Bellevue_RC_100_Vol_II_T-SeriesDWGS_2021-02-25.pdf
PDF 3 MB Posted
- Attached to
- Construct Bellevue Readiness Center
- Solicitation number
- W9124321RCH02
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A AMPERES
AC ALTERNATING CURRENT
AFF ABOVE FINISHED FLOOR
AIC AMPERES INTERRUPTING CAPACITY
AV AUDIO/VIDEO
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
BOT BOTTOM OF CABLE TRAY
C CONDUIT
CAT CATEGORY
CATV CABLE TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
COMM COMMUNICATIONS
COR CONTRACTING OFFICER'S REPRESENTATIVE
CPP COPPER HORIZONTAL PATCH PANEL
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CT CABLE TRAY
DC DIRECT CURRENT
EC EMPTY CONDUIT
EGC EQUIPMENT GROUNDING CONDUCTOR
EIA ELECTRONICS INDUSTRIES ASSOCIATIONS
EMT ELECTRICAL METALLIC TUBING
EPO EMERGENCY POWER OFF
ESS ELECTRONIC SECURITY SYSTEM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FBO FURNISHED BY OTHERS
FFE FURNITURE, FIXTURES AND EQUIPMENT
FPD FLAT PANEL DISPLAY
FPP FIBER OPTIC PATCH PANEL
FSCP FIRE SYSTEM CONTROL PANEL
FT FEET OR FOOT
GFGI GOVERNMENT FURNISHED AND INSTALLED
G OR GND GROUND
GFE GOVERNMENT FURNISHED EQUIPMENT
GRS GALVANIZED RIGID STEEL CONDUIT
HZ HERTZ
IDS INTRUSION DETECTION SYSTEM
IG ISOLATED GROUND
K KILO
KCMIL THOUSAND CIRCULAR MILS
LW LOCKABLE WIREWAY
MAX MAXIMUM
MH MAINTENANCE HOLE
MM MULTIMODE
MN/PA MASS NOTIFICATION/PUBLIC ADDRESS
N.C. NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION
NIC NOT IN CONTRACT
NIPR NON-CLASSIFIED INTERNET PROTOCOL ROUTING
N.O. NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
PBB PRIMARY BONDING BUSBAR
PDS PROTECTIVE DISTRIBUTION SYSTEM
PDU POWER DISTRIBUTION UNIT
PET PROTECTED ENTRANCE TERMINAL
PR PAIR
PVC POLYVINYL CHLORIDE
QA QUALITY ASSURANCE
RGS RIGID GALVANIZED STEEL CONDUIT
RMC RIGID METAL CONDUIT
RMS ROOT MEAN SQUARE
SBB SECONDARY BONDING BUSBAR
SCCR SHORT CIRCUIT CURRENT RATING
ScTP SHIELDED TWISTED PAIR
SIPR SECRET INTERNET PROTOCOL ROUTING
SJB SECURITY JUNCTION BOX
SM SINGLE MODE
SPD SURGE PROTECTION DEVICE
SPECS CONTRACT SPECIFICATIONS
SRG STATIC REFERENCE GRID
SYM SYMMETRICAL
TECH TECHNICIAN
TR TELECOMMUNICATIONS ROOM
TYP TYPICAL
UL UNDERWRITERS' LABORATORIES
um MICROMETER
UON UNLESS OTHERWISE NOTED
UTP UNSHIELDED TWISTED PAIR
V VOLTS
VFD VARIABLE FREQUENCY DRIVE
VOIP VOICE OVER INTERNET PROTOCOL
W WIRE OR WATT
WAP WIRELESS ACCESS POINT
XFMR TRANSFORMER
Z IMPEDANCE
SYMBOLS - COMMUNICATION ABBREVIATIONS
SYMBOL MODIFIERS
1. SYMBOL ORIENTATION DOES NOT IMPLY DEVICE OR EQUIPMENT ORIENTATION. UNLESS NOTED
AS SUCH.
2. SYMBOL SIZE DOES NOT IMPLY EQUIPMENT SIZE, UON.
3. MOUNTING HEIGHT INDICATED IN LEGEND AND ON THE DRAWINGS SHALL BE THE DISTANCE
MEASURED FROM THE CENTER OF THE DEVICE TO THE FINISHED FLOOR.
4. NOT ALL SYMBOLS ARE USED.
5. SEE ELECTRICAL & COMMUNICATIONS SITE PLAN ES100 SERIES SHEETS FOR
COMMUNICATIONS SITE WORK.
6. REFER TO TYPICAL DETAILS ON T-500 SERIES DRAWINGS.
LEGEND NOTES
WIRE IN CONDUIT, RUN CONCEALED ABOVE CEILING OR IN WALL.
WIRE IN CONDUIT ROUTED BELOW GRADE OR FLOOR SLAB
COMMUNICATION DUCTBANK
ELECTRICAL DUCTBANK
COMM
E
1. BACKBONE CABLING SHALL BE INSTALLED IN BACKBONE CONDUITS. BACKBONE CABLING SHALL NOT BE INSTALLED USING J-HOOKS
OR ANY OTHER METHOD.
2. COMMUNICATION ROOMS HAVE BEEN LOCATED TO ENSURE THE HORIZONTAL CABLING THROUGHOUT THE FACILITY DOES NOT EXCEED 295 FEET TO MEET TIA. ROUTE PATHWAYS AND CABLES TO ENSURE THIS DISTANCE IS NOT EXCEEDED. NOTIFY COR PRIOR TO PATHWAY AND CABLE INSTALLATION IF THERE ARE AREAS WHERE THE EXPECTED DISTANCE MAY BE GREATER THAN 295
FEET.
3. HORIZONTAL CABLING SERVING WALL MOUNTED COMMUNICATIONS OUTLETS SHALL BE ROUTED FROM COMMUNICATIONS OUTLET IN MINIMUM 1” CONDUIT FROM EACH COMMUNICATIONS OUTLET TO AREA CABLE TRAY, AND IN AREA CABLE TRAY TO DESIGNATED COMMUNICATION ROOM. ROUTE CONDUITS IN FINISHED AREAS CONCEALED IN WALL. WHERE COMMUNICATION OUTLETS ARE INSTALLED IN EXPOSED UNFINISHED ROOMS, CONDUITS MAY BE SURFACE MOUNTED. CONDUITS ROUTED EXPOSED SHALL BE
PAINTED TO MATCH ADJACENT SURFACES.
4. HORIZONTAL CABLING SERVING FLUSH MOUNTED COMBINATION COMM/POWER FLOOR BOXES ON THE GROUND FLOOR SHALL BE ROUTED FROM FLOOR BOX VIA UNDERGOUND CONDUITS TO DESIGNATED COMMUNICATIONS ROOM. PROVIDE MINIMUM THREE
1-1/4” CONDUITS FROM EACH FLOOR BOX TO COMMUNICATION ROOM.
5. HORIZONTAL CABLING SERVING FLUSH MOUNTED COMBINATION COMM/POWER FLOOR BOXES ON THE SECOND LEVEL OR ABOVE SHALL BE ROUTED FROM FLOOR BOX VIA CONDUIT TO CABLE TRAY ON LEVEL BELOW, AND IN CABLE TRAY TO DESIGNATED COMMUNICATION ROOM. PROVIDE MINIMUM THREE 1-1/4” CONDUITS FROM EACH FLOOR BOX TO GROUND FLOOR AREA CABLE
TRAY.
6. HORIZONTAL CABLING SERVING SYSTEMS FURNITURE FLUSH MOUNTED FLOOR BOX FEEDS ON THE GROUND FLOOR SHALL BE ROUTED FROM OUTLET LOCATION ON SYSTEMS FURNITURE, VIA SYSTEMS FURNITURE WIRE CHANNELS, THROUGH FLOOR BOX, AND IN UNDERGROUND CONDUIT TO DESIGNATED COMMUNICATIONS ROOM. PROVIDE MINIMUM THREE 1-1/4” CONDUITS FROM
EACH FLOOR BOX TO COMMUNICATION ROOM.
7. HORIZONTAL CABLING SERVING SYSTEMS FURNITURE FLUSH MOUNTED FLOOR BOX FEEDS ON THE SECOND LEVEL OR ABOVE SHALL BE ROUTED FROM OUTLET LOCATION ON SYSTEMS FURNITURE, VIA SYSTEMS FURNITURE WIRE CHANNELS, THROUGH FLOOR BOX, IN CONDUIT TO CABLE TRAY ON LEVEL BELOW, AND IN CABLE TRAY TO DESIGNATED COMMUNICATIONS ROOM ON THE SECOND FLOOR. PROVIDE MINIMUM THREE 1-1/4” CONDUITS FROM EACH FLOOR BOX TO GROUND FLOOR AREA CABLE TRAY.
8. HORIZONTAL CABLING SERVING WALL MOUNTED SYSTEMS FURNITURE JUNCTION BOX FEEDS SHALL BE ROUTED FROM OUTLET LOCATION ON SYSTEMS FURNITURE, VIA SYSTEMS FURNITURE WIRE CHANNELS, THROUGH WALL JUNCTION BOX, IN CONDUIT TO CABLE TRAY, AND IN CABLE TRAY TO DESIGNATED COMMUNICATIONS. PROVIDE MINIMUM THREE 1-1/4” CONDUITS FROM EACH
WALL MOUNTED SYSTEMS FURNITURE JUNCTION BOX FEED TO AREA CABLE TRAY.
9. THIS PROJECT REQUIRES THE INSTALLATION OF COMMUNICATIONS AND/OR SECURITY DEVICES WITHIN OR ON PRECAST WALLS.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DEVICE LOCATIONS WITHIN OR ON PRECAST WALLS.
10. COORDINATE WITH THE ELECTRICAL POWER SHEETS TO ENSURE THAT A POWER RECEPTACLE IS INSTALLED WITHIN 16" HORIZONTAL TO ALL DATA AND/OR VOICE LOCATIONS, UON. THIS REQUIREMENT IS NOT APPLICABLE TO WALL PHONE LOCATIONS.
PROJECT INSIDE PLANT GENERAL NOTES:
S
FACEPLATE TYPE
(REFER TO COMM DETAILS
FOR FACEPLATE TYPE)
S SPEAKER, WALL
SPEAKER, CEILING
FLOORBOX - COMBINED POWER AND COMM
JUNCTION BOX - COMBINED POWER AND
COMM
COMMUNICATIONS DEVICES
COMMUNICATIONS GENERAL INFORMATION
(OR)1
SECURITY CAMERA, WALL MOUNTED
• PROVIDE 1" CONDUIT FROM SECURITY CAMERA TO LADDER RACK IN THE COMMUNICATIONS
ROOM IN WHICH SECURITY CAMERA IS LOCATED.
• CAMERA, CABLING, AND CAMERA SYSTEM (GFGI).
COMMUNICATIONS DUCTBANK
DUCTBANK TURNING UP FROM BELOW GRADE
AC
C
CT
HL
FPD
PROJ
SB
TV
WAP
XX" AFF
XX"W X X"D
ABOVE COUNTER MOUNTING
RECESSED IN CEILING
CEILING TILE
HARD LID
FLAT PANEL DISPLAY
PROJECTOR
SMART BOARD
TELEVISION
WIRELESS ACCESS POINT
MOUNT XX" AFF
WIDTH AND DEPTH OF CABLE TRAY
COMM ROOM EQUIPMENT
COMMUNICATIONS 4-POST RACK
TELECOMMUNICATIONS PRIMARY BONDING BUSBAR (PBB)
• SECONDARY BONDING BUSBAR (SBB) SIMILAR
• SEE DETAILS 7 AND 8 ON SHEET T-504
FIRE RATED PLYWOOD BACKBOARD ALONG WALL AS SHOWN ON PLANS. PAINT ALL SIDES WITH FIRE
RETARDANT WHITE PAINT.
CONDUIT INTO ROOM FROM BELOW FLOOR
• 4" UON
• PROVIDE PROTECTIVE BUSHING AT BOTH ENDS
CABLE TRAY
WIRE BASKET CABLE TRAY
12"W X 4"D, UON
LADDER RACK
12"W, UON
• MOUNTING HEIGHT TO BOTTOM OF CABLE TRAY AS INDICATED ON PLANS
BASKET
LADDER RACK
CONDUIT
SYMBOLS - SECURITY
1. CONTRACTOR SHALL PROVIDE CONDUITS, BACKBOXES, AND PULL-STRINGS FOR GFGI EQUIPMENT. COORDINATE FINAL LOCATIONS OF ALL GFGI SECURITY DEVICES AND LOCATION OF CONTROL PANELS WITH THE COR PRIOR TO SUBMITTING
CONDUIT AND BACKBOX LOCATION SHOP DRAWINGS FOR GOVERNMENT REVIEW.
SECURITY GENERAL NOTES
RECESSED COMMUNICATIONS OUTLET - WALL
(OR) 1
DETAIL NUMBER
ARROW LOCATED ON MORE
SECURE SIDE OF DOOR
DOOR SECURITY ROUGH-IN CALLOUT
ACCESS CONTROL PANEL
BALANCED MAGNETIC SWITCH (GFGI)
PROVIDE CONDUIT AND BOX ROUGH-IN ONLY
CARD READER (GFGI)
PROVIDE CONDUIT AND BOX ROUGH-IN ONLY
DOOR OPERATOR CONTACT
DOOR STRIKE
ELECTRIFIED LOCKSET
ELECTRIC STRIKE
ELECTRIFIED EXIT DEVICE
INTRUSTION DETECTION SYSTEM CONTROL PANEL (GFGI)
JUNCTION BOX
KEYPAD (GFGI)
PROVIDE CONDUIT AND BOX ROUGH-IN ONLY
MOTION SENSOR (GFGI)
PROVIDE CONDUIT AND BOX ROUGH-IN ONLY
MAGNETIC LOCK (GFGI)
PROVIDE CONDUIT AND BOX ROUGH-IN ONLY
REQUEST TO EXIT DEVICE
VIBRATION SENSOR (GFGI)
PROVIDE CONDUIT AND BOX ROUGH-IN ONLY AT 90" AFF
REMOTE STATUS INDICATOR (GFGI)
PROVIDE CONDUIT AND BOX ROUGH-IN ONLY
BM
CR
DO
DS
ML
RTE
ACS
EL
J
ES
ED
E-501
DRAWING REFERENCE
IDS
KP
MS
V
SURFACE-MOUNTED COMMUNICATIONS OUTLET - WALL
JUNCTION BOX - RECESSED IN WALL, UON
JUNCTION BOX - SURFACE MOUNTED ON WALL, UON
JUNCTION BOX - SURFACE MOUNTED ON CEILING, UON
C
C
(OR) 1
RECESSED COMMUNICATIONS OUTLET - CEILING
1. THIS PROJECT REQUIRES UNDERGROUND WORK INCLUDING WORK BEING PERFORMED IN EXISTING ROADWAYS AND PAVEMENTS.
THE CONTRACTOR SHALL REPAIR ALL EXISTING ROADWAYS AND PAVEMENTS TO MATCH EXISTING.
2. THE UNDERGROUND WORK FOR THIS PROJECT REQUIRES CLOSE COORDINATION WITH EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL NEW WORK WITH ALL EXISTING UTILITIES, EXISTING EQUIPMENT, AND EXISTING CONDITIONS.
3. PRIOR TO DIGGING, OBTAIN ALL APPLICABLE DIGGING PERMITS. ALL UNDERGROUND UTILITIES IN THE WORK AREA MUST BE
POSITIVELY IDENTIFIED BY A PRIVATE UTILITY LOCATING SERVICE.
4. PHYSICALLY VERIFY UNDERGROUND UTILITY LOCATIONS BY HAND DIGGING AND/OR POT-HOLING USING WOOD OR FIBERGLASS HANDLED TOOLS WHEN ANY ADJACENT CONSTRUCTION WORK IS EXPECTED TO COME WITHIN THREE FEET OF THE UNDERGROUND SYSTEM. DIGGING WITHIN TWO FEET OF A KNOWN UTILITY SHALL NOT BE PERFORMED BY MEANS OF MECHANICAL EQUIPMENT; HAND DIGGING SHALL BE USED. IF CONSTRUCTION IS PARALLEL TO AN EXISTING UTILITY EXPOSE THE UTILITY BY
HAND DIGGING EVERY 100 FEET IF PARALLEL WITHIN 5 FEET OF THE EXCAVATION.
5. COORDINATE ACCESS TO MANHOLES, HANDHOLES, AND BUILDINGS WITH COR.
6. PRIOR TO INSTALLATION OF NEW CABLES IN EXISTING DUCTBANKS, COORDINATE WITH THE COR TO DETERMINE WHICH DUCT(S) SHALL BE USED. FIELD VERIFY (ROD & MANDREL) EACH PATHWAY IDENTIFIED TO ENSURE IT IS ADEQUATE FOR CABLE INSTALLATION. NOTIFY COR IF AN EXISTING DUCT IDENTIFIED TO BE USED IS NOT ADEQUATE FOR NEW CABLE INSTALLATION.
7. SPLICING OF COPPER CABLES NOT ALLOWED.
8. SPLICING OF FIBER CABLES NOT ALLOWED.
9. IN MANHOLES/HANDHOLES WHERE CABLES ARE TO BE ROUTED THROUGH PROVIDE A MINIMUM OF 50' OF SLACK FOR EACH FIBER
AND COPPER CABLE.
10. FIBER AND COPPER CABLES SHALL BE INSTALLED IN NEW AND EXISTING MANHOLES/HANDHOLES USING CABLE RACKS AND RACK
HOOKS.
11. PROVIDE PULL STRINGS IN ALL NEW AND EXISTING CONDUITS, INCLUDING CONDUITS WHERE MULTICELL FABRIC INNERDUCTS ARE
TO BE INSTALLED.
12. MULTICELL FABRIC INNERDUCTS SHALL BE INSTALLED IN CONDUITS WHERE INDICATED AND TERMINATED IN
MANHOLES/HANDHOLES PER MANUFACTURER INSTRUCTIONS AND RECOMMENDATIONS.
13. PROVIDE THREE 3" 3-CELL FABRIC INNERDUCTS WITH TRACER WIRE IN ALL NEW 4" CONDUITS. IN ADDITION, CONTRACTOR SHALL
INSTALL FABRIC INNERDUCTS IN EXISTING CONDUITS WHERE INDICATED.
PROJECT OUTSIDE PLANT GENERAL NOTES:
RSI
C
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o n e
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 3
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-000
TELECOMM & ESS
LEGEND
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
Revisions
ID Date Description
C
T-402
T-402
1V
WP
2D
WSW
2D
WSW
2D
WSW
2D
WSW
SF12
SF12
SF8
SF4
SF8
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
AC
2D
WSW
AC2D
WSW
2D
WSW
2D
WSW
N
FB6
AV
FB6
TV3
AV
2D
WSW
9'-6" AFF
2D
WSW
1V
WP
1V
WP
9'-6" AFF
WAP
CT
WAP
CT
WAP
CT
SF12
WAP
CT
1V
WP
2D
WSW
2D
WSW
2D
WSW
2D
WSW
T-504
L
M
N.5
P
Q
9.7
AC
AC
2D
BMS
CST COMMO
OFFICE
28B
OFFICE
28C
OFFICE
28A
OFFICE
36A
CST READY BAYS
TOILET
TOILET
CONF
CST OPERATIONS
CST MED STOR
36B
MECH
IT
ELEC
CUST
CST SURVEY
CST MED SUPPORT
OFFICE
29B
OFFICE
29A
CST COMMAND
TRAINING AID STORAGE
29C
HALL
CORRIDOR
7B
CORR
10.5
129.8 10.6 10.8 11.6
WAP
CT
WAP
CT
1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.
2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F'
'D'
'B'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 3
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-101-1B
TELECOMM & ESS
PLAN - LOWER
LEVEL - AREA B
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/8" = 1'-0"
TELECOMM & ESS PLAN - LOWER LEVEL - AREA B
MATCHLINE SEE T-101-1D FOR CONTINUATION
0 4' 8' 16'
KEYED NOTES
PROVIDE (1) EMPTY 2" CONDUIT FROM JUNCTION BOX IN ROOM 31 - CST COMMO TO
ABOVE CEILING IN ROOM 30 - CST OPERATIONS. STUB CONDUIT 12" INTO ROOM 30.
T-401
T-401
8'-11" AFF
1V
WP
2D
ELEV
D.9 1V
WP
8'-11" AFF
8'-11" AFF
2D
WSW
2D
WSW
3'-6" AFF
2D
WSW
3'-6" AFF
2D
PATCH
48" AFF
2D
PATCH
C.5
L
G.5
F.3
J.9
C
2D
BMS
2D
WSW
48" AFF
ELEV EQUIP
STAIR
CORR
FLAMMABLE STORAGE
GROUNDS & MAINTENANCE
IT
ELEC
MECH
RECEIVING
CST STORAGE
CST LOG / ADMIN
08A
B.1
H.9
K.5
9.8 10.6 10.8 11.6
2D
WSW
1V
WP
SECURITY
T-506
1V
WP
2D
BMS
STAIR
9'-6" AFF
1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.
2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F'
'D'
'B'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 3
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-101-1D
TELECOMM & ESS
PLAN - LOWER
LEVEL - AREA D
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/8" = 1'-0"
TELECOMM & ESS PLAN - LOWER LEVEL - AREA D
MATCHLINE SEE T-101-1B FOR CONTINUATION
0 4' 8' 16'
KEYED NOTES
JUNCTION BOX FOR CCTV CAMERA (GFGI) EQUIPMENT CONNECTION SHALL BE
RECESSED MOUNTED ON EXTERIOR WALL. PROVIDE BLANK FACEPLATE. COORDINATE
FINAL MOUNTING HEIGHT OF JUNCTION BOX WITH CONTRACTING OFFICER. PROVIDE
MINIMUM 1" CONDUIT FROM BACKBOX TO IT ROOM 15. DEVICES AND CABLING (GFGI).
MOUNT DATA OUTLET INDICATED HORIZONTALLY TO MATCH POWER RECEPTACLE
ORIENTATION.
PRIOR TO COMMENCING INSTALLATION OF ELEVATOR, COORDINATE TELEPHONE LINE
REQUIREMENTS AND "2D / ELEV" TELECOMMUNICATIONS OUTLET WITH CONTRACTING
OFFICER, ELEVATOR INSTALLER AND AHJ.
PROVIDE (2) CAT6 GREEN CAT6 CABLES BETWEEN "2D / PATCH" FACEPLATES INDICATED.
TERMINATE CABLES ON GREEN RJ45 CONNECTOR EACH END. RJ45 CONNECTORS MAY
BE INSTALLED WITHIN ADJACENT "2D / BMS" AND "2D / WSW" OUTLETS.
4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT ABOVE HIGHEST CABLE TRAY (TYP
OF 2). PROVIDE ANGLED APPROACH TRANSITION FROM CONDUITS ABOVE HIGHER
CABLE TRAY TO LOWER CABLE TRAY.
1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.
2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
T-403
T-403
2-4" CONDUITS FROM IT ROOM 106
FB2
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
1V
WP
OPEN TO
ABOVE
OPEN TO
ABOVE
TV1
2D
BMS
654321
N
1V
WP
TV1
3.5
4.8
5.9
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1FB1
FB1
FB1
SECURITY
WAP
CT
WAP
CT
T-506
SBB, +24" AFF
FB2
FB2
6.7
5.1
L
M
N.5
P
Q
LIFT EQUIP
105C
ANTE
105B
ANTE
105A
VEST
PLUMBING CHASE
111C
WOMEN
WOMEN LOCKERS
108A
WOMEN SHOWERS
108B
ALCOVE
101D
PHYSICAL FITNESS
DISPLAY
101A
CORR
101C
MECH
IT
CLASSROOM/ LECTURE
LOBBY / MAIN HALL
AV
105D
R
3.6 5.4
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
HL
WAP
HL
WAP
HL
WAP
CT
WAP
CT
TV2
TV2
TV2TV2
TV2
TV2
WAP
CT
TV1
TV2
TV1
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
10'-10" AFF
10'-10" AFF
10'-10" AFF
ELEC
107A
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 4
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-101-2A
TELECOMM & ESS
PLAN - MAIN
LEVEL - AREA A
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/8" = 1'-0"
TELECOMM & ESS PLAN - MAIN LEVEL - AREA A
M A
T C
H L
IN
E S
E E
T -1
-2
B F
O R
C O
N T
IN
U
A T
IO
N
MATCHLINE SEE T-101-2C FOR CONTINUATION
KEYED NOTES
LOBBY / MAIN HALL 101 IS A MULTIPLE STORY SPACE. TELECOMMUNICATIONS & ESS
MATERIALS INCLUDING, BUT NOT LIMITED TO, PATHWAYS, CABLES, CABLE TRAY,
CONDUIT, SUPPORTS, AND/OR ACCESSORIES SHALL NOT TRANSVERSE OR BE VISIBLE
WITHIN THIS SPACE. ANY EXPOSED/VISIBLE TELECOMMUNICATIONS & ESS MATERIALS
WITHIN LOBBY / MAIN HALL 101, OTHER THAN WHAT IS SHOWN ON THESE DRAWINGS,
SHALL BE APPROVED IN WRITING BY THE CONTRACTING OFFICER PRIOR TO
COMMENCING INSTALLATION.
PROVIDE 1-1/4" CONDUIT PATHWAY BELOW GRADE FROM AV ROOM 105D TO
CLASSROOM/LECTURE ROOM 105 FLOOR BOX FOR FUTURE AV CABLING.
MOUNTING LOCATION OF FUTURE WAP SHALL BE COORDINATED WITH CEILING LAYOUT.
WAP SHALL NOT BE INSTALLED IN A LOCATION IN WHICH A LOWER CEILING "CLOUD", OR
SIMILAR, IMPEDE THE COVERAGE AREA OF THE FUTURE WAP.
CONDUIT SHALL BE ROUTED FROM IT ROOM 106 TO SECURITY DEVICES INDICATED
BELOW GRADE.
UNLESS OTHERWISE NOTED, EACH ROW OF "FB1" FLOOR BOXES ASSOCIATED WITH A
ROW OF SEATING IN CLASSROOM / LECTURE 105 SHALL BE SERVED BY A DEDICATED
CONDUIT ROUTED BELOW GRADE BACK TO IT ROOM 106. AFTER CABLE INSTALLATION,
EACH CONDUIT SHALL HAVE A MINIMUM OF 50% SPARE CAPACITY TO FACILITATE THE
INSTALLATION OF FUTURE CABLING. (TYP ALL "FB1" FLOOR BOXES, UON)
"FB1" FLOOR BOXES ASSOCIATED WITH THE BACK ROW OF SEATING IN CLASSROOM /
LECTURE 105 SHALL BE SERVED BY (2) CONDUITS ROUTED BELOW GRADE BACK TO IT
ROOM 106. AFTER CABLE INSTALLATION, EACH CONDUIT SHALL HAVE A MINIMUM OF
50% SPARE CAPACITY TO FACILITATE THE INSTALLATION OF FUTURE CABLING.
4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT ABOVE HIGHEST CABLE TRAY
(TYP OF 2).
0 4' 8' 16'
2 2
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
ROOFTOP TERRACETV3
AV
TV3
AV
111098
N
FB2
FB2
FB2
FB2
FB2
FB2
FB2
FB2
TV3
AV
TV3
AV
AV
WSW
AV
WSW
AV
WSW
AV
WSW
2D
WSW
2D
WSW
2D
WSW
WORKBAYS ROOF
8.7
L
M
P
Q
9.7
8.6
LOBBY / MAIN HALL
MEN
PLUMBING CHASE
109C
MEDICAL
TRAINING
MEN SHOWERS
110B
MEN LOCKERS
110A
CLASSROOM
CLASSROOM
CORR
101E
7.7
10.5
129.2 9.8 10.6 10.8 11.6
WAP
CT
WAP
CT
WAP
CT WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
10'-10" AFF
10'-2" AFF
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 4
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-101-2B
TELECOMM & ESS
PLAN - MAIN
LEVEL - AREA B
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/8" = 1'-0"
TELECOMM & ESS PLAN - MAIN LEVEL - AREA B
M A
T C
H L
IN
E S
E E
T -1
-2
A F
O R
C O
N T
IN
U
A T
IO
N
MATCHLINE SEE T-101-2D FOR CONTINUATION
KEYED NOTES
LOBBY / MAIN HALL 101 IS A MULTIPLE STORY SPACE. TELECOMMUNICATIONS & ESS
MATERIALS INCLUDING, BUT NOT LIMITED TO, PATHWAYS, CABLES, CABLE TRAY,
CONDUIT, SUPPORTS, AND/OR ACCESSORIES SHALL NOT TRANSVERSE OR BE VISIBLE
WITHIN THIS SPACE. ANY EXPOSED/VISIBLE TELECOMMUNICATIONS & ESS MATERIALS
WITHIN LOBBY / MAIN HALL 101, OTHER THAN WHAT IS SHOWN ON THESE DRAWINGS,
SHALL BE APPROVED IN WRITING BY THE CONTRACTING OFFICER PRIOR TO
COMMENCING INSTALLATION.
4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT ABOVE HIGHEST CABLE TRAY
(TYP OF 2).
0 4' 8' 16'
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
T-404
T-404
1V
WP
2D
WSW
2D
WSW
2D
WSW
1V
WP
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
9'-11" AFF
9'-7" AFF
10'-3" AFF
2D
WSW
2D
WSW
2D
WSW
2D
WSW
1V
WP
1V
WP
2D
BMS
8654321
E-407
E-407
V V
V V
V
V
V
V
MS
BM
BMBM
IDS
KP
C
E
F
G
H
J
7.64.8
4D
WSW
1V
WP
2D
9'-7" AFF 10'-7" AFF 10'-3" AFF
10'-3" AFF
9'-10" AFF
4D
WSW
4D
WSW
4D
WSW
4D
WSW
WAP
CT
WAP
CT
WAP
CT
WAP
CT
1V
WP
2D
WSW
3'-6" AFF
2D
WSW
3'-6" AFF
2D
WSW
3'-6" AFF
2D
WSW
3'-6" AFF
TV3
9'-7" AFF
9'-7" AFF
1V
WP
C.5
L
G.5
K J.9
RSI
WAP
WALL
14'-0" AFF
WAP
WALL
14'-0" AFF
WAP
WALL
14'-0" AFF
C
TV3
2D
BMS
D
B M
S
ASSEMBLY
BREAK / VENDING
ASSEMBLY
FAMILY READINESS
RECRUITING
LACTATION
161 CORR
S E
R V
IN
G
A BEVERAGES
158B
KITCHEN
SCULLERY
160A
PANTRY / OFFICE
160D
CUST
160C
TOILET
160B
ELEC
CORR
MECH / WATER SERVICE
ISSUING
CORR
157B
ISSUING
157E
HEATED STORAGE
VAULT
153A
CORR
157A
ISSUING
152ARMORER
ISSUING
CORR
CORR
LOCKERS
MECH
CUST
ELEC
IT
CORR
CORR
LEARNING CENTER
TABLE / CHAIR STORAGE
104A
TOILET
CORR
3.62.6
B.1
H.9
5.4
K.5
FB6
FB6
FB6
2D
BMS
1V
WP
WAP
CT
WAP
CT
WAP
WALL
14'-0" AFF
WAP
WALL
14'-0" AFF
WAP
WALL
14'-0" AFF
1V
WP
2D
WSW
TV3
KP
MS
10'-3" AFF
10'-3" AFF
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 4
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-101-2C
TELECOMM & ESS
PLAN - MAIN
LEVEL - AREA C
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/8" = 1'-0"
TELECOMM & ESS PLAN - MAIN LEVEL - AREA C
M A
T C
H L
IN
E S
E E
T -1
-2
D F
O R
C O
N T
IN
U
A T
IO
N
MATCHLINE SEE T-101-2E FOR CONTINUATION
MATCHLINE SEE T-101-2A FOR CONTINUATION
PROVIDE 1/2" EMT CONDUIT EMBEDDED IN REINFORCED CONCRETE CEILING FROM
MOTION SENSOR TO VAULT WIREWAY.
PROVIDE 3/4" EMT CONDUIT EMBEDDED IN REINFORCED CONCRETE WALL FROM
VAULT VIBRATION SENSOR TO VAULT WIREWAY.
PROVIDE (5) SPARE 3/4" RGS CONDUITS ABOVE VAULT WIREWAY. STUB CONDUITS 3"
ABOVE AND 3" BELOW FINISHED VAULT ROOF/CEILING.
PROVIDE (2) 1" RGS CONDUITS FROM VAULT WIREWAY TO IT ROOM 157C. CONDUITS
SHALL BE HOME RUN TO IT ROOM 157C AND SHALL NOT TERMINATE AT AN AREA
CABLE TRAY.
PROVIDE 3/4" EMT CONDUIT FROM DEVICE INDICATED TO VAULT WIREWAY.
PROVIDE 3/4" RGS CONDUIT ROUTED ABOVE CEILING FROM DEVICE INDICATED TO
VAULT WIREWAY IN VAULT.
JUNCTION BOX FOR CCTV CAMERA (GFGI) EQUIPMENT CONNECTION SHALL BE
RECESSED MOUNTED IN COLUMN COVER. PROVIDE BLANK FACEPLATE. COORDINATE
FINAL MOUNTING HEIGHT OF JUNCTION BOX WITH CONTRACTING OFFICER. DEVICES
AND CABLING (GFGI).
PROVIDE 3/4" RGS CONDUIT ROUTED ABOVE CEILING BETWEEN DEVICES INDICATED.
4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT ABOVE HIGHEST CABLE TRAY (TYP
OF 2). PROVIDE ANGLED APPROACH TRANSITION FROM CONDUITS ABOVE HIGHER
CABLE TRAY TO LOWER CABLE TRAY.
KEYED NOTES
0 4' 8' 16'
2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
11109
C
D.9
E
F
G
H
J
C.5
8'-0" AFF
L
8.6
G.5
F.3
K
J.9
ELEV LOBBY / STAIR
101F
OPEN OFFICE
OPEN OFFICE
CONF
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
WORK RM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
WORK RM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONF
OPEN OFFICE
OPEN OFFICE
OPEN OFFICE
B.1
H.9
K.5
9.2 9.8 10.6 10.8 11.6
SF24
SF16
SF12
SF16
SF12
SF12
SF16
SF12
SF12
FB6
AV
SF12
SF24
SF24
SF24
SF24
SF24
SF24
SF12
FB6
AV
TV3
AV
L1D3-15
FB6
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
AC
2D
WSW
2D
WSW
AC
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
2D
WSW
AC
2D
WSW
2D
WSW
AC
2D
WSW
FB6
TV3
AV
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
WAP
CT
10'-8" AFF 8"W X 4"D
10'-8" AFF
8"W X 4"D
10'-8" AFF
8"W X 4"D
10'-8" AFF
8"W X 4"D
10'-8" AFF
8"W X 4"D
10'-8" AFF
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 5
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-101-2D
TELECOMM & ESS
PLAN - MAIN
LEVEL - AREA D
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/8" = 1'-0"
TELECOMM & ESS PLAN - MAIN LEVEL - AREA D
M A
T C
H L
IN
E S
E E
T -1
-2
C F
O R
C O
N T
IN
U
A T
IO
N
MATCHLINE SEE T-101-2B FOR CONTINUATION
0 4' 8' 16'
KEYED NOTES
COORDINATE CABLE TRAY ROUTING TO RUN OVER DUCTWORK IN LOCATION INDICATED.
RECESSED JUNCTION BOX FOR VAULT SIREN. VAULT SIREN SHALL BE GFGI AND NIC.
COORDINATE CONDUIT REQUIREMENTS FROM VAULT WIREWAY TO THIS LOCATION
WITH TYPICAL DESIGN MILCON INFRASTRUCTURE FOR ARMS, AMMUNITION, AND
EXPLOSIVES STORAGE AREAS (1 VAULT SYSTEM) REQUIREMENT AS INDICATED ON RF
SERIES SHEETS. CONDUIT SHALL BE HOME RUN FROM VAULT WIREWAY TO THIS
LOCATION AND SHALL NOT TERMINATE AT AN AREA CABLE TRAY.
4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT ABOVE HIGHER CABLE TRAY
(TYP OF 2). PROVIDE ANGLED APPROACH TRANSITION FROM CONDUITS ABOVE
HIGHEST CABLE TRAY TO LOWER CABLE TRAY.
T-405
T-405
1V
WP
111098654321
A
B
7.64.8
11'-2" AFF
7 8.6
2D
FA
2D
BMS
ELEC
157D
IT
157C
HEATED STORAGE
3.62.6 5.4 9.2 9.8 10.6 10.8
2D
BMS
1V
WP
LOCKERS
MECH
CORR
WAP
CT
10'-3" AFF
1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.
2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 5
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-101-2E
TELECOMM & ESS
PLAN - MAIN
LEVEL - AREA E
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/8" = 1'-0"
TELECOMM & ESS PLAN - MAIN LEVEL - AREA E
MATCHLINE SEE T-101-2C FOR CONTINUATION
0 4' 8' 16'
MATCHLINE SEE T-101-2D FOR CONTINUATION
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
T-401
T-401
F R
O N
T
R E
A R
C D
FUTURE RACK
RACK 1
RACK 2
1V
WP
SBB
+24" AFF
T-401
T-401
FIRE-RETARDANT PLYWOOD
BACKBOARD ON THIS WALL.
BACKBOARD SHALL EXTEND
FROM 0'-6" TO 8'-6" AFF.
A C
C E
S S
C O
N T
R O
L
D.9
E
EQUAL EQUAL
IT
FIRE-RETARDANT PLYWOOD
BACKBOARD ON THIS WALL.
BACKBOARD SHALL EXTEND
FROM 0'-6" TO 8'-6" AFF.
BOTTOM OF
LADDER RACK AT
8'-0" AFF (TYP)
4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT
ABOVE HIGHEST CABLE TRAY (TYP OF 2)
D.9
E
IT
6" 7"
TELECOMMUNICATIONS
RACK ID (TYP)
RACK 1 FUTURE RACK
8'-0" AFF
(TYP)
FPP4
V E
R T
IC
A
L C
A B
L E
M A
N A
G E
M E
N T
V E
R T
IC
A
L C
A B
L E
M A
N A
G E
M E
N T
SWITCH
CPP2
HCM
(TYP)
RACK 2
SWITCH
CPP2
SWITCH
CPP2
RBB RBB
RACK 2 RACK 1FUTURE RACK
PDU PDU
UPSUPS
POWER RECEPTACLE
(TYP OF 4) - REFER TO
POWER SHEETS
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 5
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-401
TELECOMM
ENLARGED PLAN
- IT 15
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/2" = 1'-0"
IT ROOM 15 TELECOMMUNICATIONS ENLARGED FLOOR PLAN
1/2" = 1'-0"
IT ROOM 15 TELECOMMUNICATIONS ENLARGED CABLE TRAY PLAN
1" = 1'-0"
IT ROOM 15 RACK ELEVATION
COMMUNICATION OUTLETS SERVED FROM IT ROOM 15
OUTLET LOCATION
OUTLET TYPE COUNT
DATA
(CAT6)
VOIP
(CAT 6)
CATV
(RG6)ROOM NUMBER ROOM NAME
08 CST STORAGE 2D 2 2 0 0
08A CST LOG / ADMIN 2D 2 2 0 0
09 MECH 1V 1 0 1 0
09 MECH 2D 1 2 0 0
14 ELEC 1V 1 0 1 0
14 ELEC 2D 1 2 0 0
15 IT 1V 1 0 1 0
18 GROUNDS & MAINTENANCE 1V 1 0 1 0
18 GROUNDS & MAINTENANCE 2D 1 2 0 0
24 RECEIVING 1V 1 0 1 0
COMMUNICATIONS RACK MOUNTED EQUIPMENT IT ROOM 15
EQUIP IDENTIFIER DESCRIPTION
CPP2 48-PORT CATEGORY 6 PATCH PANEL FOR TERMINATION OF HORIZONTAL CABLES
FPP4 2U FIBER ENCLOSURE, 2U FIBER ADAPTER PATCH PANEL, (2) 12-STRAND LC DUPLEX
FIBER ADAPTER PANELS, 6 BLANK FIBER ADAPTER PANELS
HCM HORIZONTAL CABLE MANAGER (2U)
PDU POWER DISTRIBUTION UNIT (GFGI)
RBB 1U RACK BONDING BUSBAR
SWITCH NETWORK SWITCH (GFGI)
UPS UNINTERRUPTIBLE POWER SUPPLY (GFGI)
1" = 1'-0"
IT ROOM 15 RACK ELEVATION - REAR
WALL SPACE RESERVED FOR ACCESS CONTROL WALL FIELD.
KEYED NOTES
COMMUNICATION OUTLETS SERVED FROM IT ROOM 15 (OPTION 1)
OUTLET LOCATION
OUTLET TYPE COUNT
DATA
(CAT6)
VOIP
(CAT 6)
CATV
(RG6)ROOM NUMBER ROOM NAME
19 Office SF4 1 4 0 0
19 Office SF8 1 8 0 0
19 Office SF20 1 20 0 0
20 Office SF4 1 4 0 0
20 Office SF8 1 8 0 0
20 Office SF12 1 12 0 0
21 Hall 1V 1 0 1 0
22 GPTB BAY 1V 4 0 1 0
22 GPTB BAY 2D 4 2 0 0
0 1/2' 1' 2'
0 1/2' 1' 2'
0 1/2' 1' 2'
0 1/2' 1' 2'
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
BOTTOM OF LADDER
RACK AT
8'-0" AFF (TYP)
4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT
ABOVE HIGHEST CABLE TRAY (TYP OF 2)
IT
6"
6"
6"
6"
SBB
+84" AFF
FIRE-RETARDANT PLYWOOD
BACKBOARD ON THIS WALL.
BACKBOARD SHALL EXTEND FROM
0'-6" TO 8'-6" AFF.
T-402
T-402
FRONT
REAR
FUTURE RACK
RACK 2
RACK 1
1V
WP
T-402
T-402
T-505
C0B1
A C
C E
S S
C O
N T
R O
L
IT
RACK 1RACK 2FUTURE RACK
8'-0" AFF (TYP)
TELECOMMUNICATIONS
RACK ID (TYP)
FPP4SWITCH
CPP2
SWITCH
CPP2
SWITCH
CPP2
HCM
(TYP)
V E
R T
IC
A
L C
A B
L E
M A
N A
G E
M E
N T
CATV SPLITTER
CATV
SHELF
SWITCH
CPP2
RBBRBB
V E
R T
IC
A
L C
A B
L E
M A
N A
G E
M E
N T
PDUPDU
UPSUPS
FUTURE RACKRACK 2RACK 1
POWER RECEPTACLE
(TYP OF 4) - REFER TO
POWER SHEETS
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 0
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-402
TELECOMM
ENLARGED PLAN
- IT 33
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/2" = 1'-0"
IT ROOM 33 TELECOMMUNICATIONS ENLARGED CABLE TRAY PLAN
1/2" = 1'-0"
IT ROOM 33 TELECOMMUNICATIONS ENLARGED FLOOR PLAN
COMMUNICATION OUTLETS SERVED FROM IT ROOM 33
OUTLET LOCATION
OUTLET TYPE COUNT
DATA
(CAT 6)
VOIP
(CAT 6)
CATV
(RG6)ROOM NUMBER ROOM NAME
06 ELEV EQUIP 2D 1 2 0 0
26 CONF FB6 2 6 0 0
26 CONF TV3 1 1 0 1
28 CST COMMAND WAP 1 1 0 0
28A OFFICE 2D 2 2 0 0
28B OFFICE 2D 2 2 0 0
28C OFFICE 2D 2 2 0 0
29 CST SURVEY SF12 2 12 0 0
29 CST SURVEY WAP 1 1 0 0
29A OFFICE 2D 2 2 0 0
29B OFFICE 2D 2 2 0 0
30 CST OPERATIONS SF4 1 4 0 0
30 CST OPERATIONS SF8 1 8 0 0
30 CST OPERATIONS WAP 1 1 0 0
31 CST COMMO 2D 3 2 0 0
31 CST COMMO SF8 1 8 0 0
31 CST COMMO WAP 1 1 0 0
33 IT 1V 1 0 1 0
34 ELEC 1V 1 0 1 0
35 MECH 2D 1 2 0 0
36 CST MED SUPPORT SF12 1 12 0 0
36 CST MED SUPPORT WAP 1 1 0 0
36A OFFICE 2D 2 2 0 0
37 CST READY BAYS 1V 3 0 1 0
37 CST READY BAYS 2D 4 2 0 0
COMMUNICATIONS RACK MOUNTED EQUIPMENT IT ROOM 33
EQUIP IDENTIFIER DESCRIPTION
CATV CATV PATCH PANEL
CATV SPLITTER CATV SPLITTER (BY SERVICE PROVIDER)
CPP2 48-PORT CATEGORY 6 PATCH PANEL FOR TERMINATION OF HORIZONTAL CABLES
FPP4 2U FIBER ENCLOSURE, 2U FIBER ADAPTER PATCH PANEL, (2) 12-STRAND LC DUPLEX
FIBER ADAPTER PANELS, 6 BLANK FIBER ADAPTER PANELS
HCM HORIZONTAL CABLE MANAGER (2U)
PDU POWER DISTRIBUTION UNIT (GFGI)
RBB 1U RACK BONDING BUSBAR
SHELF RACK-MOUNT SHELF
SWITCH NETWORK SWITCH (GFGI)
UPS UNINTERRUPTIBLE POWER SUPPLY (GFGI)
1" = 1'-0"
IT ROOM 33 RACK ELEVATION
1" = 1'-0"
IT ROOM 33 RACK ELEVATION - REAR
WALL SPACE RESERVED FOR ACCESS CONTROL WALL FIELD.
KEYED NOTES
0 1/2' 1' 2'
0 1/2' 1' 2' 0 1/2' 1' 2'
0 1/2' 1' 2'
T-403
T-403
FIRE-RETARDANT PLYWOOD
BACKBOARD ON ALL WALLS.
BACKBOARD SHALL EXTEND
FROM 0'-6" TO 8'-6" AFF.
TELECOMMUNICATIONS
BACKBONE CONDUITS FROM IT
ROOM 157C. REFER TO T-601.
FIRE-RETARDANT
PLYWOOD BACKBOARD ON
ALL WALLS. BACKBOARD
SHALL EXTEND FROM 0'-6"
TO 8'-6" AFF.
2-4" CONDUITS ROUTED
TO A/V ROOM 105D
FRONT
REAR
T-4035
T-403 C1A1
FUTURE RACK
FUTURE RACK
1V
WP
SBB
+24" AFF
RACK A2
RACK A1
T-403
T-403
T-403
T-403
T-403
T-403
REAR
FRONT
T-505
ACCESS CONTROL
M
N.5
IT
FIRE-RETARDANT PLYWOOD
BACKBOARD ON ALL WALLS.
BACKBOARD SHALL EXTEND
FROM 0'-6" TO 8'-6" AFF.
T-403
T-403
VERTICAL LADDER RACK
M
N.5 6"
6"
IT
BOTTOM OF LADDER
RACK AT 8'-0" AFF (TYP)
8'-0" AFF
(TYP)
TELECOMMUNICATIONS
RACK ID (TYP)
RACK A2RACK A1
SWITCH
CPP2
SWITCH
CPP2
FPP4
HCM
(TYP)
V E
R T
IC
A
L
B L E
M A
N A
G E
M E
N T
CATV SPLITTER
SHELF
CATV
RBB RBB
V E
R T
IC
B L E
M A
N A
G E
M E
N T
V E
R T
IC
B L E
M A
N A
G E
M E
N T
SWITCH
CPP2
CONDUITS STUBBED
UP +4" AFF
12" W VERTICAL LADDER RACK
(PROVIDE IN QUANTITIES AS
REQUIRED TO COVER ENTIRE
WIDTH OF STUB UPS)
HORIZONTAL LADDER RACK
PDUPDU
UPSUPS
POWER RECEPTACLE
(TYP OF 4) - REFER TO
POWER SHEETS
RACK A2 RACK A1
1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.
2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
FUTURE RACK FUTURE RACK
FUTURE RACK FUTURE RACK
8'-0" AFF
(TYP)
TELECOMMUNICATIONS
RACK ID (TYP)
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 0
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-403
TELECOMM
ENLARGED PLAN
- IT 106
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/2" = 1'-0"
IT ROOM 106 TELECOMMUNICATIONS ENLARGED FLOOR PLAN
1/2" = 1'-0"
IT ROOM 106 TELECOMMUNICATIONS ENLARGED CABLE TRAY PLAN
1" = 1'-0"
IT ROOM 106 RACK ELEVATION - RACK A1 AND A2
COMMUNICATION OUTLETS SERVED FROM IT ROOM 106
OUTLET LOCATION
OUTLET TYPE COUNT
DATA
(CAT 6)
VOIP
(CAT 6)
CATV
(RG6)ROOM NUMBER ROOM NAME
101 LOBBY / MAIN HALL TV3 1 1 0 1
101 LOBBY / MAIN HALL WAP 10 1 0 0
105 CLASSROOM/ LECTURE FB1 35 1 0 0
105 CLASSROOM/ LECTURE FB2 3 2 0 0
105 CLASSROOM/ LECTURE TV1 2 0 0 1
105 CLASSROOM/ LECTURE TV2 7 0 0 0
105 CLASSROOM/ LECTURE WAP 7 1 0 0
105A ANTE WAP 1 1 0 0
105B ANTE WAP 1 1 0 0
105D AV 1V 1 0 1 0
106 IT 1V 1 0 1 0
107 MECH 1V 1 0 1 0
107 MECH 2D 1 2 0 0
109 PHYSICAL FITNESS TV1 2 0 0 1
109 PHYSICAL FITNESS WAP 2 1 0 0
111 MEDICAL 2D 3 2 0 0
111 MEDICAL WAP 1 1 0 0
112 TRAINING AV 2 1 0 0
112 TRAINING TV3 2 1 0 1
112 TRAINING WAP 2 1 0 0
113 CLASSROOM AV 1 1 0 0
113 CLASSROOM FB2 4 2 0 0
113 CLASSROOM TV3 1 1 0 1
113 CLASSROOM WAP 1 1 0 0
114 CLASSROOM AV 1 1 0 0
114 CLASSROOM FB2 4 2 0 0
114 CLASSROOM TV3 1 1 0 1
114 CLASSROOM WAP 1 1 0 0
COMMUNICATIONS RACK MOUNTED EQUIPMENT IT ROOM 106
EQUIP IDENTIFIER DESCRIPTION
CATV CATV PATCH PANEL
CATV SPLITTER CATV SPLITTER (BY SERVICE PROVIDER)
CPP2 48-PORT CATEGORY 6 PATCH PANEL FOR TERMINATION OF HORIZONTAL CABLES
FPP4 2U FIBER ENCLOSURE, 2U FIBER ADAPTER PATCH PANEL, (2) 12-STRAND LC DUPLEX
FIBER ADAPTER PANELS, 6 BLANK FIBER ADAPTER PANELS
HCM HORIZONTAL CABLE MANAGER (2U)
PDU POWER DISTRIBUTION UNIT (GFGI)
RBB 1U RACK BONDING BUSBAR
SHELF RACK-MOUNT SHELF
SWITCH NETWORK SWITCH (GFGI)
UPS UNINTERRUPTIBLE POWER SUPPLY (GFGI)
1/2" = 1'-0"
IT ROOM 106 VERTICAL LADDER RACK ELEVATION
1" = 1'-0"
IT ROOM 106 RACK ELEVATION - REAR RACK A1 AND A2
1" = 1'-0"
IT ROOM 106 RACK ELEVATION - REAR FUTURE RACKS
1" = 1'-0"
IT ROOM 106 RACK ELEVATION - FUTURE RACKS
0 1' 2' 4'
0 1' 2' 4'
WALL SPACE RESERVED FOR ACCESS CONTROL WALL FIELD.
KEYED NOTES
0 1' 2' 4'0 1/2' 1' 2'
0 1/2' 1' 2'0 1/2' 1' 2'
0 1/2' 1' 2'
BOTTOM OF CABLE
RUNWAY AT
8'-0" AFF (TYP)
4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT
ABOVE HIGHEST CABLE TRAY (TYP OF 2)
87.6
10'-7" AFF
G.5
6"
IT
6"
4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT
ABOVE HIGHEST CABLE TRAY (TYP OF 2)
4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT
ABOVE HIGHEST CABLE TRAY (TYP OF 2)
T-404
T-404
FIRE-RETARDANT PLYWOOD
BACKBOARD ON WALL INDICATED.
BACKBOARD SHALL EXTEND
FROM 0'-6" TO 8'-6" AFF.
FRONT
REAR
1V
WP
C1D1
FUTURE RACKRACK 1 RACK 2SBB
+24" AFF
T-404
T-404
FIRE-RETARDANT PLYWOOD
BACKBOARD ON ALL WALLS.
BACKBOARD SHALL EXTEND
FROM 0'-6" TO 8'-6" AFF.
A C
C E
S S
C O
N T
R O
L
87.6
G.5
RACK 3 RACK 4
IT
8'-0" AFF
(TYP)
TELECOMMUNICATIONS
RACK ID (TYP)
FUTURE RACKRACK 1 RACK 2
FPP4 CPP2
SWITCH
CPP2
CPP2
V E
R T
IC
B L E
M A
N A
G E
M E
N T
CATV SPLITTER
CATV
SHELF
SWITCH
CPP2
HCM
(TYP)
RBBRBB
RACK 3 RACK 4
V E
R T
IC
B L E
M A
N A
G E
M E
N T
V E
R T
IC
B L E
M A
N A
G E
M E
N T
V E
R T
IC
B L E
M A
N A
G E
M E
N T
V E
R T
IC
B L E
M A
N A
G E
M E
N T
CPP2
RBB
SWITCH
CPP2
CPP2
SWITCH
CPP2
CPP2
SWITCH
CPP2
CPP2
SWITCH
CPP2
CPP2
SWITCH
CPP2
CPP2
SWITCH
RBB
RACK 2 RACK 1FUTURE RACK
PDU
UPS
POWER RECEPTACLE
(TYP OF 8) - REFER TO
POWER SHEETS
PDU
UPS
RACK 3RACK 4
PDUPDU
UPSUPS
1. SEE SHEET T-000 FOR SYMBOLS, LEGEND, AND GENERAL NOTES.
2. THESE DRAWINGS ARE SUPPLEMENTAL TO THE PROJECT SPECIFICATIONS, ARE
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 0
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-404
TELECOMM
ENLARGED PLAN
- IT 121
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/2" = 1'-0"
IT ROOM 121 TELECOMMUNICATIONS ENLARGED CABLE TRAY PLAN
1/2" = 1'-0"
IT ROOM 121 TELECOMMUNICATIONS ENLARGED FLOOR PLAN
1" = 1'-0"
IT ROOM 121 RACK ELEVATION
COMMUNICATION OUTLETS SERVED FROM IT ROOM 121
OUTLET LOCATION
OUTLET TYPE COUNT
DATA
(CAT 6)
VOIP
(CAT 6)
CATV
(RG6)ROOM NUMBER ROOM NAME
133 OFFICE 2D 2 4 0 0
134 OFFICE 2D 2 4 0 0
135 OFFICE 2D 2 4 0 0
136 OFFICE 2D 2 4 0 0
137 OFFICE 2D 2 4 0 0
138 OFFICE 2D 2 4 0 0
139 OFFICE 2D 2 4 0 0
140 OPEN OFFICE SF12 4 48 0 0
140 OPEN OFFICE SF16 2 32 0 0
140 OPEN OFFICE SF24 3 72 0 0
140 OPEN OFFICE WAP 16 16 0 0
141 WORK RM 2D 3 6 0 0
142 OFFICE 2D 2 4 0 0
143 OFFICE 2D 2 4 0 0
144 OFFICE 2D 2 4 0 0
145 OFFICE 2D 2 4 0 0
146 OFFICE 2D 2 4 0 0
147 OFFICE 2D 2 4 0 0
148 CONF 2D 2 4 0 0
148 CONF FB6 2 12 0 0
148 CONF TV3 1 1 0 1
149 LOCKERS 1V 1 0 1 0
150 MECH 1V 1 0 1 0
150 MECH 2D 1 2 0 0
158 CORR WAP 2 2 0 0
159 ELEC 1V 1 0 1 0
159 ELEC 2D 1 2 0 0
160 KITCHEN 1V 2 0 2 0
160D PANTRY / OFFICE 2D 1 2 0 0
161 LACTATION 1V 1 0 1 0
170 563 9 4
COMMUNICATION OUTLETS SERVED FROM IT ROOM 121
OUTLET LOCATION
OUTLET TYPE COUNT
DATA
(CAT 6)
VOIP
(CAT 6)
CATV
(RG6)ROOM NUMBER ROOM NAME
102 FAMILY READINESS 2D 4 8 0 0
102 FAMILY READINESS WAP 1 1 0 0
103 RECRUITING 2D 2 4 0 0
104 ASSEMBLY 2D 17 34 0 0
104 ASSEMBLY WAP 6 6 0 0
115 CORR WAP 1 1 0 0
116 BREAK / VENDING 2D 2 4 0 0
116 BREAK / VENDING TV3 1 1 0 1
116 BREAK / VENDING WAP 1 1 0 0
117 LEARNING CENTER 2D 4 8 0 0
117 LEARNING CENTER FB6 3 18 0 0
117 LEARNING CENTER TV3 1 1 0 1
117 LEARNING CENTER WAP 2 2 0 0
120 ELEC 1V 1 0 1 0
120 ELEC 2D 1 2 0 0
121 IT 1V 1 0 1 0
122 MECH 1V 1 0 1 0
122 MECH 2D 1 2 0 0
123 OPEN OFFICE SF12 3 36 0 0
123 OPEN OFFICE SF16 1 16 0 0
123 OPEN OFFICE SF24 4 96 0 0
123 OPEN OFFICE WAP 20 20 0 0
124 CONF 2D 2 4 0 0
124 CONF FB6 2 12 0 0
124 CONF TV3 1 1 0 1
125 OFFICE 2D 2 4 0 0
126 OFFICE 2D 2 4 0 0
127 OFFICE 2D 2 4 0 0
128 OFFICE 2D 2 4 0 0
129 OFFICE 2D 2 4 0 0
130 OFFICE 2D 2 4 0 0
131 WORK RM 2D 3 6 0 0
132 OFFICE 2D 2 4 0 0
COMMUNICATIONS RACK MOUNTED EQUIPMENT IT ROOM 121
EQUIP IDENTIFIER DESCRIPTION
CATV CATV PATCH PANEL
CATV SPLITTER CATV SPLITTER (BY SERVICE PROVIDER)
CPP2 48-PORT CATEGORY 6 PATCH PANEL FOR TERMINATION OF HORIZONTAL CABLES
FPP4 2U FIBER ENCLOSURE, 2U FIBER ADAPTER PATCH PANEL, (2) 12-STRAND LC DUPLEX
FIBER ADAPTER PANELS, 6 BLANK FIBER ADAPTER PANELS
HCM HORIZONTAL CABLE MANAGER (2U)
PDU POWER DISTRIBUTION UNIT (GFGI)
RBB 1U RACK BONDING BUSBAR
SHELF RACK-MOUNT SHELF
SWITCH NETWORK SWITCH (GFGI)
UPS UNINTERRUPTIBLE POWER SUPPLY (GFGI)
1" = 1'-0"
IT ROOM 121 RACK ELEVATION - REAR
WALL SPACE RESERVED FOR ACCESS CONTROL WALL FIELD.
PROVIDE VERTICAL LADDER RACK TRANSITION FROM CONDUITS THROUGH WALL TO
LADDER RACK IN IT ROOM 121.
KEYED NOTES
0 1' 2' 4'
0 1' 2' 4'
0 1/2' 1' 2'
0 1/2' 1' 2'
SCHEMATIC IN NATURE AND SHALL NOT BE USED FOR FIELD INSTALLATION. FIELD
INSTALLATION SHALL BE PER APPROVED SHOP DRAWINGS. SEE PROJECT
SPECIFCATIONS FOR SHOP DRAWING REQUIREMENTS. THE LAYOUT OF ALL
TELECOMMUNICATIONS EQUIPMENT SHALL BE FULLY COORDINATED WITH OTHER
TRADES, EQUIPMENT AND/OR FURNITURE WITHIN THE ROOM AND/OR SPACE PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR APPROVAL.
3. COORDINATE FFE COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS OF
CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION IS
REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE EXACT
CONNECTION LOCATION.
NOTES:
BOTTOM OF LADDER
RACK AT
8'-0" AFF (TYP)
T-405
T-405
T-405
T-405
VERTICAL LADDER RACK
VERTICAL
LADDER RACK
B
11'-2" AFF
4" CONDUIT INSTALLED 2" TO BOTTOM OF CONDUIT
ABOVE HIGHEST CABLE TRAY (TYP OF 2)
IT
157C
6"
6"
T-405
T-405
FIRE-RETARDANT PLYWOOD
BACKBOARD ON ALL WALLS.
BACKBOARD SHALL EXTEND FROM
0'-6" TO 8'-6" AFF.
2-4" C ROUTED TO EXTERIOR
MAINTENANCE HOLE (TYP)
TELECOMMUNICATIONS
BACKBONE CONDUITS ROUTED
TO IT ROOM 106. REFER TO T-601.
F R
O N
T
R E
A R
T-405
T-405
T-405
T-405
C1E1
RACK 1
RACK 2
RACK 3
FUTURE RACK
1V
WP
PBB
+48" AFF
T-405
T-405
A C
C E
S S
C O
N T
R O
L
B
PET
IT
157C
8'-0" AFF
(TYP)
TELECOMMUNICATIONS
RACK ID (TYP)
(TYP)
FUTURE RACK RACK 3RACK 2RACK 1
CPP1
FPP1 FPP2 SWITCH
CPP2
HCM
FPP4
V E
R T
IC
B L E
M A
N A
G E
M E
N T
V E
R T
IC
B L E
M A
N A
G E
M E
N T
V E
R T
IC
B L E
M A
N A
G E
M E
N T
CATV
CATV SPLITTER
SHELF
SHELF
V2A
RBBRBBRBB
HORIZONTAL LADDER RACK
12" W VERTICAL LADDER RACK
(PROVIDE IN QUANTITIES AS
REQUIRED TO COVER ENTIRE
WIDTH OF STUB UPS)
CONDUITS STUBBED
UP +4" AFF
HORIZONTAL LADDER RACK
12" W VERTICAL LADDER RACK
(PROVIDE IN QUANTITIES AS
REQUIRED TO COVER ENTIRE
WIDTH OF STUB UPS)
CONDUITS STUBBED
UP +4" AFF
RACK 1RACK 2RACK 3 FUTURE RACK
PDUPDUPDU
UPS UPS UPS
POWER RECEPTACLE
(TYP OF 6) - REFER TO
POWER SHEETS
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:0 : 1
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
T-405
TELECOMM
ENLARGED PLAN
- MAIN IT 157C
18-0061
02-25-2021
S. GOEKEN
B. PINKLEY
1/2" = 1'-0"
COMM ENTRANCE ROOM 157C TELECOMMUNICATIONS ENLARGED CABLE TRAY PLAN
1/2" = 1'-0"
COMM ENTRANCE ROOM 157C TELECOMMUNICATIONS ENLARGED FLOOR PLAN
1" = 1'-0"
MAIN IT ROOM 157C RACK ELEVATION
COMMUNICATION OUTLETS SERVED FROM IT ROOM 157C
OUTLET LOCATION
OUTLET TYPE COUNT
DATA
(CAT 6)
VOIP
(CAT 6)
CATV
(RG6)ROOM NUMBER ROOM NAME
152 ISSUING 4D 1 4 0 0
153 ARMORER 4D 1 4 0 0
153A VAULT 1V 1 0 1 0
153A VAULT 2D 1 2 0 0
154 ISSUING 4D 1 4 0 0
155 ISSUING 4D 1 4 0 0
156…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .