365 x251 EMAIL: sam.huck@3j-consulting.com
OWNER/APPLICANT
PLANNING CONSULTANT
CIVIL ENGINEER / ESCP PREPARER
LAND SURVEYOR
TBD
GENERAL CONTRACTOR
EXISTING SITE CONDITIONS
THE EXISTING SITE IS A FAIRGROUND OCCUPIED BY EXISTING BUILDINGS, LANDSCAPE, AND
AMENITIES.
DEVELOPED CONDITIONS
THE PROPOSED ONSITE DEVELOPMENT CONSISTS OF THE CONSTRUCTION OF A NEW EVENT
CENTER BUILDING AND SURROUNDING ASPHALT.
NATURE OF CONSTRUCTION ACTIVITY AND ESTIMATED TIME TABLE
DECEMBER 2023 - DECEMBER 2023 CLEARING
JANUARY 2024 - FEBRUARY 2024 UTILITY INSTALLATION
FEBRUARY 2024 - MARCH 2024 GRADING
MARCH 2024 - JUNE 2024 VERTICAL CONSTRUCTION
JUNE 2024 - JULY 2024 FINAL STABILIZATION
EXISTING SITE SOIL CONDITIONS:
THE SOIL TYPE AS CLASSIFIED BY THE UNITED STATES DEPARTMENT OF AGRICULTURE SOIL
SURVEY OF CLACKAMAS COUNTY IS LATOURELL LOAM WITH A CORRESPONDING HYDROLOGIC
GROUP RATING OF B.
RECEIVING WATER BODIES:
RUNOFF SHEET FLOWS TO THE SOUTHEAST INTO WILSON CREEK. WILSON CREEK TRAVELS
THROUGH PRIVATE PROPERTY EVENTUALLY DISCHARGING INTO THE TUALATIN RIVER
APPROXIMATELY 4,900 FEET DOWNSTREAM.
BMP MATRIX FOR CONSTRUCTION PHASES
YEAR: 2023-2024
BMPs MONTH #: 12 1 2 3 4 5 6 7
BIOBAGS
BIOSWALES
CHECK DAMS
COMPOST BERM
COMPOST BLANKETS
COMPOST SOCKS
CONCRETE TRUCK WASHOUT
CONSTRUCTION ENTRANCE X X X X X X X X
DEWATERING (TREATMENT LOCATION, SCHEMATIC,
AND SAMPLING PLAN REQUIRED)
DRAINAGE SWALES
EARTH DIKES (STABILIZED)
ENERGY DISSIPATERS
EROSION CONTROL BLANKETS & MATS (SPECIFY TYPE)
HYDROSEEDING
INLET PROTECTION X X X X X X X X
MULCHES (SPECIFY TYPE)
MYCORRHIZAE/BIOFERTILIZERS
NATURAL BUFFER ZONE
ORANGE FENCING (PROTECTING
SENSITIVE/PRESERVED AREAS)
OUTLET PROTECTION
PERMANENT SEEDING AND PLANTING X X
PIPE SLOPE DRAINS
PLASTIC SHEETING X X X X X X
PRESERVE EXISTING VEGETATION X X X X X X X X
SEDIMENT FENCING X X X X X X X X
SEDIMENT BARRIER
SEDIMENT TRAP
SODDING
SOIL TRACKIFIERS
STORM DRAIN INLET PROTECTION X X X X X X X X
STRAW WATTLES (OR OTHER MATERIALS) X X X X X X X X
TEMPORARY DIVERSION DIKES
TEMPORARY OR PERMANENT SEDIMENTATION BASINS
TEMPORARY SEEDING AND PLANTING X X
TREATMENT SYSTEM (O & M PLAN REQUIRED)
UNPAVED ROADS GRAVELED OR OTHER BMP ON THE
ROAD
VEGETATIVE BUFFER STRIPS
REFER TO DEQ GUIDANCE MANUAL FOR A COMPREHENSIVE LIST OF AVAILABLE BMP'S.
PERMITTEE'S SITE INSPECTOR (VISUAL MONITORING):
NAME:
COMPANY/AGENCY:
PHONE:
FAX:
E-MAIL:
DESCRIPTION OF EXPERIENCE:
TBD
THE PERMITTEE IS REQUIRED TO MEET ALL THE CONDITIONS OF THE 1200-C PERMIT. THIS ESCP AND GENERAL CONDITIONS HAVE BEEN DEVELOPED TO FACILITATE COMPLIANCE WITH THE 1200-C
PERMIT REQUIREMENTS. IN CASES OF DISCREPANCIES OR OMISSIONS, THE 1200-C PERMIT
REQUIREMENTS SUPERCEDE REQUIREMENTS OF THIS PLAN.
ODEQ 1200-C FILE NUMBER
TBD
A COMPREHENSIVE LIST OF AVAILABLE BEST MANAGEMENT PRACTICES (BMP) OPTIONS BASED ON DEQ's GUIDANCE MANUAL HAS BEEN REVIEWED TO COMPLETE THIS EROSION AND SEDIMENT CONTROL PLAN. SOME OF THE ABOVE LISTED BMP's WERE NOT CHOSEN BECAUSE THEY WERE
DETERMINED TO NOT EFFECTIVELY MANAGE EROSION PREVENTION AND SEDIMENT CONTROL FOR
THIS PROJECT BASED ON SPECIFIC SITE CONDITIONS, INCLUDING SOIL CONDITIONS TOPOGRAPHIC CONSTRAINTS, ACCESSIBILITY TO THE SITE, AND OTHER RELATED CONDITIONS, AS THE PROJECT
PROGRESSES AND THERE IS A NEED TO REVISE THE ESC PLAN, AN ACTION PLAN WILL BE
SUBMITTED.
INITIAL LO___
RATIONALE STATEMENT
NARRATIVE DESCRIPTIONS
Sheet List Table Sheet Number Sheet Title
C110 ESCP COVER SHEET
C111 EXISTING CONDITIONS & DEMOLITION ESCP PHASE I
C112 GRADING ESCP PHASE II
C113 UTILITY INSTALLATION ESCP PHASE III
C114 VERTICAL CONSTRUCTION ESCP PHASE IV
C115 FINAL LANDSCAPING AND STABILIZATION ESCP PHASE V
MULTI-PURPOSE BUILDING
(PROPOSED)
M A Y 8 , 2 0 18
L A U R A E L I Z A B E T H O X S EN
89566PE
EXPIRES: 12/31/24
OREGON
ENGINEER
RE
GIS
TERED PROFESSIONAL
CL
AC
KA
M
AS
C
O
UN
TY
F
AI
RG
RO
UN
DS
M
UL
TI
-P
UR
PO
SE
B
UI
LD
IN
G
CA
N
BY
, O R
CL
AC
KA
M
AS
C
O U
N
TY
F
AI
RG
RO
U N
D S
5/5/2023
BID SET
22799
LEO, SMT
AJM, LEO
100, 700
P:
\2
-C
LA
C
KA
M
AS
C O
U N
TY
F
AI
R
G R
O U
N D
-M U
LT
I P
U R
PO
SE
B U
IL
D
IN
G
\C
AD
\S H
EE
TS
\2
-1
0C
E
XI
ST
IN
G C
O N
D
IT
IO
N
S.
D
W G
3J PROJECT #
LAND USE #
DESIGNED BY
CHECKED BY
TAX LOT(S)
REVISIONS
PUBLISH DATE
ISSUED FOR
SHEET NUMBER
PROJECT INFORMATION
CI
VI
L
EN
G
IN
EE
RI
N G
W
AT
ER
R
ES
O
U
RC
ES
CO
M M
U N
IT
Y
PL
AN
N
IN
G
S W
N
IM
BU
S
AV
E.
, S U
IT
E
0;
B
EA
VE
RT
O N
, O R
PRELIM
IN
ARY
Knowwhat's below.
Callbefore you dig. C111
EX
IS
TI
N
G
CO
N
DI
TI
O
N S
D
EM
O
LI
TI
O N
E
SC
P
PH
AS
E
I
FT
SCALE: 1" = 60'
60' 120'
N
EW
S
PRE-CONSTRUCTION, CLEARING, AND DEMOLITION NOTES:
1. ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT
CONTROL, GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN PLACE,
FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION, PRIOR TO
COMMENCEMENT OF CONSTRUCTION ACTIVITIES.
2. SEDIMENT BARRIERS APPROVED FOR USE INCLUDE SEDIMENT FENCE,
BERMS CONSTRUCTED OUT OF MULCH, CHIPPINGS, OR OTHER SUITABLE
MATERIAL, STRAW WATTLES, OR OTHER APPROVED MATERIALS.
3. SENSITIVE RESOURCES INCLUDING, BUT NOT LIMITED TO, TREES,
WETLANDS, AND RIPARIAN PROTECTION AREAS SHALL BE CLEARLY
DELINEATED WITH ORANGE CONSTRUCTION FENCING OR CHAIN LINK
FENCING IN A MANNER THAT IS CLEARLY VISIBLE TO ANYONE IN THE AREA.
NO ACTIVITIES ARE PERMITTED TO OCCUR BEYOND THE CONSTRUCTION
BARRIER.
4. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES INCLUDING, BUT NOT LIMITED TO, STREET
SWEEPING, AND VACUUMING, MAY BE REQUIRED TO INSURE THAT ALL PAVED
AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
5. RUN-ON AND RUN-OFF CONTROLS SHALL BE IN PLACE AND FUNCTIONING
PRIOR TO BEGINNING SUBSTANTIAL CONSTRUCTION ACTIVITIES. RUN-ON
AND RUN-OFF CONTROL MEASURES INCLUDE:
SLOPE DRAINS (WITH OUTLET PROTECTION), CHECK DAMS, AND SURFACE
ROUGHENING.
GENERAL EROSION CONTROL NOTES:
1. COMPLY WITH ALL APPLICABLE PROVISIONS IN CHAPTER6 OF THE
DESIGN AND CONSTRUCTION STANDARDS (CURRENT): R&O 19-5 AS
AMENDED BY R&O 19-22, ADOPTED NOVEMBER 12, 2019.
2. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE DISCHARGED OVER
AN UNDISTURBED, PREFERABLY VEGETATED AREA, AND THROUGH A
SEDIMENT CONTROL BMP LIKE A FILTER BAG.
3. ALL EXPOSED SOILS MUST BE COVERED DURING WET WEATHER PERIOD,
OCTOBER 1, - MAY 31.
4. HOLD A PRECONSTRUCTION MEETING WITH PROJECT CONSTRUCTION
PERSONAL THAT INCLUDES THE INSPECTOR TO DISCUSS EROSION AND
SEDIMENT CONTROL MEASURES AND CONSTRUCTION LIMITS.
EROSION CONTROL NOTES
CONSTRUCT GRAVEL CONSTRUCTION ENTRANCE AT LOCATION
SHOWN AND PER DETAIL 1 ON SHEET C116.
INSTALL SEDIMENT FENCING AT LOCATION SHOWN AND PER
DETAIL 2 ON SHEET C116.
INSTALL INLET PROTECTION AT LOCATIONS SHOWN AND PER
DETAIL 3 ON SHEET C116.
INSTALL TREE PROTECTION FENCING AT LOCATION SHOWN AND
PER DETAIL 4 ON SHEET C116.
CONSTRUCT TIRE WASH AT LOCATION SHOWN AND PER DETAIL 5
ON SHEET C116.
140 140
M A Y 8 , 2 0 18
L A U R A E L I Z A B E T H O X S EN
89566PE
EXPIRES: 12/31/24
OREGON
ENGINEER
RE
GIS
TERED PROFESSIONAL
CL
AC
KA
M
AS
C
O
UN
TY
F
AI
RG
RO
UN
DS
M
UL
TI
-P
UR
PO
SE
B
UI
LD
IN
G
CA
N
BY
, O R
CL
AC
KA
M
AS
C
O U
N
TY
F
AI
RG
RO
U N
D S
5/5/2023
BID SET
22799
LEO, SMT
AJM, LEO
100, 700
P:
\2
-C
LA
C
KA
M
AS
C O
U N
TY
F
AI
R
G R
O U
N D
-M U
LT
I P
U R
PO
SE
B U
IL
D
IN
G
\C
AD
\S H
EE
TS
\2
-1
0C
G R
AD
IN
G .D
W G
3J PROJECT #
LAND USE #
DESIGNED BY
CHECKED BY
TAX LOT(S)
REVISIONS
PUBLISH DATE
ISSUED FOR
SHEET NUMBER
PROJECT INFORMATION
CI
VI
L
EN
G
IN
EE
RI
N G
W
AT
ER
R
ES
O
U
RC
ES
CO
M M
U N
IT
Y
PL
AN
N
IN
G
S W
N
IM
BU
S
AV
E.
, S U
IT
E
0;
B
EA
VE
RT
O N
, O R
PRELIM
IN
ARY
C112
GR
AD
IN
G
ES
CP
P
HA
SE
II
Knowwhat's below.
Callbefore you dig.
FT
SCALE: 1" = 60'
60' 120'
N
EW
S
EROSION AND SEDIMENT CONTROL BMP IMPLEMENTATION:
1. ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT
CONTROL, GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN PLACE,
FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION, PRIOR TO
COMMENCEMENT OF CONSTRUCTION ACTIVITIES.
2. ALL "SEDIMENT BARRIERS (TO BE INSTALLED AFTER GRADING)" SHALL BE
INSTALLED IMMEDIATELY FOLLOWING ESTABLISHMENT OF FINISHED GRADE
AS SHOWN ON THESE PLANS.
3. LONG TERM SLOPE STABILIZATION MEASURES "INCLUDING MATTING" SHALL
BE IN PLACE OVER ALL EXPOSED SOILS BY OCTOBER 1.
4. THE STORM WATER FACILITY SHALL BE CONSTRUCTED AND LANDSCAPED
PRIOR TO THE STORM WATER SYSTEM FUNCTIONING AND SITE PAVING.
5. INLET PROTECTION SHALL BE IN-PLACE IMMEDIATELY FOLLOWING PAVING
ACTIVITIES.
TOTAL CUT = 991 CU. YD.
TOTAL FILL = 1538 CU. YD.
EROSION CONTROL NOTES
CONSTRUCT GRAVEL CONSTRUCTION ENTRANCE AT LOCATION
SHOWN AND PER DETAIL 1 ON SHEET C116.
INSTALL SEDIMENT FENCING AT LOCATION SHOWN AND PER
DETAIL 2 ON SHEET C116.
INSTALL INLET PROTECTION AT LOCATIONS SHOWN AND PER
DETAIL 3 ON SHEET C116.
INSTALL TREE PROTECTION FENCING AT LOCATION SHOWN AND
PER DETAIL 4 ON SHEET C116.
CONSTRUCT TIRE WASH AT LOCATION SHOWN AND PER DETAIL 5
ON SHEET C116.
MATERIALS STOCKPILE AND STAGING AREA. DESIGNATED
STAGING AREA FOR EQUIPMENT MAINTENANCE, FUELING, FIELD
TOILETS AND SOLID WASTE. PROTECT SOIL STOCKPILES WITH
PLASTIC SHEETING PER DETAIL 6 ON SHEET C117.
DCD
A
FDC
140 140
MULTI-PURPOSE BUILDING
M A Y 8 , 2 0 18
L A U R A E L I Z A B E T H O X S EN
89566PE
EXPIRES: 12/31/24
OREGON
ENGINEER
RE
GIS
TERED PROFESSIONAL
CL
AC
KA
M
AS
C
O
UN
TY
F
AI
RG
RO
UN
DS
M
UL
TI
-P
UR
PO
SE
B
UI
LD
IN
G
CA
N
BY
, O R
CL
AC
KA
M
AS
C
O U
N
TY
F
AI
RG
RO
U N
D S
5/5/2023
BID SET
22799
LEO, SMT
AJM, LEO
100, 700
P:
\2
-C
LA
C
KA
M
AS
C O
U N
TY
F
AI
R
G R
O U
N D
-M U
LT
I P
U R
PO
SE
B U
IL
D
IN
G
\C
AD
\S H
EE
TS
\2
-1
0C
U
TI
LI
TY
.D W
G
3J PROJECT #
LAND USE #
DESIGNED BY
CHECKED BY
TAX LOT(S)
REVISIONS
PUBLISH DATE
ISSUED FOR
SHEET NUMBER
PROJECT INFORMATION
CI
VI
L
EN
G
IN
EE
RI
N G
W
AT
ER
R
ES
O
U
RC
ES
CO
M M
U N
IT
Y
PL
AN
N
IN
G
S W
N
IM
BU
S
AV
E.
, S U
IT
E
0;
B
EA
VE
RT
O N
, O R
PRELIM
IN
ARY
C113
UT
IL
IT
Y
IN
ST
AL
LA
TI
O
N E
SC
P
PH
AS
E
III
Knowwhat's below.
Callbefore you dig. C113
UT
IL
IT
Y
IN
ST
AL
LA
TI
O
N E
SC
P
PH
AS
E
III
Knowwhat's below.
Callbefore you dig.
FT
SCALE: 1" = 60'
60' 120'
N
EW
S
EROSION AND SEDIMENT CONTROL BMP IMPLEMENTATION:
1. ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT
CONTROL, GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN PLACE,
FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION, PRIOR TO
COMMENCEMENT OF CONSTRUCTION ACTIVITIES.
2. ALL "SEDIMENT BARRIERS (TO BE INSTALLED AFTER GRADING)" SHALL BE
INSTALLED IMMEDIATELY FOLLOWING ESTABLISHMENT OF FINISHED GRADE AS
SHOWN ON THESE PLANS.
3. LONG TERM SLOPE STABILIZATION MEASURES "INCLUDING MATTING" SHALL
BE IN PLACE OVER ALL EXPOSED SOILS BY OCTOBER 1.
4. THE STORM WATER FACILITY SHALL BE CONSTRUCTED AND LANDSCAPED
PRIOR TO THE STORM WATER SYSTEM FUNCTIONING AND SITE PAVING.
5. INLET PROTECTION SHALL BE IN-PLACE IMMEDIATELY FOLLOWING PAVING
ACTIVITIES.
EROSION CONTROL NOTES
CONSTRUCT GRAVEL CONSTRUCTION ENTRANCE AT LOCATION
SHOWN AND PER DETAIL 1 ON SHEET C116.
INSTALL SEDIMENT FENCING AT LOCATION SHOWN AND PER
DETAIL 2 ON SHEET C116.
INSTALL INLET PROTECTION AT LOCATIONS SHOWN AND PER
DETAIL 3 ON SHEET C116.
INSTALL TREE PROTECTION FENCING AT LOCATION SHOWN AND
PER DETAIL 4 ON SHEET C116.
CONSTRUCT TIRE WASH AT LOCATION SHOWN AND PER DETAIL 5
ON SHEET C116.
MATERIALS STOCKPILE AND STAGING AREA. DESIGNATED
STAGING AREA FOR EQUIPMENT MAINTENANCE, FUELING, FIELD
TOILETS AND SOLID WASTE. PROTECT SOIL STOCKPILES WITH
PLASTIC SHEETING PER DETAIL 6 ON SHEET C117.
INSTALL STRAW WATTLES AT LOCATION SHOWN AND PER DETAIL 7
ON SHEET C117.
140 140
MULTI-PURPOSE BUILDING
M A Y 8 , 2 0 18
L A U R A E L I Z A B E T H O X S EN
89566PE
EXPIRES: 12/31/24
OREGON
ENGINEER
RE
GIS
TERED PROFESSIONAL
CL
AC
KA
M
AS
C
O
UN
TY
F
AI
RG
RO
UN
DS
M
UL
TI
-P
UR
PO
SE
B
UI
LD
IN
G
CA
N
BY
, O R
CL
AC
KA
M
AS
C
O U
N
TY
F
AI
RG
RO
U N
D S
5/5/2023
BID SET
22799
LEO, SMT
AJM, LEO
100, 700
P:
\2
-C
LA
C
KA
M
AS
C O
U N
TY
F
AI
R
G R
O U
N D
-M U
LT
I P
U R
PO
SE
B U
IL
D
IN
G
\C
AD
\S H
EE
TS
\2
-1
0C
V
ER
TI
C
AL
.D
W G
3J PROJECT #
LAND USE #
DESIGNED BY
CHECKED BY
TAX LOT(S)
REVISIONS
PUBLISH DATE
ISSUED FOR
SHEET NUMBER
PROJECT INFORMATION
CI
VI
L
EN
G
IN
EE
RI
N G
W
AT
ER
R
ES
O
U
RC
ES
CO
M M
U N
IT
Y
PL
AN
N
IN
G
S W
N
IM
BU
S
AV
E.
, S U
IT
E
0;
B
EA
VE
RT
O N
, O R
PRELIM
IN
ARY
C114
VE
RT
IC
AL
C O
N
ST
RU
CT
IO
N
E
SC
P
PH
AS
E
IV
Knowwhat's below.
Callbefore you dig.
FT
SCALE: 1" = 60'
60' 120'
N
EW
S
EROSION AND SEDIMENT CONTROL BMP IMPLEMENTATION:
1. ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT
CONTROL, GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN PLACE,
FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION, PRIOR TO
COMMENCEMENT OF CONSTRUCTION ACTIVITIES.
2. ALL "SEDIMENT BARRIERS (TO BE INSTALLED AFTER GRADING)" SHALL BE
INSTALLED IMMEDIATELY FOLLOWING ESTABLISHMENT OF FINISHED GRADE
AS SHOWN ON THESE PLANS.
3. LONG TERM SLOPE STABILIZATION MEASURES "INCLUDING MATTING" SHALL
BE IN PLACE OVER ALL EXPOSED SOILS BY OCTOBER 1.
4. THE STORM WATER FACILITY SHALL BE CONSTRUCTED AND LANDSCAPED
PRIOR TO THE STORM WATER SYSTEM FUNCTIONING AND SITE PAVING.
5. INLET PROTECTION SHALL BE IN-PLACE IMMEDIATELY FOLLOWING PAVING
ACTIVITIES.
VERTICAL CONSTRUCTION PHASE INFORMATION:
1. PHASE SCHEDULE:
START: MARCH 2024
FINISH: JUNE 2024
VERTICAL CONSTRUCTION PHASE NOTES:
1. ALL CONSTRUCTION MATERIALS THAT COULD LEAD TO
POLLUTION IF SPILLED NOT IN IMMEDIATE USE SHALL BE STORED
IN A STORAGE BOX AT THE NORTH EAST OF THE SITE (AS
SHOWN) TO PREVENT SPILLS AND EXPOSURE TO WET WEATHER.
2. FOR SPILL PREVENTION SPILL KITS AND OTHER SPILL
CONTAINMENT DEVICES (I.E. WATTLES, ABSORBENT
SOCKS/BOOMS, ORGANIC OIL ABSORBENT AGENT, ETC.) SHALL
BE KEPT ONSITE WITHIN THE STORAGE CONTAINER MENTIONED
ABOVE THROUGH THE COMPLETION OF THE PROJECT.
EROSION CONTROL NOTES
CONSTRUCT GRAVEL CONSTRUCTION ENTRANCE AT LOCATION
SHOWN AND PER DETAIL 1 ON SHEET C116.
INSTALL SEDIMENT FENCING AT LOCATION SHOWN AND PER
DETAIL 2 ON SHEET C116.
INSTALL INLET PROTECTION AT LOCATIONS SHOWN AND PER
DETAIL 3 ON SHEET C116.
INSTALL TREE PROTECTION FENCING AT LOCATION SHOWN AND
PER DETAIL 4 ON SHEET C116.
CONSTRUCT TIRE WASH AT LOCATION SHOWN AND PER DETAIL 5
ON SHEET C116.
MATERIALS STOCKPILE AND STAGING AREA. DESIGNATED
STAGING AREA FOR EQUIPMENT MAINTENANCE, FUELING, FIELD
TOILETS AND SOLID WASTE. PROTECT SOIL STOCKPILES WITH
PLASTIC SHEETING PER DETAIL 6 ON SHEET C117.
INSTALL STRAW WATTLES AT LOCATION SHOWN AND PER DETAIL 7
ON SHEET C117.
138 138
138 13
DCD
A
FDC
MULTI-PURPOSE BUILDING
M A Y 8 , 2 0 18
L A U R A E L I Z A B E T H O X S EN
89566PE
EXPIRES: 12/31/24
OREGON
ENGINEER
RE
GIS
TERED PROFESSIONAL
CL
AC
KA
M
AS
C
O
UN
TY
F
AI
RG
RO
UN
DS
M
UL
TI
-P
UR
PO
SE
B
UI
LD
IN
G
CA
N
BY
, O R
CL
AC
KA
M
AS
C
O U
N
TY
F
AI
RG
RO
U N
D S
5/5/2023
BID SET
22799
LEO, SMT
AJM, LEO
100, 700
P:
\2
-C
LA
C
KA
M
AS
C O
U N
TY
F
AI
R
G R
O U
N D
-M U
LT
I P
U R
PO
SE
B U
IL
D
IN
G
\C
AD
\S H
EE
TS
\2
-1
0C
F
IN
AL
.D
W G
3J PROJECT #
LAND USE #
DESIGNED BY
CHECKED BY
TAX LOT(S)
REVISIONS
PUBLISH DATE
ISSUED FOR
SHEET NUMBER
PROJECT INFORMATION
CI
VI
L
EN
G
IN
EE
RI
N G
W
AT
ER
R
ES
O
U
RC
ES
CO
M M
U N
IT
Y
PL
AN
N
IN
G
S W
N
IM
BU
S
AV
E.
, S U
IT
E
0;
B
EA
VE
RT
O N
, O R
PRELIM
IN
ARY
C115
FI
N
AL
L
AN
DS
CA
PI
N G
AN
D
ST
AB
IL
IZ
AT
IO
N E
SC
P
PH
AS
E V
Knowwhat's below.
Callbefore you dig.
FT
SCALE: 1" = 60'
60' 120'
N
EW
S
EROSION AND SEDIMENT CONTROL BMP IMPLEMENTATION:
1. ALL BASE ESC MEASURES (INLET PROTECTION, PERIMETER SEDIMENT
CONTROL, GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN PLACE,
FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION, PRIOR TO
COMMENCEMENT OF CONSTRUCTION ACTIVITIES.
2. ALL "SEDIMENT BARRIERS (TO BE INSTALLED AFTER GRADING)" SHALL BE
INSTALLED IMMEDIATELY FOLLOWING ESTABLISHMENT OF FINISHED GRADE AS
SHOWN ON THESE PLANS.
3. LONG TERM SLOPE STABILIZATION MEASURES "INCLUDING MATTING" SHALL BE
IN PLACE OVER ALL EXPOSED SOILS BY OCTOBER 1.
4. THE STORM WATER FACILITY SHALL BE CONSTRUCTED AND LANDSCAPED
PRIOR TO THE STORM WATER SYSTEM FUNCTIONING AND SITE PAVING.
5. INLET PROTECTION SHALL BE IN-PLACE IMMEDIATELY FOLLOWING PAVING
ACTIVITIES.
FINAL STABILIZATION PHASE NOTES:
1. ALL PERIMETER SEDIMENT FENCING AND CATCH BASIN FILTER
INSERTS TO BE REMOVED UPON COMPLETION OF THIS PHASE.
FINAL STABILIZATION PHASE INFORMATION:
1. PHASE SCHEDULE:
START: JUNE 2024
FINISH: JULY 2024
EROSION CONTROL NOTES
CONSTRUCT GRAVEL CONSTRUCTION ENTRANCE AT LOCATION
SHOWN AND PER DETAIL 1 ON SHEET C116.
INSTALL SEDIMENT FENCING AT LOCATION SHOWN AND PER
DETAIL 2 ON SHEET C116.
INSTALL INLET PROTECTION AT LOCATIONS SHOWN AND PER
DETAIL 3 ON SHEET C116.
INSTALL TREE PROTECTION FENCING AT LOCATION SHOWN AND
PER DETAIL 4 ON SHEET C116.
CONSTRUCT TIRE WASH AT LOCATION SHOWN AND PER DETAIL 5
ON SHEET C116.
MATERIALS STOCKPILE AND STAGING AREA. DESIGNATED
STAGING AREA FOR EQUIPMENT MAINTENANCE, FUELING, FIELD
TOILETS AND SOLID WASTE. PROTECT SOIL STOCKPILES WITH
PLASTIC SHEETING PER DETAIL 6 ON SHEET C117.
INSTALL STRAW WATTLES AT LOCATION SHOWN AND PER DETAIL 7
ON SHEET C117.
89566PE
EXPIRES: 12/31/24
OREGON
ENGINEER
RE
GIS
TERED PROFESSIONAL
CL
AC
KA
M
AS
C
O
UN
TY
F
AI
RG
RO
UN
DS
M
UL
TI
-P
UR
PO
SE
B
UI
LD
IN
G
CA
N
BY
, O R
CL
AC
KA
M
AS
C
O U
N
TY
F
AI
RG
RO
U N
D S
5/5/2023
BID SET
22799
LEO, SMT
AJM, LEO
100, 700
P:
\2
-C
LA
C
KA
M
AS
C O
U N
TY
F
AI
R
G R
O U
N D
-M U
LT
I P
U R
PO
SE
B U
IL
D
IN
G
\C
AD
\S H
EE
TS
\2
-E
R O
SI
O
N C
O N
TR
O
L D
ET
AI
LS
.D
W G
3J PROJECT #
LAND USE #
DESIGNED BY
CHECKED BY
TAX LOT(S)
REVISIONS
PUBLISH DATE
ISSUED FOR
SHEET NUMBER
PROJECT INFORMATION
CI
VI
L
EN
G
IN
EE
RI
N G
W
AT
ER
R
ES
O
U
RC
ES
CO
M M
U N
IT
Y
PL
AN
N
IN
G
S W
N
IM
BU
S
AV
E.
, S U
IT
E
0;
B
EA
VE
RT
O N
, O R
PRELIM
IN
ARY
C116
ER
O
SI
O
N C
O N
TR
O
L
DE
TA
IL
S
2'-6"
6"
2'-6"
1'-6"
6"
4'-0"
FROM TOE TO SLOPE
3' MIN.
FRONT VIEW
NTS
PROFILE
NTS
FILTER FABRIC MATERIAL
36" WIDE ROLLS
6' MAXIMUM SPACING
NOTES:
1. BURY BOTTOM OF FILTER FABRIC 6"
VERTICALLY BELOW FINISHED GRADE.
2. 2"x2" FIR, PINE OR STEEL FENCE
POSTS.
3. POSTS TO BE INSTALLED ON
DOWNHILL SIDE OF SLOPE.
4. COMPACT BOTH SIDES OF FILTER
FABRIC TRENCH.
5. REFERENCE LOCAL AGENCY HAVING
JURISDICTION FOR EROSION CONTROL
STANDARDS.
6. SEE SPACING TABLE FOR SPACING
REQUIREMENTS.
USE STITCHED LOOPS
OVER 2"x2" POSTS
INTERLOCKED
2"x2" POSTS
AND ATTACH PLAN VIEW
NTS
ANGLE FILTER FABRIC FENCE
TO ASSURE SOIL IS TRAPPED
4'-0"
DETAIL NUMBER SEDIMENT FENCE
NOT TO SCALE
D R
IP
LI
N E
RADIUS
SEE NOTE 2
D R
IP
LI
N E
CHAIN LINK
FENCE
NOTES:
1. 6' CHAIN LINK ON 2" POST AT 10' SPACING, DRIVEN 2' INTO THE
GROUND.
2. RADIUS IS EITHER 1/2' PER CALIPER INCH OR 10' OUTSIDE OF
DRIP LINE - SEE PLANS.
3. TO BE USED FOR CONSTRUCTION OR AN EQUAL AS APPROVED
BY PROJECT ARBORIST FOR ALL RETAINED TREES ADJACENT TO
CONSTRUCTION ACTIVITIES.
4. REFERENCE LOCAL AGENCY HAVING JURISDICTION FOR
EROSION CONTROL STANDARDS.
DETAIL NUMBER TREE PROTECTION
NOT TO SCALE
A
A
ROCK BERM AT EXIT
(OPTIONAL; PLACE AT END
OF APPROACH RETURNS)
FINISHED ROAD
SURFACE
SUBGRADE REINFORCEMENT
WOVEN GEOTEXTILE
10' MIN
8" MIN
6" MIN
24" MIN
SECTION A-A
3"-6" CLEAN
ROCK 1. EXCAVATE MINIMUM OF 8" OF
EXISTING SOILS.
2. PLACE MINIMUM OF 8" OF 3"-6"
CLEAN ROCK.
3. CONSTRUCT ROCK BERM ALONG
TRANSITION POINT TO FINISH ROAD
SURFACES. DIVERT RUNOFF TO
ONSITE AREA (OPTIONAL).
SUBGRADE REINFORCEMENT
WOVEN GEOTEXTILE
3"-6" CLEAN ROCK
2% CROSS
SLOPE
RADIUS
25' MIN
ROCK BERM
(OPTIONAL)
INSTALL DRIVEWAY
CULVERT IF ROADSIDE
DITCH PRESENT
1'x1' DITCH TO TRAP
SEDIMENT TO RUN FULL
LENGTH OF ENTRANCE
50' MIN.
100' IF AREA > 5 ACRES
PROVIDE FULL WIDTH
OF INGRESS/EGRESS
AREA - 2
0' MIN.
MATCH
EXISTING
GROUND
8" MIN.
DEPTH
DETAIL NUMBER CONSTRUCTION ENTRANCE
NOT TO SCALE
NOTES:
1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OF FLOWING OF
SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEAN
OUT OF ANY MEASURES USED TO TRAP SEDIMENT.
2. WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY.
3. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT
DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN.
4. WHERE RUNOFF CONTAINING SEDIMENT LADEN WATER IS LEAVING THE SITE VIA THE CONSTRUCTION
ENTRANCE, OTHER MEASURES SHALL BE IMPLEMENTED TO DIVERT RUNOFF THROUGH AN APPROVED
FILTERING SYSTEM.
5. FOR DEVELOPMENT PROJECTS REVIEWED BY ENGINEERING SERVICES. NOT FOR USE WITH SINGLE FAMILY OR DUPLEX RESIDENTIAL BUILDING PERMITS. SEE BUILDING DEPT. FOR GRAVEL CONSTRUCTION
ENTRANCE PLAN.
6. INSTALL WOVEN GEOTEXTILE FABRIC TO PREVENT SUB-SOIL PUMPING.
7. REFERENCE LOCAL AUTHORITY HAVING JURISDICTION FOR EROSION CONTROL STANDARDS.
WOODEN RAMP
AT CURB
DIRECTION
OF TRAVEL1% MIN
4:1 MAX
4:1 MAX
A A
PLAN
12"
18"12"
50' MIN 10' 16' MIN. 14'
4:1 MAX 4:1 MAX
SECTION A-A
DETAIL NUMBER TIRE WASH
NOT TO SCALE
NOTES:
1. CONTRACTOR TO REMOVE ACCUMULATED SEDIMENT AS NEEDED TO PREVENT TRACKING
FROM TIRE WASH; SEDIMENT LADEN WATER MAY BE PIPED TO AN APPROVED BMP.
2. REFERENCE LOCAL AUTHORITY HAVING JURISDICTION FOR EROSION CONTROL STANDARDS
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .