PDF 3 MB Posted

Attached to
Construct Bellevue Readiness Center
Solicitation number
W9124321RCH02
Issued by

View the file

Other files

File Type Posted
BRC.Amendment.0003.pdf PDF
Amendment.0002.pdf PDF
Amendment.0001.pdf PDF
Bellevue_RC_100_Vol_II_E-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_L-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_A-Reference-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_S-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_II_F-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_A-SeriesDWGS_2021-02-25.pdf PDF
Exhibit G.subcontracting.plan.requirements.docx DOCX document
Bellevue_RC_100_Vol_I_C-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_II_M-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_G-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_SPEC_Vol_III_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_II_G-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_II_P-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_I-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_FFE-SeriesDWGS_2021-02-25.pdf PDF
EXHIBIT B.doc DOC document
EXHIBIT F.small.business.participation.plan.docx DOCX document
Exhibit D_Letter of Commitment.docx DOCX document
W9124321RCH02.pdf PDF
Bellevue_RC_100_SPEC_Vol_I_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_FS-SeriesDWGS_2021-02-25.pdf PDF
Section.01000 General Requirements.pdf PDF
EXHIBIT A.doc DOC document
Bellevue_RC_100_Vol_II_RF-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_SPEC_Vol_II_2021-02-25.pdf PDF
EXHIBIT_C_Reference_Questionnaire_Package.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A AMPERES

AC ALTERNATING CURRENT

AFF ABOVE FINISHED FLOOR

AIC AMPERES INTERRUPTING CAPACITY

AV AUDIO/VIDEO

AWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEM

BOT BOTTOM OF CABLE TRAY

C CONDUIT

CAT CATEGORY

CATV CABLE TELEVISION

CCTV CLOSED CIRCUIT TELEVISION

COMM COMMUNICATIONS

COR CONTRACTING OFFICER'S REPRESENTATIVE

CPP COPPER HORIZONTAL PATCH PANEL

CRAC COMPUTER ROOM AIR CONDITIONING UNIT

CT CABLE TRAY

DC DIRECT CURRENT

EC EMPTY CONDUIT

EGC EQUIPMENT GROUNDING CONDUCTOR

EIA ELECTRONICS INDUSTRIES ASSOCIATIONS

EMT ELECTRICAL METALLIC TUBING

EPO EMERGENCY POWER OFF

ESS ELECTRONIC SECURITY SYSTEM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FBO FURNISHED BY OTHERS

FFE FURNITURE, FIXTURES AND EQUIPMENT

FPD FLAT PANEL DISPLAY

FPP FIBER OPTIC PATCH PANEL

FSCP FIRE SYSTEM CONTROL PANEL

FT FEET OR FOOT

GFGI GOVERNMENT FURNISHED AND INSTALLED

G OR GND GROUND

GFE GOVERNMENT FURNISHED EQUIPMENT

GRS GALVANIZED RIGID STEEL CONDUIT

HZ HERTZ

IDS INTRUSION DETECTION SYSTEM

IG ISOLATED GROUND

K KILO

KCMIL THOUSAND CIRCULAR MILS

LW LOCKABLE WIREWAY

MAX MAXIMUM

MH MAINTENANCE HOLE

MM MULTIMODE

MN/PA MASS NOTIFICATION/PUBLIC ADDRESS

N.C. NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION

NIC NOT IN CONTRACT

NIPR NON-CLASSIFIED INTERNET PROTOCOL ROUTING

N.O. NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

PBB PRIMARY BONDING BUSBAR

PDS PROTECTIVE DISTRIBUTION SYSTEM

PDU POWER DISTRIBUTION UNIT

PET PROTECTED ENTRANCE TERMINAL

PR PAIR

PVC POLYVINYL CHLORIDE

QA QUALITY ASSURANCE

RGS RIGID GALVANIZED STEEL CONDUIT

RMC RIGID METAL CONDUIT

RMS ROOT MEAN SQUARE

SBB SECONDARY BONDING BUSBAR

SCCR SHORT CIRCUIT CURRENT RATING

ScTP SHIELDED TWISTED PAIR

SIPR SECRET INTERNET PROTOCOL ROUTING

SJB SECURITY JUNCTION BOX

SM SINGLE MODE

SPD SURGE PROTECTION DEVICE

SPECS CONTRACT SPECIFICATIONS

SRG STATIC REFERENCE GRID

SYM SYMMETRICAL

TECH TECHNICIAN

TR TELECOMMUNICATIONS ROOM

TYP TYPICAL

UL UNDERWRITERS' LABORATORIES

um MICROMETER

UON UNLESS OTHERWISE NOTED

UTP UNSHIELDED TWISTED PAIR

V VOLTS

VFD VARIABLE FREQUENCY DRIVE

VOIP VOICE OVER INTERNET PROTOCOL

W WIRE OR WATT

WAP WIRELESS ACCESS POINT

XFMR TRANSFORMER

Z IMPEDANCE

SYMBOLS - COMMUNICATION ABBREVIATIONS

SYMBOL MODIFIERS

1. SYMBOL ORIENTATION DOES NOT IMPLY DEVICE OR EQUIPMENT ORIENTATION. UNLESS NOTED

AS SUCH.

2. SYMBOL SIZE DOES NOT IMPLY EQUIPMENT SIZE, UON.

3. MOUNTING HEIGHT INDICATED IN LEGEND AND ON THE DRAWINGS SHALL BE THE DISTANCE

MEASURED FROM THE CENTER OF THE DEVICE TO THE FINISHED FLOOR.

4. NOT ALL SYMBOLS ARE USED.

5. SEE ELECTRICAL & COMMUNICATIONS SITE PLAN ES100 SERIES SHEETS FOR

COMMUNICATIONS SITE WORK.

6. REFER TO TYPICAL DETAILS ON T-500 SERIES DRAWINGS.

LEGEND NOTES

WIRE IN CONDUIT, RUN CONCEALED ABOVE CEILING OR IN WALL.

WIRE IN CONDUIT ROUTED BELOW GRADE OR FLOOR SLAB

COMMUNICATION DUCTBANK

ELECTRICAL DUCTBANK

COMM

E

1. BACKBONE CABLING SHALL BE INSTALLED IN BACKBONE CONDUITS. BACKBONE CABLING SHALL NOT BE INSTALLED USING J-HOOKS

OR ANY OTHER METHOD.

2. COMMUNICATION ROOMS HAVE BEEN LOCATED TO ENSURE THE HORIZONTAL CABLING THROUGHOUT THE FACILITY DOES NOT EXCEED 295 FEET TO MEET TIA. ROUTE PATHWAYS AND CABLES TO ENSURE THIS DISTANCE IS NOT EXCEEDED. NOTIFY COR PRIOR TO PATHWAY AND CABLE INSTALLATION IF THERE ARE AREAS WHERE THE EXPECTED DISTANCE MAY BE GREATER THAN 295

FEET.

3. HORIZONTAL CABLING SERVING WALL MOUNTED COMMUNICATIONS OUTLETS SHALL BE ROUTED FROM COMMUNICATIONS OUTLET IN MINIMUM 1” CONDUIT FROM EACH COMMUNICATIONS OUTLET TO AREA CABLE TRAY, AND IN AREA CABLE TRAY TO DESIGNATED COMMUNICATION ROOM. ROUTE CONDUITS IN FINISHED AREAS CONCEALED IN WALL. WHERE COMMUNICATION OUTLETS ARE INSTALLED IN EXPOSED UNFINISHED ROOMS, CONDUITS MAY BE SURFACE MOUNTED. CONDUITS ROUTED EXPOSED SHALL BE

PAINTED TO MATCH ADJACENT SURFACES.

4. HORIZONTAL CABLING SERVING FLUSH MOUNTED COMBINATION COMM/POWER FLOOR BOXES ON THE GROUND FLOOR SHALL BE ROUTED FROM FLOOR BOX VIA UNDERGOUND CONDUITS TO DESIGNATED COMMUNICATIONS ROOM. PROVIDE MINIMUM THREE

1-1/4” CONDUITS FROM EACH FLOOR BOX TO COMMUNICATION ROOM.

5. HORIZONTAL CABLING SERVING FLUSH MOUNTED COMBINATION COMM/POWER FLOOR BOXES ON THE SECOND LEVEL OR ABOVE SHALL BE ROUTED FROM FLOOR BOX VIA CONDUIT TO CABLE TRAY ON LEVEL BELOW, AND IN CABLE TRAY TO DESIGNATED COMMUNICATION ROOM. PROVIDE MINIMUM THREE 1-1/4” CONDUITS FROM EACH FLOOR BOX TO GROUND FLOOR AREA CABLE

TRAY.

6. HORIZONTAL CABLING SERVING SYSTEMS FURNITURE FLUSH MOUNTED FLOOR BOX FEEDS ON THE GROUND FLOOR SHALL BE ROUTED FROM OUTLET LOCATION ON SYSTEMS FURNITURE, VIA SYSTEMS FURNITURE WIRE CHANNELS, THROUGH FLOOR BOX, AND IN UNDERGROUND CONDUIT TO DESIGNATED COMMUNICATIONS ROOM. PROVIDE MINIMUM THREE 1-1/4” CONDUITS FROM

EACH FLOOR BOX TO COMMUNICATION ROOM.

7. HORIZONTAL CABLING SERVING SYSTEMS FURNITURE FLUSH MOUNTED FLOOR BOX FEEDS ON THE SECOND LEVEL OR ABOVE SHALL BE ROUTED FROM OUTLET LOCATION ON SYSTEMS FURNITURE, VIA SYSTEMS FURNITURE WIRE CHANNELS, THROUGH FLOOR BOX, IN CONDUIT TO CABLE TRAY ON LEVEL BELOW, AND IN CABLE TRAY TO DESIGNATED COMMUNICATIONS ROOM ON THE SECOND FLOOR. PROVIDE MINIMUM THREE 1-1/4” CONDUITS FROM EACH FLOOR BOX TO GROUND FLOOR AREA CABLE TRAY.

8. HORIZONTAL CABLING SERVING WALL MOUNTED SYSTEMS FURNITURE JUNCTION BOX FEEDS SHALL BE ROUTED FROM OUTLET LOCATION ON SYSTEMS FURNITURE, VIA SYSTEMS FURNITURE WIRE CHANNELS, THROUGH WALL JUNCTION BOX, IN CONDUIT TO CABLE TRAY, AND IN CABLE TRAY TO DESIGNATED COMMUNICATIONS. PROVIDE MINIMUM THREE 1-1/4” CONDUITS FROM EACH

WALL MOUNTED SYSTEMS FURNITURE JUNCTION BOX FEED TO AREA CABLE TRAY.

9. THIS PROJECT REQUIRES THE INSTALLATION OF COMMUNICATIONS AND/OR SECURITY DEVICES WITHIN OR ON PRECAST WALLS.

CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DEVICE LOCATIONS WITHIN OR ON PRECAST WALLS.

10. COORDINATE WITH THE ELECTRICAL POWER SHEETS TO ENSURE THAT A POWER RECEPTACLE IS INSTALLED WITHIN 16" HORIZONTAL TO ALL DATA AND/OR VOICE LOCATIONS, UON. THIS REQUIREMENT IS NOT APPLICABLE TO WALL PHONE LOCATIONS.

PROJECT INSIDE PLANT GENERAL NOTES:

S

FACEPLATE TYPE

(REFER TO COMM DETAILS

FOR FACEPLATE TYPE)

S SPEAKER, WALL

SPEAKER, CEILING

FLOORBOX - COMBINED POWER AND COMM

JUNCTION BOX - COMBINED POWER AND

COMM

COMMUNICATIONS DEVICES

COMMUNICATIONS GENERAL INFORMATION

(OR)1

SECURITY CAMERA, WALL MOUNTED

• PROVIDE 1" CONDUIT FROM SECURITY CAMERA TO LADDER RACK IN THE COMMUNICATIONS

ROOM IN WHICH SECURITY CAMERA IS LOCATED.

• CAMERA, CABLING, AND CAMERA SYSTEM (GFGI).

COMMUNICATIONS DUCTBANK

DUCTBANK TURNING UP FROM BELOW GRADE

AC

C

CT

HL

FPD

PROJ

SB

TV

WAP

XX" AFF

XX"W X X"D

ABOVE COUNTER MOUNTING

RECESSED IN CEILING

CEILING TILE

HARD LID

FLAT PANEL DISPLAY

PROJECTOR

SMART BOARD

TELEVISION

WIRELESS ACCESS POINT

MOUNT XX" AFF

WIDTH AND DEPTH OF CABLE TRAY

COMM ROOM EQUIPMENT

COMMUNICATIONS 4-POST RACK

TELECOMMUNICATIONS PRIMARY BONDING BUSBAR (PBB)

• SECONDARY BONDING BUSBAR (SBB) SIMILAR

• SEE DETAILS 7 AND 8 ON SHEET T-504

FIRE RATED PLYWOOD BACKBOARD ALONG WALL AS SHOWN ON PLANS. PAINT ALL SIDES WITH FIRE

RETARDANT WHITE PAINT.

CONDUIT INTO ROOM FROM BELOW FLOOR

• 4" UON

• PROVIDE PROTECTIVE BUSHING AT BOTH ENDS

CABLE TRAY

WIRE BASKET CABLE TRAY

12"W X 4"D, UON

LADDER RACK

12"W, UON

• MOUNTING HEIGHT TO BOTTOM OF CABLE TRAY AS INDICATED ON PLANS

BASKET

LADDER RACK

CONDUIT

SYMBOLS - SECURITY

1. CONTRACTOR SHALL PROVIDE CONDUITS, BACKBOXES, AND PULL-STRINGS FOR GFGI EQUIPMENT. COORDINATE FINAL LOCATIONS OF ALL GFGI SECURITY DEVICES AND LOCATION OF CONTROL PANELS WITH THE COR PRIOR TO SUBMITTING

CONDUIT AND BACKBOX LOCATION SHOP DRAWINGS FOR GOVERNMENT REVIEW.

SECURITY GENERAL NOTES

RECESSED COMMUNICATIONS OUTLET - WALL

(OR) 1

DETAIL NUMBER

ARROW LOCATED ON MORE

SECURE SIDE OF DOOR

DOOR SECURITY ROUGH-IN CALLOUT

ACCESS CONTROL PANEL

BALANCED MAGNETIC SWITCH (GFGI)

PROVIDE CONDUIT AND BOX ROUGH-IN ONLY

CARD READER (GFGI)

PROVIDE CONDUIT AND BOX ROUGH-IN ONLY

DOOR OPERATOR CONTACT

DOOR STRIKE

ELECTRIFIED LOCKSET

ELECTRIC STRIKE

ELECTRIFIED EXIT DEVICE

INTRUSTION DETECTION SYSTEM CONTROL PANEL (GFGI)

JUNCTION BOX

KEYPAD (GFGI)

PROVIDE CONDUIT AND BOX ROUGH-IN ONLY

MOTION SENSOR (GFGI)

PROVIDE CONDUIT AND BOX ROUGH-IN ONLY

MAGNETIC LOCK (GFGI)

PROVIDE CONDUIT AND BOX ROUGH-IN ONLY

REQUEST TO EXIT DEVICE

VIBRATION SENSOR (GFGI)

PROVIDE CONDUIT AND BOX ROUGH-IN ONLY AT 90" AFF

REMOTE STATUS INDICATOR (GFGI)

PROVIDE CONDUIT AND BOX ROUGH-IN ONLY

BM

CR

DO

DS

ML

RTE

ACS

EL

J

ES

ED

E-501

DRAWING REFERENCE

IDS

KP

MS

V

SURFACE-MOUNTED COMMUNICATIONS OUTLET - WALL

JUNCTION BOX - RECESSED IN WALL, UON

JUNCTION BOX - SURFACE MOUNTED ON WALL, UON

JUNCTION BOX - SURFACE MOUNTED ON CEILING, UON

C

C

(OR) 1

RECESSED COMMUNICATIONS OUTLET - CEILING

1. THIS PROJECT REQUIRES UNDERGROUND WORK INCLUDING WORK BEING PERFORMED IN EXISTING ROADWAYS AND PAVEMENTS.

THE CONTRACTOR SHALL REPAIR ALL EXISTING ROADWAYS AND PAVEMENTS TO MATCH EXISTING.

2. THE UNDERGROUND WORK FOR THIS PROJECT REQUIRES CLOSE COORDINATION WITH EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL NEW WORK WITH ALL EXISTING UTILITIES, EXISTING EQUIPMENT, AND EXISTING CONDITIONS.

3. PRIOR TO DIGGING, OBTAIN ALL APPLICABLE DIGGING PERMITS. ALL UNDERGROUND UTILITIES IN THE WORK AREA MUST BE

POSITIVELY IDENTIFIED BY A PRIVATE UTILITY LOCATING SERVICE.

4. PHYSICALLY VERIFY UNDERGROUND UTILITY LOCATIONS BY HAND DIGGING AND/OR POT-HOLING USING WOOD OR FIBERGLASS HANDLED TOOLS WHEN ANY ADJACENT CONSTRUCTION WORK IS EXPECTED TO COME WITHIN THREE FEET OF THE UNDERGROUND SYSTEM. DIGGING WITHIN TWO FEET OF A KNOWN UTILITY SHALL NOT BE PERFORMED BY MEANS OF MECHANICAL EQUIPMENT; HAND DIGGING SHALL BE USED. IF CONSTRUCTION IS PARALLEL TO AN EXISTING UTILITY EXPOSE THE UTILITY BY

HAND DIGGING EVERY 100 FEET IF PARALLEL WITHIN 5 FEET OF THE EXCAVATION.

5. COORDINATE ACCESS TO MANHOLES, HANDHOLES, AND BUILDINGS WITH COR.

6. PRIOR TO INSTALLATION OF NEW CABLES IN EXISTING DUCTBANKS, COORDINATE WITH THE COR TO DETERMINE WHICH DUCT(S) SHALL BE USED. FIELD VERIFY (ROD & MANDREL) EACH PATHWAY IDENTIFIED TO ENSURE IT IS ADEQUATE FOR CABLE INSTALLATION. NOTIFY COR IF AN EXISTING DUCT IDENTIFIED TO BE USED IS NOT ADEQUATE FOR NEW CABLE INSTALLATION.

7. SPLICING OF COPPER CABLES NOT ALLOWED.

8. SPLICING OF FIBER CABLES NOT ALLOWED.

9. IN MANHOLES/HANDHOLES WHERE CABLES ARE TO BE ROUTED THROUGH PROVIDE A MINIMUM OF 50' OF SLACK FOR EACH FIBER

AND COPPER CABLE.

10. FIBER AND COPPER CABLES SHALL BE INSTALLED IN NEW AND EXISTING MANHOLES/HANDHOLES USING CABLE RACKS AND RACK

HOOKS.

11. PROVIDE PULL STRINGS IN ALL NEW AND EXISTING CONDUITS, INCLUDING CONDUITS WHERE MULTICELL FABRIC INNERDUCTS ARE

TO BE INSTALLED.

12. MULTICELL FABRIC INNERDUCTS SHALL BE INSTALLED IN CONDUITS WHERE INDICATED AND TERMINATED IN

MANHOLES/HANDHOLES PER MANUFACTURER INSTRUCTIONS AND RECOMMENDATIONS.

13. PROVIDE THREE 3" 3-CELL FABRIC INNERDUCTS WITH TRACER WIRE IN ALL NEW 4" CONDUITS. IN ADDITION, CONTRACTOR SHALL

INSTALL FABRIC INNERDUCTS IN EXISTING CONDUITS WHERE INDICATED.

PROJECT OUTSIDE PLANT GENERAL NOTES:

RSI

C

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o n e

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 3

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-000

TELECOMM & ESS

LEGEND

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

Revisions

ID Date Description

C

T-402

T-402

1V

WP

2D

WSW

2D

WSW

2D

WSW

2D

WSW

SF12

SF12

SF8

SF4

SF8

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

AC

2D

WSW

AC2D

WSW

2D

WSW

2D

WSW

N

FB6

AV

FB6

TV3

AV

2D

WSW

9'-6" AFF

2D

WSW

1V

WP

1V

WP

9'-6" AFF

WAP

CT

WAP

CT

WAP

CT

SF12

WAP

CT

1V

WP

2D

WSW

2D

WSW

2D

WSW

2D

WSW

T-504

L

M

N.5

P

Q

9.7

AC

AC

2D

BMS

CST COMMO

OFFICE

28B

OFFICE

28C

OFFICE

28A

OFFICE

36A

CST READY BAYS

TOILET

TOILET

CONF

CST OPERATIONS

CST MED STOR

36B

MECH

IT

ELEC

CUST

CST SURVEY

CST MED SUPPORT

OFFICE

29B

OFFICE

29A

CST COMMAND

TRAINING AID STORAGE

29C

HALL

CORRIDOR

7B

CORR

10.5

129.8 10.6 10.8 11.6

WAP

CT

WAP

CT

1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.

2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F'

'D'

'B'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 3

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-101-1B

TELECOMM & ESS

PLAN - LOWER

LEVEL - AREA B

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/8" = 1'-0"

TELECOMM & ESS PLAN - LOWER LEVEL - AREA B

MATCHLINE SEE T-101-1D FOR CONTINUATION

0 4' 8' 16'

KEYED NOTES

PROVIDE (1) EMPTY 2" CONDUIT FROM JUNCTION BOX IN ROOM 31 - CST COMMO TO

ABOVE CEILING IN ROOM 30 - CST OPERATIONS. STUB CONDUIT 12" INTO ROOM 30.

T-401

T-401

8'-11" AFF

1V

WP

2D

ELEV

D.9 1V

WP

8'-11" AFF

8'-11" AFF

2D

WSW

2D

WSW

3'-6" AFF

2D

WSW

3'-6" AFF

2D

PATCH

48" AFF

2D

PATCH

C.5

L

G.5

F.3

J.9

C

2D

BMS

2D

WSW

48" AFF

ELEV EQUIP

STAIR

CORR

FLAMMABLE STORAGE

GROUNDS & MAINTENANCE

IT

ELEC

MECH

RECEIVING

CST STORAGE

CST LOG / ADMIN

08A

B.1

H.9

K.5

9.8 10.6 10.8 11.6

2D

WSW

1V

WP

SECURITY

T-506

1V

WP

2D

BMS

STAIR

9'-6" AFF

1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.

2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F'

'D'

'B'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 3

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-101-1D

TELECOMM & ESS

PLAN - LOWER

LEVEL - AREA D

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/8" = 1'-0"

TELECOMM & ESS PLAN - LOWER LEVEL - AREA D

MATCHLINE SEE T-101-1B FOR CONTINUATION

0 4' 8' 16'

KEYED NOTES

JUNCTION BOX FOR CCTV CAMERA (GFGI) EQUIPMENT CONNECTION SHALL BE

RECESSED MOUNTED ON EXTERIOR WALL. PROVIDE BLANK FACEPLATE. COORDINATE

FINAL MOUNTING HEIGHT OF JUNCTION BOX WITH CONTRACTING OFFICER. PROVIDE

MINIMUM 1" CONDUIT FROM BACKBOX TO IT ROOM 15. DEVICES AND CABLING (GFGI).

MOUNT DATA OUTLET INDICATED HORIZONTALLY TO MATCH POWER RECEPTACLE

ORIENTATION.

PRIOR TO COMMENCING INSTALLATION OF ELEVATOR, COORDINATE TELEPHONE LINE

REQUIREMENTS AND "2D / ELEV" TELECOMMUNICATIONS OUTLET WITH CONTRACTING

OFFICER, ELEVATOR INSTALLER AND AHJ.

PROVIDE (2) CAT6 GREEN CAT6 CABLES BETWEEN "2D / PATCH" FACEPLATES INDICATED.

TERMINATE CABLES ON GREEN RJ45 CONNECTOR EACH END. RJ45 CONNECTORS MAY

BE INSTALLED WITHIN ADJACENT "2D / BMS" AND "2D / WSW" OUTLETS.

4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT ABOVE HIGHEST CABLE TRAY (TYP

OF 2). PROVIDE ANGLED APPROACH TRANSITION FROM CONDUITS ABOVE HIGHER

CABLE TRAY TO LOWER CABLE TRAY.

1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.

2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

T-403

T-403

2-4" CONDUITS FROM IT ROOM 106

FB2

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

1V

WP

OPEN TO

ABOVE

OPEN TO

ABOVE

TV1

2D

BMS

654321

N

1V

WP

TV1

3.5

4.8

5.9

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1

FB1FB1

FB1

FB1

SECURITY

WAP

CT

WAP

CT

T-506

SBB, +24" AFF

FB2

FB2

6.7

5.1

L

M

N.5

P

Q

LIFT EQUIP

105C

ANTE

105B

ANTE

105A

VEST

PLUMBING CHASE

111C

WOMEN

WOMEN LOCKERS

108A

WOMEN SHOWERS

108B

ALCOVE

101D

PHYSICAL FITNESS

DISPLAY

101A

CORR

101C

MECH

IT

CLASSROOM/ LECTURE

LOBBY / MAIN HALL

AV

105D

R

3.6 5.4

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

HL

WAP

HL

WAP

HL

WAP

CT

WAP

CT

TV2

TV2

TV2TV2

TV2

TV2

WAP

CT

TV1

TV2

TV1

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

10'-10" AFF

10'-10" AFF

10'-10" AFF

ELEC

107A

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 4

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-101-2A

TELECOMM & ESS

PLAN - MAIN

LEVEL - AREA A

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/8" = 1'-0"

TELECOMM & ESS PLAN - MAIN LEVEL - AREA A

M A

T C

H L

IN

E S

E E

T -1

-2

B F

O R

C O

N T

IN

U

A T

IO

N

MATCHLINE SEE T-101-2C FOR CONTINUATION

KEYED NOTES

LOBBY / MAIN HALL 101 IS A MULTIPLE STORY SPACE. TELECOMMUNICATIONS & ESS

MATERIALS INCLUDING, BUT NOT LIMITED TO, PATHWAYS, CABLES, CABLE TRAY,

CONDUIT, SUPPORTS, AND/OR ACCESSORIES SHALL NOT TRANSVERSE OR BE VISIBLE

WITHIN THIS SPACE. ANY EXPOSED/VISIBLE TELECOMMUNICATIONS & ESS MATERIALS

WITHIN LOBBY / MAIN HALL 101, OTHER THAN WHAT IS SHOWN ON THESE DRAWINGS,

SHALL BE APPROVED IN WRITING BY THE CONTRACTING OFFICER PRIOR TO

COMMENCING INSTALLATION.

PROVIDE 1-1/4" CONDUIT PATHWAY BELOW GRADE FROM AV ROOM 105D TO

CLASSROOM/LECTURE ROOM 105 FLOOR BOX FOR FUTURE AV CABLING.

MOUNTING LOCATION OF FUTURE WAP SHALL BE COORDINATED WITH CEILING LAYOUT.

WAP SHALL NOT BE INSTALLED IN A LOCATION IN WHICH A LOWER CEILING "CLOUD", OR

SIMILAR, IMPEDE THE COVERAGE AREA OF THE FUTURE WAP.

CONDUIT SHALL BE ROUTED FROM IT ROOM 106 TO SECURITY DEVICES INDICATED

BELOW GRADE.

UNLESS OTHERWISE NOTED, EACH ROW OF "FB1" FLOOR BOXES ASSOCIATED WITH A

ROW OF SEATING IN CLASSROOM / LECTURE 105 SHALL BE SERVED BY A DEDICATED

CONDUIT ROUTED BELOW GRADE BACK TO IT ROOM 106. AFTER CABLE INSTALLATION,

EACH CONDUIT SHALL HAVE A MINIMUM OF 50% SPARE CAPACITY TO FACILITATE THE

INSTALLATION OF FUTURE CABLING. (TYP ALL "FB1" FLOOR BOXES, UON)

"FB1" FLOOR BOXES ASSOCIATED WITH THE BACK ROW OF SEATING IN CLASSROOM /

LECTURE 105 SHALL BE SERVED BY (2) CONDUITS ROUTED BELOW GRADE BACK TO IT

ROOM 106. AFTER CABLE INSTALLATION, EACH CONDUIT SHALL HAVE A MINIMUM OF

50% SPARE CAPACITY TO FACILITATE THE INSTALLATION OF FUTURE CABLING.

4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT ABOVE HIGHEST CABLE TRAY

(TYP OF 2).

0 4' 8' 16'

2 2

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

ROOFTOP TERRACETV3

AV

TV3

AV

111098

N

FB2

FB2

FB2

FB2

FB2

FB2

FB2

FB2

TV3

AV

TV3

AV

AV

WSW

AV

WSW

AV

WSW

AV

WSW

2D

WSW

2D

WSW

2D

WSW

WORKBAYS ROOF

8.7

L

M

P

Q

9.7

8.6

LOBBY / MAIN HALL

MEN

PLUMBING CHASE

109C

MEDICAL

TRAINING

MEN SHOWERS

110B

MEN LOCKERS

110A

CLASSROOM

CLASSROOM

CORR

101E

7.7

10.5

129.2 9.8 10.6 10.8 11.6

WAP

CT

WAP

CT

WAP

CT WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

10'-10" AFF

10'-2" AFF

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 4

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-101-2B

TELECOMM & ESS

PLAN - MAIN

LEVEL - AREA B

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/8" = 1'-0"

TELECOMM & ESS PLAN - MAIN LEVEL - AREA B

M A

T C

H L

IN

E S

E E

T -1

-2

A F

O R

C O

N T

IN

U

A T

IO

N

MATCHLINE SEE T-101-2D FOR CONTINUATION

KEYED NOTES

LOBBY / MAIN HALL 101 IS A MULTIPLE STORY SPACE. TELECOMMUNICATIONS & ESS

MATERIALS INCLUDING, BUT NOT LIMITED TO, PATHWAYS, CABLES, CABLE TRAY,

CONDUIT, SUPPORTS, AND/OR ACCESSORIES SHALL NOT TRANSVERSE OR BE VISIBLE

WITHIN THIS SPACE. ANY EXPOSED/VISIBLE TELECOMMUNICATIONS & ESS MATERIALS

WITHIN LOBBY / MAIN HALL 101, OTHER THAN WHAT IS SHOWN ON THESE DRAWINGS,

SHALL BE APPROVED IN WRITING BY THE CONTRACTING OFFICER PRIOR TO

COMMENCING INSTALLATION.

4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT ABOVE HIGHEST CABLE TRAY

(TYP OF 2).

0 4' 8' 16'

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

T-404

T-404

1V

WP

2D

WSW

2D

WSW

2D

WSW

1V

WP

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

9'-11" AFF

9'-7" AFF

10'-3" AFF

2D

WSW

2D

WSW

2D

WSW

2D

WSW

1V

WP

1V

WP

2D

BMS

8654321

E-407

E-407

V V

V V

V

V

V

V

MS

BM

BMBM

IDS

KP

C

E

F

G

H

J

7.64.8

4D

WSW

1V

WP

2D

9'-7" AFF 10'-7" AFF 10'-3" AFF

10'-3" AFF

9'-10" AFF

4D

WSW

4D

WSW

4D

WSW

4D

WSW

WAP

CT

WAP

CT

WAP

CT

WAP

CT

1V

WP

2D

WSW

3'-6" AFF

2D

WSW

3'-6" AFF

2D

WSW

3'-6" AFF

2D

WSW

3'-6" AFF

TV3

9'-7" AFF

9'-7" AFF

1V

WP

C.5

L

G.5

K J.9

RSI

WAP

WALL

14'-0" AFF

WAP

WALL

14'-0" AFF

WAP

WALL

14'-0" AFF

C

TV3

2D

BMS

D

B M

S

ASSEMBLY

BREAK / VENDING

ASSEMBLY

FAMILY READINESS

RECRUITING

LACTATION

161 CORR

S E

R V

IN

G

A BEVERAGES

158B

KITCHEN

SCULLERY

160A

PANTRY / OFFICE

160D

CUST

160C

TOILET

160B

ELEC

CORR

MECH / WATER SERVICE

ISSUING

CORR

157B

ISSUING

157E

HEATED STORAGE

VAULT

153A

CORR

157A

ISSUING

152ARMORER

ISSUING

CORR

CORR

LOCKERS

MECH

CUST

ELEC

IT

CORR

CORR

LEARNING CENTER

TABLE / CHAIR STORAGE

104A

TOILET

CORR

3.62.6

B.1

H.9

5.4

K.5

FB6

FB6

FB6

2D

BMS

1V

WP

WAP

CT

WAP

CT

WAP

WALL

14'-0" AFF

WAP

WALL

14'-0" AFF

WAP

WALL

14'-0" AFF

1V

WP

2D

WSW

TV3

KP

MS

10'-3" AFF

10'-3" AFF

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 4

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-101-2C

TELECOMM & ESS

PLAN - MAIN

LEVEL - AREA C

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/8" = 1'-0"

TELECOMM & ESS PLAN - MAIN LEVEL - AREA C

M A

T C

H L

IN

E S

E E

T -1

-2

D F

O R

C O

N T

IN

U

A T

IO

N

MATCHLINE SEE T-101-2E FOR CONTINUATION

MATCHLINE SEE T-101-2A FOR CONTINUATION

PROVIDE 1/2" EMT CONDUIT EMBEDDED IN REINFORCED CONCRETE CEILING FROM

MOTION SENSOR TO VAULT WIREWAY.

PROVIDE 3/4" EMT CONDUIT EMBEDDED IN REINFORCED CONCRETE WALL FROM

VAULT VIBRATION SENSOR TO VAULT WIREWAY.

PROVIDE (5) SPARE 3/4" RGS CONDUITS ABOVE VAULT WIREWAY. STUB CONDUITS 3"

ABOVE AND 3" BELOW FINISHED VAULT ROOF/CEILING.

PROVIDE (2) 1" RGS CONDUITS FROM VAULT WIREWAY TO IT ROOM 157C. CONDUITS

SHALL BE HOME RUN TO IT ROOM 157C AND SHALL NOT TERMINATE AT AN AREA

CABLE TRAY.

PROVIDE 3/4" EMT CONDUIT FROM DEVICE INDICATED TO VAULT WIREWAY.

PROVIDE 3/4" RGS CONDUIT ROUTED ABOVE CEILING FROM DEVICE INDICATED TO

VAULT WIREWAY IN VAULT.

JUNCTION BOX FOR CCTV CAMERA (GFGI) EQUIPMENT CONNECTION SHALL BE

RECESSED MOUNTED IN COLUMN COVER. PROVIDE BLANK FACEPLATE. COORDINATE

FINAL MOUNTING HEIGHT OF JUNCTION BOX WITH CONTRACTING OFFICER. DEVICES

AND CABLING (GFGI).

PROVIDE 3/4" RGS CONDUIT ROUTED ABOVE CEILING BETWEEN DEVICES INDICATED.

4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT ABOVE HIGHEST CABLE TRAY (TYP

OF 2). PROVIDE ANGLED APPROACH TRANSITION FROM CONDUITS ABOVE HIGHER

CABLE TRAY TO LOWER CABLE TRAY.

KEYED NOTES

0 4' 8' 16'

2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

11109

C

D.9

E

F

G

H

J

C.5

8'-0" AFF

L

8.6

G.5

F.3

K

J.9

ELEV LOBBY / STAIR

101F

OPEN OFFICE

OPEN OFFICE

CONF

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

WORK RM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

WORK RM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONF

OPEN OFFICE

OPEN OFFICE

OPEN OFFICE

B.1

H.9

K.5

9.2 9.8 10.6 10.8 11.6

SF24

SF16

SF12

SF16

SF12

SF12

SF16

SF12

SF12

FB6

AV

SF12

SF24

SF24

SF24

SF24

SF24

SF24

SF12

FB6

AV

TV3

AV

L1D3-15

FB6

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

AC

2D

WSW

2D

WSW

AC

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

2D

WSW

AC

2D

WSW

2D

WSW

AC

2D

WSW

FB6

TV3

AV

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

WAP

CT

10'-8" AFF 8"W X 4"D

10'-8" AFF

8"W X 4"D

10'-8" AFF

8"W X 4"D

10'-8" AFF

8"W X 4"D

10'-8" AFF

8"W X 4"D

10'-8" AFF

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 5

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-101-2D

TELECOMM & ESS

PLAN - MAIN

LEVEL - AREA D

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/8" = 1'-0"

TELECOMM & ESS PLAN - MAIN LEVEL - AREA D

M A

T C

H L

IN

E S

E E

T -1

-2

C F

O R

C O

N T

IN

U

A T

IO

N

MATCHLINE SEE T-101-2B FOR CONTINUATION

0 4' 8' 16'

KEYED NOTES

COORDINATE CABLE TRAY ROUTING TO RUN OVER DUCTWORK IN LOCATION INDICATED.

RECESSED JUNCTION BOX FOR VAULT SIREN. VAULT SIREN SHALL BE GFGI AND NIC.

COORDINATE CONDUIT REQUIREMENTS FROM VAULT WIREWAY TO THIS LOCATION

WITH TYPICAL DESIGN MILCON INFRASTRUCTURE FOR ARMS, AMMUNITION, AND

EXPLOSIVES STORAGE AREAS (1 VAULT SYSTEM) REQUIREMENT AS INDICATED ON RF

SERIES SHEETS. CONDUIT SHALL BE HOME RUN FROM VAULT WIREWAY TO THIS

LOCATION AND SHALL NOT TERMINATE AT AN AREA CABLE TRAY.

4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT ABOVE HIGHER CABLE TRAY

(TYP OF 2). PROVIDE ANGLED APPROACH TRANSITION FROM CONDUITS ABOVE

HIGHEST CABLE TRAY TO LOWER CABLE TRAY.

T-405

T-405

1V

WP

111098654321

A

B

7.64.8

11'-2" AFF

7 8.6

2D

FA

2D

BMS

ELEC

157D

IT

157C

HEATED STORAGE

3.62.6 5.4 9.2 9.8 10.6 10.8

2D

BMS

1V

WP

LOCKERS

MECH

CORR

WAP

CT

10'-3" AFF

1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.

2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 5

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-101-2E

TELECOMM & ESS

PLAN - MAIN

LEVEL - AREA E

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/8" = 1'-0"

TELECOMM & ESS PLAN - MAIN LEVEL - AREA E

MATCHLINE SEE T-101-2C FOR CONTINUATION

0 4' 8' 16'

MATCHLINE SEE T-101-2D FOR CONTINUATION

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

T-401

T-401

F R

O N

T

R E

A R

C D

FUTURE RACK

RACK 1

RACK 2

1V

WP

SBB

+24" AFF

T-401

T-401

FIRE-RETARDANT PLYWOOD

BACKBOARD ON THIS WALL.

BACKBOARD SHALL EXTEND

FROM 0'-6" TO 8'-6" AFF.

A C

C E

S S

C O

N T

R O

L

D.9

E

EQUAL EQUAL

IT

FIRE-RETARDANT PLYWOOD

BACKBOARD ON THIS WALL.

BACKBOARD SHALL EXTEND

FROM 0'-6" TO 8'-6" AFF.

BOTTOM OF

LADDER RACK AT

8'-0" AFF (TYP)

4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT

ABOVE HIGHEST CABLE TRAY (TYP OF 2)

D.9

E

IT

6" 7"

TELECOMMUNICATIONS

RACK ID (TYP)

RACK 1 FUTURE RACK

8'-0" AFF

(TYP)

FPP4

V E

R T

IC

A

L C

A B

L E

M A

N A

G E

M E

N T

V E

R T

IC

A

L C

A B

L E

M A

N A

G E

M E

N T

SWITCH

CPP2

HCM

(TYP)

RACK 2

SWITCH

CPP2

SWITCH

CPP2

RBB RBB

RACK 2 RACK 1FUTURE RACK

PDU PDU

UPSUPS

POWER RECEPTACLE

(TYP OF 4) - REFER TO

POWER SHEETS

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 5

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-401

TELECOMM

ENLARGED PLAN

- IT 15

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/2" = 1'-0"

IT ROOM 15 TELECOMMUNICATIONS ENLARGED FLOOR PLAN

1/2" = 1'-0"

IT ROOM 15 TELECOMMUNICATIONS ENLARGED CABLE TRAY PLAN

1" = 1'-0"

IT ROOM 15 RACK ELEVATION

COMMUNICATION OUTLETS SERVED FROM IT ROOM 15

OUTLET LOCATION

OUTLET TYPE COUNT

DATA

(CAT6)

VOIP

(CAT 6)

CATV

(RG6)ROOM NUMBER ROOM NAME

08 CST STORAGE 2D 2 2 0 0

08A CST LOG / ADMIN 2D 2 2 0 0

09 MECH 1V 1 0 1 0

09 MECH 2D 1 2 0 0

14 ELEC 1V 1 0 1 0

14 ELEC 2D 1 2 0 0

15 IT 1V 1 0 1 0

18 GROUNDS & MAINTENANCE 1V 1 0 1 0

18 GROUNDS & MAINTENANCE 2D 1 2 0 0

24 RECEIVING 1V 1 0 1 0

COMMUNICATIONS RACK MOUNTED EQUIPMENT IT ROOM 15

EQUIP IDENTIFIER DESCRIPTION

CPP2 48-PORT CATEGORY 6 PATCH PANEL FOR TERMINATION OF HORIZONTAL CABLES

FPP4 2U FIBER ENCLOSURE, 2U FIBER ADAPTER PATCH PANEL, (2) 12-STRAND LC DUPLEX

FIBER ADAPTER PANELS, 6 BLANK FIBER ADAPTER PANELS

HCM HORIZONTAL CABLE MANAGER (2U)

PDU POWER DISTRIBUTION UNIT (GFGI)

RBB 1U RACK BONDING BUSBAR

SWITCH NETWORK SWITCH (GFGI)

UPS UNINTERRUPTIBLE POWER SUPPLY (GFGI)

1" = 1'-0"

IT ROOM 15 RACK ELEVATION - REAR

WALL SPACE RESERVED FOR ACCESS CONTROL WALL FIELD.

KEYED NOTES

COMMUNICATION OUTLETS SERVED FROM IT ROOM 15 (OPTION 1)

OUTLET LOCATION

OUTLET TYPE COUNT

DATA

(CAT6)

VOIP

(CAT 6)

CATV

(RG6)ROOM NUMBER ROOM NAME

19 Office SF4 1 4 0 0

19 Office SF8 1 8 0 0

19 Office SF20 1 20 0 0

20 Office SF4 1 4 0 0

20 Office SF8 1 8 0 0

20 Office SF12 1 12 0 0

21 Hall 1V 1 0 1 0

22 GPTB BAY 1V 4 0 1 0

22 GPTB BAY 2D 4 2 0 0

0 1/2' 1' 2'

0 1/2' 1' 2'

0 1/2' 1' 2'

0 1/2' 1' 2'

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

BOTTOM OF LADDER

RACK AT

8'-0" AFF (TYP)

4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT

ABOVE HIGHEST CABLE TRAY (TYP OF 2)

IT

6"

6"

6"

6"

SBB

+84" AFF

FIRE-RETARDANT PLYWOOD

BACKBOARD ON THIS WALL.

BACKBOARD SHALL EXTEND FROM

0'-6" TO 8'-6" AFF.

T-402

T-402

FRONT

REAR

FUTURE RACK

RACK 2

RACK 1

1V

WP

T-402

T-402

T-505

C0B1

A C

C E

S S

C O

N T

R O

L

IT

RACK 1RACK 2FUTURE RACK

8'-0" AFF (TYP)

TELECOMMUNICATIONS

RACK ID (TYP)

FPP4SWITCH

CPP2

SWITCH

CPP2

SWITCH

CPP2

HCM

(TYP)

V E

R T

IC

A

L C

A B

L E

M A

N A

G E

M E

N T

CATV SPLITTER

CATV

SHELF

SWITCH

CPP2

RBBRBB

V E

R T

IC

A

L C

A B

L E

M A

N A

G E

M E

N T

PDUPDU

UPSUPS

FUTURE RACKRACK 2RACK 1

POWER RECEPTACLE

(TYP OF 4) - REFER TO

POWER SHEETS

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 0

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-402

TELECOMM

ENLARGED PLAN

- IT 33

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/2" = 1'-0"

IT ROOM 33 TELECOMMUNICATIONS ENLARGED CABLE TRAY PLAN

1/2" = 1'-0"

IT ROOM 33 TELECOMMUNICATIONS ENLARGED FLOOR PLAN

COMMUNICATION OUTLETS SERVED FROM IT ROOM 33

OUTLET LOCATION

OUTLET TYPE COUNT

DATA

(CAT 6)

VOIP

(CAT 6)

CATV

(RG6)ROOM NUMBER ROOM NAME

06 ELEV EQUIP 2D 1 2 0 0

26 CONF FB6 2 6 0 0

26 CONF TV3 1 1 0 1

28 CST COMMAND WAP 1 1 0 0

28A OFFICE 2D 2 2 0 0

28B OFFICE 2D 2 2 0 0

28C OFFICE 2D 2 2 0 0

29 CST SURVEY SF12 2 12 0 0

29 CST SURVEY WAP 1 1 0 0

29A OFFICE 2D 2 2 0 0

29B OFFICE 2D 2 2 0 0

30 CST OPERATIONS SF4 1 4 0 0

30 CST OPERATIONS SF8 1 8 0 0

30 CST OPERATIONS WAP 1 1 0 0

31 CST COMMO 2D 3 2 0 0

31 CST COMMO SF8 1 8 0 0

31 CST COMMO WAP 1 1 0 0

33 IT 1V 1 0 1 0

34 ELEC 1V 1 0 1 0

35 MECH 2D 1 2 0 0

36 CST MED SUPPORT SF12 1 12 0 0

36 CST MED SUPPORT WAP 1 1 0 0

36A OFFICE 2D 2 2 0 0

37 CST READY BAYS 1V 3 0 1 0

37 CST READY BAYS 2D 4 2 0 0

COMMUNICATIONS RACK MOUNTED EQUIPMENT IT ROOM 33

EQUIP IDENTIFIER DESCRIPTION

CATV CATV PATCH PANEL

CATV SPLITTER CATV SPLITTER (BY SERVICE PROVIDER)

CPP2 48-PORT CATEGORY 6 PATCH PANEL FOR TERMINATION OF HORIZONTAL CABLES

FPP4 2U FIBER ENCLOSURE, 2U FIBER ADAPTER PATCH PANEL, (2) 12-STRAND LC DUPLEX

FIBER ADAPTER PANELS, 6 BLANK FIBER ADAPTER PANELS

HCM HORIZONTAL CABLE MANAGER (2U)

PDU POWER DISTRIBUTION UNIT (GFGI)

RBB 1U RACK BONDING BUSBAR

SHELF RACK-MOUNT SHELF

SWITCH NETWORK SWITCH (GFGI)

UPS UNINTERRUPTIBLE POWER SUPPLY (GFGI)

1" = 1'-0"

IT ROOM 33 RACK ELEVATION

1" = 1'-0"

IT ROOM 33 RACK ELEVATION - REAR

WALL SPACE RESERVED FOR ACCESS CONTROL WALL FIELD.

KEYED NOTES

0 1/2' 1' 2'

0 1/2' 1' 2' 0 1/2' 1' 2'

0 1/2' 1' 2'

T-403

T-403

FIRE-RETARDANT PLYWOOD

BACKBOARD ON ALL WALLS.

BACKBOARD SHALL EXTEND

FROM 0'-6" TO 8'-6" AFF.

TELECOMMUNICATIONS

BACKBONE CONDUITS FROM IT

ROOM 157C. REFER TO T-601.

FIRE-RETARDANT

PLYWOOD BACKBOARD ON

ALL WALLS. BACKBOARD

SHALL EXTEND FROM 0'-6"

TO 8'-6" AFF.

2-4" CONDUITS ROUTED

TO A/V ROOM 105D

FRONT

REAR

T-4035

T-403 C1A1

FUTURE RACK

FUTURE RACK

1V

WP

SBB

+24" AFF

RACK A2

RACK A1

T-403

T-403

T-403

T-403

T-403

T-403

REAR

FRONT

T-505

ACCESS CONTROL

M

N.5

IT

FIRE-RETARDANT PLYWOOD

BACKBOARD ON ALL WALLS.

BACKBOARD SHALL EXTEND

FROM 0'-6" TO 8'-6" AFF.

T-403

T-403

VERTICAL LADDER RACK

M

N.5 6"

6"

IT

BOTTOM OF LADDER

RACK AT 8'-0" AFF (TYP)

8'-0" AFF

(TYP)

TELECOMMUNICATIONS

RACK ID (TYP)

RACK A2RACK A1

SWITCH

CPP2

SWITCH

CPP2

FPP4

HCM

(TYP)

V E

R T

IC

A

L

B L E

M A

N A

G E

M E

N T

CATV SPLITTER

SHELF

CATV

RBB RBB

V E

R T

IC

B L E

M A

N A

G E

M E

N T

V E

R T

IC

B L E

M A

N A

G E

M E

N T

SWITCH

CPP2

CONDUITS STUBBED

UP +4" AFF

12" W VERTICAL LADDER RACK

(PROVIDE IN QUANTITIES AS

REQUIRED TO COVER ENTIRE

WIDTH OF STUB UPS)

HORIZONTAL LADDER RACK

PDUPDU

UPSUPS

POWER RECEPTACLE

(TYP OF 4) - REFER TO

POWER SHEETS

RACK A2 RACK A1

1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.

2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

FUTURE RACK FUTURE RACK

FUTURE RACK FUTURE RACK

8'-0" AFF

(TYP)

TELECOMMUNICATIONS

RACK ID (TYP)

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 0

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-403

TELECOMM

ENLARGED PLAN

- IT 106

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/2" = 1'-0"

IT ROOM 106 TELECOMMUNICATIONS ENLARGED FLOOR PLAN

1/2" = 1'-0"

IT ROOM 106 TELECOMMUNICATIONS ENLARGED CABLE TRAY PLAN

1" = 1'-0"

IT ROOM 106 RACK ELEVATION - RACK A1 AND A2

COMMUNICATION OUTLETS SERVED FROM IT ROOM 106

OUTLET LOCATION

OUTLET TYPE COUNT

DATA

(CAT 6)

VOIP

(CAT 6)

CATV

(RG6)ROOM NUMBER ROOM NAME

101 LOBBY / MAIN HALL TV3 1 1 0 1

101 LOBBY / MAIN HALL WAP 10 1 0 0

105 CLASSROOM/ LECTURE FB1 35 1 0 0

105 CLASSROOM/ LECTURE FB2 3 2 0 0

105 CLASSROOM/ LECTURE TV1 2 0 0 1

105 CLASSROOM/ LECTURE TV2 7 0 0 0

105 CLASSROOM/ LECTURE WAP 7 1 0 0

105A ANTE WAP 1 1 0 0

105B ANTE WAP 1 1 0 0

105D AV 1V 1 0 1 0

106 IT 1V 1 0 1 0

107 MECH 1V 1 0 1 0

107 MECH 2D 1 2 0 0

109 PHYSICAL FITNESS TV1 2 0 0 1

109 PHYSICAL FITNESS WAP 2 1 0 0

111 MEDICAL 2D 3 2 0 0

111 MEDICAL WAP 1 1 0 0

112 TRAINING AV 2 1 0 0

112 TRAINING TV3 2 1 0 1

112 TRAINING WAP 2 1 0 0

113 CLASSROOM AV 1 1 0 0

113 CLASSROOM FB2 4 2 0 0

113 CLASSROOM TV3 1 1 0 1

113 CLASSROOM WAP 1 1 0 0

114 CLASSROOM AV 1 1 0 0

114 CLASSROOM FB2 4 2 0 0

114 CLASSROOM TV3 1 1 0 1

114 CLASSROOM WAP 1 1 0 0

COMMUNICATIONS RACK MOUNTED EQUIPMENT IT ROOM 106

EQUIP IDENTIFIER DESCRIPTION

CATV CATV PATCH PANEL

CATV SPLITTER CATV SPLITTER (BY SERVICE PROVIDER)

CPP2 48-PORT CATEGORY 6 PATCH PANEL FOR TERMINATION OF HORIZONTAL CABLES

FPP4 2U FIBER ENCLOSURE, 2U FIBER ADAPTER PATCH PANEL, (2) 12-STRAND LC DUPLEX

FIBER ADAPTER PANELS, 6 BLANK FIBER ADAPTER PANELS

HCM HORIZONTAL CABLE MANAGER (2U)

PDU POWER DISTRIBUTION UNIT (GFGI)

RBB 1U RACK BONDING BUSBAR

SHELF RACK-MOUNT SHELF

SWITCH NETWORK SWITCH (GFGI)

UPS UNINTERRUPTIBLE POWER SUPPLY (GFGI)

1/2" = 1'-0"

IT ROOM 106 VERTICAL LADDER RACK ELEVATION

1" = 1'-0"

IT ROOM 106 RACK ELEVATION - REAR RACK A1 AND A2

1" = 1'-0"

IT ROOM 106 RACK ELEVATION - REAR FUTURE RACKS

1" = 1'-0"

IT ROOM 106 RACK ELEVATION - FUTURE RACKS

0 1' 2' 4'

0 1' 2' 4'

WALL SPACE RESERVED FOR ACCESS CONTROL WALL FIELD.

KEYED NOTES

0 1' 2' 4'0 1/2' 1' 2'

0 1/2' 1' 2'0 1/2' 1' 2'

0 1/2' 1' 2'

BOTTOM OF CABLE

RUNWAY AT

8'-0" AFF (TYP)

4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT

ABOVE HIGHEST CABLE TRAY (TYP OF 2)

87.6

10'-7" AFF

G.5

6"

IT

6"

4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT

ABOVE HIGHEST CABLE TRAY (TYP OF 2)

4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT

ABOVE HIGHEST CABLE TRAY (TYP OF 2)

T-404

T-404

FIRE-RETARDANT PLYWOOD

BACKBOARD ON WALL INDICATED.

BACKBOARD SHALL EXTEND

FROM 0'-6" TO 8'-6" AFF.

FRONT

REAR

1V

WP

C1D1

FUTURE RACKRACK 1 RACK 2SBB

+24" AFF

T-404

T-404

FIRE-RETARDANT PLYWOOD

BACKBOARD ON ALL WALLS.

BACKBOARD SHALL EXTEND

FROM 0'-6" TO 8'-6" AFF.

A C

C E

S S

C O

N T

R O

L

87.6

G.5

RACK 3 RACK 4

IT

8'-0" AFF

(TYP)

TELECOMMUNICATIONS

RACK ID (TYP)

FUTURE RACKRACK 1 RACK 2

FPP4 CPP2

SWITCH

CPP2

CPP2

V E

R T

IC

B L E

M A

N A

G E

M E

N T

CATV SPLITTER

CATV

SHELF

SWITCH

CPP2

HCM

(TYP)

RBBRBB

RACK 3 RACK 4

V E

R T

IC

B L E

M A

N A

G E

M E

N T

V E

R T

IC

B L E

M A

N A

G E

M E

N T

V E

R T

IC

B L E

M A

N A

G E

M E

N T

V E

R T

IC

B L E

M A

N A

G E

M E

N T

CPP2

RBB

SWITCH

CPP2

CPP2

SWITCH

CPP2

CPP2

SWITCH

CPP2

CPP2

SWITCH

CPP2

CPP2

SWITCH

CPP2

CPP2

SWITCH

RBB

RACK 2 RACK 1FUTURE RACK

PDU

UPS

POWER RECEPTACLE

(TYP OF 8) - REFER TO

POWER SHEETS

PDU

UPS

RACK 3RACK 4

PDUPDU

UPSUPS

1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.

2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 0

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-404

TELECOMM

ENLARGED PLAN

- IT 121

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/2" = 1'-0"

IT ROOM 121 TELECOMMUNICATIONS ENLARGED CABLE TRAY PLAN

1/2" = 1'-0"

IT ROOM 121 TELECOMMUNICATIONS ENLARGED FLOOR PLAN

1" = 1'-0"

IT ROOM 121 RACK ELEVATION

COMMUNICATION OUTLETS SERVED FROM IT ROOM 121

OUTLET LOCATION

OUTLET TYPE COUNT

DATA

(CAT 6)

VOIP

(CAT 6)

CATV

(RG6)ROOM NUMBER ROOM NAME

133 OFFICE 2D 2 4 0 0

134 OFFICE 2D 2 4 0 0

135 OFFICE 2D 2 4 0 0

136 OFFICE 2D 2 4 0 0

137 OFFICE 2D 2 4 0 0

138 OFFICE 2D 2 4 0 0

139 OFFICE 2D 2 4 0 0

140 OPEN OFFICE SF12 4 48 0 0

140 OPEN OFFICE SF16 2 32 0 0

140 OPEN OFFICE SF24 3 72 0 0

140 OPEN OFFICE WAP 16 16 0 0

141 WORK RM 2D 3 6 0 0

142 OFFICE 2D 2 4 0 0

143 OFFICE 2D 2 4 0 0

144 OFFICE 2D 2 4 0 0

145 OFFICE 2D 2 4 0 0

146 OFFICE 2D 2 4 0 0

147 OFFICE 2D 2 4 0 0

148 CONF 2D 2 4 0 0

148 CONF FB6 2 12 0 0

148 CONF TV3 1 1 0 1

149 LOCKERS 1V 1 0 1 0

150 MECH 1V 1 0 1 0

150 MECH 2D 1 2 0 0

158 CORR WAP 2 2 0 0

159 ELEC 1V 1 0 1 0

159 ELEC 2D 1 2 0 0

160 KITCHEN 1V 2 0 2 0

160D PANTRY / OFFICE 2D 1 2 0 0

161 LACTATION 1V 1 0 1 0

170 563 9 4

COMMUNICATION OUTLETS SERVED FROM IT ROOM 121

OUTLET LOCATION

OUTLET TYPE COUNT

DATA

(CAT 6)

VOIP

(CAT 6)

CATV

(RG6)ROOM NUMBER ROOM NAME

102 FAMILY READINESS 2D 4 8 0 0

102 FAMILY READINESS WAP 1 1 0 0

103 RECRUITING 2D 2 4 0 0

104 ASSEMBLY 2D 17 34 0 0

104 ASSEMBLY WAP 6 6 0 0

115 CORR WAP 1 1 0 0

116 BREAK / VENDING 2D 2 4 0 0

116 BREAK / VENDING TV3 1 1 0 1

116 BREAK / VENDING WAP 1 1 0 0

117 LEARNING CENTER 2D 4 8 0 0

117 LEARNING CENTER FB6 3 18 0 0

117 LEARNING CENTER TV3 1 1 0 1

117 LEARNING CENTER WAP 2 2 0 0

120 ELEC 1V 1 0 1 0

120 ELEC 2D 1 2 0 0

121 IT 1V 1 0 1 0

122 MECH 1V 1 0 1 0

122 MECH 2D 1 2 0 0

123 OPEN OFFICE SF12 3 36 0 0

123 OPEN OFFICE SF16 1 16 0 0

123 OPEN OFFICE SF24 4 96 0 0

123 OPEN OFFICE WAP 20 20 0 0

124 CONF 2D 2 4 0 0

124 CONF FB6 2 12 0 0

124 CONF TV3 1 1 0 1

125 OFFICE 2D 2 4 0 0

126 OFFICE 2D 2 4 0 0

127 OFFICE 2D 2 4 0 0

128 OFFICE 2D 2 4 0 0

129 OFFICE 2D 2 4 0 0

130 OFFICE 2D 2 4 0 0

131 WORK RM 2D 3 6 0 0

132 OFFICE 2D 2 4 0 0

COMMUNICATIONS RACK MOUNTED EQUIPMENT IT ROOM 121

EQUIP IDENTIFIER DESCRIPTION

CATV CATV PATCH PANEL

CATV SPLITTER CATV SPLITTER (BY SERVICE PROVIDER)

CPP2 48-PORT CATEGORY 6 PATCH PANEL FOR TERMINATION OF HORIZONTAL CABLES

FPP4 2U FIBER ENCLOSURE, 2U FIBER ADAPTER PATCH PANEL, (2) 12-STRAND LC DUPLEX

FIBER ADAPTER PANELS, 6 BLANK FIBER ADAPTER PANELS

HCM HORIZONTAL CABLE MANAGER (2U)

PDU POWER DISTRIBUTION UNIT (GFGI)

RBB 1U RACK BONDING BUSBAR

SHELF RACK-MOUNT SHELF

SWITCH NETWORK SWITCH (GFGI)

UPS UNINTERRUPTIBLE POWER SUPPLY (GFGI)

1" = 1'-0"

IT ROOM 121 RACK ELEVATION - REAR

WALL SPACE RESERVED FOR ACCESS CONTROL WALL FIELD.

PROVIDE VERTICAL LADDER RACK TRANSITION FROM CONDUITS THROUGH WALL TO

LADDER RACK IN IT ROOM 121.

KEYED NOTES

0 1' 2' 4'

0 1' 2' 4'

0 1/2' 1' 2'

0 1/2' 1' 2'

SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD

INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT

SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL

TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER

TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO

SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.

3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF

CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS

REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT

CONNECTION LOCATION.

NOTES:

BOTTOM OF LADDER

RACK AT

8'-0" AFF (TYP)

T-405

T-405

T-405

T-405

VERTICAL LADDER RACK

VERTICAL

LADDER RACK

B

11'-2" AFF

4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT

ABOVE HIGHEST CABLE TRAY (TYP OF 2)

IT

157C

6"

6"

T-405

T-405

FIRE-RETARDANT PLYWOOD

BACKBOARD ON ALL WALLS.

BACKBOARD SHALL EXTEND FROM

0'-6" TO 8'-6" AFF.

2-4" C ROUTED TO EXTERIOR

MAINTENANCE HOLE (TYP)

TELECOMMUNICATIONS

BACKBONE CONDUITS ROUTED

TO IT ROOM 106. REFER TO T-601.

F R

O N

T

R E

A R

T-405

T-405

T-405

T-405

C1E1

RACK 1

RACK 2

RACK 3

FUTURE RACK

1V

WP

PBB

+48" AFF

T-405

T-405

A C

C E

S S

C O

N T

R O

L

B

PET

IT

157C

8'-0" AFF

(TYP)

TELECOMMUNICATIONS

RACK ID (TYP)

(TYP)

FUTURE RACK RACK 3RACK 2RACK 1

CPP1

FPP1 FPP2 SWITCH

CPP2

HCM

FPP4

V E

R T

IC

B L E

M A

N A

G E

M E

N T

V E

R T

IC

B L E

M A

N A

G E

M E

N T

V E

R T

IC

B L E

M A

N A

G E

M E

N T

CATV

CATV SPLITTER

SHELF

SHELF

V2A

RBBRBBRBB

HORIZONTAL LADDER RACK

12" W VERTICAL LADDER RACK

(PROVIDE IN QUANTITIES AS

REQUIRED TO COVER ENTIRE

WIDTH OF STUB UPS)

CONDUITS STUBBED

UP +4" AFF

HORIZONTAL LADDER RACK

12" W VERTICAL LADDER RACK

(PROVIDE IN QUANTITIES AS

REQUIRED TO COVER ENTIRE

WIDTH OF STUB UPS)

CONDUITS STUBBED

UP +4" AFF

RACK 1RACK 2RACK 3 FUTURE RACK

PDUPDUPDU

UPS UPS UPS

POWER RECEPTACLE

(TYP OF 6) - REFER TO

POWER SHEETS

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:0 : 1

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

T-405

TELECOMM

ENLARGED PLAN

- MAIN IT 157C

18-0061

02-25-2021

S. GOEKEN

B. PINKLEY

1/2" = 1'-0"

COMM ENTRANCE ROOM 157C TELECOMMUNICATIONS ENLARGED CABLE TRAY PLAN

1/2" = 1'-0"

COMM ENTRANCE ROOM 157C TELECOMMUNICATIONS ENLARGED FLOOR PLAN

1" = 1'-0"

MAIN IT ROOM 157C RACK ELEVATION

COMMUNICATION OUTLETS SERVED FROM IT ROOM 157C

OUTLET LOCATION

OUTLET TYPE COUNT

DATA

(CAT 6)

VOIP

(CAT 6)

CATV

(RG6)ROOM NUMBER ROOM NAME

152 ISSUING 4D 1 4 0 0

153 ARMORER 4D 1 4 0 0

153A VAULT 1V 1 0 1 0

153A VAULT 2D 1 2 0 0

154 ISSUING 4D 1 4 0 0

155 ISSUING 4D 1 4 0 0

156…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .