Bellevue_RC_100_Vol_I_A-Reference-SeriesDWGS_2021-02-25.pdf
PDF 2 MB Posted
- Attached to
- Construct Bellevue Readiness Center
- Solicitation number
- W9124321RCH02
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
'B'
'D'
'F' (OPTION 1)
10 11
H.9
P
L
N
10.8
K.5
B.1
D.9
F.3
J.9
G.5
10.5 9.7
11.610.6
C.5
ELEV
CORR
CST STORAGE
STAIR
CONF
CST LOG / ADMIN
08A
MECH
CORR
ELEC
FLAMABLE
STORAGE
RECEIVING
CORR
IT
CUST
CST READY BAYS
CUST
TOILET
TOILET
OFFICE
36A
CST SURVEY
CST COMMO
OFFICE
29A
CST MED
SUPPORT
OFFICE
28A
CST MED STOR
36B
IT
ELEC
CST OPERATIONS
OFFICE
29B
OFFICE
28B
CST COMMAND
OFFICE
28C
MECH
ELEV EQUIP
GROUNDS &
MAINTENANCE
TRAINING AID
STORAGE
29C
TRAINING AID
STORAGE
30A
Room
Room
Room
13A
GPTB BAY
Room
/SEE DRAWING 1 A-101-1B
/SEE DRAWING 1 A-101-1D
S
E E
D R
A W
IN
G
A
-1 -1
D
S
E E
D R
A W
IN
G
A
-9
A-901
OPTION 1
GPTB ADDITION
FIN. FLR. ELEV. = 1037.50 ENGINEERING
FIN. FLR. ELEV. = 86'-0" ARCHITECTURAL
10.1 11.3
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o n e
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
D
R e v it
L o c a l2
\1
-0
-A
IS
V
R C d a n .w a rn e r6
R
A Q
.r v t
/2
/2
:3 : 5
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
A-001
LOWER LEVEL
REFERENCE
FLOOR PLAN
INDICATING
OPTIONS
18-0060
02/25/21
BS
AS
1/16" = 1'-0"
LOWER LEVEL FLOOR PLAN
NOTE:
FOR METAL SEALS INDICATED HERE AND ANY OTHER OVERHEAD
MOUNTED ARCHITECTURAL FEATURES WITHIN THE FACILITY,
INSTALLATION MUST COMPLY WITH THE FOLLOWING STANDARD:
FOR NEW CONSTRUCTION AND EXISTING BUILDINGS REQUIRED TO
COMPLY WITH THESE STANDARDS, ENSURE THAT OVERHEAD
MOUNTED FEATURES WEIGHING 31 POUNDS (14 KILOGRAMS) OR
MORE (EXCLUDING DISTRIBUTED SYSTEMS SUCH AS SUSPENDED
CEILINGS THAT COLLECTIVELY EXCEED THAT WEIGHT) ARE MOUNTED
USING EITHER RIGID OR FLEXIBLE SYSTEMS TO MINIMIZE THE
LIKELIHOOD THAT THEY WILL FALL AND INJURE BUILDING OCCUPANTS.
MOUNT ALL SUCH SYSTEMS SO THAT THEY RESIST FORCES OF 0.5
TIMES THE COMPONENT WEIGHT IN ANY HORIZONTAL DIRECTION AND
1.5 TIMES THE COMPONENT WEIGHT IN THE DOWNWARD DIRECTION.
THIS STANDARD DOES NOT PRECLUDE THE NEED TO DESIGN
ARCHITECTURAL FEATURE MOUNTINGS FOR FORCES REQUIRED BY
OTHER CRITERIA SUCH AS SEISMIC STANDARDS.
Revisions
ID Date Description
02/25/2021
'B'
'D'
'F'
'A'
'C'
'E' (OPTION 1)
2 3 4 5 6 7 8 9 10 11
A
3.6
H.9
H
P
L
M
Q
N
2.6 10.87.6
K.5
B.1
K
R
8.6
N.5
D.9
F.3
J.9
G
F
4.8
B
G.5
10.5
9.7 8.7
7.7 6.7
5.9
9.8
1.7
11.65.4
J
9.2
E
C
10.6
3.5
5.1
C.5
FLAG PLAZA
TERRACE
DOCK
ELEV
/4
ASSEMBLY
CLASSROOM/
LECTURE
FAMILY
READINESS
RECRUITING
LEARNING
CENTER
DISPLAY
101A
LACTATION
HEATED
STORAGE
LOCKERS
BREAK / VENDING
TRAINING
112ELEC
107A
VEST
MECH / WATER
SERVICE
ANTE
105A
ANTE
105B
ELEC
157D
PHYSICAL
FITNESS
MEN
WOMEN
ISSUING
BEVERAGES
158B
MEDICAL
TABLE / CHAIR
STORAGE
104A
KITCHEN
SERVING
158A
LOBBY / MAIN
HALL
CORR
CORR
ELEC
IT
VAULT
153A
ARMORER
ISSUING
ISSUING
WOMEN
LOCKERS
108A
MEN LOCKERS
110A
MECH
IT
157C
ELEC
CUST
IT
PANTRY / OFFICE
160D
CUST
160C
TOILET
160B
SCULLERY
160A
CORR
157B
CORR
157A
CORR
CORR
101C
ALCOVE
101B
ALCOVE
101D
LIFT EQUIP
105C
MEN SHOWERS
110BWOMEN
SHOWERS
108B
TOILET
CONF
OFFICE
OFFICE
WORK RM
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONF
OFFICE
OFFICE
MECH
WORK RM
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CLASSROOM
CLASSROOM
MECH
PLUMBING
CHASE
109C
PLUMBING
CHASE
111C
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ISSUING
157E
A-901
/SEE DRAWING 1 A-101-2E
/SEE DRAWING 1 A-101-2C
S
E E
D R
A W
IN
G
A
-1 -2
E
S
E E
D R
A W
IN
G
A
-9
S
E E
D R
A W
IN
G
A
-1 -2
B
S
E E
D R
A W
IN
G
A
-1 -2
A
/SEE DRAWING 1 A-101-2C /SEE DRAWING 1 A-101-2D
/SEE DRAWING 1 A-101-2A /SEE DRAWING 1 A-101-2B
/SEE DRAWING 1 A-101-2D
Corridor
101E
C.6
C.7
2.5
A-905
1 OPTION 6
ROOF TERRACE
OPTION 1
GPTB ADDITION
OPTION 4
OPERABLE WALL
OPTION 2
STANDBY
GENERATOR
A-904
FIN. FLR. ELEV. = 1051.50 ENGINEERING
FIN. FLR. ELEV. = 100'-0" ARCHITECTURAL
10.1 11.3
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o n e
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
D
R e v it
L o c a l2
\1
-0
-A
IS
V
R C d a n .w a rn e r6
R
A Q
.r v t
/2
/2
:3 : 0
P
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
A-002
MAIN LEVEL
REFERENCE
FLOOR PLAN
INDICATING
OPTIONS
18-0060
02/25/21
BS
AS
1/16" = 1'-0"
MAIN LEVEL FLOOR PLAN
NOTE:
ANY OVERHEAD MOUNTED ARCHITECTURAL FEATURES WITHIN THE
FACILITY, INSTALLATION MUST COMPLY WITH THE FOLLOWING
STANDARD:
FOR NEW CONSTRUCTION AND EXISTING BUILDINGS REQUIRED TO
COMPLY WITH THESE STANDARDS, ENSURE THAT OVERHEAD
MOUNTED FEATURES WEIGHING 31 POUNDS (14 KILOGRAMS) OR
MORE (EXCLUDING DISTRIBUTED SYSTEMS SUCH AS SUSPENDED
CEILINGS THAT COLLECTIVELY EXCEED THAT WEIGHT) ARE MOUNTED
USING EITHER RIGID OR FLEXIBLE SYSTEMS TO MINIMIZE THE
LIKELIHOOD THAT THEY WILL FALL AND INJURE BUILDING OCCUPANTS.
MOUNT ALL SUCH SYSTEMS SO THAT THEY RESIST FORCES OF 0.5
TIMES THE COMPONENT WEIGHT IN ANY HORIZONTAL DIRECTION AND
1.5 TIMES THE COMPONENT WEIGHT IN THE DOWNWARD DIRECTION.
THIS STANDARD DOES NOT PRECLUDE THE NEED TO DESIGN
ARCHITECTURAL FEATURE MOUNTINGS FOR FORCES REQUIRED BY
OTHER CRITERIA SUCH AS SEISMIC STANDARDS.
Revisions
ID Date Description
02/25/2021
| A-001 - LOWER LEVEL REFERENCE FLOOR PLAN INDICATING OPTIONS |
| A-002 - MAIN LEVEL REFERENCE FLOOR PLAN INDICATING OPTIONS |
File details come from the government source that posted it. Updated .