Bellevue_RC_100_Vol_II_E-SeriesDWGS_2021-02-25.pdf

PDF 13 MB Posted

Attached to
Construct Bellevue Readiness Center
Solicitation number
W9124321RCH02
Issued by

View the file

Other files

File Type Posted
BRC.Amendment.0003.pdf PDF
Amendment.0002.pdf PDF
Amendment.0001.pdf PDF
Bellevue_RC_100_Vol_I_L-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_A-Reference-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_S-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_II_F-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_A-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_II_T-SeriesDWGS_2021-02-25.pdf PDF
Exhibit G.subcontracting.plan.requirements.docx DOCX document
Bellevue_RC_100_Vol_I_C-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_II_M-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_G-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_SPEC_Vol_III_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_II_G-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_II_P-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_I-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_FFE-SeriesDWGS_2021-02-25.pdf PDF
EXHIBIT B.doc DOC document
EXHIBIT F.small.business.participation.plan.docx DOCX document
Exhibit D_Letter of Commitment.docx DOCX document
W9124321RCH02.pdf PDF
Bellevue_RC_100_SPEC_Vol_I_2021-02-25.pdf PDF
Bellevue_RC_100_Vol_I_FS-SeriesDWGS_2021-02-25.pdf PDF
Section.01000 General Requirements.pdf PDF
EXHIBIT A.doc DOC document
Bellevue_RC_100_Vol_II_RF-SeriesDWGS_2021-02-25.pdf PDF
Bellevue_RC_100_SPEC_Vol_II_2021-02-25.pdf PDF
EXHIBIT_C_Reference_Questionnaire_Package.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOLS - LIGHTINGSYMBOLS - POWER

CONNECTION

CONTINUATION

SEPARABLE CONNECTOR OR CONNECTION FOR DRAWOUT ASSEMBLIES

FUSED DISCONNECT SWITCH

TRANSFORMER

GROUND

DELTA - WYE TRANSFORMER CONNECTION

DELTA - DELTA TRANSFORMER CONNECTION

DIGITAL METER

SURGE PROTECTIVE DEVICE

VARIABLE FREQUENCY DRIVE

SHUNT TRIP

KILOWATT HOUR METER

VOLTMETER SELECTOR SWITCH

AMMETER SELECTOR SWITCH

VOLTMETER

AMMETER

CIRCUIT BREAKER

"XXX" DENOTES AMPACITY

SWITCH

DISCONNECT SWITCH

SPECIAL RECEPTACLE

PANELBOARD (NAMED "H1A1")

NAMING CONVENTION:

H1A1

EQUIPMENT NUMBER

BUILDING AREA (PLAN REFERENCE)

BUILDING LEVEL

EQUIPMENT TYPE:

H = 480Y/277V GENERAL & LIGHTING

L = 208Y/120V GENERAL

M = 480Y/277V HVAC & PLUMBING

P = 208Y/120V HVAC & PLUMBING

C = 208Y/120V COMM ROOM

LIGHTNING ARRESTOR

AUTOMATIC TRANSFER SWITCH

MULTI-FUNCTION DIGITAL UTILITY METER

NEUTRAL CONNECTION TO GROUND

DIESEL ENGINE GENERATOR

KIRK-KEY INTERLOCK

RELAY

CONTACTOR

ELECTRICAL EQUIPMENT CONNECTION

PHOTOCELL

ELECTRICAL MOTOR

20 - MOTOR HORSEPOWER

Y

H1A1

KWH

V

RECEPTACLES

RECESSED SIMPLEX

RECESSED DUPLEX

RECESSED SIMPLEX,

HORIZONTAL MOUNTED

RECESSED DUPLEX,

HORIZONTAL MOUNTED

RECESSED QUAD

CEILING RECESSED DUPLEX

FLOORBOX RECESSED DUPLEX

JUNCTION BOXES AND POWER SUPPLIES

RECESSED IN WALL, UON

SURFACE MOUNTED, UON

RECESSED IN FLOOR, UON

ELECTRONIC FLUSH

TRANSFORMER / POWER SUPPLY

SWITCHES

DISCONNECT SWITCH

MOTOR-RATED SWITCH

M

POWER DEVICES GENERAL INFORMATION

LP-X

GFI

PANELBOARD - CIRCUIT

ANY RECEPTACLE LISTED ABOVE

2'X4' FIXTURE, UON

EGRESS FIXTURE, UON

(NOTE: ALL FIXTURES NOTED ON PLAN WITH HALF-SHADE INDICATE EGRESS)

1'X4' FIXTURE, UON

2'X2' FIXTURE, UON

DOWNLIGHT OR SPOTLIGHT, UON

EXIT SIGNS, CEILING: ARROW INDICATES EGRESS

EXIT SIGNS, WALL: ARROW INDICATES EGRESS

(NOTE: SEE TYPICAL DEVICE MOUNTING DETAILS AND NOTES THIS SHEET)

PHOTOCELL

WALL MOUNTED FIXTURE

EGRESS WALL MOUNTED FIXTURE

FIXTURE TYPE

F1

LP-1

10' - 0" a SWITCH 'LEG'

• THE SWITCH WITH SAME LETTER OPERATES THIS FIXTURE

3a , 3b

SWITCH 'LEG'

DESIGNATION

DEMARCATION

D: DIMMER

TM: TIMER

OC: OCCUPANCY SENSOR

3: 3-WAY

4: 4-WAY

EP: EXPLOSION PROOF

NOTES:

1. NO DEMARCATION OR SWITCH 'LEG' INDICATES THAT THE SWITCH CONTROLS ALL OF

THE FIXTURES WITHIN THE SAME ROOM

2. ADDITIONAL DEMARCATIONS SEPARATED BY A COMMA "," INDICATE ADDITIONAL

SWITCHES WITHIN A COMMON SWITCH BACKBOX.

LIGHTING FIXTURES

FIXTURE GENERAL INFORMATION

CONTROL DEVICES GENERAL INFORMATION

TOGGLE SWITCH

VFD

ST

VS

AS

A

• REFER TO FIXTURE SCHEDULE FOR FIXTURE TYPE INFORMATION

FLOORBOX RECESSED QUAD

SPECIAL RECEPTACLE

(REFER TO DRAWINGS FOR NEMA CONFIGURATION)

SURFACE SIMPLEX

SURFACE DUPLEX

SURFACE QUAD

EF-X

LP-X

GFI

J

EQUIPMENT IDENTIFICATION

ANY JUNCTION BOX LISTED ABOVE

SYMBOL MODIFIER(S)

SYMBOL MODIFIER(S)

PANELBOARD - CIRCUIT NUMBER

PANELBOARD - CIRCUIT

FIXTURE MOUNTING HEIGHT

(IF APPLICABLE)

• 120V, NEMA 5-20R, UON

SYMBOLS - ONE-LINE DIAGRAM

DM

J

M

J

EF-X

HL-X

GFI

M

EQUIPMENT IDENTIFICATION

MECHANICAL EQUIPMENT CONNECTION

• SEE MECHANICAL EQUIPMENT SCHEDULE FOR CONNECTION INFORMATION

SYMBOL MODIFIER(S)

PANELBOARD - CIRCUIT

REMOTE DISCONNECT SWITCH:

• SEE MECHANICAL EQUIPMENT SCHEDULE FOR ADDITIONAL INFORMATION

EQUIPMENT CONNECTIONS

MECHANICAL EQUIPMENT CONNECTION. PROVIDE DISCONNECT / STARTER / VFD AS INDICATED ON

MECHANICAL EQUIPMENT CONNECTION SCHEDULE

EQUIPMENT CONNECTION

RECEPTACLES WITH COMM OUTLETS

RECESSED FLOOR BOX WITH POWER, DATA AND/OR AV CAPABILITIES

"FB1" = FLOOR BOX TYPE, SEE PROJECT SPECIFICATIONS FOR REQUIREMENTS OF FLOOR BOX TYPES

RECESSED POWER/COMM

SURFACE POWER/COMM

• SEE COMMUNICATIONS OUTLET DETAILS FOR POWER AND COMMUNICATIONS REQUIREMENTS

N

G

G

WIRING RACEWAY TYPES

EXPOSED CONDUIT - SINGLE LINE

CONCEALED CONDUIT - SINGLE LINE

UNDERGROUND DUCTBANK

CONDUIT ROUTED VERTICALLY

K

PC

SYMBOLS - GROUNDING / LIGHTNING PROTECTION

GROUND ROD

GROUND TEST WELL

RECESSED STATIC GROUND

GROUNDING COUNTERPOISE/CONDUCTOR

• BURIED, BARE CABLE (EXTERIOR & BELOW GRADE)

• BARE CABLE (INTERIOR)

• COPPER, #4/0 AWG MINIMUM, UON

GROUND BAR

MGB, EGB, PBB, SBB

BOLTED GROUND CONNECTION

EXOTHERMIC WELDED CONNECTION

SYMBOL MODIFIERS

AC

C

EP OR EXP

F

FPD

GFI

IG

REF

SF#

SW: XX

TV

WC

WP

WPIU

XX" AFF

XX" AFP

ABOVE COUNTER MOUNTING

RECESSED IN CEILING

EXPLOSION PROOF

RECESSED IN FLOOR

FLAT PANEL DISPLAY

GROUND FAULT CIRCUIT INTERRUPTER

ISOLATED GROUND

REFRIGERATOR

SYSTEMS FURNITURE CONNECTION

• # INDICATES QUANTITY OF COMMUNICATIONS CONNECTIONS. SEE

TELECOMMUNICATIONS SHEETS FOR ADDITIONAL INFORMATION.

CONTROLLED BY SWITCH LABELED "XX"

TELEVISION

WALL-MOUNTED CLOCK

WEATHERPROOF, WITH GFI

WEATHERPROOF IN USE, WITH GFI

MOUNT XX" AFF

MOUNT XX" AFP

EQUIPMENT

LP11

• ELECTRICAL EQUIPMENT INCLUDING, BUT NOT LIMITED TO, TRANSFORMERS, SWITCHBOARDS AND

PANELBOARDS ARE DRAWN TO SCALE IN THE PLANS AND ARE CALLED OUT WITH A UNIQUE

IDENTIFIER.

EQUIPMENT IDENTIFIER

• COORDINATE JUNCTION BOX INSTALLATION WITH NEARBY EQUIPMENT.

R

C

MFM

SEE NOTE 2

SYMBOLS ORIENTATION DOES NOT IMPLY DEVICE OR EQUIPMENT ORIENTATION UNLESS NOTED AS SUCH. SEE REFLECTED CEILING

PLANS FOR LIGHT FIXTURE POSITIONS AND ORIENTATIONS.

SYMBOL SIZE DOES NOT IMPLY EQUIPMENT SIZE, UON.

MOUNTING HEIGHT INDICATED IN LEGEND AND ON THE DRAWINGS SHALL BE THE DISTANCE MEASURED FROM THE CENTER OF THE

DEVICE TO THE FINISHED FLOOR.

NOT ALL SYMBOLS ON THIS SHEET ARE USED AS PART OF THIS PROJECT.

1.

2.

3.

4.

FB1

SPD

ALL ELECTRICAL WORK AND MATERIAL SHALL BE NEW AND PROVIDED BY THE CONTRACTOR UNLESS OTHERWISE NOTED.

ALL CONDUCTORS SHALL BE RUN IN CONDUIT, AND ALL CONDUIT SHALL BE CONCEALED UNLESS OTHERWISE NOTED ON THE SHEETS.

ALL NEW SWITCHBOARDS AND PANELBOARDS SHALL BE FIELD MARKED TO WARN QUALIFIED PERSONS OF POTENTIAL ELECTRIC ARC

FLASH HAZARD IN ACCORDANCE WITH NFPA 70 AND 70E.

ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL CONTRACTOR REGARDING ELECTRICAL REQUIREMENTS OF ACTUAL

EQUIPMENT PROVIDED.

MOUNTING HEIGHT FOR LIGHT FIXTURES SHALL BE FROM THE BOTTOM OF FIXTURES TO THE FINISHED FLOOR OR GRADE.

ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101, AND UNIFORM FACILITY CRITERIA, OR TECHNICAL

LETTERS, IN ADDITION TO LOCAL CODES AND ORDINANCES.

ALL GROUNDING SHALL COMPLY WITH NFPA 70, ARTICLE 250 FOR ELECTRICAL SYSTEMS AND NEC ARTICLE 800 AND TIA-607-C FOR

TELECOMMUNICATIONS SYSTEMS.

PROVIDE A GREEN CONTINUOUS INSULATED EQUIPMENT GROUNDING CONDUCTOR TO ALL ELECTRICAL, TELECOMMUNICATIONS AND

SECURITY EQUIPMENT SIZED PER NEC ARTICLE 250.

ALL CONDUCTORS SHALL BE COPPER.

ALL ELECTRICAL EQUIPMENT AND OUTLET INSTALLATION LOCATIONS SHALL BE COORDINATED WITH FURNITURE INSTALLATION.

COORDINATE PENETRATIONS IN FIRE RATED WALLS WITH DETAILS SHOWN ON ARCHITECTURAL DRAWINGS.

ALL NEW FLOOR MOUNTED ELECTRICAL EQUIPMENT INCLUDING BUT NOT LIMITED TO AUTOMATIC TRANSFER SWITCHES, SWITCHBOARDS, AND TRANSFORMERS SHALL BE MOUNTED ON A CONCRETE EQUIPMENT PAD IN ACCORDANCE WITH STRUCTURAL

DETAILS.

COORDINATE ALL EQUIPMENT REQUIREMENTS AND SIZES WITH FINAL ELEVATOR SELECTION AND MANUFACTURER'S REQUIREMENTS.

ANY SIGNIFICANT CHANGES TO THE DESIGN BROUGHT FORTH BY THE ELEVATOR UNIT SELECTED SHALL BE BROUGHT TO THE

ATTENTION OF THE CONTRACTING OFFICER PRIOR TO INSTALLATION.

AIC RATING LISTED ON ELECTRICAL EQUIPMENT IS A MINIMUM RATING.

PER UFC 3-560-01, NORMAL MAINTENANCE IS NOT AUTHORIZED TO BE PERFORMED 'HOT' ON DISCONNECTS, STARTERS AND VFDs.

WORKING CLEARANCES FOR SUCH DEVICES TAKE INTO ACCOUNT ADJACENT PIPING OR DUCTWORK WHICH MAY BE WITHIN VOLUME OF WORKING AREA IF WORK WAS TO BE PERFORMED HOT. REASONABLE ACCESS HAS BEEN TAKEN INTO ACCOUNT.

THIS PROJECT REQUIRES THE INSTALLATION OF ELECTRICAL DEVICES WITHIN OR ON PRECAST WALLS. CONTRACTOR IS RESPONSIBLE

FOR COORDINATION OF DEVICE LOCATIONS WITHIN OR ON PRECAST WALLS.

ALL EXPOSED CONDUIT WHICH IS NOT FACTORY PAINTED (BLUE, GREEN, YELLOW, ETC.) SHALL BE PAINTED IN ACCORDANCE WITH

DIVISION 09 SPECIFICATIONS. FACTORY COLORED CONDUIT SHALL NOT BE FIELD PAINTED.

GENERAL NOTES:

APPLICABLE TO ALL ELECTRICAL SHEETS

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

APPLY ARC FLASH HAZARD LABELS ON ALL EQUIPMENT PER

UFC 3-560-01.

PROVIDE A COPY OF THE ARC FLASH STUDY REQUIRED BY

SECTION

260573.19 POSTED IN THE MAIN ELECTRICAL ROOM.

1.

2.

ARC FLASH LABEL FOR EQUIPMENT

ABBREVIATIONS

LEGEND NOTES

EXIT

NOTE 4

NOTE 1

NOTE 2

SINK OR

BASIN

CEILING

FINISHED

FLOOR

1.

2.

3.

4.

5.

6.

7.

8.

COORDINATE ABOVE COUNTER DEVICES AND RECEPTACLES WITH CASEWORK OR COUNTERS SUCH THAT THE DEVICES AND RECEPTACLES ARE LOCATED AT +42" AFF OR 6" ABOVE THE COUNTERTOP OR BACKSPLASH, WHICHEVER IS HIGHER.

ALL RECEPTACLES INSTALLED WITHIN 6'-0" OF ANY SINK OF BASIN SHALL HAVE GFI PROTECTION. DO NOT INSTALL

RECEPTACLES WITHIN 12" OF THE EDGE OF A SINK OR BASIN.

COORDINATE WITH THE COMMUNICATIONS DRAWINGS TO ENSURE THAT A DUPLEX RECEPTACLE IS INSTALLED WITHIN 16"

HORIZONTAL TO ALL SIGNAL AND DATA DEVICE LOCATIONS, UON.

SWITCHES AND OTHER FLUSH WALL-MOUNTED DEVICES SHALL BE MOUNTED WITHIN 16" OF DOORFRAME. COORDINATE WITH ARCHITECTURAL DRAWINGS FOR DOORS WITH ADJACENT SIDELIGHTS. WHERE DEVICES ARE SHOWN ADJACENT TO THE DOOR ON THE HINGE-SIDE OF THE DOOR, AND THE DOOR SWINGS IN A MANNER THAT SHALL BLOCK THE DEVICE, MOUNT THE DEVICE 12" BEYOND THE DOOR SWING. COORDINATE ROUGH-IN LOCATIONS WITH DIV. 27 AND 28 DEVICES AS WELL. COORDINATE MOUNTING LOCATION WITH OTHER TRADES TO ENSURE A UNIFORM MOUNTING AND AESTHETICALLY-PLEASING APPEARANCE.

MOUNTING HEIGHT INDICATED IN LEGEND AND ON THE DRAWINGS SHALL BE THE DISTANCE MEASURED FROM THE CENTER OF

THE DEVICE TO THE FINISHED FLOOR, UON.

COORDINATE FINAL HEIGHT AND LOCATION FOR ALL DEVICE RECEPTACLES WITH ARCHITECTURAL/INTERIORS PLANS.

COORDINATE FINAL RECEPTACLE HEIGHT AND LOCATION WITH MANUFACTURER REQUIREMENTS.

EXIT SIGNS LOCATED ABOVE DOORS SHALL BE CENTERED BETWEEN TOP OF DOOR FRAME AND FINISHED CEILING. IN NO CASE SHALL THE CENTER OF THE EXIT SIGN BE MORE THAN 6'-8" ABOVE THE EGRESS OPENING. WHERE EXIT SIGNS ARE INSTALLED IN ROOMS WITH NO CEILING, MOUNT EXIT SIGN (TO CENTER) 1'-0" ABOVE TOP OF DOOR FRAME.

NOTE 3

16"

S

TYPICAL DEVICE MVMOUNTING DETAIL AND NOTES

NOTE 5

J

.E Q

U

O N

SYMBOLS - SITE

UNDERGROUND PRIMARY ELECTRICAL POWER DUCTBANK

UNDERGROUND ELECTRICAL

UNDERGROUND TELECOMMUNICATIONS DUCTBANK

UNDERGROUND TELECOMMUNICATIONS

UNDERGROUND ACCESS CONTROL SYSTEM CONDUIT

FIXTURE TYPE

POLE-MOUNTED LIGHTING FIXTURE

EU

E

COMM

C

ACS

X

MH MANHOLE

MANHOLE IDENTIFIER

MH-X

T PAD-MOUNT ELECTRIC UTILITY TRANSFORMER

T

E Q

U

O N

NOTE 8

J

S

ME

PEDESTRIAN POLE LIGHTING FIXTURE

FIXTURE TYPE

XXX AT

XXX AF

X

HH HANDHOLE

E

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o n e

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 4

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-001

ELECTRICAL

SYMBOLS

LEGEND

18-0061

02-25-2021

K. HIATT

B. PINKLEY

ABBR DESCRIPTION

A AMPERES

AC ALTERNATING CURRENT

ACS ACCESS CONTROL SYSTEM

AF AMP FRAME

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AIC AMPERES INTERRUPTING CAPACITY

AMP AMPACITY

AT AMP TRIP

AV AUDIO/VIDEO

AWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEM

C CONDUIT

CAT CATEGORY

CATV CABLE TELEVISION

CCTV CLOSED CIRCUIT TELEVISION

CL CENTERLINE

COMM COMMUNICATIONS

COR CONTRACTING OFFICER'S REPRESENTATIVE

CT CABLE TRAY

DC DIRECT CURRENT

DDC DIRECT DIGITAL CONTROLS

EF EXHAUST FAN

EGB ELECTRICAL GROUND BUSBAR

EGC EQUIPMENT GROUNDING CONDUCTOR

EIA ELECTRONICS INDUSTRIES ASSOCIATIONS

EM/NL EMERGENCY / NIGHT LIGHT

EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM

EMT ELECTRICAL METALLIC TUBING

EPC EMERGENCY POWER CONTROL RELAY

EPO EMERGENCY POWER OFF

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FBO FURNISHED BY OTHERS

FO FIBER OPTIC

FPP FIBER OPTIC PATCH PANEL

FSCP FIRE SYSTEM CONTROL PANEL

FT FEET OR FOOT

FTR FIRE ALARM TRANSMITTER/TRANSCEIVER

G OR GND GROUND

GFE GOVERNMENT FURNISHED EQUIPMENT

GFGI GOVERNMENT FURNISHED AND INSTALLED

GFI GROUND FAULT INTERRUPTER

GFP GROUND FAULT PROTECTION

GFR GROUND FAULT RELAY

GRS GALVANIZED RIGID STEEL CONDUIT

HOA HAND-OFF-AUTO SWITCH

HZ HERTZ

I.E. FOR EXAMPLE

IDS INTRUSION DETECTION SYSTEM

IG ISOLATED GROUND

IT INFORMATION TECHNOLOGY

K KILO

KCMIL THOUSAND CIRCULAR MILS

KV KILOVOLT

KVA KILOVOLT AMPERES

KWH KILOWATT HOURS

LPI LIGHTNING PROTECTION INSTALLER

LPS LIGHTNING PROTECTION SYSTEM

LSIG LONG, SHORT, INSTANTANEOUS, GROUND FAULT

LW LOCKABLE WIREWAY

MAX MAXIMUM

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MGB MAIN GROUND BUSBAR

MH MAINTENANCE HOLE

MLO MAIN LUGS ONLY

MM MULTIMODE

MN/PA MASS NOTIFICATION/PUBLIC ADDRESS

N NEUTRAL CONDUCTOR

N.C. NORMALLY CLOSED

N.O. NORMALLY OPEN

NAC NOTIFICATION APPLIANCE CIRCUIT BOOSTER POWER SUPPLY

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NTS NOT TO SCALE

OCC OCCUPANCY SENSOR

PIR PASSIVE INFRARED

PIV POST INDICATOR VALVE

PROJ PROJECTOR

PVC POLYVINYL CHLORIDE

RCP REFLECTED CEILING PLAN

RGS RIGID GALVANIZED STEEL CONDUIT

RMC RIGID METAL CONDUIT

SCCR SHORT CIRCUIT CURRENT RATING

SPD SURGE PROTECTIVE DEVICE

SPECS CONTRACT SPECIFICATIONS

SRG STATIC REFERENCE GRID

STR STRAND

SWBD SWITCHBOARD

TBB TELECOMMUNICATIONS BONDING BACKBONE

TGB TELECOMMUNICATIONS GROUND BUSBAR

TMGB TELECOMMUNICATIONS MAIN GROUND BUSBAR

TR TELECOMMUNICATIONS ROOM

TYP TYPICAL

UL UNDERWRITERS' LABORATORIES

UON UNLESS OTHERWISE NOTED

UTP UNSHIELDED TWISTED PAIR

V VOLTS

VA VOLT AMPERES

VFC -or- VFD VARIABLE FREQUENCY CONVERTER -or- VARIABLE FREQUENCY DRIVE

VGA VIDEO GRAPHICS ARRAY

W WIRE OR WATT

WM WIRE MANAGEMENT

WP WEATHERPROOF

WPIU WEATHERPROOF WHILE IN USE, INCLUDES GFI PROTECTION

XFMR TRANSFORMER

Z IMPEDANCE

Revisions

ID Date Description

(TYP OF 2)

(TYP)

E-504

E-504

E-504

E-504

E-504

(TYP OF 2)

(TYP)

(TYP)

ELEC

IT

1. ELECTRICAL DISTRIBUTION GROUNDING SHALL COMPLY WITH NEC ARTICLE 250.

2. TELECOMMUNICATIONS GROUNDING SHALL COMPLY WITH NEC ARTICLE 800 AND

TIA-607-D, AND UFC 3-580-01.

3. ALL LIGHTNING PROTECTION SHALL COMPLY WITH THE NEC, NFPA 780 AND UL 96. SEE

SHEET E-005 FOR ASSOCIATED WORK REGARDING LIGHTNING PROTECTION SYSTEM

INSTALLATION.

4. THE PLANS AND DETAILS SHOWN WITHIN THIS DRAWING PACKAGE DO NOT PRECLUDE

THE REQUIREMENTS OF NEC ARTICLE 250, ARTICLE 800 OR NFPA 780.

5. PROVIDE A GREEN CONTINUOUS INSULATED EQUIPMENT GROUNDING CONDUCTOR TO

ALL ELECTRICAL, TELECOMMUNICATIONS AND SECURITY EQUIPMENT SIZED PER NEC

ARTICLE 250.

6. CONNECTION SHALL BE MADE WITH GROUND CLAMP WITHIN 5 FEET OF WATER PIPE

ENTRANCE INTO BUILDING AND AHEAD OF ANY VALVE, CONNECTOR, OR METERING

DEVICE. METAL UNDERGROUND WATER PIPE SHALL PROVIDE AT LEAST 10 FEET OF

ELECTRICAL CONTINUITY. PROVIDE BONDING JUMPERS AROUND INSULATING JOINTS,

FILTERING DEVICES AND METERING EQUIPMENT.

7. SEE SITE PLANS FOR GENERATOR AND PAD-MOUNT TRANSFORMER GROUNDING DETAIL

INFORMATION.

8. SEE SHEET E-641 FOR GROUNDING SCHEMATICS.

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F'

'D'

'B'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 4

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-002

GROUNDING

PLAN - LOWER

LEVEL - OVERALL

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1" = 20'-0"

GROUNDING PLAN - LOWER LEVEL - OVERALL

EGB

SBB

SEE SHEET E-003 FOR CONTINUATION OF GROUNDING COUNTERPOISE.

EGB

KEYED NOTES:

NOTES:

SBB

0 20'10' 40'

UTILITY

TRANSFORMER

E-504

(TYP)

E-504

E-504

IT

157C

IT

IT

ELEC

MECH

ELEC

ELEC

157D

1. ELECTRICAL DISTRIBUTION GROUNDING SHALL COMPLY WITH NEC ARTICLE 250.

2. TELECOMMUNICATIONS GROUNDING SHALL COMPLY WITH NEC ARTICLE 800 AND

TIA-607-D, AND UFC 3-580-01.

3. ALL LIGHTNING PROTECTION SHALL COMPLY WITH THE NEC, NFPA 780 AND UL 96. SEE

SHEET E-005 FOR ASSOCIATED WORK REGARDING LIGHTNING PROTECTION SYSTEM

INSTALLATION.

4. THE PLANS AND DETAILS SHOWN WITHIN THIS DRAWING PACKAGE DO NOT PRECLUDE

THE REQUIREMENTS OF NEC ARTICLE 250, ARTICLE 800 OR NFPA 780.

5. PROVIDE A GREEN CONTINUOUS INSULATED EQUIPMENT GROUNDING CONDUCTOR TO

ALL ELECTRICAL, TELECOMMUNICATIONS AND SECURITY EQUIPMENT SIZED PER NEC

ARTICLE 250.

6. CONNECTION SHALL BE MADE WITH GROUND CLAMP WITHIN 5 FEET OF WATER PIPE

ENTRANCE INTO BUILDING AND AHEAD OF ANY VALVE, CONNECTOR, OR METERING

DEVICE. METAL UNDERGROUND WATER PIPE SHALL PROVIDE AT LEAST 10 FEET OF

ELECTRICAL CONTINUITY. PROVIDE BONDING JUMPERS AROUND INSULATING JOINTS,

FILTERING DEVICES AND METERING EQUIPMENT.

7. SEE SITE PLANS FOR GENERATOR AND PAD-MOUNT TRANSFORMER GROUNDING DETAIL

INFORMATION.

8. SEE SHEET E-641 FOR GROUNDING SCHEMATICS.

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 4

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-003

GROUNDING

PLAN - MAIN

LEVEL - OVERALL

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1" = 20'-0"

GROUNDING PLAN - MAIN LEVEL - OVERALL

SEE SHEET E-002 FOR CONTINUATION OF GROUNDING COUNTERPOISE.

ROUTE TO EGB IN ELECTRICAL ROOM 14.

ROUTE TBB CONDUCTOR IN UNDERGROUND DUCTBANK.

PROVIDE CONNECTION TO FLAG POLE.

MGB

PBB

SBBEGB

EGB

SBB

EGB

NOTES:

KEYED NOTES:

0 20'10' 40'

E-502

E-502

H1A1

E-502

E-502

E-502

E-502 2

E-502

E-502

E-502

E-502

E-502

E-502

E-502

E-502

E-502

MECH

IT

ELEC

107A

1. SEE E-000 SERIES SHEETS FOR GROUND COUNTERPOISE INFORMATION.

2. CONTRACTOR SHALL VERIFY ALL EQUIPMENT STUB-UP LOCATIONS PRIOR TO

CONDUIT PLACEMENT.

3. COORDINATE ALL UNDERGROUND DUCTBANKS AND/OR CONDUITS WITH CIVIL AND

STRUCTURAL DRAWINGS AND OTHER UTILITIES.

4. SEE CORRESPONDING "AREA" PLAN ON E-101-XX SERIES SHEETS FOR LOCATION OF

EQUIPMENT ("UTILITY TRANSFORMER", "SWGR1", ETC.) REFERENCED ON THIS

SHEET.

5. A MINIMUM OF 2'-0" SEPARATION SHALL BE MAINTAINED BETWEEN ALL HORIZONTAL

SECTIONS OF POWER DUCTBANKS.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 4

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-0

ELECTRICAL &

TELECOMM

BELOW GRADE

PATHWAYS

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1/16" = 1'-0"

ELECTRICAL & TELECOMM BELOW GRADE PATHWAYS

STUB DUCTBANK 5'-0" BEYOND EDGE OF GRADE BEAM. STUB AND CAP

CONDUITS 1'-0" BEYOND EDGE OF DUCTBANK. CAST ALUMINUM

"ELECTRICAL" UTILITY MARKER INTO CONCRETE AT FINISHED GRADE.

MARKER SHALL INDICATE "ELECTRICAL DUCTBANK X'-X" BELOW FINISHED

GRADE." ACTUAL DIMENSION SHALL BE INDICATED IN LIEU OF "X'-X" ".

SEE ES100 SERIES SHEETS FOR DUCTBANK CONTINUATION.

COORDINATE STUB-UPS INTO PAD-MOUNT TRANSFORMER WITH DETAILS

SHOWN ON SHEET E-503 AND ELECTRIC UTILITY COMPANY PRIOR TO

COMMENCING INSTALLATION.

SEE DETAIL 5 ON SHEET E-502 FOR DUCTBANK DETAILS.

KEYED NOTES

0 8' 16' 32'

3U T

IL

IT

Y T

R A

N S

F O

R M

E R

P E

S W

G R

1 4

M

M

M

M

M

M

M

E

E

M

M

M

M

J

J

J

J

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,

AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.

3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS

OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION

IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE

EXACT CONNECTION LOCATION.

NOTES:

E-401

L0B1-1,3,5

SF12

L0B1-1,3,5

SF12

OH-37.5

H0B1-7,9,11

OH-37.7

H0B1-7,9,11

OH-37.9

H0B1-7,9,11

OH-37.9

H0B1-7,9,11

OH-37.4

H0B1-1,3,5

OH-37.3

H0B1-1,3,5

OH-37.2

H0B1-1,3,5

OH-37.1

H0B1-1,3,5

L0B1-7,9,11

SF8

L0B1-7,9,11

SF4

L0B1-7,9,11

SF8

L0B1-19

L0B1-29

L0B1-19

L0B1-25

AC

AC

L0B1-33

L0B1-27

L0B1-19

L0B1-17

L0B1-12

FB6

GFI

L0B1-12

FB6

L0B1-14

AC,GFI

L0B1-14

AC,GFI

N

L0B1-37

GFI

WPIU

L0B2-30

GFI

+48" AFF

L0B2-30

GFI

WPIU

L0B2-30

GFI

+48" AFF

L0B2-24

GFI

+48" AFF

L0B2-39

GFI, +48" AFF

C-24 SVY-1

L0B2-30

GFI

WPIU

L0B2-24

GFI

WPIU

L0B2-32

GFI

WPIU

L0B2-32

GFI

WPIU

L0B2-34

GFI

WPIU

L0B2-14

GFI,+48" AFF

L0B2-8

GFI,+48" AFF

L0B2-26

GFI,+48" AFF

L0B2-16

GFI,+48" AFF

L0B2-32

GFI

+48" AFF

L0B2-28

GFI,+48" AFF

L0B2-41

GFI, +48" AFF

C-25 SVY-2

L0B2-35

GFI, +48" AFF

C-11 MRV VEHICLE

L0B3-3

GFI

+48" AFF

L0B2-29

GFI, +48" AFF

C-2 ADVON VEHICLE

L0B2-34

GFI

WPIU

L0B2-36

GFI

WPIU

L0B3-3

GFI

WPIU

L0B3-3

GFI

WPIU

L0B2-21,23

L14-30R, +36" AFF

C-7 DRYER

L0B2-27

GFI, +36" AFF

C-6 WASHER

L0B1-15

L0B1-1,3,5

SF12

L0B1-25

L0B1-31

L0B1-17

L0B1-27

L0B2-33

GFI, +48" AFF

C-8 ICE MACHINE

C-12 L0B2-17,19

ALS VEHICLE

L0B2-31

GFI, +48" AFF

C-13 REFRIGERATOR

C-26

T-COMPRESSOR-1

COMPRESSOR

L0B2-37

GFI,+48" AFF

L0B2-37

GFI,+48" AFF

L0B2-37

GFI,+48" AFF

L0B2-37

GFI,+48" AFF

L0B2-37

GFI,+48" AFF

L0B2-8

GFI,+48" AFF

L0B2-20

GFI,+48" AFF

L0B2-20

GFI,+48" AFF

L0B2-20

GFI,+48" AFF

L0B2-26

GFI,+48" AFF

L0B2-26

GFI,+48" AFF

L0B2-26

GFI,+48" AFF

L0B2-12

GFI,+48" AFF

L0B2-12

GFI,+48" AFF

L0B2-12

GFI,+48" AFF

L0B2-12

GFI,+48" AFF

L0B2-12

GFI,+48" AFF

L0B2-10

GFI,+48" AFF

L0B2-10

GFI,+48" AFF

L0B2-10

GFI,+48" AFF

L0B2-10

GFI,+48" AFF

L0B2-10

GFI,+48" AFF

L0B2-28

GFI,+48" AFF

L0B2-28

GFI,+48" AFF

L0B2-28

GFI,+48" AFF

L0B2-22

GFI,+48" AFF

L0B2-22

GFI,+48" AFF

L0B2-22

GFI,+48" AFF

L0B2-14

GFI,+48" AFF

L0B2-14

GFI,+48" AFF

L0B2-14

GFI,+48" AFF

L0B2-14

GFI,+48" AFF

L0B2-16

GFI,+48" AFF

L0B2-16

GFI,+48" AFF

L0B2-16

GFI,+48" AFF

L0B2-16

GFI,+48" AFF

L0B2-18

GFI,+48" AFF

L0B2-18

GFI,+48" AFF

L0B2-18

GFI,+48" AFF

L0B2-18

GFI,+48" AFF

L0B2-18

GFI,+48" AFF

L B

-2

G

F I

A F

F

L0B2-24

GFI

WPIU

L0B2-34

GFI

+48" AFF

L0B2-36

GFI

WPIU

L0B2-36

GFI

+48" AFF

L0B2-30

GFI

+48" AFF

L0B3-3

GFI

+48" AFF

L0B2-13

GFI, WPIU

C-2 ADVON VEHICLE

L0B2-1,3

NEMA 14-50R,WPIU, +48" AFF

C-1 UCS VEHICLE

EF-106

M0B1-13,15,17

AC

AC

L B

-1

,3 N

E M

A

-5

R

A F

F C

-1 U

C S

V E

H

IC

L E

L0B2-7,9

NEMA 14-50R, +48" AFF

C-24 TOC TRAILER

P0B1-9

EWC-1

L0B1-35

AC

AC

AC

AC

L

M

N.5

P

Q

9.7

DSCU-104

P0B1-1,3

T-COMPRESSOR

CST COMMO

OFFICE

28B

OFFICE

28C

OFFICE

28A

OFFICE

36A

CST READY BAYS

TOILET

TOILET

CONF

CST OPERATIONS

CST MED STOR

36B

MECH

IT

ELEC

CUST

CST SURVEY

CST MED SUPPORT

OFFICE

29B

OFFICE

29A

CST COMMAND

TRAINING AID STORAGE

29C

HALL

39CORRIDOR

7B

10.5

129.8 10.6 10.8 11.6

L0B1-21

L0B1-15

L0B1-21

L0B1-21 L0B1-21

L0B1-25 25

L0B1-29 L0B1-35

L0B1-37

L0B1-37

L0B1-37

L0B1-37

L0B1-37 L0B1-41

L0B1-41

L0B1-41

L0B1-8

L0B1-14

EF-105

P0B1-5

L0B1-20

FPVAV-101-03

P0B1-15

HALL

P0B1-17

EEWS -101

P0B1-17

EEWS -101

P0B1-17

EEWS -101

P0B1-17

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F'

'D'

'B'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 5

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-1B

POWER PLAN -

LOWER LEVEL -

AREA B

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1/8" = 1'-0"

POWER PLAN - LOWER LEVEL - AREA B

MATCHLINE SEE SEET E-101-1D FOR CONTINUATION

0 4' 8' 16'

TRANSFORMER "T-COMPRESSOR" SHALL BE TAPPED DOWN SUCH THAT SECONDARY

TRANSFORMER VOLTAGE IS EQUAL TO 230V, THREE-PHASE.

KEYED NOTES:

M

M

J J

E

E

J

M

M

M M

M

J

M

MM

M

M

M

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,

AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.

3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS

OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION

IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE

EXACT CONNECTION LOCATION.

NOTES:

E-401

AC

AC

L0D1-15

AC

L0D1-15

AC

UH-101

P0D1-29

AHU-101

M0D1-1,3,5

OH-18.3

H0D1-7,9,11

C

D.9

E

F

G

H

J

D S

C U

-1

P D

-1

,1

ELEVATOR CAB LIGHTS

L0D1-3

P0D1-2

SUMP PUMP

60" AFF

L0D1-1

+36" AFF, GFI, WPIU

NEMA 4 ENC

L0D1-1

+36" AFF, GFI, WPIU

NEMA 4 ENC

L0D1-1

+36" AFF, GFI, WPIU

NEMA 4 ENC

L0D1-21

GFI

WPIU

AC

EF-101

P0D1-4

EF-102

P0D1-25

EF-103

P0D1-27

D S

C U

-1

P D

-1

,1

UH-104

P0D1-31

P0D1-37

DDC PANEL MECH 09

L0D1-21

GFI

48" AFF

L0D1-21

GFI

48" AFF

L0D1-21

GFI

48" AFF

C.5

L

G.5

F.3

KJ.9

EF-104

M0D1-7,9,11

CP-DSFCU-103

P0D1-39

DSFCU-103

P1D1-2,4

ELEVATOR

H0D1-1,3,5

CORR

CST STORAGE

CST LOG / ADMIN

08A

RECEIVING

MECH

ELEC

F L A

M M

A B

L E

S T

O R

A G

E

B.1

H.9

K.5

9.8 10.6 10.8 11.6

P0D1-35

GFI

48" AFF

AC

L0D1-13

L0D1-9

L0D1-9

L0D1-9

+48" AFF

L0D1-9

+48" AFF

L0D1-9

L0D1-9

+48" AFF

L0D1-11

+48" AFF

L0D1-11

+48" AFF

L0D1-11

+48" AFF

L0D1-11

+48" AFF

L0D1-11

L0D1-17

L0D1-17

L0D1-17

+48" AFF

L0D1-17

+48" AFF

ELEV EQUIP

S T

A

IR

IT

GROUNDS & MAINTENANCE

L0B1-10 L0B1-10 L0B1-10

TV3

L0B1-10

UH-102

P0D1-29

UH-103

P0D1-31

L0D1-17

GFI

WPIU

L0D1-25

GFI

48" AFF

L0D1-25

GFI

48" AFF

L0D1-25

GFI

48" AFF

L0D1-23

GFI

48" AFF

L0D1-23

GFI

48" AFF

L0D1-19

AUTO DOOR OPENER

L0D1-23

48" AFF

SF-101

P0D1-33

L0D1-17

L0D1-29

GFI

WPIU

L0D1-29

GFI

WPIU

L0D1-29

GFI

WPIU

FPE0D1-3

AMP

FPE0D1-1

NAC

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F'

'D'

'B'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 5

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-1D

POWER PLAN -

LOWER LEVEL -

AREA D

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1/8" = 1'-0"

POWER PLAN - LOWER LEVEL - AREA D

MATCHLINE SEE E-902 FOR CONTINUATION

MATCHLINE SEE E-101-1B FOR CONTINUATION

0 4' 8' 16'

PROVIDE ELEVATOR SERVICE PIT RECEPTACLE(S) AND ELEVATOR PIT LIGHT. CONNECT

TO JUNCTION BOX AND CIRCUIT INDICATED. SERVICE RECEPTACLES AND SERVICE

LIGHT SHALL BE INSTALLED IN ACCORDANCE WITH ASME-A17.1.

PROVIDE INDICATOR LIGHT WITH RECEPTACLE TO INDICATE CIRCUIT IS ENERGIZED.

INDICATOR LIGHT MAY BE INTEGRAL TO THE RECEPTACLE.

FOR ALL ELEVATOR EQUIPMENT LOCATED WITHIN ELEVATOR EQUIPMENT ROOM,

CONTRACTOR SHALL BE RESPONSIBLE FOR EXTENDING FEEDER CONDUCTORS FROM

CONNECTION LOCATION INDICATED ON THIS SHEET TO DEVICES WITHIN ELEVATOR PIT

AND SHAFT. COORDINATE ALL ELECTRICAL REQUIREMENTS OF ALL DEVICES WITHIN

ELEVATOR PIT AND SHAFT REQUIRING POWER WITH ELEVATOR SHOP DRAWINGS.

COORDINATE DOOR HARDWARE POWER REQUIREMENTS PRIOR TO COMMENCING

INSTALLATION.

COORDINATE FINAL LOCATION OF ELECTRICAL CONNECTION WITH FIRE ALARM

EQUIPMENT TO BE INSTALLED.

KEYED NOTES:

J J J J J J J J J

M

M

J

M

J J

E

JJ

M

M

M

E-402

T

L1A1-3

GFI

WPIU

L1A2-11

FB2

L1A2-16

GFI

WPIU

L1A2-12

GFI

L1A2-19

FB1

L1A2-21

FB1

L1A2-25

FB1

L1A2-29

FB1

L1A2-33

FB1

L1A2-37

FB1

L1A2-41

FB1

L1A2-19

FB1

L1A2-23

FB1

L1A2-27

FB1

L1A2-31

FB1

L1A2-35

FB1

L1A2-39

FB1

L1A2-10

FB1

L1A2-27

FB1

L1A2-31

FB1

L1A2-35

FB1

L1A2-39

FB1

L1A2-8

FB1

L1A1-11

L1A2-14

L1A2-14

L1A1-1

FB0

L1A1-3

L1A1-1

L1A1-1

L1A1-1

L1A1-11

L1A1-11

L1A1-11

L1A2-16

L1A1-13

GFI

WPIU

L1A1-13

+7" AFF, GFI

WPIU

L1A1-7

L1A1-13

AC,GFI

654321

N

E-406

E-406

L1A2-1

L1A2-9

UH-203

P1A1-1,3

L1A1-7

L1A1-13

GFI

WPIU

L1A1-17

L1A1-39

TV1

L1A1-19

L1A1-21

L1A1-25

L1A1-7

L1A1-39

L1A1-35

TREADMILL

L1A1-33

TREADMILL

L1A1-31

L1A1-29

L1A1-39

TV1

L1A1-27

L1C1-3

7.6

3.5

4.8

5.9

E-407

E-407

CHAIR LIFT

L1A2-40,42

L1A1-3

L1A1-3

L1A1-3

L1A1-11

P1A1-15

L1A1-7

L1A1-37

TREADMILL

L1A1-15

L1C1-3

L1A1-3

L1A2-12

GFI

WPIU

L1A2-12

L1A2-12

GFI

L1A2-18

L1A2-22 L1A2-20

L1A2-18

L1A2-13

FB1

L1A2-13

FB1

L1A2-13

FB1

L1A2-15

FB1

L1A2-15

FB1

L1A2-15

FB1

L1A2-17

FB1

L1A2-17

FB1

L1A2-23

FB1

L1A2-21

FB1

L1A2-25

FB1

L1A2-29

FB1

L1A2-16

L1A2-33

FB1

L1A2-37

FB1

L1A2-41

FB1

L1A1-5 L1A1-5

L1A1-23

L1A2-11

FB2

L1A2-11

FB2

L1A2-8

FB1

L1C1-13

TV3

L1A2-16

GFI

WPIU

L1A2-16

GFI

WPIU

L1A2-12

GFI

WPIU

6.7

5.1

L

M

N.5

P

Q

E-404

LIFT EQUIP

105C

ANTE

105B

ANTE

105A

VEST

PLUMBING CHASE

111C

WOMEN

WOMEN LOCKERS

108A

WOMEN SHOWERS

108B

ALCOVE

101D

PHYSICAL FITNESS

DISPLAY

101A

CORR

101C

MECH

IT

CLASSROOM/ LECTURE

LOBBY / MAIN HALL

AV

105D

R

3.6 5.4

L1A2-3

TV2 L1A2-3

TV2

L1A2-3

TV2

L1A2-3

TV2

L1A2-3

TV2

L1A2-3

TV2

DF-206

P1A1-21

DF-207

P1A1-21

DF-208

P1A1-21

DF-209

P1A1-21

L1A1-13

AC,GFI

ALCOVE

101B

L1C1-13 L1C1-1 L1D4-27

L1C1-9

GENERATOR

REMOTE

ANNUNCIATOR

F P

E C

-1

F A

A

L C

-1

L1C1-9

GFI

WPIU

FPVAV-208-01

P1A1-29

FPVAV-208-03

P1A1-31

ELEC

107A

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,

AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.

3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS

OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION

IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE

EXACT CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 5

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-2A

POWER PLAN -

MAIN LEVEL -

AREA A

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1/8" = 1'-0"

POWER PLAN - MAIN LEVEL - AREA A

MATCHLINE SEE E-101-2C FOR CONTINUATION

M A

T C

H L

IN

E S

E E

E -1

-2

B F

O R

C O

N T

IN

U

A T

IO

N

OPTION 2: PROVIDE GENERATOR REMOTE ANNUNCIATOR IN THIS LOCATION.

PROVIDE 2" CONDUIT FROM GENERATOR REMOTE ANNUNCIATOR LOCATION TO MAIN

ELECTRICAL ROOM 157D.

LOBBY / MAIN HALL 101 IS A MULTIPLE STORY SPACE. ELECTRICAL MATERIALS INCLUDING,

BUT NOT LIMITED TO, PATHWAYS, CONDUCTORS, WIRES, SUPPORTS, AND/OR

ACCESSORIES SHALL NOT TRANSVERSE OR BE VISIBLE WITHIN THIS SPACE. ANY

EXPOSED/VISIBLE ELECTRICAL MATERIALS WITHIN LOBBY / MAIN HALL 101, OTHER THAN

WHAT IS SHOWN ON THESE DRAWINGS, SHALL BE APPROVED IN WRITING BY THE

CONTRACTING OFFICER PRIOR TO COMMENCING INSTALLATION.

COORDINATE DOOR HADRWARE POWER REQUIREMENTS PRIOR TO COMMENCING

INSTALLATION.

PROVIDE ELECTRONIC FLUSH TRANSFORMER & POWER SUPPLY. PROVIDE CONDUIT,

BOXES, AND WIRING FOR ALL ELECTRONIC FLUSH DEVICES. INSTALL PER

MANUFACTURER RECOMMENDATIONS. COORDINATE WITH FIXTURE INSTALLER FOR

JUNCTION BOX HEIGHTS AND CONNECTIONS. MOUNT TRANSFORMER & POWER SUPPLY

ABOVE CEILING. PROVIDE LOCKABLE ACCESS PANEL SIZED AS REQUIRED INSTALLED

FLUSH WITH CEILING.

KEYED NOTES

OPEN TO ABOVE

0 4' 8' 16'

J J J J J

J J J J J J J J

M

M

T

S

111098

N

L1A1-41

GFI

WPIU

L1A1-41

GFI

WPIU

L1A3-9

GFI

WPIU

L1A3-9

GFI

WPIU

L1A1-41

GFI

WPIU

P1A1-17

L0B1-16

GFI

WPIU

L0B1-16

GFI

WPIU

L1A3-9

L1A3-11

L1A3-11 L1A3-11

L1A3-9

L1A3-9

L1A3-9

L1A3-21

L1A3-19

L1A3-21

L1A3-15

L1A3-19

L1A3-15 L1A3-15

L1A3-15

L1A3-17

L1A3-17

L1A3-17

L1A3-19

TV3

L1A3-15

TV3

L A

-2

T

V

L1A3-9

L A

-9

L1A3-11

TV3

L1A3-13

AC

L1A3-13

AC

L1A3-13

AC

L1A3-13

AC

L1A3-1

FB2

L1A3-1

FB2

L1A3-3

FB2

L1A3-3

FB2

L1A3-5

FB2

L1A3-5

FB2

L1A3-7

FB2

L1A3-7

FB2

L1A3-13

L1A3-13

L1A3-19

L1A3-19

L1A1-4

L1A1-4

8.7

L

M

P

Q

9.7

8.6

PLUMBING CHASE

109C

MEN LOCKERS

110A

MEDICAL

MEN

CLASSROOM

CLASSROOM

TRAINING

CORR

101E

MEN SHOWERS

110B

7.7

10.5

129.8

P1A1-19

GFI

EWC-1

DF-210

P1A1-25

DF-211

P1A1-25

DF-212

P1A1-25

L1A1-41

AC,GFI

L1A1-41

AC,GFI

L1A1-4

L1A3-23 L1A3-23

L1A3-23

L1A3-25

L1A3-25 L1A3-25

L1A3-23

L1A3-17

L1A3-21

L1D4-27 L1D4-27 L1D4-27 L1D4-27

L1A1-4

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,

AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.

3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS

OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION

IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE

EXACT CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 0

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-2B

POWER PLAN -

MAIN LEVEL -

AREA B

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1/8" = 1'-0"

POWER PLAN - MAIN LEVEL - AREA B

M A

T C

H L

IN

E S

E E

E -1

-2

A F

O R

C O

N T

IN

U

A T

IO

N

MATCHLINE SEE E-101-2D FOR CONTINUATION

KEYED NOTES

PROVIDE ELECTRONIC FLUSH TRANSFORMER & POWER SUPPLY. PROVIDE CONDUIT,

BOXES, AND WIRING FOR ALL ELECTRONIC FLUSH DEVICES. INSTALL PER

MANUFACTURER RECOMMENDATIONS. COORDINATE WITH FIXTURE INSTALLER FOR

JUNCTION BOX HEIGHTS AND CONNECTIONS. MOUNT TRANSFORMER & POWER SUPPLY

ABOVE CEILING. PROVIDE LOCKABLE ACCESS PANEL SIZED AS REQUIRED INSTALLED

FLUSH WITH CEILING.

LOBBY / MAIN HALL 101 IS A MULTIPLE STORY SPACE. ELECTRICAL MATERIALS

INCLUDING, BUT NOT LIMITED TO, PATHWAYS, CONDUCTORS, WIRES, SUPPORTS,

AND/OR ACCESSORIES SHALL NOT TRANSVERSE OR BE VISIBLE WITHIN THIS SPACE.

ANY EXPOSED/VISIBLE ELECTRICAL MATERIALS WITHIN LOBBY / MAIN HALL 101, OTHER

THAN WHAT IS SHOWN ON THESE DRAWINGS, SHALL BE APPROVED IN WRITING BY THE

CONTRACTING OFFICER PRIOR TO COMMENCING INSTALLATION.

OPEN TO

ABOVE

WORKBAY ROOF

0 4' 8' 16'

J J

M

J

M

M

M

M

M

M M

MM

M

M

J

J

M

E-402

E-402

E-403

L1C1-9

GFI

WPIU

8654321

E-407

E-407

FPE1C1-1

FAA

E-405

L1C1-3 L1C1-3 L1C1-1 L1C1-1 L1C1-1

L1C1-15

L1C1-11

L1C1-9

L1C1-9

15 15 15

L1C1-11

L1C1-7

L1C1-7

GFI

L1C1-5

L1C1-21

GFI

WPIU

L1C1-27

L1C1-27

L1C1-5

L1C1-5

L1C1-27 L1C1-27

L1C1-27

L1C1-27

L1D1-17 L1D1-17

L1C1-17

3'-8" AFF

L1C1-17

3'-8" AFF

L1C1-17

3'-8" AFF L1C1-17

L1C1-23

L1C1-29

3'-8" AFF

L1C1-29

3'-8" AFF

L1C1-33

L1C1-29

3'-8" AFF

L1C1-31

L1C1-31

L1C1-37

L1C1-37

3'-8" AFF

L1C1-33

L1C1-37

3'-8" AFF L1C1-35

L1C1-35

L1D1-17

AC,GFI

L1D1-17

L C

-3

L C

-3

A F

F

L1C1-39

L1C1-23

L1D1-27

L1D1-25

C

E

F

G

H

J

7.64.8

L C

-3

A F

F

L1C1-37

3'-8" AFFL1C1-29

L1E1-3

+48" AFF

L1D1-25

+48" AFF

L1D1-27

L1D1-27

+48" AFF

L1D1-29

+48" AFF

L1D1-25

+48" AFF

L1D1-29

+48" AFF

L1D1-17

L1D1-9

L1D1-9

L1D1-9

L1D1-9

L1D1-17

L1C1-7

GFI

REF

L1C1-11

L1D1-7

TV3

L1D1-9

L1C1-21

GFI

WPIU

L1C1-41

GFI

WPIU

L1E1-3

+48" AFF

L1C1-33

L1C1-33

L1D1-37

ESS MAINT

RECEPT

L1D1-35

ESS PANEL(S)

L1C1-41

GFI

WPIU

EF-214

P1D1-5

L1D1-11

L1D1-11

L1D1-15

L1D1-15

GENERATOR

REMOTE

ANNUNCIATOR

L D

-3

L1C1-13

TV3

C.5

L

G.5

K J.9

P1D1-7

GFI

EWC-1

EF-213

P1D1-37

VAULT

153A

LACTATION

ELEC

PANTRY / OFFICE

160D

TOILET

160B

CUST

160C

SCULLERY

160A

RECRUITING

FAMILY READINESS

CORR

157B

CORR

157A

SERVING

158A

MECH / WATER SERVICE

IT

CUST

ELEC

LOCKERS

ISSUING

157E

HEATED STORAGE

LEARNING CENTER

TABLE / CHAIR STORAGE

104A

ARMORER

ASSEMBLY

ISSUING

ISSUING

ISSUING

BREAK / VENDING

CORR

TOILET

MECH

CORR

KITCHEN

CORR

3.62.6

B.1

H.9

5.4

K.5

L1D1-41

FB6

L1D1-41

FB6

L1D1-8

FB6

L1D1-11

TV3

P1D1-9

GFI

EWC-1

DF-201

P1C1-8

DF-202

P1C1-8

DF-203

P1C1-8

DF-204

P1C1-8

DF-205

P1C1-8

ERU-201

M1D1-13,15,17

AHU-204

M1D1-1,3,5

AHU-205

M1D1-7,9,11ERU-202

M1D1-19,21,23

FCU-201

P1D1-23

L1D1-7

L1D1-7

L1D3-25

EF-212

P1D1-3

L1C1-23

L1D1-23

+48" AFF

L1D1-23

+48" AFF

L1D1-23

+48" AFF

L1D1-23

+48" AFF

P D

-3

D

D C

P A

N E

L M

E C

H

L1D1-25

+48" AFF

L1D3-19

L1D3-19

L1D3-25

L1C1-13

L1C1-9

P1C1-41

GFI

EWC-1

L1C1-23

L1C1-31

L1C1-31 L1C1-35

L1C1-35

L1D1-27

+48" AFF

L1D1-31

L1C1-8

SCREEN

16'-9" AFF

PHRP-207/208

P1D1-41

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,

AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.

3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS

OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION

IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE

EXACT CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 0

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-2C

POWER PLAN -

MAIN LEVEL -

AREA C

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1/8" = 1'-0"

POWER PLAN - MAIN LEVEL - AREA C

M A

T C

H L

IN

E S

E E

E -1

-2

D F

O R

C O

N T

IN

U

A T

IO

N

MATCHLINE SEE E-101-2A FOR CONTINUATION

MATCHLINE SEE E-101-2E FOR CONTINUATION

0 4' 8' 16'

FINAL LAYOUT OF HEATED STORAGE ROOM FENCED CAGES LAYOUT IS TO BE

DETERMINED BY GOVERNMENT. RECEPTACLE LOCATIONS INDICATED ARE

REPRESENTATIVE OF A POTENTIAL RECEPTACLE LAYOUT BASED UPON ASSUMED LAYOUT

OF FENCED CAGES. CONTRACTOR SHALL MODIFY RECEPTACLE LAYOUT TO PROVIDE

MAINTENANCE RECEPTACLES IN CORRIDOR AREAS BASED UPON FINAL CONFIGURATION

OF HEATED STORAGE FENCED CAGES. NO POINT WITHIN THE CORRIDOR AREAS OF

HEATED STORAGE SHALL BE FURTHER THAN 25'-0" FROM A RECEPTACLE.

OPTION 2: PROVIDE GENERATOR REMOTE ANNUNICIATOR IN THIS LOCATION.

PROVIDE 2" CONDUIT FROM GENERATOR REMOTE ANNUNCIATOR LOCATION TO MAIN

ELECTRICAL ROOM 157D.

PROJECTOR SCREEN IS GFGI. COORDINATE FINAL JUNCTION BOX PLACEMENT WITH

ACTUAL PROJECTOR SCREEN PROCURED BY GOVERNMENT.

KEYED NOTES

2 3

11109

C

D.9

E

F

G

H

J

C.5

L

8.6

G.5

F.3

KJ.9

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONF

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONF

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

WORK RM

WORK RM

OPEN OFFICE

OPEN OFFICE

OPEN OFFICE

OPEN OFFICE

B.1

H.9

K.5

9.2 9.8 10.6 10.8 11.6

ELEV LOBBY / STAIR

101F

L1D2-25,27,29

SF12

L1D2-25,27,29

SF16

L1D2-19,21,23

SF12

L1D2-19,21,23

SF12

L1D2-13,15,17

SF16

L1D2-13,15,17

SF12

L1D2-7,9,11

SF12

L1D2-7,9,11

SF16

L1D2-1,3,5

SF24

L1D2-31,33,35

SF12

L1D2-37,39,41

SF24

L1D3-13

FB6

L1D2-2,4,6

SF24

L1D2-8,10,12

SF24

L1D2-14,16,18

SF24

L1D2-20,22,24

SF24

L1D3-1,3,5

SF24

L1D3-7,9,11

SF12

L1D3-15

FB6

L1D3-27

TV3

L1D3-15

FB6

L1D3-13

FB6

L1D4-23

TV3

L1D3-25

L1D3-19

L1D3-19

L1D3-19

L1D3-19 L1D3-19

L1D3-25

L1D3-25

L1D3-25

L1D3-25

L1D3-25

L1D3-23

L1D4-3

L1D3-23

L1D3-23

L1D3-23

L1D3-23

L1D3-21

L1D3-21

L1D3-21

L1D3-21

L1D3-21

L1D3-17L1D3-17

L1D4-3

L1D4-23

L1D4-23 L1D4-21 L1D4-21

L1D4-25 L1D4-3

L1D4-25L1D4-25L1D4-25

L1D4-17

L1D4-17

L1D4-21L1D4-23

L1D4-21

L1D4-19

L1D4-19

L1D4-21

L1D4-13

L1D4-13

L1D4-11

L1D4-17

L1D4-19

L1D4-11

L1D4-15

L1D4-15

L1D4-7

L1D4-7

L1D4-11

L1D4-13

L1D4-11

L1D4-15

L1D4-9

L1D4-9

L1D4-3

L1D4-3

L1D4-9

AC

L1D4-9

ACL1D4-5

L1D4-7

AC

L1D4-7

AC

L1D3-24

L1D4-1

L1D3-24

L1D4-1

L1D3-24

L1D3-24

L1D3-22

L1D3-22

L1D3-24

L1D3-18

L1D3-18

L1D4-1

L1D3-16

L1D3-16

L1D3-22

L1D3-20

L1D3-20

L1D3-17

L1D3-12

L1D3-12

L1D3-16

L1D3-18

L1D3-16

L1D3-14

L1D3-14

L1D3-17

L1D3-20

L1D3-8

L1D3-12

L1D3-8

L1D3-10

L1D3-10

L1D3-8

L1D3-10

L1D3-10

L1D3-14

L1D3-2

AC

L1D3-2

AC

L1D3-6 L1D3-4

AC

L1D3-4

AC

L1D3-2

L1D3-37

L1D3-2

L1D3-41

L1D3-41

L1D3-39

L1D3-4

L1D3-4

L1D3-33

L1D3-37 L1D3-37

L1D3-41

L1D3-41

L1D3-35

L1D3-39

L1D3-39

L1D3-17

L1D3-33

L1D3-33

L1D3-31

L1D3-31 L1D3-31

L1D3-29

L1D3-35

L1D3-35

L1D3-17

L1D3-27 L1D3-27 L1D3-29

L1D3-29L1D3-29L1D3-31

L1D3-27

L1D3-29

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,

AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.

3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS

OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION

IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE

EXACT CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 0

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-2D

POWER PLAN -

MAIN LEVEL -

AREA D

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1/8" = 1'-0"

POWER PLAN - MAIN LEVEL - AREA D

MATCHLINE SEE E-101-2E FOR CONTINUATION

M A

T C

H L

IN

E S

E E

E -1

-2

C F

O R

C O

N T

IN

U

A T

IO

N

MATCHLINE SEE E-101-2B FOR CONTINUATION

0 4' 8' 16'

MM

M

M MM

E-401

111098654321

A

B

7.64.8

L1E1-3

+48" AFF

L1E1-5

+48" AFF

L1E1-5

GFI

WPIU

L1D1-19

GFI

WPIU

L1D1-29

+48" AFF

OH-157.4

H1E1-1,3,5

OH-157.3

H1E1-1,3,5

DSCU-201

P1E1-9,11

DSCU-202A

P1E1-1,3

7 8.6

L1E1-5

+48" AFF

L1E1-1

GFI

WPIU

L1E1-5

+48" AFF

DSCU-202B

P1E1-5,7

ELEC

157D

IT

157C

MECH

HEATED STORAGE

CORR

LOCKERS

3.62.6 5.4 9.2 9.8 10.6 10.8

CH-102

SWGR1-8

CH-101

SWGR1-7

CHILLER

CHILLER

L1D1-29

+48" AFF

E-404

L1D1-21

+48" AFF

L1D1-21

+48" AFF

L1D1-19

L1D1-25

+48" AFF

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,

AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.

3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS

OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION

IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE

EXACT CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 1

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-2E

POWER PLAN -

MAIN LEVEL -

AREA E

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1/8" = 1'-0"

POWER PLAN - MAIN LEVEL - AREA E

MATCHLINE SEE E-101-2C FOR CONTINUATION

UTILITY

TRANSFORMER

0 4' 8' 16'

FINAL LAYOUT OF HEATED STORAGE ROOM FENCED CAGES LAYOUT IS TO BE

DETERMINED BY GOVERNMENT. RECEPTACLE LOCATIONS INDICATED IS REPRESENTATIVE

OF A POTENTIAL RECEPTACLE LAYOUT BASED UPON ASSUMED LAYOUT OF FENCED

CAGES. CONTRACTOR SHALL MODIFY RECEPTACLE LAYOUT TO PROVIDE MAINTENANCE

RECEPTACLES IN CORRIDOR AREAS BASED UPON FINAL CONFIGURATION OF HEATED

STORAGE FENCED CAGES. NO POINT WITHIN THE CORRIDOR AREAS OF HEATED

STORAGE SHALL BE FURTHER THAN 25'-0" FROM A RECEPTACLE.

MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO MECHANICAL EQUIPMENT.

SEE MECHANICAL EQUIPMENT SCHEDULES.

KEYED NOTES

MATCHLINE SEE E-101-2D FOR CONTINUATION

M

M

8654321

N

7.6

3.5

4.8

5.9 6.7

5.1

L

M

N.5

P

Q

R

3.6

7.7

5.4

EF-216

M1A1-31,33,35

(ON ROOF)

L1A1-6

GFI

WPIU DSCU-206

P1A1-5,7

(ON ROOF)

EF-215

M1A1-25,27,29

(ON ROOF)

EF-217

M1A1-37,39,41

(ON ROOF)

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,

AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.

3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS

OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION

IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE

EXACT CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 1

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-3A

POWER PLAN -

ROOF LEVEL -

AREA A

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1/8" = 1'-0"

POWER PLAN - ROOF LEVEL - AREA A

MATCHLINE SEE E-101-3C FOR CONTINUATION

M A

T C

H L

IN

E S

E E

E -1

-3

B F

O R

C O

N T

IN

U

A T

IO

N

CONDUIT AND CONDUCTORS SHALL BE INSTALLED IN ACCORDANCE WITH NEC 310.15(B)(3)

(c) SUCH THAT AMPACITY OF CONDUCTORS DO NOT NEED ADJUSTMENT DUE TO

PROXIMITY TO ROOF. MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO

MECHANICAL EQUIPMENT. SEE MECHANICAL EQUIPMENT SCHEDULES.

KEYED NOTES

0 4' 8' 16'

M M

M

M

M

M

M

M

M

M

M M M

8654321

C

E

F

G

H

J

7.64.8

C.5

L

7 8.6

G.5

K J.9

3.62.6

B.1

H.9

5.4

K.5

EF-209

P1C1-37,39

(ON ROOF)

MAU-201

P1C1-1,3,5

(ON ROOF)EF-208

P1C1-33,35

(ON ROOF)

EF-207

P1C1-31

(ON ROOF)

EF-206

P1C1-29

(ON ROOF)

L1C1-19

GFI

WPIU DSCU-203

P1C1-13,15

(ON ROOF)

EF-202

P1C1-25

(ON ROOF)

EF-205

M1C1-25,27,29

(ON ROOF)

EF-204

P1C1-27

(ON ROOF)

EF-203

M1C1-19,21,23

(ON ROOF)

L1D1-39

GFI

WPIU

DSCU-205A

P1D1-15,17

(ON ROOF)

L1D1-39

GFI

WPIU

L1D1-39

GFI

WPIU

DSCU-204

P1D1-11,13

(ON ROOF)

DSCU-205B

P1D1-19,21

(ON ROOF)

EF-210

M1D1-8,10,12

(ON ROOF)

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,

AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.

3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS

OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION

IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE

EXACT CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 1

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-3C

POWER PLAN -

ROOF LEVEL -

AREA C

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1/8" = 1'-0"

POWER PLAN - ROOF LEVEL - AREA C

M A

T C

H L

IN

E S

E E

E -1

-3

D F

O R

C O

N T

IN

U

A T

IO

N

MATCHLINE SEE E-101-3A FOR CONTINUATION

MATCHLINE SEE E-101-3E FOR CONTINUATION

CONDUIT AND CONDUCTORS SHALL BE INSTALLED IN ACCORDANCE WITH NEC 310.15(B)(3)

(c) SUCH THAT AMPACITY OF CONDUCTORS DO NOT NEED ADJUSTMENT DUE TO

PROXIMITY TO ROOF. MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO

MECHANICAL EQUIPMENT. SEE MECHANICAL EQUIPMENT SCHEDULES.

MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO MECHANICAL EQUIPMENT.

SEE MECHANICAL EQUIPMENT SCHEDULES.

KEYED NOTES

1 1

1 1 1

0 4' 8' 16'

11109

C

D.9

E

F

G

H

J

C.5

L

8.6

G.5

F.3

KJ.9

B.1

H.9

K.5

9.2 9.8 10.6 10.8 11.6

EF-211

M1D1-14,16,18

(ON ROOF)

DSCU-103

P1D1-2,4

L1D1-39

GFI

WPIU

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,

AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.

3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS

OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION

IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE

EXACT CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 1

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-3D

POWER PLAN -

ROOF LEVEL -

AREA D

18-0061

02-25-2021

K. HIATT

B. PINKLEY

1/8" = 1'-0"

POWER PLAN - ROOF LEVEL - AREA D

MATCHLINE SEE E-101-3E FOR CONTINUATION

M A

T C

H L

IN

E S

E E

E -1

-3

C F

O R

C O

N T

IN

U

A T

IO

N

MATCHLINE SEE E-101-3B FOR CONTINUATION

0 4' 8' 16'

CONDUIT AND CONDUCTORS SHALL BE INSTALLED IN ACCORDANCE WITH NEC 310.15(B)(3)

(c) SUCH THAT AMPACITY OF CONDUCTORS DO NOT NEED ADJUSTMENT DUE TO

PROXIMITY TO ROOF. MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO

MECHANICAL EQUIPMENT. SEE MECHANICAL EQUIPMENT SCHEDULES.

KEYED NOTES

Revisions

1110986543

A

B

7.64.8 7 8.63.62.6

B.1

5.4 9.2 9.8 10.6 10.8

EF-201

P1D1-35

(ON ROOF)

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101,

AND UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. PROVIDE EQUIPMENT CONNECTIONS PER SHEET E-712.

3. COORDINATE FFE POWER INFRASTRUCTURE REQUIREMENTS WITH SHOP

DRAWINGS OF ACTUAL FFE TO BE PROCURED BY THE GOVERNMENT. LOCATIONS

OF CONNECTION POINTS SHOWN ON THE SHEETS INDICATE THAT A CONNECTION

IS REQUIRED FOR THE ADJACENT FFE SHOWN BUT IS NOT INDICATIVE OF THE

EXACT CONNECTION LOCATION.

NOTES:

SHEET NUMBER

SHEET TITLE

CLIENT INFORMATION

PROJECT INFORMATION

JOB #

ISSUE DATE

Checked by Drawn by

Davis Design All Rights Reserved

E a s t

M a in

S u it e

V e rm ill io n S

D

P h o n e

-6

-1

V e rm il li o n

N S tr e e t, S u it e

L in c o ln N

E

P h o

-4

-9

F a x

-4

-9

L in c o ln L in c o ln

N th

S tr e e t, S u it e

O m a h a

N E

-4

-3

W a rd

P a rk w a y

K a n s a s C it y

M O

-3

-9

'F''E'

'C' 'D'

'B' 'A'

C

R e v it

P ro je c ts

\1

E

C e n tr a l_ b d p in k le y .r v t

/2

/2

:5 : 1

P

M

Nebraska National Guard

Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE

E-101-3E

POWER PLAN -

ROOF LEVEL -

AREA E

18-0061

02-25-2021

K. HIATT

B. PINKLEY1/8" = 1'-0"

POWER PLAN - ROOF LEVEL - AREA E

MATCHLINE SEE E-101-3C FOR CONTINUATION

0 4' 8' 16'

MATCHLINE SEE E-101-3D FOR CONTINUATION

CONDUIT AND CONDUCTORS SHALL BE INSTALLED IN ACCORDANCE WITH NEC 310.15(B)(3)

(c) SUCH THAT AMPACITY OF CONDUCTORS DO NOT NEED ADJUSTMENT DUE TO

PROXIMITY TO ROOF. MAINTENANCE RECEPTACLE TO BE INCLUDED INTEGRAL TO

MECHANICAL EQUIPMENT. SEE MECHANICAL EQUIPMENT SCHEDULES.

KEYED NOTES

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NEC (NFPA 70), NFPA 72, NFPA 101, AND

UNIFORM FACILITY CRITERIA, OR TECHNICAL LETTERS, IN ADDITION TO LOCAL

CODES AND ORDINANCES.

2. SET LUMINAIRES PLUMB, SQUARE, AND LEVEL WITH CEILING AND WALLS, IN

ALIGNMENT WITH ADJACENT LUMINAIRES AND SECURE IN ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS. LUMINAIRES INSTALLED ASKEW FROM

ADJACENT LUMINAIRES IN ANY DIRECTION, DIMENSION AND/OR PLANE SHALL NOT BE

ACCEPTABLE.

3. FULLY COORDINATE EXACT LOCATION AND MOUNTING HEIGHT OF FIXTURES IN

SERVICE SPACES (MECHANICAL, ELECTRICAL, TELECOMM, STORAGE, ETC.) WITH

OTHER TRADES. MINOR ADJUSTMENTS TO MOUNTING HEIGHT OR PLAN LOCATION

MAY BE REQUIRED TO ACCOMMODATE OTHER TRADES.

4. LIGHTING CONTROLS SHALL BE LOCAL TO THE SPACE THEY CONTROL. A BUILDING-

WIDE, NETWORKED LIGHTING CONTROL SYSTEM SHALL NOT BE INSTALLED.

5. WHERE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .