Bellevue_RC_100_Vol_II_E-SeriesDWGS_2021-02-25.pdf
PDF 13 MB Posted
- Attached to
- Construct Bellevue Readiness Center
- Solicitation number
- W9124321RCH02
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOLS - LIGHTINGSYMBOLS - POWER
CONNECTION
CONTINUATION
SEPARABLE CONNECTOR OR CONNECTION FOR DRAWOUT ASSEMBLIES
FUSED DISCONNECT SWITCH
TRANSFORMER
GROUND
DELTA - WYE TRANSFORMER CONNECTION
DELTA - DELTA TRANSFORMER CONNECTION
DIGITAL METER
SURGE PROTECTIVE DEVICE
VARIABLE FREQUENCY DRIVE
SHUNT TRIP
KILOWATT HOUR METER
VOLTMETER SELECTOR SWITCH
AMMETER SELECTOR SWITCH
VOLTMETER
AMMETER
CIRCUIT BREAKER
"XXX" DENOTES AMPACITY
SWITCH
DISCONNECT SWITCH
SPECIAL RECEPTACLE
PANELBOARD (NAMED "H1A1")
NAMING CONVENTION:
H1A1
EQUIPMENT NUMBER
BUILDING AREA (PLAN REFERENCE)
BUILDING LEVEL
EQUIPMENT TYPE:
H = 480Y/277V GENERAL & LIGHTING
L = 208Y/120V GENERAL
M = 480Y/277V HVAC & PLUMBING
P = 208Y/120V HVAC & PLUMBING
C = 208Y/120V COMM ROOM
LIGHTNING ARRESTOR
AUTOMATIC TRANSFER SWITCH
MULTI-FUNCTION DIGITAL UTILITY METER
NEUTRAL CONNECTION TO GROUND
DIESEL ENGINE GENERATOR
KIRK-KEY INTERLOCK
RELAY
CONTACTOR
ELECTRICAL EQUIPMENT CONNECTION
PHOTOCELL
ELECTRICAL MOTOR
20 - MOTOR HORSEPOWER
Y
H1A1
KWH
V
RECEPTACLES
RECESSED SIMPLEX
RECESSED DUPLEX
RECESSED SIMPLEX,
HORIZONTAL MOUNTED
RECESSED DUPLEX,
HORIZONTAL MOUNTED
RECESSED QUAD
CEILING RECESSED DUPLEX
FLOORBOX RECESSED DUPLEX
JUNCTION BOXES AND POWER SUPPLIES
RECESSED IN WALL, UON
SURFACE MOUNTED, UON
RECESSED IN FLOOR, UON
ELECTRONIC FLUSH
TRANSFORMER / POWER SUPPLY
SWITCHES
DISCONNECT SWITCH
MOTOR-RATED SWITCH
M
POWER DEVICES GENERAL INFORMATION
LP-X
GFI
PANELBOARD - CIRCUIT
ANY RECEPTACLE LISTED ABOVE
2'X4' FIXTURE, UON
EGRESS FIXTURE, UON
(NOTE: ALL FIXTURES NOTED ON PLAN WITH HALF-SHADE INDICATE EGRESS)
1'X4' FIXTURE, UON
2'X2' FIXTURE, UON
DOWNLIGHT OR SPOTLIGHT, UON
EXIT SIGNS, CEILING: ARROW INDICATES EGRESS
EXIT SIGNS, WALL: ARROW INDICATES EGRESS
(NOTE: SEE TYPICAL DEVICE MOUNTING DETAILS AND NOTES THIS SHEET)
PHOTOCELL
WALL MOUNTED FIXTURE
EGRESS WALL MOUNTED FIXTURE
FIXTURE TYPE
F1
LP-1
10' - 0" a SWITCH 'LEG'
• THE SWITCH WITH SAME LETTER OPERATES THIS FIXTURE
3a , 3b
SWITCH 'LEG'
DESIGNATION
DEMARCATION
D: DIMMER
TM: TIMER
OC: OCCUPANCY SENSOR
3: 3-WAY
4: 4-WAY
EP: EXPLOSION PROOF
NOTES:
1. NO DEMARCATION OR SWITCH 'LEG' INDICATES THAT THE SWITCH CONTROLS ALL OF
THE FIXTURES WITHIN THE SAME ROOM
2. ADDITIONAL DEMARCATIONS SEPARATED BY A COMMA "," INDICATE ADDITIONAL
SWITCHES WITHIN A COMMON SWITCH BACKBOX.
LIGHTING FIXTURES
FIXTURE GENERAL INFORMATION
CONTROL DEVICES GENERAL INFORMATION
TOGGLE SWITCH
VFD
ST
VS
AS
A
• REFER TO FIXTURE SCHEDULE FOR FIXTURE TYPE INFORMATION
FLOORBOX RECESSED QUAD
SPECIAL RECEPTACLE
(REFER TO DRAWINGS FOR NEMA CONFIGURATION)
SURFACE SIMPLEX
SURFACE DUPLEX
SURFACE QUAD
EF-X
LP-X
GFI
J
EQUIPMENT IDENTIFICATION
ANY JUNCTION BOX LISTED ABOVE
SYMBOL MODIFIER(S)
SYMBOL MODIFIER(S)
PANELBOARD - CIRCUIT NUMBER
PANELBOARD - CIRCUIT
FIXTURE MOUNTING HEIGHT
(IF APPLICABLE)
• 120V, NEMA 5-20R, UON
SYMBOLS - ONE-LINE DIAGRAM
DM
J
M
J
EF-X
HL-X
GFI
M
EQUIPMENT IDENTIFICATION
MECHANICAL EQUIPMENT CONNECTION
• SEE MECHANICAL EQUIPMENT SCHEDULE FOR CONNECTION INFORMATION
SYMBOL MODIFIER(S)
PANELBOARD - CIRCUIT
REMOTE DISCONNECT SWITCH:
• SEE MECHANICAL EQUIPMENT SCHEDULE FOR ADDITIONAL INFORMATION
EQUIPMENT CONNECTIONS
MECHANICAL EQUIPMENT CONNECTION. PROVIDE DISCONNECT / STARTER / VFD AS INDICATED ON
MECHANICAL EQUIPMENT CONNECTION SCHEDULE
EQUIPMENT CONNECTION
RECEPTACLES WITH COMM OUTLETS
RECESSED FLOOR BOX WITH POWER, DATA AND/OR AV CAPABILITIES
"FB1" = FLOOR BOX TYPE, SEE PROJECT SPECIFICATIONS FOR REQUIREMENTS OF FLOOR BOX TYPES
RECESSED POWER/COMM
SURFACE POWER/COMM
• SEE COMMUNICATIONS OUTLET DETAILS FOR POWER AND COMMUNICATIONS REQUIREMENTS
N
G
G
WIRING RACEWAY TYPES
EXPOSED CONDUIT - SINGLE LINE
CONCEALED CONDUIT - SINGLE LINE
UNDERGROUND DUCTBANK
CONDUIT ROUTED VERTICALLY
K
PC
SYMBOLS - GROUNDING / LIGHTNING PROTECTION
GROUND ROD
GROUND TEST WELL
RECESSED STATIC GROUND
GROUNDING COUNTERPOISE/CONDUCTOR
• BURIED, BARE CABLE (EXTERIOR & BELOW GRADE)
• BARE CABLE (INTERIOR)
• COPPER, #4/0 AWG MINIMUM, UON
GROUND BAR
MGB, EGB, PBB, SBB
BOLTED GROUND CONNECTION
EXOTHERMIC WELDED CONNECTION
SYMBOL MODIFIERS
AC
C
EP OR EXP
F
FPD
GFI
IG
REF
SF#
SW: XX
TV
WC
WP
WPIU
XX" AFF
XX" AFP
ABOVE COUNTER MOUNTING
RECESSED IN CEILING
EXPLOSION PROOF
RECESSED IN FLOOR
FLAT PANEL DISPLAY
GROUND FAULT CIRCUIT INTERRUPTER
ISOLATED GROUND
REFRIGERATOR
SYSTEMS FURNITURE CONNECTION
• # INDICATES QUANTITY OF COMMUNICATIONS CONNECTIONS. SEE
TELECOMMUNICATIONS SHEETS FOR ADDITIONAL INFORMATION.
CONTROLLED BY SWITCH LABELED "XX"
TELEVISION
WALL-MOUNTED CLOCK
WEATHERPROOF, WITH GFI
WEATHERPROOF IN USE, WITH GFI
MOUNT XX" AFF
MOUNT XX" AFP
EQUIPMENT
LP11
• ELECTRICAL EQUIPMENT INCLUDING, BUT NOT LIMITED TO, TRANSFORMERS, SWITCHBOARDS AND
PANELBOARDS ARE DRAWN TO SCALE IN THE PLANS AND ARE CALLED OUT WITH A UNIQUE
IDENTIFIER.
EQUIPMENT IDENTIFIER
• COORDINATE JUNCTION BOX INSTALLATION WITH NEARBY EQUIPMENT.
R
C
MFM
SEE NOTE 2
SYMBOLS ORIENTATION DOES NOT IMPLY DEVICE OR EQUIPMENT ORIENTATION UNLESS NOTED AS SUCH. SEE REFLECTED CEILING
PLANS FOR LIGHT FIXTURE POSITIONS AND ORIENTATIONS.
SYMBOL SIZE DOES NOT IMPLY EQUIPMENT SIZE, UON.
MOUNTING HEIGHT INDICATED IN LEGEND AND ON THE DRAWINGS SHALL BE THE DISTANCE MEASURED FROM THE CENTER OF THE
DEVICE TO THE FINISHED FLOOR.
NOT ALL SYMBOLS ON THIS SHEET ARE USED AS PART OF THIS PROJECT.
1.
2.
3.
4.
FB1
SPD
ALL ELECTRICAL WORK AND MATERIAL SHALL BE NEW AND PROVIDED BY THE CONTRACTOR UNLESS OTHERWISE NOTED.
ALL CONDUCTORS SHALL BE RUN IN CONDUIT, AND ALL CONDUIT SHALL BE CONCEALED UNLESS OTHERWISE NOTED ON THE SHEETS.
ALL NEW SWITCHBOARDS AND PANELBOARDS SHALL BE FIELD MARKED TO WARN QUALIFIED PERSONS OF POTENTIAL ELECTRIC ARC
FLASH HAZARD IN ACCORDANCE WITH NFPA 70 AND 70E.
ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL CONTRACTOR REGARDING ELECTRICAL REQUIREMENTS OF ACTUAL
EQUIPMENT PROVIDED.
MOUNTING HEIGHT FOR LIGHT FIXTURES SHALL BE FROM THE BOTTOM OF FIXTURES TO THE FINISHED FLOOR OR GRADE.
ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101, AND UNIFORM FACILITY CRITERIA, OR TECHNICAL
LETTERS, IN ADDITION TO LOCAL CODES AND ORDINANCES.
ALL GROUNDING SHALL COMPLY WITH NFPA 70, ARTICLE 250 FOR ELECTRICAL SYSTEMS AND NEC ARTICLE 800 AND TIA-607-C FOR
TELECOMMUNICATIONS SYSTEMS.
PROVIDE A GREEN CONTINUOUS INSULATED EQUIPMENT GROUNDING CONDUCTOR TO ALL ELECTRICAL, TELECOMMUNICATIONS AND
SECURITY EQUIPMENT SIZED PER NEC ARTICLE 250.
ALL CONDUCTORS SHALL BE COPPER.
ALL ELECTRICAL EQUIPMENT AND OUTLET INSTALLATION LOCATIONS SHALL BE COORDINATED WITH FURNITURE INSTALLATION.
COORDINATE PENETRATIONS IN FIRE RATED WALLS WITH DETAILS SHOWN ON ARCHITECTURAL DRAWINGS.
ALL NEW FLOOR MOUNTED ELECTRICAL EQUIPMENT INCLUDING BUT NOT LIMITED TO AUTOMATIC TRANSFER SWITCHES, SWITCHBOARDS, AND TRANSFORMERS SHALL BE MOUNTED ON A CONCRETE EQUIPMENT PAD IN ACCORDANCE WITH STRUCTURAL
DETAILS.
COORDINATE ALL EQUIPMENT REQUIREMENTS AND SIZES WITH FINAL ELEVATOR SELECTION AND MANUFACTURER'S REQUIREMENTS.
ANY SIGNIFICANT CHANGES TO THE DESIGN BROUGHT FORTH BY THE ELEVATOR UNIT SELECTED SHALL BE BROUGHT TO THE
ATTENTION OF THE CONTRACTING OFFICER PRIOR TO INSTALLATION.
AIC RATING LISTED ON ELECTRICAL EQUIPMENT IS A MINIMUM RATING.
PER UFC 3-560-01, NORMAL MAINTENANCE IS NOT AUTHORIZED TO BE PERFORMED 'HOT' ON DISCONNECTS, STARTERS AND VFDs.
WORKING CLEARANCES FOR SUCH DEVICES TAKE INTO ACCOUNT ADJACENT PIPING OR DUCTWORK WHICH MAY BE WITHIN VOLUME OF WORKING AREA IF WORK WAS TO BE PERFORMED HOT. REASONABLE ACCESS HAS BEEN TAKEN INTO ACCOUNT.
THIS PROJECT REQUIRES THE INSTALLATION OF ELECTRICAL DEVICES WITHIN OR ON PRECAST WALLS. CONTRACTOR IS RESPONSIBLE
FOR COORDINATION OF DEVICE LOCATIONS WITHIN OR ON PRECAST WALLS.
ALL EXPOSED CONDUIT WHICH IS NOT FACTORY PAINTED (BLUE, GREEN, YELLOW, ETC.) SHALL BE PAINTED IN ACCORDANCE WITH
DIVISION 09 SPECIFICATIONS. FACTORY COLORED CONDUIT SHALL NOT BE FIELD PAINTED.
GENERAL NOTES:
APPLICABLE TO ALL ELECTRICAL SHEETS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
APPLY ARC FLASH HAZARD LABELS ON ALL EQUIPMENT PER
UFC 3-560-01.
PROVIDE A COPY OF THE ARC FLASH STUDY REQUIRED BY
SECTION
260573.19 POSTED IN THE MAIN ELECTRICAL ROOM.
1.
2.
ARC FLASH LABEL FOR EQUIPMENT
ABBREVIATIONS
LEGEND NOTES
EXIT
NOTE 4
NOTE 1
NOTE 2
SINK OR
BASIN
CEILING
FINISHED
FLOOR
1.
2.
3.
4.
5.
6.
7.
8.
COORDINATE ABOVE COUNTER DEVICES AND RECEPTACLES WITH CASEWORK OR COUNTERS SUCH THAT THE DEVICES AND RECEPTACLES ARE LOCATED AT +42" AFF OR 6" ABOVE THE COUNTERTOP OR BACKSPLASH, WHICHEVER IS HIGHER.
ALL RECEPTACLES INSTALLED WITHIN 6'-0" OF ANY SINK OF BASIN SHALL HAVE GFI PROTECTION. DO NOT INSTALL
RECEPTACLES WITHIN 12" OF THE EDGE OF A SINK OR BASIN.
COORDINATE WITH THE COMMUNICATIONS DRAWINGS TO ENSURE THAT A DUPLEX RECEPTACLE IS INSTALLED WITHIN 16"
HORIZONTAL TO ALL SIGNAL AND DATA DEVICE LOCATIONS, UON.
SWITCHES AND OTHER FLUSH WALL-MOUNTED DEVICES SHALL BE MOUNTED WITHIN 16" OF DOORFRAME. COORDINATE WITH ARCHITECTURAL DRAWINGS FOR DOORS WITH ADJACENT SIDELIGHTS. WHERE DEVICES ARE SHOWN ADJACENT TO THE DOOR ON THE HINGE-SIDE OF THE DOOR, AND THE DOOR SWINGS IN A MANNER THAT SHALL BLOCK THE DEVICE, MOUNT THE DEVICE 12" BEYOND THE DOOR SWING. COORDINATE ROUGH-IN LOCATIONS WITH DIV. 27 AND 28 DEVICES AS WELL. COORDINATE MOUNTING LOCATION WITH OTHER TRADES TO ENSURE A UNIFORM MOUNTING AND AESTHETICALLY-PLEASING APPEARANCE.
MOUNTING HEIGHT INDICATED IN LEGEND AND ON THE DRAWINGS SHALL BE THE DISTANCE MEASURED FROM THE CENTER OF
THE DEVICE TO THE FINISHED FLOOR, UON.
COORDINATE FINAL HEIGHT AND LOCATION FOR ALL DEVICE RECEPTACLES WITH ARCHITECTURAL/INTERIORS PLANS.
COORDINATE FINAL RECEPTACLE HEIGHT AND LOCATION WITH MANUFACTURER REQUIREMENTS.
EXIT SIGNS LOCATED ABOVE DOORS SHALL BE CENTERED BETWEEN TOP OF DOOR FRAME AND FINISHED CEILING. IN NO CASE SHALL THE CENTER OF THE EXIT SIGN BE MORE THAN 6'-8" ABOVE THE EGRESS OPENING. WHERE EXIT SIGNS ARE INSTALLED IN ROOMS WITH NO CEILING, MOUNT EXIT SIGN (TO CENTER) 1'-0" ABOVE TOP OF DOOR FRAME.
NOTE 3
16"
S
TYPICAL DEVICE MVMOUNTING DETAIL AND NOTES
NOTE 5
J
.E Q
U
O N
SYMBOLS - SITE
UNDERGROUND PRIMARY ELECTRICAL POWER DUCTBANK
UNDERGROUND ELECTRICAL
UNDERGROUND TELECOMMUNICATIONS DUCTBANK
UNDERGROUND TELECOMMUNICATIONS
UNDERGROUND ACCESS CONTROL SYSTEM CONDUIT
FIXTURE TYPE
POLE-MOUNTED LIGHTING FIXTURE
EU
E
COMM
C
ACS
X
MH MANHOLE
MANHOLE IDENTIFIER
MH-X
T PAD-MOUNT ELECTRIC UTILITY TRANSFORMER
T
E Q
U
O N
NOTE 8
J
S
ME
PEDESTRIAN POLE LIGHTING FIXTURE
FIXTURE TYPE
XXX AT
XXX AF
X
HH HANDHOLE
E
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o n e
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 4
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-001
ELECTRICAL
SYMBOLS
LEGEND
18-0061
02-25-2021
K. HIATT
B. PINKLEY
ABBR DESCRIPTION
A AMPERES
AC ALTERNATING CURRENT
ACS ACCESS CONTROL SYSTEM
AF AMP FRAME
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AIC AMPERES INTERRUPTING CAPACITY
AMP AMPACITY
AT AMP TRIP
AV AUDIO/VIDEO
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
C CONDUIT
CAT CATEGORY
CATV CABLE TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
CL CENTERLINE
COMM COMMUNICATIONS
COR CONTRACTING OFFICER'S REPRESENTATIVE
CT CABLE TRAY
DC DIRECT CURRENT
DDC DIRECT DIGITAL CONTROLS
EF EXHAUST FAN
EGB ELECTRICAL GROUND BUSBAR
EGC EQUIPMENT GROUNDING CONDUCTOR
EIA ELECTRONICS INDUSTRIES ASSOCIATIONS
EM/NL EMERGENCY / NIGHT LIGHT
EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM
EMT ELECTRICAL METALLIC TUBING
EPC EMERGENCY POWER CONTROL RELAY
EPO EMERGENCY POWER OFF
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FBO FURNISHED BY OTHERS
FO FIBER OPTIC
FPP FIBER OPTIC PATCH PANEL
FSCP FIRE SYSTEM CONTROL PANEL
FT FEET OR FOOT
FTR FIRE ALARM TRANSMITTER/TRANSCEIVER
G OR GND GROUND
GFE GOVERNMENT FURNISHED EQUIPMENT
GFGI GOVERNMENT FURNISHED AND INSTALLED
GFI GROUND FAULT INTERRUPTER
GFP GROUND FAULT PROTECTION
GFR GROUND FAULT RELAY
GRS GALVANIZED RIGID STEEL CONDUIT
HOA HAND-OFF-AUTO SWITCH
HZ HERTZ
I.E. FOR EXAMPLE
IDS INTRUSION DETECTION SYSTEM
IG ISOLATED GROUND
IT INFORMATION TECHNOLOGY
K KILO
KCMIL THOUSAND CIRCULAR MILS
KV KILOVOLT
KVA KILOVOLT AMPERES
KWH KILOWATT HOURS
LPI LIGHTNING PROTECTION INSTALLER
LPS LIGHTNING PROTECTION SYSTEM
LSIG LONG, SHORT, INSTANTANEOUS, GROUND FAULT
LW LOCKABLE WIREWAY
MAX MAXIMUM
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MGB MAIN GROUND BUSBAR
MH MAINTENANCE HOLE
MLO MAIN LUGS ONLY
MM MULTIMODE
MN/PA MASS NOTIFICATION/PUBLIC ADDRESS
N NEUTRAL CONDUCTOR
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
NAC NOTIFICATION APPLIANCE CIRCUIT BOOSTER POWER SUPPLY
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NTS NOT TO SCALE
OCC OCCUPANCY SENSOR
PIR PASSIVE INFRARED
PIV POST INDICATOR VALVE
PROJ PROJECTOR
PVC POLYVINYL CHLORIDE
RCP REFLECTED CEILING PLAN
RGS RIGID GALVANIZED STEEL CONDUIT
RMC RIGID METAL CONDUIT
SCCR SHORT CIRCUIT CURRENT RATING
SPD SURGE PROTECTIVE DEVICE
SPECS CONTRACT SPECIFICATIONS
SRG STATIC REFERENCE GRID
STR STRAND
SWBD SWITCHBOARD
TBB TELECOMMUNICATIONS BONDING BACKBONE
TGB TELECOMMUNICATIONS GROUND BUSBAR
TMGB TELECOMMUNICATIONS MAIN GROUND BUSBAR
TR TELECOMMUNICATIONS ROOM
TYP TYPICAL
UL UNDERWRITERS' LABORATORIES
UON UNLESS OTHERWISE NOTED
UTP UNSHIELDED TWISTED PAIR
V VOLTS
VA VOLT AMPERES
VFC -or- VFD VARIABLE FREQUENCY CONVERTER -or- VARIABLE FREQUENCY DRIVE
VGA VIDEO GRAPHICS ARRAY
W WIRE OR WATT
WM WIRE MANAGEMENT
WP WEATHERPROOF
WPIU WEATHERPROOF WHILE IN USE, INCLUDES GFI PROTECTION
XFMR TRANSFORMER
Z IMPEDANCE
Revisions
ID Date Description
(TYP OF 2)
(TYP)
E-504
E-504
E-504
E-504
E-504
(TYP OF 2)
(TYP)
(TYP)
ELEC
IT
1. ELECTRICAL DISTRIBUTION GROUNDING SHALL COMPLY WITH NEC ARTICLE 250.
2. TELECOMMUNICATIONS GROUNDING SHALL COMPLY WITH NEC ARTICLE 800 AND
TIA-607-D, AND UFC 3-580-01.
3. ALL LIGHTNING PROTECTION SHALL COMPLY WITH THE NEC, NFPA 780 AND UL 96. SEE
SHEET E-005 FOR ASSOCIATED WORK REGARDING LIGHTNING PROTECTION SYSTEM
INSTALLATION.
4. THE PLANS AND DETAILS SHOWN WITHIN THIS DRAWING PACKAGE DO NOT PRECLUDE
THE REQUIREMENTS OF NEC ARTICLE 250, ARTICLE 800 OR NFPA 780.
5. PROVIDE A GREEN CONTINUOUS INSULATED EQUIPMENT GROUNDING CONDUCTOR TO
ALL ELECTRICAL, TELECOMMUNICATIONS AND SECURITY EQUIPMENT SIZED PER NEC
ARTICLE 250.
6. CONNECTION SHALL BE MADE WITH GROUND CLAMP WITHIN 5 FEET OF WATER PIPE
ENTRANCE INTO BUILDING AND AHEAD OF ANY VALVE, CONNECTOR, OR METERING
DEVICE. METAL UNDERGROUND WATER PIPE SHALL PROVIDE AT LEAST 10 FEET OF
ELECTRICAL CONTINUITY. PROVIDE BONDING JUMPERS AROUND INSULATING JOINTS,
FILTERING DEVICES AND METERING EQUIPMENT.
7. SEE SITE PLANS FOR GENERATOR AND PAD-MOUNT TRANSFORMER GROUNDING DETAIL
INFORMATION.
8. SEE SHEET E-641 FOR GROUNDING SCHEMATICS.
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F'
'D'
'B'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 4
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-002
GROUNDING
PLAN - LOWER
LEVEL - OVERALL
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1" = 20'-0"
GROUNDING PLAN - LOWER LEVEL - OVERALL
EGB
SBB
SEE SHEET E-003 FOR CONTINUATION OF GROUNDING COUNTERPOISE.
EGB
KEYED NOTES:
NOTES:
SBB
0 20'10' 40'
UTILITY
TRANSFORMER
E-504
(TYP)
E-504
E-504
IT
157C
IT
IT
ELEC
MECH
ELEC
ELEC
157D
1. ELECTRICAL DISTRIBUTION GROUNDING SHALL COMPLY WITH NEC ARTICLE 250.
2. TELECOMMUNICATIONS GROUNDING SHALL COMPLY WITH NEC ARTICLE 800 AND
TIA-607-D, AND UFC 3-580-01.
3. ALL LIGHTNING PROTECTION SHALL COMPLY WITH THE NEC, NFPA 780 AND UL 96. SEE
SHEET E-005 FOR ASSOCIATED WORK REGARDING LIGHTNING PROTECTION SYSTEM
INSTALLATION.
4. THE PLANS AND DETAILS SHOWN WITHIN THIS DRAWING PACKAGE DO NOT PRECLUDE
THE REQUIREMENTS OF NEC ARTICLE 250, ARTICLE 800 OR NFPA 780.
5. PROVIDE A GREEN CONTINUOUS INSULATED EQUIPMENT GROUNDING CONDUCTOR TO
ALL ELECTRICAL, TELECOMMUNICATIONS AND SECURITY EQUIPMENT SIZED PER NEC
ARTICLE 250.
6. CONNECTION SHALL BE MADE WITH GROUND CLAMP WITHIN 5 FEET OF WATER PIPE
ENTRANCE INTO BUILDING AND AHEAD OF ANY VALVE, CONNECTOR, OR METERING
DEVICE. METAL UNDERGROUND WATER PIPE SHALL PROVIDE AT LEAST 10 FEET OF
ELECTRICAL CONTINUITY. PROVIDE BONDING JUMPERS AROUND INSULATING JOINTS,
FILTERING DEVICES AND METERING EQUIPMENT.
7. SEE SITE PLANS FOR GENERATOR AND PAD-MOUNT TRANSFORMER GROUNDING DETAIL
INFORMATION.
8. SEE SHEET E-641 FOR GROUNDING SCHEMATICS.
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 4
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-003
GROUNDING
PLAN - MAIN
LEVEL - OVERALL
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1" = 20'-0"
GROUNDING PLAN - MAIN LEVEL - OVERALL
SEE SHEET E-002 FOR CONTINUATION OF GROUNDING COUNTERPOISE.
ROUTE TO EGB IN ELECTRICAL ROOM 14.
ROUTE TBB CONDUCTOR IN UNDERGROUND DUCTBANK.
PROVIDE CONNECTION TO FLAG POLE.
MGB
PBB
SBBEGB
EGB
SBB
EGB
NOTES:
KEYED NOTES:
0 20'10' 40'
E-502
E-502
H1A1
E-502
E-502
E-502
E-502 2
E-502
E-502
E-502
E-502
E-502
E-502
E-502
E-502
E-502
MECH
IT
ELEC
107A
1. SEE E-000 SERIES SHEETS FOR GROUND COUNTERPOISE INFORMATION.
2. CONTRACTOR SHALL VERIFY ALL EQUIPMENT STUB-UP LOCATIONS PRIOR TO
CONDUIT PLACEMENT.
3. COORDINATE ALL UNDERGROUND DUCTBANKS AND/OR CONDUITS WITH CIVIL AND
STRUCTURAL DRAWINGS AND OTHER UTILITIES.
4. SEE CORRESPONDING "AREA" PLAN ON E-101-XX SERIES SHEETS FOR LOCATION OF
EQUIPMENT ("UTILITY TRANSFORMER", "SWGR1", ETC.) REFERENCED ON THIS
SHEET.
5. A MINIMUM OF 2'-0" SEPARATION SHALL BE MAINTAINED BETWEEN ALL HORIZONTAL
SECTIONS OF POWER DUCTBANKS.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 4
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-0
ELECTRICAL &
TELECOMM
BELOW GRADE
PATHWAYS
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1/16" = 1'-0"
ELECTRICAL & TELECOMM BELOW GRADE PATHWAYS
STUB DUCTBANK 5'-0" BEYOND EDGE OF GRADE BEAM. STUB AND CAP
CONDUITS 1'-0" BEYOND EDGE OF DUCTBANK. CAST ALUMINUM
"ELECTRICAL" UTILITY MARKER INTO CONCRETE AT FINISHED GRADE.
MARKER SHALL INDICATE "ELECTRICAL DUCTBANK X'-X" BELOW FINISHED
GRADE." ACTUAL DIMENSION SHALL BE INDICATED IN LIEU OF "X'-X" ".
SEE ES100 SERIES SHEETS FOR DUCTBANK CONTINUATION.
COORDINATE STUB-UPS INTO PAD-MOUNT TRANSFORMER WITH DETAILS
SHOWN ON SHEET E-503 AND ELECTRIC UTILITY COMPANY PRIOR TO
COMMENCING INSTALLATION.
SEE DETAIL 5 ON SHEET E-502 FOR DUCTBANK DETAILS.
KEYED NOTES
0 8' 16' 32'
3U T
IL
IT
Y T
R A
N S
F O
R M
E R
P E
S W
G R
1 4
M
M
M
M
M
M
M
E
E
M
M
M
M
J
J
J
J
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,
AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.
3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS
OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION
IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE
EXACT CONNECTION LOCATION.
NOTES:
E-401
L0B1-1,3,5
SF12
L0B1-1,3,5
SF12
OH-37.5
H0B1-7,9,11
OH-37.7
H0B1-7,9,11
OH-37.9
H0B1-7,9,11
OH-37.9
H0B1-7,9,11
OH-37.4
H0B1-1,3,5
OH-37.3
H0B1-1,3,5
OH-37.2
H0B1-1,3,5
OH-37.1
H0B1-1,3,5
L0B1-7,9,11
SF8
L0B1-7,9,11
SF4
L0B1-7,9,11
SF8
L0B1-19
L0B1-29
L0B1-19
L0B1-25
AC
AC
L0B1-33
L0B1-27
L0B1-19
L0B1-17
L0B1-12
FB6
GFI
L0B1-12
FB6
L0B1-14
AC,GFI
L0B1-14
AC,GFI
N
L0B1-37
GFI
WPIU
L0B2-30
GFI
+48" AFF
L0B2-30
GFI
WPIU
L0B2-30
GFI
+48" AFF
L0B2-24
GFI
+48" AFF
L0B2-39
GFI, +48" AFF
C-24 SVY-1
L0B2-30
GFI
WPIU
L0B2-24
GFI
WPIU
L0B2-32
GFI
WPIU
L0B2-32
GFI
WPIU
L0B2-34
GFI
WPIU
L0B2-14
GFI,+48" AFF
L0B2-8
GFI,+48" AFF
L0B2-26
GFI,+48" AFF
L0B2-16
GFI,+48" AFF
L0B2-32
GFI
+48" AFF
L0B2-28
GFI,+48" AFF
L0B2-41
GFI, +48" AFF
C-25 SVY-2
L0B2-35
GFI, +48" AFF
C-11 MRV VEHICLE
L0B3-3
GFI
+48" AFF
L0B2-29
GFI, +48" AFF
C-2 ADVON VEHICLE
L0B2-34
GFI
WPIU
L0B2-36
GFI
WPIU
L0B3-3
GFI
WPIU
L0B3-3
GFI
WPIU
L0B2-21,23
L14-30R, +36" AFF
C-7 DRYER
L0B2-27
GFI, +36" AFF
C-6 WASHER
L0B1-15
L0B1-1,3,5
SF12
L0B1-25
L0B1-31
L0B1-17
L0B1-27
L0B2-33
GFI, +48" AFF
C-8 ICE MACHINE
C-12 L0B2-17,19
ALS VEHICLE
L0B2-31
GFI, +48" AFF
C-13 REFRIGERATOR
C-26
T-COMPRESSOR-1
COMPRESSOR
L0B2-37
GFI,+48" AFF
L0B2-37
GFI,+48" AFF
L0B2-37
GFI,+48" AFF
L0B2-37
GFI,+48" AFF
L0B2-37
GFI,+48" AFF
L0B2-8
GFI,+48" AFF
L0B2-20
GFI,+48" AFF
L0B2-20
GFI,+48" AFF
L0B2-20
GFI,+48" AFF
L0B2-26
GFI,+48" AFF
L0B2-26
GFI,+48" AFF
L0B2-26
GFI,+48" AFF
L0B2-12
GFI,+48" AFF
L0B2-12
GFI,+48" AFF
L0B2-12
GFI,+48" AFF
L0B2-12
GFI,+48" AFF
L0B2-12
GFI,+48" AFF
L0B2-10
GFI,+48" AFF
L0B2-10
GFI,+48" AFF
L0B2-10
GFI,+48" AFF
L0B2-10
GFI,+48" AFF
L0B2-10
GFI,+48" AFF
L0B2-28
GFI,+48" AFF
L0B2-28
GFI,+48" AFF
L0B2-28
GFI,+48" AFF
L0B2-22
GFI,+48" AFF
L0B2-22
GFI,+48" AFF
L0B2-22
GFI,+48" AFF
L0B2-14
GFI,+48" AFF
L0B2-14
GFI,+48" AFF
L0B2-14
GFI,+48" AFF
L0B2-14
GFI,+48" AFF
L0B2-16
GFI,+48" AFF
L0B2-16
GFI,+48" AFF
L0B2-16
GFI,+48" AFF
L0B2-16
GFI,+48" AFF
L0B2-18
GFI,+48" AFF
L0B2-18
GFI,+48" AFF
L0B2-18
GFI,+48" AFF
L0B2-18
GFI,+48" AFF
L0B2-18
GFI,+48" AFF
L B
-2
G
F I
A F
F
L0B2-24
GFI
WPIU
L0B2-34
GFI
+48" AFF
L0B2-36
GFI
WPIU
L0B2-36
GFI
+48" AFF
L0B2-30
GFI
+48" AFF
L0B3-3
GFI
+48" AFF
L0B2-13
GFI, WPIU
C-2 ADVON VEHICLE
L0B2-1,3
NEMA 14-50R,WPIU, +48" AFF
C-1 UCS VEHICLE
EF-106
M0B1-13,15,17
AC
AC
L B
-1
,3 N
E M
A
-5
R
A F
F C
-1 U
C S
V E
H
IC
L E
L0B2-7,9
NEMA 14-50R, +48" AFF
C-24 TOC TRAILER
P0B1-9
EWC-1
L0B1-35
AC
AC
AC
AC
L
M
N.5
P
Q
9.7
DSCU-104
P0B1-1,3
T-COMPRESSOR
CST COMMO
OFFICE
28B
OFFICE
28C
OFFICE
28A
OFFICE
36A
CST READY BAYS
TOILET
TOILET
CONF
CST OPERATIONS
CST MED STOR
36B
MECH
IT
ELEC
CUST
CST SURVEY
CST MED SUPPORT
OFFICE
29B
OFFICE
29A
CST COMMAND
TRAINING AID STORAGE
29C
HALL
39CORRIDOR
7B
10.5
129.8 10.6 10.8 11.6
L0B1-21
L0B1-15
L0B1-21
L0B1-21 L0B1-21
L0B1-25 25
L0B1-29 L0B1-35
L0B1-37
L0B1-37
L0B1-37
L0B1-37
L0B1-37 L0B1-41
L0B1-41
L0B1-41
L0B1-8
L0B1-14
EF-105
P0B1-5
L0B1-20
FPVAV-101-03
P0B1-15
HALL
P0B1-17
EEWS -101
P0B1-17
EEWS -101
P0B1-17
EEWS -101
P0B1-17
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F'
'D'
'B'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 5
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-1B
POWER PLAN -
LOWER LEVEL -
AREA B
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1/8" = 1'-0"
POWER PLAN - LOWER LEVEL - AREA B
MATCHLINE SEE SEET E-101-1D FOR CONTINUATION
0 4' 8' 16'
TRANSFORMER "T-COMPRESSOR" SHALL BE TAPPED DOWN SUCH THAT SECONDARY
TRANSFORMER VOLTAGE IS EQUAL TO 230V, THREE-PHASE.
KEYED NOTES:
M
M
J J
E
E
J
M
M
M M
M
J
M
MM
M
M
M
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,
AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.
3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS
OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION
IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE
EXACT CONNECTION LOCATION.
NOTES:
E-401
AC
AC
L0D1-15
AC
L0D1-15
AC
UH-101
P0D1-29
AHU-101
M0D1-1,3,5
OH-18.3
H0D1-7,9,11
C
D.9
E
F
G
H
J
D S
C U
-1
P D
-1
,1
ELEVATOR CAB LIGHTS
L0D1-3
P0D1-2
SUMP PUMP
60" AFF
L0D1-1
+36" AFF, GFI, WPIU
NEMA 4 ENC
L0D1-1
+36" AFF, GFI, WPIU
NEMA 4 ENC
L0D1-1
+36" AFF, GFI, WPIU
NEMA 4 ENC
L0D1-21
GFI
WPIU
AC
EF-101
P0D1-4
EF-102
P0D1-25
EF-103
P0D1-27
D S
C U
-1
P D
-1
,1
UH-104
P0D1-31
P0D1-37
DDC PANEL MECH 09
L0D1-21
GFI
48" AFF
L0D1-21
GFI
48" AFF
L0D1-21
GFI
48" AFF
C.5
L
G.5
F.3
KJ.9
EF-104
M0D1-7,9,11
CP-DSFCU-103
P0D1-39
DSFCU-103
P1D1-2,4
ELEVATOR
H0D1-1,3,5
CORR
CST STORAGE
CST LOG / ADMIN
08A
RECEIVING
MECH
ELEC
F L A
M M
A B
L E
S T
O R
A G
E
B.1
H.9
K.5
9.8 10.6 10.8 11.6
P0D1-35
GFI
48" AFF
AC
L0D1-13
L0D1-9
L0D1-9
L0D1-9
+48" AFF
L0D1-9
+48" AFF
L0D1-9
L0D1-9
+48" AFF
L0D1-11
+48" AFF
L0D1-11
+48" AFF
L0D1-11
+48" AFF
L0D1-11
+48" AFF
L0D1-11
L0D1-17
L0D1-17
L0D1-17
+48" AFF
L0D1-17
+48" AFF
ELEV EQUIP
S T
A
IR
IT
GROUNDS & MAINTENANCE
L0B1-10 L0B1-10 L0B1-10
TV3
L0B1-10
UH-102
P0D1-29
UH-103
P0D1-31
L0D1-17
GFI
WPIU
L0D1-25
GFI
48" AFF
L0D1-25
GFI
48" AFF
L0D1-25
GFI
48" AFF
L0D1-23
GFI
48" AFF
L0D1-23
GFI
48" AFF
L0D1-19
AUTO DOOR OPENER
L0D1-23
48" AFF
SF-101
P0D1-33
L0D1-17
L0D1-29
GFI
WPIU
L0D1-29
GFI
WPIU
L0D1-29
GFI
WPIU
FPE0D1-3
AMP
FPE0D1-1
NAC
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F'
'D'
'B'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 5
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-1D
POWER PLAN -
LOWER LEVEL -
AREA D
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1/8" = 1'-0"
POWER PLAN - LOWER LEVEL - AREA D
MATCHLINE SEE E-902 FOR CONTINUATION
MATCHLINE SEE E-101-1B FOR CONTINUATION
0 4' 8' 16'
PROVIDE ELEVATOR SERVICE PIT RECEPTACLE(S) AND ELEVATOR PIT LIGHT. CONNECT
TO JUNCTION BOX AND CIRCUIT INDICATED. SERVICE RECEPTACLES AND SERVICE
LIGHT SHALL BE INSTALLED IN ACCORDANCE WITH ASME-A17.1.
PROVIDE INDICATOR LIGHT WITH RECEPTACLE TO INDICATE CIRCUIT IS ENERGIZED.
INDICATOR LIGHT MAY BE INTEGRAL TO THE RECEPTACLE.
FOR ALL ELEVATOR EQUIPMENT LOCATED WITHIN ELEVATOR EQUIPMENT ROOM,
CONTRACTOR SHALL BE RESPONSIBLE FOR EXTENDING FEEDER CONDUCTORS FROM
CONNECTION LOCATION INDICATED ON THIS SHEET TO DEVICES WITHIN ELEVATOR PIT
AND SHAFT. COORDINATE ALL ELECTRICAL REQUIREMENTS OF ALL DEVICES WITHIN
ELEVATOR PIT AND SHAFT REQUIRING POWER WITH ELEVATOR SHOP DRAWINGS.
COORDINATE DOOR HARDWARE POWER REQUIREMENTS PRIOR TO COMMENCING
INSTALLATION.
COORDINATE FINAL LOCATION OF ELECTRICAL CONNECTION WITH FIRE ALARM
EQUIPMENT TO BE INSTALLED.
KEYED NOTES:
J J J J J J J J J
M
M
J
M
J J
E
JJ
M
M
M
E-402
T
L1A1-3
GFI
WPIU
L1A2-11
FB2
L1A2-16
GFI
WPIU
L1A2-12
GFI
L1A2-19
FB1
L1A2-21
FB1
L1A2-25
FB1
L1A2-29
FB1
L1A2-33
FB1
L1A2-37
FB1
L1A2-41
FB1
L1A2-19
FB1
L1A2-23
FB1
L1A2-27
FB1
L1A2-31
FB1
L1A2-35
FB1
L1A2-39
FB1
L1A2-10
FB1
L1A2-27
FB1
L1A2-31
FB1
L1A2-35
FB1
L1A2-39
FB1
L1A2-8
FB1
L1A1-11
L1A2-14
L1A2-14
L1A1-1
FB0
L1A1-3
L1A1-1
L1A1-1
L1A1-1
L1A1-11
L1A1-11
L1A1-11
L1A2-16
L1A1-13
GFI
WPIU
L1A1-13
+7" AFF, GFI
WPIU
L1A1-7
L1A1-13
AC,GFI
654321
N
E-406
E-406
L1A2-1
L1A2-9
UH-203
P1A1-1,3
L1A1-7
L1A1-13
GFI
WPIU
L1A1-17
L1A1-39
TV1
L1A1-19
L1A1-21
L1A1-25
L1A1-7
L1A1-39
L1A1-35
TREADMILL
L1A1-33
TREADMILL
L1A1-31
L1A1-29
L1A1-39
TV1
L1A1-27
L1C1-3
7.6
3.5
4.8
5.9
E-407
E-407
CHAIR LIFT
L1A2-40,42
L1A1-3
L1A1-3
L1A1-3
L1A1-11
P1A1-15
L1A1-7
L1A1-37
TREADMILL
L1A1-15
L1C1-3
L1A1-3
L1A2-12
GFI
WPIU
L1A2-12
L1A2-12
GFI
L1A2-18
L1A2-22 L1A2-20
L1A2-18
L1A2-13
FB1
L1A2-13
FB1
L1A2-13
FB1
L1A2-15
FB1
L1A2-15
FB1
L1A2-15
FB1
L1A2-17
FB1
L1A2-17
FB1
L1A2-23
FB1
L1A2-21
FB1
L1A2-25
FB1
L1A2-29
FB1
L1A2-16
L1A2-33
FB1
L1A2-37
FB1
L1A2-41
FB1
L1A1-5 L1A1-5
L1A1-23
L1A2-11
FB2
L1A2-11
FB2
L1A2-8
FB1
L1C1-13
TV3
L1A2-16
GFI
WPIU
L1A2-16
GFI
WPIU
L1A2-12
GFI
WPIU
6.7
5.1
L
M
N.5
P
Q
E-404
LIFT EQUIP
105C
ANTE
105B
ANTE
105A
VEST
PLUMBING CHASE
111C
WOMEN
WOMEN LOCKERS
108A
WOMEN SHOWERS
108B
ALCOVE
101D
PHYSICAL FITNESS
DISPLAY
101A
CORR
101C
MECH
IT
CLASSROOM/ LECTURE
LOBBY / MAIN HALL
AV
105D
R
3.6 5.4
L1A2-3
TV2 L1A2-3
TV2
L1A2-3
TV2
L1A2-3
TV2
L1A2-3
TV2
L1A2-3
TV2
DF-206
P1A1-21
DF-207
P1A1-21
DF-208
P1A1-21
DF-209
P1A1-21
L1A1-13
AC,GFI
ALCOVE
101B
L1C1-13 L1C1-1 L1D4-27
L1C1-9
GENERATOR
REMOTE
ANNUNCIATOR
F P
E C
-1
F A
A
L C
-1
L1C1-9
GFI
WPIU
FPVAV-208-01
P1A1-29
FPVAV-208-03
P1A1-31
ELEC
107A
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,
AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.
3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS
OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION
IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE
EXACT CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 5
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-2A
POWER PLAN -
MAIN LEVEL -
AREA A
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1/8" = 1'-0"
POWER PLAN - MAIN LEVEL - AREA A
MATCHLINE SEE E-101-2C FOR CONTINUATION
M A
T C
H L
IN
E S
E E
E -1
-2
B F
O R
C O
N T
IN
U
A T
IO
N
OPTION 2: PROVIDE GENERATOR REMOTE ANNUNCIATOR IN THIS LOCATION.
PROVIDE 2" CONDUIT FROM GENERATOR REMOTE ANNUNCIATOR LOCATION TO MAIN
ELECTRICAL ROOM 157D.
LOBBY / MAIN HALL 101 IS A MULTIPLE STORY SPACE. ELECTRICAL MATERIALS INCLUDING,
BUT NOT LIMITED TO, PATHWAYS, CONDUCTORS, WIRES, SUPPORTS, AND/OR
ACCESSORIES SHALL NOT TRANSVERSE OR BE VISIBLE WITHIN THIS SPACE. ANY
EXPOSED/VISIBLE ELECTRICAL MATERIALS WITHIN LOBBY / MAIN HALL 101, OTHER THAN
WHAT IS SHOWN ON THESE DRAWINGS, SHALL BE APPROVED IN WRITING BY THE
CONTRACTING OFFICER PRIOR TO COMMENCING INSTALLATION.
COORDINATE DOOR HADRWARE POWER REQUIREMENTS PRIOR TO COMMENCING
INSTALLATION.
PROVIDE ELECTRONIC FLUSH TRANSFORMER & POWER SUPPLY. PROVIDE CONDUIT,
BOXES, AND WIRING FOR ALL ELECTRONIC FLUSH DEVICES. INSTALL PER
MANUFACTURER RECOMMENDATIONS. COORDINATE WITH FIXTURE INSTALLER FOR
JUNCTION BOX HEIGHTS AND CONNECTIONS. MOUNT TRANSFORMER & POWER SUPPLY
ABOVE CEILING. PROVIDE LOCKABLE ACCESS PANEL SIZED AS REQUIRED INSTALLED
FLUSH WITH CEILING.
KEYED NOTES
OPEN TO ABOVE
0 4' 8' 16'
J J J J J
J J J J J J J J
M
M
T
S
111098
N
L1A1-41
GFI
WPIU
L1A1-41
GFI
WPIU
L1A3-9
GFI
WPIU
L1A3-9
GFI
WPIU
L1A1-41
GFI
WPIU
P1A1-17
L0B1-16
GFI
WPIU
L0B1-16
GFI
WPIU
L1A3-9
L1A3-11
L1A3-11 L1A3-11
L1A3-9
L1A3-9
L1A3-9
L1A3-21
L1A3-19
L1A3-21
L1A3-15
L1A3-19
L1A3-15 L1A3-15
L1A3-15
L1A3-17
L1A3-17
L1A3-17
L1A3-19
TV3
L1A3-15
TV3
L A
-2
T
V
L1A3-9
L A
-9
L1A3-11
TV3
L1A3-13
AC
L1A3-13
AC
L1A3-13
AC
L1A3-13
AC
L1A3-1
FB2
L1A3-1
FB2
L1A3-3
FB2
L1A3-3
FB2
L1A3-5
FB2
L1A3-5
FB2
L1A3-7
FB2
L1A3-7
FB2
L1A3-13
L1A3-13
L1A3-19
L1A3-19
L1A1-4
L1A1-4
8.7
L
M
P
Q
9.7
8.6
PLUMBING CHASE
109C
MEN LOCKERS
110A
MEDICAL
MEN
CLASSROOM
CLASSROOM
TRAINING
CORR
101E
MEN SHOWERS
110B
7.7
10.5
129.8
P1A1-19
GFI
EWC-1
DF-210
P1A1-25
DF-211
P1A1-25
DF-212
P1A1-25
L1A1-41
AC,GFI
L1A1-41
AC,GFI
L1A1-4
L1A3-23 L1A3-23
L1A3-23
L1A3-25
L1A3-25 L1A3-25
L1A3-23
L1A3-17
L1A3-21
L1D4-27 L1D4-27 L1D4-27 L1D4-27
L1A1-4
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,
AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.
3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS
OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION
IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE
EXACT CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 0
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-2B
POWER PLAN -
MAIN LEVEL -
AREA B
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1/8" = 1'-0"
POWER PLAN - MAIN LEVEL - AREA B
M A
T C
H L
IN
E S
E E
E -1
-2
A F
O R
C O
N T
IN
U
A T
IO
N
MATCHLINE SEE E-101-2D FOR CONTINUATION
KEYED NOTES
PROVIDE ELECTRONIC FLUSH TRANSFORMER & POWER SUPPLY. PROVIDE CONDUIT,
BOXES, AND WIRING FOR ALL ELECTRONIC FLUSH DEVICES. INSTALL PER
MANUFACTURER RECOMMENDATIONS. COORDINATE WITH FIXTURE INSTALLER FOR
JUNCTION BOX HEIGHTS AND CONNECTIONS. MOUNT TRANSFORMER & POWER SUPPLY
ABOVE CEILING. PROVIDE LOCKABLE ACCESS PANEL SIZED AS REQUIRED INSTALLED
FLUSH WITH CEILING.
LOBBY / MAIN HALL 101 IS A MULTIPLE STORY SPACE. ELECTRICAL MATERIALS
INCLUDING, BUT NOT LIMITED TO, PATHWAYS, CONDUCTORS, WIRES, SUPPORTS,
AND/OR ACCESSORIES SHALL NOT TRANSVERSE OR BE VISIBLE WITHIN THIS SPACE.
ANY EXPOSED/VISIBLE ELECTRICAL MATERIALS WITHIN LOBBY / MAIN HALL 101, OTHER
THAN WHAT IS SHOWN ON THESE DRAWINGS, SHALL BE APPROVED IN WRITING BY THE
CONTRACTING OFFICER PRIOR TO COMMENCING INSTALLATION.
OPEN TO
ABOVE
WORKBAY ROOF
0 4' 8' 16'
J J
M
J
M
M
M
M
M
M M
MM
M
M
J
J
M
E-402
E-402
E-403
L1C1-9
GFI
WPIU
8654321
E-407
E-407
FPE1C1-1
FAA
E-405
L1C1-3 L1C1-3 L1C1-1 L1C1-1 L1C1-1
L1C1-15
L1C1-11
L1C1-9
L1C1-9
15 15 15
L1C1-11
L1C1-7
L1C1-7
GFI
L1C1-5
L1C1-21
GFI
WPIU
L1C1-27
L1C1-27
L1C1-5
L1C1-5
L1C1-27 L1C1-27
L1C1-27
L1C1-27
L1D1-17 L1D1-17
L1C1-17
3'-8" AFF
L1C1-17
3'-8" AFF
L1C1-17
3'-8" AFF L1C1-17
L1C1-23
L1C1-29
3'-8" AFF
L1C1-29
3'-8" AFF
L1C1-33
L1C1-29
3'-8" AFF
L1C1-31
L1C1-31
L1C1-37
L1C1-37
3'-8" AFF
L1C1-33
L1C1-37
3'-8" AFF L1C1-35
L1C1-35
L1D1-17
AC,GFI
L1D1-17
L C
-3
L C
-3
A F
F
L1C1-39
L1C1-23
L1D1-27
L1D1-25
C
E
F
G
H
J
7.64.8
L C
-3
A F
F
L1C1-37
3'-8" AFFL1C1-29
L1E1-3
+48" AFF
L1D1-25
+48" AFF
L1D1-27
L1D1-27
+48" AFF
L1D1-29
+48" AFF
L1D1-25
+48" AFF
L1D1-29
+48" AFF
L1D1-17
L1D1-9
L1D1-9
L1D1-9
L1D1-9
L1D1-17
L1C1-7
GFI
REF
L1C1-11
L1D1-7
TV3
L1D1-9
L1C1-21
GFI
WPIU
L1C1-41
GFI
WPIU
L1E1-3
+48" AFF
L1C1-33
L1C1-33
L1D1-37
ESS MAINT
RECEPT
L1D1-35
ESS PANEL(S)
L1C1-41
GFI
WPIU
EF-214
P1D1-5
L1D1-11
L1D1-11
L1D1-15
L1D1-15
GENERATOR
REMOTE
ANNUNCIATOR
L D
-3
L1C1-13
TV3
C.5
L
G.5
K J.9
P1D1-7
GFI
EWC-1
EF-213
P1D1-37
VAULT
153A
LACTATION
ELEC
PANTRY / OFFICE
160D
TOILET
160B
CUST
160C
SCULLERY
160A
RECRUITING
FAMILY READINESS
CORR
157B
CORR
157A
SERVING
158A
MECH / WATER SERVICE
IT
CUST
ELEC
LOCKERS
ISSUING
157E
HEATED STORAGE
LEARNING CENTER
TABLE / CHAIR STORAGE
104A
ARMORER
ASSEMBLY
ISSUING
ISSUING
ISSUING
BREAK / VENDING
CORR
TOILET
MECH
CORR
KITCHEN
CORR
3.62.6
B.1
H.9
5.4
K.5
L1D1-41
FB6
L1D1-41
FB6
L1D1-8
FB6
L1D1-11
TV3
P1D1-9
GFI
EWC-1
DF-201
P1C1-8
DF-202
P1C1-8
DF-203
P1C1-8
DF-204
P1C1-8
DF-205
P1C1-8
ERU-201
M1D1-13,15,17
AHU-204
M1D1-1,3,5
AHU-205
M1D1-7,9,11ERU-202
M1D1-19,21,23
FCU-201
P1D1-23
L1D1-7
L1D1-7
L1D3-25
EF-212
P1D1-3
L1C1-23
L1D1-23
+48" AFF
L1D1-23
+48" AFF
L1D1-23
+48" AFF
L1D1-23
+48" AFF
P D
-3
D
D C
P A
N E
L M
E C
H
L1D1-25
+48" AFF
L1D3-19
L1D3-19
L1D3-25
L1C1-13
L1C1-9
P1C1-41
GFI
EWC-1
L1C1-23
L1C1-31
L1C1-31 L1C1-35
L1C1-35
L1D1-27
+48" AFF
L1D1-31
L1C1-8
SCREEN
16'-9" AFF
PHRP-207/208
P1D1-41
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,
AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.
3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS
OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION
IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE
EXACT CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 0
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-2C
POWER PLAN -
MAIN LEVEL -
AREA C
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1/8" = 1'-0"
POWER PLAN - MAIN LEVEL - AREA C
M A
T C
H L
IN
E S
E E
E -1
-2
D F
O R
C O
N T
IN
U
A T
IO
N
MATCHLINE SEE E-101-2A FOR CONTINUATION
MATCHLINE SEE E-101-2E FOR CONTINUATION
0 4' 8' 16'
FINAL LAYOUT OF HEATED STORAGE ROOM FENCED CAGES LAYOUT IS TO BE
DETERMINED BY GOVERNMENT. RECEPTACLE LOCATIONS INDICATED ARE
REPRESENTATIVE OF A POTENTIAL RECEPTACLE LAYOUT BASED UPON ASSUMED LAYOUT
OF FENCED CAGES. CONTRACTOR SHALL MODIFY RECEPTACLE LAYOUT TO PROVIDE
MAINTENANCE RECEPTACLES IN CORRIDOR AREAS BASED UPON FINAL CONFIGURATION
OF HEATED STORAGE FENCED CAGES. NO POINT WITHIN THE CORRIDOR AREAS OF
HEATED STORAGE SHALL BE FURTHER THAN 25'-0" FROM A RECEPTACLE.
OPTION 2: PROVIDE GENERATOR REMOTE ANNUNICIATOR IN THIS LOCATION.
PROVIDE 2" CONDUIT FROM GENERATOR REMOTE ANNUNCIATOR LOCATION TO MAIN
ELECTRICAL ROOM 157D.
PROJECTOR SCREEN IS GFGI. COORDINATE FINAL JUNCTION BOX PLACEMENT WITH
ACTUAL PROJECTOR SCREEN PROCURED BY GOVERNMENT.
KEYED NOTES
2 3
11109
C
D.9
E
F
G
H
J
C.5
L
8.6
G.5
F.3
KJ.9
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONF
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONF
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
WORK RM
WORK RM
OPEN OFFICE
OPEN OFFICE
OPEN OFFICE
OPEN OFFICE
B.1
H.9
K.5
9.2 9.8 10.6 10.8 11.6
ELEV LOBBY / STAIR
101F
L1D2-25,27,29
SF12
L1D2-25,27,29
SF16
L1D2-19,21,23
SF12
L1D2-19,21,23
SF12
L1D2-13,15,17
SF16
L1D2-13,15,17
SF12
L1D2-7,9,11
SF12
L1D2-7,9,11
SF16
L1D2-1,3,5
SF24
L1D2-31,33,35
SF12
L1D2-37,39,41
SF24
L1D3-13
FB6
L1D2-2,4,6
SF24
L1D2-8,10,12
SF24
L1D2-14,16,18
SF24
L1D2-20,22,24
SF24
L1D3-1,3,5
SF24
L1D3-7,9,11
SF12
L1D3-15
FB6
L1D3-27
TV3
L1D3-15
FB6
L1D3-13
FB6
L1D4-23
TV3
L1D3-25
L1D3-19
L1D3-19
L1D3-19
L1D3-19 L1D3-19
L1D3-25
L1D3-25
L1D3-25
L1D3-25
L1D3-25
L1D3-23
L1D4-3
L1D3-23
L1D3-23
L1D3-23
L1D3-23
L1D3-21
L1D3-21
L1D3-21
L1D3-21
L1D3-21
L1D3-17L1D3-17
L1D4-3
L1D4-23
L1D4-23 L1D4-21 L1D4-21
L1D4-25 L1D4-3
L1D4-25L1D4-25L1D4-25
L1D4-17
L1D4-17
L1D4-21L1D4-23
L1D4-21
L1D4-19
L1D4-19
L1D4-21
L1D4-13
L1D4-13
L1D4-11
L1D4-17
L1D4-19
L1D4-11
L1D4-15
L1D4-15
L1D4-7
L1D4-7
L1D4-11
L1D4-13
L1D4-11
L1D4-15
L1D4-9
L1D4-9
L1D4-3
L1D4-3
L1D4-9
AC
L1D4-9
ACL1D4-5
L1D4-7
AC
L1D4-7
AC
L1D3-24
L1D4-1
L1D3-24
L1D4-1
L1D3-24
L1D3-24
L1D3-22
L1D3-22
L1D3-24
L1D3-18
L1D3-18
L1D4-1
L1D3-16
L1D3-16
L1D3-22
L1D3-20
L1D3-20
L1D3-17
L1D3-12
L1D3-12
L1D3-16
L1D3-18
L1D3-16
L1D3-14
L1D3-14
L1D3-17
L1D3-20
L1D3-8
L1D3-12
L1D3-8
L1D3-10
L1D3-10
L1D3-8
L1D3-10
L1D3-10
L1D3-14
L1D3-2
AC
L1D3-2
AC
L1D3-6 L1D3-4
AC
L1D3-4
AC
L1D3-2
L1D3-37
L1D3-2
L1D3-41
L1D3-41
L1D3-39
L1D3-4
L1D3-4
L1D3-33
L1D3-37 L1D3-37
L1D3-41
L1D3-41
L1D3-35
L1D3-39
L1D3-39
L1D3-17
L1D3-33
L1D3-33
L1D3-31
L1D3-31 L1D3-31
L1D3-29
L1D3-35
L1D3-35
L1D3-17
L1D3-27 L1D3-27 L1D3-29
L1D3-29L1D3-29L1D3-31
L1D3-27
L1D3-29
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,
AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.
3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS
OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION
IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE
EXACT CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 0
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-2D
POWER PLAN -
MAIN LEVEL -
AREA D
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1/8" = 1'-0"
POWER PLAN - MAIN LEVEL - AREA D
MATCHLINE SEE E-101-2E FOR CONTINUATION
M A
T C
H L
IN
E S
E E
E -1
-2
C F
O R
C O
N T
IN
U
A T
IO
N
MATCHLINE SEE E-101-2B FOR CONTINUATION
0 4' 8' 16'
MM
M
M MM
E-401
111098654321
A
B
7.64.8
L1E1-3
+48" AFF
L1E1-5
+48" AFF
L1E1-5
GFI
WPIU
L1D1-19
GFI
WPIU
L1D1-29
+48" AFF
OH-157.4
H1E1-1,3,5
OH-157.3
H1E1-1,3,5
DSCU-201
P1E1-9,11
DSCU-202A
P1E1-1,3
7 8.6
L1E1-5
+48" AFF
L1E1-1
GFI
WPIU
L1E1-5
+48" AFF
DSCU-202B
P1E1-5,7
ELEC
157D
IT
157C
MECH
HEATED STORAGE
CORR
LOCKERS
3.62.6 5.4 9.2 9.8 10.6 10.8
CH-102
SWGR1-8
CH-101
SWGR1-7
CHILLER
CHILLER
L1D1-29
+48" AFF
E-404
L1D1-21
+48" AFF
L1D1-21
+48" AFF
L1D1-19
L1D1-25
+48" AFF
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,
AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.
3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS
OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION
IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE
EXACT CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 1
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-2E
POWER PLAN -
MAIN LEVEL -
AREA E
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1/8" = 1'-0"
POWER PLAN - MAIN LEVEL - AREA E
MATCHLINE SEE E-101-2C FOR CONTINUATION
UTILITY
TRANSFORMER
0 4' 8' 16'
FINAL LAYOUT OF HEATED STORAGE ROOM FENCED CAGES LAYOUT IS TO BE
DETERMINED BY GOVERNMENT. RECEPTACLE LOCATIONS INDICATED IS REPRESENTATIVE
OF A POTENTIAL RECEPTACLE LAYOUT BASED UPON ASSUMED LAYOUT OF FENCED
CAGES. CONTRACTOR SHALL MODIFY RECEPTACLE LAYOUT TO PROVIDE MAINTENANCE
RECEPTACLES IN CORRIDOR AREAS BASED UPON FINAL CONFIGURATION OF HEATED
STORAGE FENCED CAGES. NO POINT WITHIN THE CORRIDOR AREAS OF HEATED
STORAGE SHALL BE FURTHER THAN 25'-0" FROM A RECEPTACLE.
MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO MECHANICAL EQUIPMENT.
SEE MECHANICAL EQUIPMENT SCHEDULES.
KEYED NOTES
MATCHLINE SEE E-101-2D FOR CONTINUATION
M
M
8654321
N
7.6
3.5
4.8
5.9 6.7
5.1
L
M
N.5
P
Q
R
3.6
7.7
5.4
EF-216
M1A1-31,33,35
(ON ROOF)
L1A1-6
GFI
WPIU DSCU-206
P1A1-5,7
(ON ROOF)
EF-215
M1A1-25,27,29
(ON ROOF)
EF-217
M1A1-37,39,41
(ON ROOF)
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,
AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.
3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS
OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION
IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE
EXACT CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 1
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-3A
POWER PLAN -
ROOF LEVEL -
AREA A
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1/8" = 1'-0"
POWER PLAN - ROOF LEVEL - AREA A
MATCHLINE SEE E-101-3C FOR CONTINUATION
M A
T C
H L
IN
E S
E E
E -1
-3
B F
O R
C O
N T
IN
U
A T
IO
N
CONDUIT AND CONDUCTORS SHALL BE INSTALLED IN ACCORDANCE WITH NEC 310.15(B)(3)
(c) SUCH THAT AMPACITY OF CONDUCTORS DO NOT NEED ADJUSTMENT DUE TO
PROXIMITY TO ROOF. MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO
MECHANICAL EQUIPMENT. SEE MECHANICAL EQUIPMENT SCHEDULES.
KEYED NOTES
0 4' 8' 16'
M M
M
M
M
M
M
M
M
M
M M M
8654321
C
E
F
G
H
J
7.64.8
C.5
L
7 8.6
G.5
K J.9
3.62.6
B.1
H.9
5.4
K.5
EF-209
P1C1-37,39
(ON ROOF)
MAU-201
P1C1-1,3,5
(ON ROOF)EF-208
P1C1-33,35
(ON ROOF)
EF-207
P1C1-31
(ON ROOF)
EF-206
P1C1-29
(ON ROOF)
L1C1-19
GFI
WPIU DSCU-203
P1C1-13,15
(ON ROOF)
EF-202
P1C1-25
(ON ROOF)
EF-205
M1C1-25,27,29
(ON ROOF)
EF-204
P1C1-27
(ON ROOF)
EF-203
M1C1-19,21,23
(ON ROOF)
L1D1-39
GFI
WPIU
DSCU-205A
P1D1-15,17
(ON ROOF)
L1D1-39
GFI
WPIU
L1D1-39
GFI
WPIU
DSCU-204
P1D1-11,13
(ON ROOF)
DSCU-205B
P1D1-19,21
(ON ROOF)
EF-210
M1D1-8,10,12
(ON ROOF)
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,
AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.
3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS
OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION
IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE
EXACT CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 1
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-3C
POWER PLAN -
ROOF LEVEL -
AREA C
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1/8" = 1'-0"
POWER PLAN - ROOF LEVEL - AREA C
M A
T C
H L
IN
E S
E E
E -1
-3
D F
O R
C O
N T
IN
U
A T
IO
N
MATCHLINE SEE E-101-3A FOR CONTINUATION
MATCHLINE SEE E-101-3E FOR CONTINUATION
CONDUIT AND CONDUCTORS SHALL BE INSTALLED IN ACCORDANCE WITH NEC 310.15(B)(3)
(c) SUCH THAT AMPACITY OF CONDUCTORS DO NOT NEED ADJUSTMENT DUE TO
PROXIMITY TO ROOF. MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO
MECHANICAL EQUIPMENT. SEE MECHANICAL EQUIPMENT SCHEDULES.
MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO MECHANICAL EQUIPMENT.
SEE MECHANICAL EQUIPMENT SCHEDULES.
KEYED NOTES
1 1
1 1 1
0 4' 8' 16'
11109
C
D.9
E
F
G
H
J
C.5
L
8.6
G.5
F.3
KJ.9
B.1
H.9
K.5
9.2 9.8 10.6 10.8 11.6
EF-211
M1D1-14,16,18
(ON ROOF)
DSCU-103
P1D1-2,4
L1D1-39
GFI
WPIU
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,
AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.
3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS
OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION
IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE
EXACT CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 1
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-3D
POWER PLAN -
ROOF LEVEL -
AREA D
18-0061
02-25-2021
K. HIATT
B. PINKLEY
1/8" = 1'-0"
POWER PLAN - ROOF LEVEL - AREA D
MATCHLINE SEE E-101-3E FOR CONTINUATION
M A
T C
H L
IN
E S
E E
E -1
-3
C F
O R
C O
N T
IN
U
A T
IO
N
MATCHLINE SEE E-101-3B FOR CONTINUATION
0 4' 8' 16'
CONDUIT AND CONDUCTORS SHALL BE INSTALLED IN ACCORDANCE WITH NEC 310.15(B)(3)
(c) SUCH THAT AMPACITY OF CONDUCTORS DO NOT NEED ADJUSTMENT DUE TO
PROXIMITY TO ROOF. MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO
MECHANICAL EQUIPMENT. SEE MECHANICAL EQUIPMENT SCHEDULES.
KEYED NOTES
Revisions
1110986543
A
B
7.64.8 7 8.63.62.6
B.1
5.4 9.2 9.8 10.6 10.8
EF-201
P1D1-35
(ON ROOF)
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,
AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.
3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP
DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS
OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION
IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE
EXACT CONNECTION LOCATION.
NOTES:
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
'F''E'
'C' 'D'
'B' 'A'
C
R e v it
P ro je c ts
\1
E
C e n tr a l_ b d p in k le y .r v t
/2
/2
:5 : 1
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
E-101-3E
POWER PLAN -
ROOF LEVEL -
AREA E
18-0061
02-25-2021
K. HIATT
B. PINKLEY1/8" = 1'-0"
POWER PLAN - ROOF LEVEL - AREA E
MATCHLINE SEE E-101-3C FOR CONTINUATION
0 4' 8' 16'
MATCHLINE SEE E-101-3D FOR CONTINUATION
CONDUIT AND CONDUCTORS SHALL BE INSTALLED IN ACCORDANCE WITH NEC 310.15(B)(3)
(c) SUCH THAT AMPACITY OF CONDUCTORS DO NOT NEED ADJUSTMENT DUE TO
PROXIMITY TO ROOF. MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO
MECHANICAL EQUIPMENT. SEE MECHANICAL EQUIPMENT SCHEDULES.
KEYED NOTES
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101, AND
UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL
CODES AND ORDINANCES.
2. SET LUMINAIRES PLUMB, SQUARE, AND LEVEL WITH CEILING AND WALLS, IN
ALIGNMENT WITH ADJACENT LUMINAIRES AND SECURE IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS. LUMINAIRES INSTALLED ASKEW FROM
ADJACENT LUMINAIRES IN ANY DIRECTION, DIMENSION AND/OR PLANE SHALL NOT BE
ACCEPTABLE.
3. FULLY COORDINATE EXACT LOCATION AND MOUNTING HEIGHT OF FIXTURES IN
SERVICE SPACES (MECHANICAL, ELECTRICAL, TELECOMM, STORAGE, ETC.) WITH
OTHER TRADES. MINOR ADJUSTMENTS TO MOUNTING HEIGHT OR PLAN LOCATION
MAY BE REQUIRED TO ACCOMMODATE OTHER TRADES.
4. LIGHTING CONTROLS SHALL BE LOCAL TO THE SPACE THEY CONTROL. A BUILDING-
WIDE, NETWORKED LIGHTING CONTROL SYSTEM SHALL NOT BE INSTALLED.
5. WHERE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .