Concrete
1. Footing widths not dimensioned shall be a total of 12" wider than the wall above (16" minimum).
2. All concrete work shall conform to ACI 301 and ACI 318. All reinforcing supplied shall conform to ACI 315.
3. Dowels shall be set 3" from the bottom of footing and shall extend above the top of footing the minimum distance required for lap lengths or as noted on the drawings. Bars shall be the same size and spacing as bars above.
4. Bars marked continuous shall be in as long lengths as possible. Lap bars as shown in Typical Reinforcement Table. Laps shall occur in regions of low stress only. Provide corner bars in the same size and number as the continuous reinforcing at all concrete and footing intersections or 90 degree bends of proper length at the ends of reinforcing bars at intersections.
5. Reinforcing in footings shall be accurately placed before placing concrete. Do not float reinforcing into footings.
6. Mechanically vibrate all concrete.
7. Do not place pipes, ducts, or chases in structural concrete without approval of the CONTRACTING OFFICER. See architectural, mechanical, and electrical drawings for locations.
8. Construct form work so concrete members and structures are of size, shape, alignment, elevation, and position indicated within tolerance limits of ACI 117.
9. Finish concrete suspended slabs and slabs on grade per the following criteria according to ASTM E1155.
Comply with ACI 302.1R recommendations for screeding, re-straightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.
A. Slabs on grade [TYPICAL]: specified overall values of flatness F[F]=35 and levelness F[L]=25 with minimum local values of flatness F[F]=24 and levelness F[L]=17.
10. Control joints in slab on grade shall be placed at column line intersections and as shown on plans. Where joints are not shown, submit proposed jointing lay-out to ARCHITECT for approval. Joints shall be laid out in as close to a square pattern as possible with maximum spacing 2-3 times the depth of slab. Isolate columns.
Joints must align when crossing a control joint.
11. All reinforcing steel shall be bent cold, detailed, fabricated, and held in place in accordance with the "Manual of Standard Practice For Detailing Reinforced Concrete Structures" [ACI 315 latest edition], except as otherwise detailed or specified.
12. Provide the following concrete cover to reinforcing:
for concrete cast against the earth and permanently exposed to earth: 3" for concrete exposed to earth or weather: 2" for concrete not exposed to weather or in contact with earth:
slabs, walls, joists: 3/4" beams, columns: 1 1/2"
13. The CONTRACTOR shall exercise extreme caution so as to not undermine, disturb, damage, or in any way cause un-desirable movement, cracking, and/or settlement of adjacent construction. The CONTRACTOR is completely responsible for all shoring, forming, bracing, etc.
14. The concrete mix design for slabs on grade shall be designed to reduce the potential for shrinkage and curling by reducing the amount of cement [maximum 5.3 sacks] in the mix and increasing the amount of course aggregate [minimum 45%]. Placing and finishing techniques shall also be considered in the mix design.
15. See the plans for floor slab on grade thickness. All mesh reinforcing shall be supplied in sheet stock not roll stock.
16. All continuous footings and grade beams have been designed for a "net" allowable bearing pressure of 2,000 psf. See the soils report. See the soils report for information about slab on grade sub-grade requirements.
17. All pad footings have been designed for a "net" allowable bearing pressure of 2,000 psf.
18. Sub-soils supporting or in direct contact with footings, slabs on grade, or other foundation elements shall be protected against freezing conditions that could cause movements or other detrimental effect to the structure as a whole or to any of its component parts.
19. All slabs on grade shall bear on properly compacted backfill. Any unacceptable backfill as determined by project's geotechnical engineer, shall be removed and replaced as required by the geotechnical engineer.
20. The CONTRACTOR shall employ the services of a qualified geotechnical firm to perform all required field observations and tests for soil and concrete.
21. Special care shall be taken not to disrupt adjacent construction. The CONTRACTOR is completely responsible for all shoring, forming, bracing, etc.
22. The bottoms of all exterior footings shall be placed at a minimum depth of 48" below finish grade.
Coordinate footing elevations with final grading plan.
23. Submit concrete mix designs to the CONTRACTING OFFICER for approval.
24. Submit shop drawings of reinforcing steel for footings and other concrete work to the CONTRACTING OFFICER for approval.
Structural Steel
1. Structural steel shall be fabricated and erected in conformance with "AISC Specification for Design, Fabrication, and Erection of Structural Steel For Buildings".
2. Shop paint structural steel with fabricator's standard lead and chromate free, non-asphaltic, rust inhibiting primer, unless noted otherwise. All exterior exposed steel shall be galvanized.
3. All connections shall be designed by the supplier based upon maximum beam reactions unless noted otherwise on the drawings.
4. All bolted connections shall be high strength ASTM A325 bolts. Tension indicating "twist-off" type bolts shall be used for all main member connections. Bolts shall be installed per the requirements of RCSC's "Specification For Structural Joints Using ASTM A325 or A490 Bolts".
5. Comply with American Welding Society standards. ALL welders shall have valid certificates and have current experience in the types of welds called for.
6. Provide anchor rods in lengths stated on the drawings. All anchor rods for column base plates shall be secured in place with a template and shall be tied securely to reinforcing bars before placing concrete.
7. Submit shop drawings to the CONTRACTING OFFICER for approval.
Steel Joists
1. Steel bar joists (K, LH, DLH) shall comply with AISC/SJI Specifications.
2. Furnish bridging in accordance with AISC/SJI Specifications and as noted on drawings. Where bridging nterferes with mechanical items or other installations, remove bridging after the deck is in place and eplace as directed by the joist supplier.
3. Connections and bearing material required by SJI Specifications, but not called out, shall be designed and furnished by the joist supplier.
4. All joist headers and accessories shall be designed and furnished by the joist supplier.
5. Joist supplier shall review the structural, architectural, mechanical, and electrical drawings to become familiar with the project.
6. Coordinate size and locations of mechanical openings with the mechanical contractor.
7. See the requirements for holes to be drilled in the top chord of joists. Coordinate requirements with wood plank designer.
7. Joists shall have a shop prime painted surface unless noted otherwise.
8. Note all loads in the 'LOADS' section, special loads on the drawings, dimensions, and bearing conditions. The CONTRACTOR shall coordinate the locations and magnitude of loads with respective equipment supplier or as indicated on the framing plans, including piping systems, mechanical equipment, or any other supported items. The joists have been specified for dead load, live load, snow load, drift load, roof top units, and any load shown on joist loading diagrams.
9. See the 'LOADS' section for required uplift load to be resisted.
10. Submit joist shop drawings to the CONTRACTING OFFICER for approval.
Steel Deck
1. Steel deck supplier shall be a member of the Steel Deck Institute. The material, design, manufacture, and installion shall be in accordance with the Steel Deck Institute and AISC.
2. Metal roof deck shall be 3 span minimum.
3. The deck supplier shall provide closure plates, sump pans and drain plates, ridge and valley plates, cover plates, welding washers, and other accessories required to provide a finished surface for application or insulation and roofing.
4. Welding shall conform to AWS D1.3. Welders shall have current welding certificates and have current experience with required welds.
5. Welded connections only at the ends and at intermediate supports. Sidelaps shall be attached with screws.
6. Provide L3x3x1/4" around all roof penetrations. See details for other requirements at roof drains, mechanical penetrations, and roof openings.
Precast Concrete
1. Design, fabricate, transport, and erect per latest ACI and PCI codes and handbooks.
2. Check architectural, electrical, and mechanical plans to verify sizes and locations of all openings reveals, block-outs, inserts, etc.
3. Reinforce ends of members to prevent cracking due to column changes.
4. All precast connections and embedded items shall be designed and detailed by the precast concrete supplier.
5. The PRECAST CONCRETE SUPPLIER shall supply all loose connection hardware to the PRECAST CONCRETE ERECTOR and FOUNDATION SUB-CONTRACTOR necessary to complete precast concrete erection. This shall include but not be limited to the following: bearing pads, structural steel, bolts, etc.
6. Details showing reinforcing are intended for in place conditions. The CONTRACTOR is responsible for pick-up point locations and inserts, special pick-up point reinforcing and strong backs, and all pick-up placing operations. The CONTRACTOR is completely responsible for all bracing and shoring.
7. The CONTRACTOR, PRECAST CONCRETE SUPPLIER, and PEMB SUPPLIER shall coordinate connections between steel members and precast concrete.
8. Submit shop drawings of precast concrete, detailing lay-out, connections, and details, and calculations to the CONTRACTING OFFICER for review. The calculations shall be stamped by a registered professional engineer licensed to practice in the state of Nebraska.
Concrete Masonry
1. Concrete masonry units shall be normal weight hollow units and shall comply with "Quality Concrete Block Specifications For the State of Nebraska".
2. Masonry units shall conform to ASTM C-90. Minimum compressive strength shall be the more stringent of 1,250 psi on the gross area of the block or 2,000 psi on the net area of the block. Design compressive strength f'm=2,000 psi.
3. Mortar shall conform to ASTM C-270, type 'N'. Grout shall conform to ASTM C-476.
4. Provide continuous full height, vertical reinforcing in center of grout, in center of wall. See the SCHEDULE and PLANS for required reinforcing.
5. In addition to the reinforcing called out on the PLANS, DETAILS, and schedule, provide ONE #5 at corners, intersections, ends of walls, door and window jambs, and adjacent to expansion or control joints.
6. Reinforce all masonry horizontally with 9 gauge ladder type reinforcing at 16" o.c. vertical, unless noted otherwise.
7. Grout all vertically reinforced cores AND those cores noted as "GROUT FULL by the "low lift method".
Maximum grout height shall not exceed 4'-8". The "high lift method" of grouting is subject to written approval of STRUCTURAL ENGINEER and will require additional observations and inspections per
IBC 2012.
8. Grout cells full at all expansion anchor locations. Contractor shall coordinate with details and requirements of other trades.
9. Lap splice vertical bars 48 bar diameters [2'-0" minimum]. Vertical reinforcing shall be in position prior to laying block. Provide bar positioning devices to hold reinforcing in place during grouting operations.
10. Splice bond beam reinforcing at masonry control/expansion joints.
11. Provide continuous bond beams at all beam bearing elevations, tops of all walls, and as noted in the details.
12. Provide lintels [steel or masonry] over all openings and recesses in masonry walls. All lintels shall have a minimum bearing length of 8".
13. Compliance with f'm=2,000 psi may be shown by masonry prism testing [IBC 2012 2105.2.2.2] or by the 'unit strength method' [IBC 2012 2105.2.2.1].
14. Provide horizontal steel as noted on the drawings for all lintels and bond beams. Note location of steel in lintels and bond beams. The reinforcing steel in the bond beams shall be continuous. Provide corner bars as required.
15. Submit grout mix design, reinforcing shop drawings, mortar mix design, and material certificates or test reports to the CONTRACTING OFFICER for approval.
Special Inspection
1. The CONTRACTOR shall employ the services of an independent inspection agency.
2. Special Inspections shall be performed by an independent inspection agency in conformance with IBC 2015, section 1705 and as noted below. Testing and inspection shall be conducted under the supervision of a professional engineer licensed to practice in the state of Nebraska and employed by the inspection agency. The engineer shall be deemed the designated engineer of record for special inspections performed by his/her firm or his/her consultants.
Inspectors shall be ICBO certified as a minimum requirement and approved by the BUILDING OFFICIAL.
3. The designated engineer of record for special inspections shall be responsible for defining the activities of the inspectors, for certifying the qualifications of the inspectors with the BUILDING OFFICIAL, for attending the pre-construction meeting to define the scope of services and testing and testing procedures that are required as outlined in IBC 2015. The designated engineer of record for special inspections shall meet with the ARCHITECT prior to the pre-construction meeting.
4. Special inspections shall be provided in addition to the inspections conducted by the local building department and shall not be construed to relieve the GOVERNMENT or his authorized agent from requesting the periodic and called out inspections required by section 104.4 of IBC 2015.
5. The CONTRACTOR shall notify the inspection agency when construction is ready for inspection.
6. The CONTRACTOR shall provide access to construction that is elevated above grade.
7. Non-conforming inspected items shall be corrected and re-inspected before being covered by further construction.
Costs for re-inspected items shall be paid for by the CONTRACTOR.
8. Special inspections required include, but may not be limited to the following:
a. CONCRETE per table 1705.3 and section 1705.3 will all applicable exceptions.
b. REINFORCING STEEL per table 1705.3 and exception for concrete requiring special inspection
c. EMBEDDED items and POST INSTALLED ANCHORS per table 1705.3
d. ANCHOR RODS per table 1705.3
e. STRUCTURAL STEEL per section 1705.2
f. MASONRY per section 1705.4
g. SOILS per table 1705.6 and section 1705.6
GOVERNING CODE: 2015 International Building Code
SOILS REPORT
A soil investigation report was prepared by Alfred E. Benesch, Lincoln, Nebraska.
The soil investigation report [dated: March 27, 2019] can be obtained from the GOVERNMENT. Contractors and users of the report should become familiar with the report and the requirements for over excavation, grading, slab sub-grade preparation, and all things related to foundation construction.
Allowable net soil bearing pressure 2,000 psf
DESIGN LOADS
Risk Category II
Live Loads Roof minimum roof live load 20 psf Snow ground snow Pg 25 psf flat roof snow Pf 18 psf snow exposure Ce 1.0 thermal factor Ct 1.0 importance factor Is 1.0
Floor slab on grade 100 psf supported slab 100 psf industrial slab on grade 1000 psf stairs 100 psf roof over locker rooms 250 psf
Wind basic wind speed 115 mph exposure C cladding see applicable tables in IBC 2015
Seismic site classification D importance factor Ie 1.00 seismic design category B spectral response coefficients
Ss 0.100 S1 0.0459 Sds 0.107 Sd1 0.073 basic seismic force resisting system ordinary moment frames R = 3.50 analysis procedure ELF Cs = 0.0381 basic seismic force resisting system ordinary precast concrete shear walls R=3.00 analysis procedure ELF Cs = 0.044
MATERIALS
CONCRETE
28 Day Concrete Strength [minimum] foundations 3000 psi walls, beams, columns, piers 4000 psi Reinforcing bars ASTM A615 Gr. 60 Welded bars & anchors ASTM A706 Gr. 60 Welded wire fabric ASTM A185
MASONRY
CMU Grade N normal weight f'm 2000 psi Reinforcing bars ASTM A615 Gr. 60 Horizontal joint reinforcing 9 gauge ladder type
Galvanizing Interior walls ASTM A641 Class 1 Exterior walls ASTM A153 Class B-2
Masonry grout 6 1/2 sack, ready mix sand-gravel concrete with a slump of 8" to 11"
Mortar CMU type N
STRUCTURAL STEEL
W shapes ASTM A992 Rolled shapes & plates ASTM A36 Tubes ASTM A500 Gr. C Pipes ASTM A53 Type E or S Bolts [unless noted otherwise] ASTM A325 Anchor rods ASTM F1554, Gr. 36 E or S Welding elecrodes E70XXX unless noted otherwise Expansion bolts Hilti Kwik Bolt III or approved equivalent Adhesive anchor system Hilti HIT-HY 200 Screw anchor Hilti HUS-H or Simpson Titen HD Sleeve anchors Hilti HLC
STEEL ROOF DECK see PLANS CONCRETE FLOOR & FORM DECK 1.5C24 galvanized at frost stoops see PLANS for supported floors
RECYCLED, CRUSHED CONCRETE
1" MINUS 100% passing the 1" sieve less than 6% passing the no. 200 sieve
SPECIAL INSPECTION
Special inspection shall be performed, as required by local building official, according to chapter 17 of IBC.
CODES
IBC 2015
ASCE 7-10
ACI 318-11
ACI 530
AISC 13TH Addition
LOADS
Dead Load roof 30 psf 3-4-3 P.C. wall panel 81 psf 4-4-3 P.C. wall panel 94 psf 4-4-4 P.C. wall panel 106 psf 8" CMU [un-grouted] 44 psf 8" CMU [reinf. 24" o.c.] 59 psf 8" CMU [fully grouted] 88 psf 10" CMU [un-grouted] 57 psf 10" CMU [reinf. 24" o.c.] 77 psf 10" CMU [fully grouted] 115 psf 8" deep precast concrete plank 64 psf 2" thick topping slab 25 psf 12" deep precast concrete plank 80 psf 6" thick topping slab 75 psf
CORNER BAR
LAP SPLICE
L A
P S
P L
IC
E
STANDARD 90°
HOOK
STANDARD 90°
HOOK U.N.O.
STANDARD 90°
HOOK U.N.O.
DOWEL TYP.
L A
P S
P L
IC
E
PROVIDE (2)-#5's @
TERMINATIONS OF C.I.P.
CONCRETE WALLS. (TYP.)
STANDARD 90°
HOOK U.N.O.
HORIZONTAL WALL/FOOTING REINFORCEMENT DETAILS
LAP SPLICE
L A
P S
P L
IC
E
STANDARD 90°
HOOK U.N.O.
STANDARD 90°
HOOK U.N.O.
DOWEL TYP.
HOOKED BAR L
A
P S
P L
IC
E
M
IM
IM
U
M E
M B
E D
M E
N T
L A
P S
P L
IC
E
S E
E N
O T
E
CRITICAL SECTION
L E
N G
T H
12 BAR DIA.
L E
N G
T H
/2
O R
B
A R
D
IA
MINIMUM DIAMETERS
OF BEND
#3 - #8 = 4 BAR DIA.
#9 - #11 = 5 BAR DIA.
DETAIL 1 DETAIL 2
#3 1'-0" 1'-3" 2'-0"
BAR
SIZE
OTHER TOP OTHER TOP
DEVELOPMENT LENGTH SPLICE LENGTH
#4 1'-3" 1'-8" 2'-4"
#5 1'-7" 2'-1" 2'-9"
#6 1'-11" 2'-6" 3'-3"
#7 3'-6" 4'-6" 5'-11"
#8 3'-11" 5'-1" 6'-8"
#9 4'-6" 5'-9" 7'-6"
#10 5'-1" 6'-6" 8'-8"
#11 5'-7" 7'-3" 9'-6"
REINFORCING DEVELOPMENT AND SPLICE
f'c = 4,000 psi
1'-3"
1'-8"
2'-1"
2'-6"
4'-6"
5'-1"
5'-9"
6'-6"
7'-3"
DEVELOPMENT LENGTH NOTES
Where drawings are detailed similar to Detail 2 (below) extend the embedment length such that the hooked bar contacts the layer of main reinforcing shown.
1.
2.
TYPICAL REINFORCING NOTES
Reinforcing bar development and lap splice length shall be as shown in table, unless noted otherwise.
The lengths shown in the table are based on the following concrete coverage and reinforcing center to center (c.c.) spacing.
Beams or Columns - Cover greater than or equal to 2.0 bar dia. c.c. spacing greater than or equal to 2.0 bar dia.
All others - Cover greater than or equal to 1.0 bar dia. c.c. spacing greater than or equal to 3.0 bar dia.
1.
2.
Top bars are defined as horizontal reinforcement such that more than 12" of fresh concrete is cast in the member below the development length or splice.
3.
Development length and splice length shown shall NOT apply if any one of the following conditions occur:
a. f'c < 4,000 psi
b. fy < 60,000 psi
c. The cover or c.c. spacing is not as listed above.
d. The reinforcing steel is epoxy coated.
e. light weight concrete is used.
4.
Center to center spacing is defined as below.5.
MAIN REINFORCING BAR
LAPPED REINFORCING BAR
's'
#3 1'-5" 1'-10" 2'-4"
BAR
SIZE
OTHER TOP OTHER TOP
DEVELOPMENT LENGTH SPLICE LENGTH
#4 1'-10" 2'-5" 3'-1"
#5 2'-4" 3'-0" 3'-11"
#6 2'-9" 3'-7" 4'-8"
#7 4'-0" 5'-3" 6'-9"
#8 4'-5" 6'-0" 7'-9"
#9 5'-2" 6'-9" 8'-9"
#10 5'-10" 7'-7" 9'-10"
#11 6'-5" 8'-4" 10'-10"
REINFORCING DEVELOPMENT AND SPLICE
f'c = 3,000 psi
1'-10"
2'-5"
3'-0"
3'-7"
5'-3"
6'-0"
6'-9"
7'-7"
8'-4"
#3 8"
BAR
SIZE
DEVELOPMENT LENGTH OR
MINIMUM EMBEDMENT
#4 10"
#5 1'-0"
#6 1'-3"
#7 1'-5"
#8 1'-7"
#9 1'-10"
#10 2'-1"
#11 2'-3"
DEVELOPMENT LENGTH HOOKED BARS
f'c = 4,000 psi
#3 9"
BAR
SIZE
DEVELOPMENT LENGTH OR
MINIMUM EMBEDMENT
#4 11"
#5 1'-2"
#6 1'-5"
#7 1'-8"
#8 1'-10"
#9 2'-1"
#10 2'-4"
#11 2'-7"
DEVELOPMENT LENGTH HOOKED BARS
f'c = 3,000 psi
2,000
PAD
MARK
SIZE REINFORCING
ALLOWABLE SOIL
BEARING
CAPACITY
(PSF)
PAD FOOTING
COLUMN PAD FOOTING SCHEDULE
DOWELS
---PF7-0
7'-0"x7'-0"x1'-2" Deep 8-#6's Each Way
Bottom --- 2,000
--- 2,000
--- 2,000
2,000
2,000
P5-0 5'-0"x5'-0"x3'-4" Deep 6-#7's Each Way
Top & Bottom ---
2,000
2,000
2,000
PF4-6
4'-6"x4'-6"x1'-0" Deep 5-#5's Each Way
Bottom ---
PF4-0
4'-0"x4'-0"x1'-0" Deep 5-#5's Each Way
Bottom ---
PF5-0
5'-0"x5'-0"x1'-2" Deep 6-#6's Each Way
Bottom ---
PF3-6
3'-6"x3'-6"x1'-0" Deep 4-#5's Each Way
Bottom ---
PF6-0
6'-0"x6'-0"x1'-0" Deep 7-#6's Each Way
Bottom
PF6-6
6'-6"x6'-6"x1'-2" Deep 7-#6's Each Way
Bottom
PF8-0
8'-0"x8'-0"x1'-6" Deep 9-#7's Each Way
Top & Bottom
'P' TYPE FOOTINGS ARE 3'-4" DEEP.
'PF' TYPE FOOTINGS DEPTH VARIES.
2,000P6-0 6'-0"x6'-0"x3'-4" Deep 7-#7's Each Way
Top & Bottom ---
2,000P8-0 8'-0"x8'-0"x3'-4" Deep 9-#7's Each Way
Top & Bottom ---
2,000PF8-0-A
8'-0"x8'-0"x1'-6" Deep 9-#7's Each Way
Bottom
--- 2,000PF9-6
9'-6"x9'-6"x1'-6" Deep 10-#7's Each Way
Bottom
2'-0"x3'-4" Deep 2-#7's T & B.
2-#4's Mid Ht.
#4 Stirrups @ 24"o.c.GB2-0
MARK SIZE
GRADE BEAMS
FOOTING REINFORCING SCHEDULE
CONTINUOUS DOWELSVERTICAL
REINFORCING
MARK SIZE
CONTINUOUS FOOTINGS
CONTINUOUS DOWELSTRANSVERSE
REINFORCING
1'-4"x1'-0" Deep 2-#6's Bottom
------CF1-4
CF2-6
2'-6"x1'-0" Deep 3-#6's Bottom
#4's @ 32" o.c.
Notes:
1. Continuous footings that support masonry walls, provide continuous reinforcing @ top & bottom.
2'-6"x3'-4" Deep 2-#7's T & B.
2-#4's Mid Ht.
#4 Stirrups @ 24"o.c.GB2-6
3'-6"x3'-4" Deep 4-#7's T & B.
2-#4's Mid Ht.
#4 Stirrups @ 24"o.c.GB3-6
4'-0"x3'-4" Deep 4-#7's T & B.
2-#4's Mid Ht.
#4 Stirrups @ 24"o.c.GB4-0
2'-0"x1'-0" Deep 3-#6's Bottom
CF2-0
CF3-0 3'-0"x1'-0" Deep 4-#6's Bottom
#4's @ 32" o.c.
CF3-6 3'-6"x1'-0" Deep 4-#6's Bottom
#4's @ 32" o.c.
CF4-0 4'-0"x1'-0" Deep 5-#6's Bottom
#4's @ 32" o.c.
CF5-0 5'-0"x1'-0" Deep 6-#6's Bottom
#4's @ 28" o.c.
#4's @ 32" o.c.
Note 1
Note 1
4'-6"x3'-4" Deep 5-#7's T & B.
2-#4's Mid Ht.
#4 Stirrups @ 24"o.c.GB4-6 ---
5'-0"x3'-4" Deep 5-#7's T & B.
2-#4's Mid Ht.
#4 Stirrups @ 16"o.c.GB5-0-A ---
1'-4"x3'-4" Deep 2-#7's T & B.
2-#4's Mid Ht.
#4 Stirrups @ 24"o.c.GB1-4
---3'-0"x3'-4" Deep 3-#7's T & B.
2-#4's Mid Ht.
#4 Stirrups @ 24"o.c.GB3-0
4" Slab On Grade Over 15 mil Vapor Barrier & 4" Thick Sub-Base
6x6-10/10 W.W.M. See The Plan & Details For More Information
STRUCTURAL
COMPONENT REINFORCING REMARKS
REINFORCING SCHEDULE
#4's @ 14"o.c. E.W., Top & Bottom
8" Masonry Wall See the plan and details for more information. Grout reinforced cells full. Grout all cells full, reinforced & un-reinforced, where noted "GROUT FULL". Coordinate grouting requirements for post installed anchors & for beam bearing locations. Provide factory fabricated horizontal reinforcing T's and L's.
[2]-#4's Cont.
8" Bond Beam Provide corner bars and 'L' bars @ intersections.
#4's @ 24" o.c. Vert.
& 9 Ga. Galvanized Dur-O-Wal @ 16" o.c.
2" Hollow Core Topping Slab 6x6-10/10 W.W.M. See The Plan & Details For More Information
5" Supported Slab See The Plan & Details For More Information4x4-6/6 W.W.M.
[6]-#7's Vert.
#4 Ties @ 12" o.c.12"X30" Grade Beam Ledge See The Plan & Details For More Information
[8]-#8's Vert.
#4 Ties @ 16" o.c.24"x24" Concrete Pier
PR24x24 See The Plan & Details For More Information
#5's @ 12" o.c. Vert., Each Face #4's @ 12" o.c. Hor., Each Face12" Concrete Wall See The Plan & Details For More Information
#8's @ 12" o.c.
Each Way, Top & Bottom20" Deep Elevator Pit Slab See The Plan & Details For More Information
10" Masonry Wall See the plan and details for more information. Grout reinforced cells full. Grout all cells full, reinforced & un-reinforced, where noted "GROUT FULL". Coordinate grouting requirements for post installed anchors & for beam bearing locations. Provide factory fabricated horizontal reinforcing T's and L's.
[2]-#4's Cont.
10" Bond Beam Provide corner bars and 'L' bars @ intersections.
#4's @ 24" o.c. Vert.
& 9 Ga. Galvanized Dur-O-Wal @ 16" o.c.
#5's @ 10" o.c. Vert., Each Face #5's @ 12" o.c. Hor., Each Face14" Concrete Wall See The Plan & Details For More Information
#4's @ 9" o.c. Each Way See The Plan & Details For More Information
6" Slab On Grade Over 4" Thick Sub-Base & 15 mil Vapor Barrier
4x4-4/4 W.W.M.
6" Hollow Core Topping Slab
#6's @ 10" o.c. Vert., Each Face #6's @ 12" o.c. Hor., Each Face16" Concrete Wall See The Plan & Details For More Information
See The Plan & Details For More Information
See The Plan & Details For More Information8" Slab On Grade Over 4" Thick Sub-Base & 15 mil Vapor Barrier
[1] #4 Continuous Horizontal #4x3'-0" Dowels @ 16" o.c.
6" Concrete Curb See The Plan & Details For More Information
#8's @ 10" o.c. Vert., Each Face #7's @ 12" o.c. Hor., Each Face24" Concrete Wall See The Plan & Details For More Information
3 1/2" Supported Slab @ Stair Landing
See The Plan & Details For More Information6x6-10/10 W.W.M.
4'-0" TYP.
1/2" JOINT CAULK AND
SEAL
SIDEWALK
(SEE PLAN)
5 1/2" CONCRETE SLAB
W/ #4'S @ 12"o.c. EA. WAY
ON 1.5C22 METAL DECK
GALVANIZED
[SEE DETAIL]
2 1/2" AIR SPACE
CONCRETE BRICK
#4 DOWELS @ 12"o.c.
CORBEL AS SHOWN
PROVIDE #4'S @ 12"o.c.
#4'S @ 2'-0"o.c.
VERTICAL
3-#4'S @ CONT.
HORIZONTAL
TOP BTM, MID-HGT
1" JOINT CAULK AND SEAL
SEE ARCH FOR MORE INFORMATION
MAXIMUM CONSTRUCTION SPAN FOR 1.5C22 DECK: 4'-10" IF DECK SPAN IS GREATER THAT 4'-10", PROVIDE ADDITIONAL
INTERMEDIATE 8" WIDE GRADE BEAM
8"
SEE PLAN
2'-0"
1/4" 12"
B E
L O
W G
R A
D E
M
IN
PILE CAP
OR
GRADE BEAM OR
WALL
SEE PLAN
CONCRETE SLAB ON
GRADE SEE PLAN
1/8"x3/4" DEEP JOINT [4" SLAB]
1/8"X1 1/2" DEEP JOINT [6" & 8" SLAB]
CLEAN AND RE-SAW JOINT PRIOR
TO FILL, CAULK, AND SEAL. SEE
ARCHITECTURAL FOR MORE
INFORMATION.
REINFORCING
SEE PLAN
SUPPORT FOR REINFORCING.
REINFORCING SHALL BE
MAINTAINED @ SPECIFIED
ELEVATION WITHOUT "HOOKING" OF
THE REINFORCING
VAPOR BARRIER - SEE PLAN FOR
CUSHION/GRANULAR LAYER
LOCATE VAPOR BARRIER BELOW SLAB FOR 4" SLAB.
LOCATE VAPOR BARRIER BELOW DRAINAGE LAYER
FOR THICKER SLABS.
T
D
T
4"
D
1 1/2"
T=CONCRETE SLAB THICKNESS
D= DISTANCE TO REINFORCING
6" 2"
8" 2"
D
T
KEYED JOINT
T
D
4"
1 1/2"
T=CONCRETE SLAB THICKNESS
D= DISTANCE TO REINFORCING
1/8"X3/4" DEEP JOINT [4" SLAB]
CLEAN & RE-SAW JOINT PRIOR TO FILL, CAULK,
& SEAL. SEE ARCHITECTURAL FOR MORE
INFORMATION.
REINFORCING - SEE PLAN
SUPPORT FOR REINFORCING.
REINFORCING SHALL BE MAINTAINED @ SPECIFIED
ELEVATION WITHOUT "HOOKING" OF THE
REINFORCING
VAPOR BARRIER - SEE PLAN FOR DRAINAGE LAYERCOMPACTED, TESTED, AND
APPROVED SUB-GRADE
THICKENED SLAB FOR
KEYED JOINT AT 4" THICK
SLABS
#8x2'-0" SMOOTH DOWELS @ 12" O.C.
PAINT & GREASE ONE END.
T
6"
D
2"
T=CONCRETE SLAB THICKNESS
D= DISTANCE TO REINFORCING
1/8"X1 1/2" DEEP JOINT [6" & 8" SLAB]
CLEAN & RE-SAW JOINT PRIOR TO
FILL, CAULK, & SEAL. SEE
ARCHITECTURAL FOR MORE
INFORMATION.
REINFORCING - SEE PLAN
SUPPORT FOR REINFORCING.
REINFORCING SHALL BE MAINTAINED @ SPECIFIED
ELEVATION WITHOUT "HOOKING" OF THE
REINFORCING
VAPOR BARRIER TO BE LOCATED BELOW DRAINAGE
LAYER - SEE PLAN FOR DRAINAGE LAYER
COMPACTED, TESTED, & APPROVED SUB-GRADE
8" 2"
#8X2'-0" SMOOTH DOWELS @ 12" O.C.
PAINT & GREASE ONE END.
T
6"
D
2"
T=CONCRETE SLAB THICKNESS
D= DISTANCE TO REINFORCING
1/8"X1 1/2" DEEP JOINT [6" & 8" SLAB]
CLEAN & RE-SAW JOINT PRIOR TO FILL, CAULK,
& SEAL. SEE ARCHITECTURAL FOR MORE
INFORMATION.
REINFORCING - SEE PLAN
SUPPORT FOR REINFORCING.
REINFORCING SHALL BE MAINTAINED @ SPECIFIED
ELEVATION WITHOUT "HOOKING" OF THE
REINFORCING
VAPOR BARRIER TO BE LOCATED BELOW DRAINAGE
LAYER - SEE PLAN FOR DRAINAGE LAYER
COMPACTED, TESTED, & APPROVED
SUB-GRADE
8" 2"
DT
/2
T
EDGE FORM
[REMOVE AFTER FIRST POUR]
CONCRETE SLAB
GREASE END THAT IS IN FIRST POUR
CONT. KEY
PROVIDE EXPANSION END
CAPS
DOWEL
USE DOWEL GUIDE TO
HOLD DOWELS STRAIGHT &
LEVEL
B
A
3/4" CHAMFER
FINISHED SURFACE
ANCHOR BOLTS
FURNISHED WITH POLE
CONDUIT PER PLAN
ROUND POURED
CONCRETE BASE
DIMENSIONS
POLE HT. A B
8'-15' 16" 48"
16'-29' 20" 60"
30'-40' 24" 72"
MINIMUM REQUIRED STEEL
AT 16" DIAMETER IS 6-#6'S
VERTICAL, #4 TIES @8" O.C.
MINIMUM REQUIRED STEEL
AT 20" DIAMETER IS 6-#7'S
VERTICAL, #4 TIES @8" O.C.
MINIMUM REQUIRED STEEL
AT 24" DIAMETER IS 6-#8'S
VERTICAL, #4 TIES @8" O.C.
5/8" X 10' COPPER CLAD
GROUND ROD, DRIVEN 4' (MIN)
BELOW BOTTOM OF BASE
#6 BARE
GROUND CLAMP
BASE COVER TO
MATCH POLE
ATTACH TO POLE
GROUND LUGS
HANDHOLE
POLE (SEE SCHEDULE) #12 (MIN) TO FIXTURE
HEAD(S)
IN-LINE FUSE - EACH
PHASE
SPLICE
PHASE CONDUCTORS
PER PLAN
NOTE:
SEE ELECTRICAL PLANS FOR
ADDITIONAL INFORMATION
STEEL STRINGER
SEE PLAN /
ARCHITECTURAL
FOR SIZE AND LOCATION
L3X3X1/4"X6" LONG
W/ HOLE FOR [1] 3/4"⌀
HILTI KWIK BOLT III EXPANSION
ANCHOR. 3 1/4" EMBEDMENT
NEW OR EXISTING
CONCRETE SLAB ON GRADE
CONSTRUCTION SEE PLAN
AT NEW CONSTRUCTION
24"x12"x( WIDTH OF STAIRS + 6" )
THICKENED SLAB
W/ (2) #4's CONTINUOUS AT BOTTOM
SIMILAR AT STAIR STRINGERS AT
CONCRETE TOPPING AT SUPPORTED
LEVELS
2'-0"
FINISH FLOOR
ELEV.=SEE PLAN
3/16"
PROVIDE 5/8" WELDS @ 12"o.c. @ THE PERIMETER OF THE ROOF (ALL LOCATIONS)
DECK 2 @ ELEVATOR LID
ATTACH W/ 5/8" PUDDLE WELDS & #10 TEK SCREWS
[PER SIDE]. WELDS ONLY BY CERTIFIED WELDER.
METAL ROOF DECK PAINTED TOP & BOTTOM
DECK 1 1.5B22 PAINTED 2
MARK DECK TYPE
36/3
CONNECTION PATTERN
# OF
SIDELAPS
DECK 2 1.5B22 PAINTED 536/5
DECK 3 1.5B22 PAINTED 436/3
DECK 4 1.5B22 PAINTED 536/4
DECK 1A 1.5BA22 PAINTED 236/3
01 - MAIN LEVEL
100' - 0"
1/2" EXPANSION JOINT
FILL, CAULK. SEAL
CONCRETE SLAB ON GRADE
SEE PLAN & SCHEDULE
2" RIGID INSULATION
SEE ARCHITECTURAL
ALTERNATE STIRRUP HOOK
LOCATION FROM TOP TO BOTTOM
6" CONCRETE CURB
SEE SCHEDULE
GRADE BEAM
SEE PLAN & SCHEDULE
GLASS CONSTRUCTION
SEE ARCHITECTURAL
EXTERIOR PAVING
SEE CIVIL / ARCHITECTURAL
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o n e
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
D
R e v it
L o c a l2
\1
-0
-A
IS
V
R C s te v e
.m a cd o n a ld F
R
M .r v t
/2
/2
:0
:4
A
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
S-001
General Notes, Schedules, & Details
18-0060
02/25/21
3/4" = 1'-0"
Frost Slab Detail
3/4" = 1'-0"
Slab On Grade Control Joint
3/4" = 1'-0"
Slab On Grade Construction Joint Detail 1
3/4" = 1'-0"
Slab On Grade Construction Joint Detail 2
3/4" = 1'-0"
Slab On Grade Construction Joint Detail 3
3/4" = 1'-0"
Slab On Grade Dowel Detail
12" = 1'-0"
Exterior Light Pole Base Detail 3/4" = 1'-0"
Stair Sringer Bearing Detail
1 1/2" = 1'-0"
Roof Deck Connection Detail
3/4" = 1'-0"
6" Concrete Curb Detail
Revisions
ID Date Description
2/25/2021
'B'
'D'
'F' (OPTION 1)
8 9 10 11
P
L
Q
N
8.6
10.5
9.7
8.7
7.7
9.8
A-303
A-303
A-408
GB2-0
CF5-0
CF4-0
GB2-6
GB2-6
GB2-6
GB2-0
PF8-0-A
CF3-0
STEP
STEP
S T
E P
S T
E P
CF2-0
8" CONCRETE SLAB ON GRADE
SEE SCHEDULE
FINISH FLOOR = 86'-0"
6" CONCRETE SLAB ON GRADE
SEE SCHEDULE
FINISH FLOOR = 86'-0"
6" CONCRETE SLAB ON GRADE
SEE SCHEDULE
FINISH FLOOR = 86'-0"
6" CONCRETE SLAB ON GRADE
SEE SCHEDULE
FINISH FLOOR = 86'-0"
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
PF5-6
PF6-6
T.O.F.= 85' - 0"
T.O.F.= 85' - 0"
T.O.F.= 85' - 0"
T.O.F.= 85' - 0"
T.O.F.= 85' - 0"
P8-0
P8-0
T.O.F.= 85' - 0"
T.O.F.= 85' - 0"
T.O.F.= 85' - 0"
GB2-0
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
PF8-0
PF8-0
T.O.F.= 85' - 4"
PF8-0PF8-0
T.O.F.= 82' - 0" T.O.F.= 85' - 4"
CF2-0
STEP
STEP
S-501
STEP
S-501
PR
x2
PR
x2
PR
x2
PR
x2
S-501
T.O.F.= 82' - 8"
T.O.F.= 82' - 8"
T.O.F.= 85' - 4"
LOW
ER
INDICATES LOWER BOTTOM
OF FOOTING TO MATCH
BOTTOM OF GRADE BEAM.
SEE
T.O.F.= 85' - 0"
GB2-6
S-508
S-508
SIM
SIM
RWF-1
RWF-2
T.O.F.= 83' - 4"
T.O.F.= 83' - 4"
' - 0
T.O.F.= 82' - 0"
STEP
STEP
T.O.F.= 85' - 4"
T.O.F.= 83' - 4"
T.O.F.= 82' - 0"
CF2-0
CF2-0
CF2-0
T.O.F.= 82' - 0"
T.O.F.= 83' - 4"
T.O.F.= 85' - 4"
CF2-0
CF2-0
CF4-0
CF4-0
T.O.F.= 82' - 8"
T.O.F.= 82' - 8"
CF3-0
S T
E P
S T
E P
T.O.F.= 82' - 0"
T.O.F.= 83' - 4"
CF4-0
CF4-0
T.O.F.= 85' - 4" T.O.F.= 82' - 8"
CF4-0 CF4-0
CF5-0
S-501
CIP WALL CONTROL /
SONSTRUCTION JOINTS
SEE
S-501
S-501
INDICATES STEPPED FOUNDATION
SEE
10.1
11.3
L O
W E
R
GB2-0
T.O.F.= 85' - 0"
CF2-6
T.O.F.= 85' - 4"
CF2-0
T.O.F.= 85' - 4"
FOR FOOTING INFORMATION
SEE SHEET S-103-1B
FOR FOOTING INFORMATION
SEE SHEET S-103-1B
GB4-6
T.O.F.= 85' - 0"
T.O.F.= 85' - 0"
GB3-6
6" CONCRETE CURB
SEE SCHEDULE
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
D
R e v it
L o c a l2
\1
-0
-A
IS
V
R C s te v e
.m a cd o n a ld F
R
M .r v t
/2
/2
:0
:5
A
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
S-101-1B
Lower Level Foundation Plan - Area B
18-0060
02/25/21
Checker Author
1/8" = 1'-0"
Lower Level Foundation Plan - Area B
Revisions
10 11
H.9
L
10.8
K.5
B.1
D.9
F.3
J.9
G.5
9.8 11.610.6
C.5
PF7-0
PF7-0
PF7-0
PF6-0
PF6-6
PF5-0
PF4-6
S T
E P
CF3-6
CF2-0
STEP
6" CONCRETE SLAB ON GRADE
SEE SCHEDULE
FINISH FLOOR = 86'-0"
H E
L
IC
A L S
O
IL
A N
C H
O R
S
O .C
M
A X
C
A N
T D
O W
N W
A R
D A
S R
E Q
U
IR
E D
W O
R K
IN
G
L O
A D
K
IP
S
D E
S
IG
N B
Y S
U P
P L
IE
R
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
T.O.F.= 85' - 4"
S-503
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
T.O.F.= 85' - 0"
GB2-0
PF8-0PF8-0
T.O.F.= 82' - 0" T.O.F.= 85' - 4"
18" THICK REINFORCED ELEVATOR PIT PAD
1' WIDER THAN ELEVATOR PIT WALLS
ALL 4 SIDES ( T.O. PAD 82'-0" )
STEP
STEP
PR
x2
PR
x2
12x30 Grade Beam Ledge
STEP
T.O.F.= 82' - 8"
THICKEN SLAB AT BOTTOM
OF STAIRS SEE DETAIL
S-001
T.O.F.= 85' - 4"
CF3-6
STEP
CF3-6
STEP
STEP
T.O.F.= 83' - 4"
CF2-0
CF2-0
T.O.F.= 82' - 0"
T.O.F.= 83' - 4"
CF2-0
S T
E P
S T
E P
T.O.F.= 82' - 0"
T.O.F.= 83' - 4"
CF4-0
CF4-0
T.O.F.= 85' - 4" T.O.F.= 82' - 8"
CF4-0 CF4-0
T.O.F.= 83' - 4"
T.O.F.= 82' - 0"
CF3-6
S-501
S-501
CIP WALL CONTROL /
SONSTRUCTION JOINTS
SEE
S-501
S-501
GB3-6
T.O.F.= 85' - 0"
T.O.F.= 85' - 0"
P5-0
'B'
'D'
'F' (OPTION 1)
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
D
R e v it
L o c a l2
\1
-0
-A
IS
V
R C s te v e
.m a cd o n a ld F
R
M .r v t
/2
/2
:0
:5
A
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
S-101-1D
Lower Level Foundation Plan - Area D
18-0060
02/25/21
Checker Author
1/8" = 1'-0"
Lower Level Foundation Plan - Area D
Revisions
2 3 4 5 6 7 8
3.6
P
L
M
Q
N
R
N.5
7.7
6.7
5.9
1.7
3.5
5.1
A-403
PF8-0PF8-0PF8-0PF8-0PF8-0PF8-0P8-0
P8-0
PF8-0
PF8-0
PF8-0
PF8-0
PF8-0
PF8-0
C.6
C.7
1 2.5
PF4-0
P5-0 P6-0
P6-0
P5-0 PF4-0
T.O.F.= 99' - 4"
PF4-6
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
PF5-0
T.O.F.= 99' - 4"
PF4-0
T.O.F.= 99' - 4" T.O.F.= 99' - 4"T.O.F.= 99' - 4"T.O.F.= 99' - 4"T.O.F.= 99' - 4"T.O.F.= 99' - 4"T.O.F.= 99' - 4"
4" CONCRETE SLAB ON GRADE
SEE REINFORCING SCHEDULE
FINISH FLOOR = 100'-0"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"T.O.F.= 99' - 0"
CF2-0
CF2-0
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
CF2-6
T.O.F.= 99' - 0"
T.O.F.= 99' - 4"
STEP
STEP
STEP
STEP
S T
E P
S T
E
P CF2-0
T.O.F.= 96' - 8"
T.O.F.= 94' - 4"
T.O.F.= 92' - 2"
STEP
T.O.F.= 96' - 8"
INDICATES A STEP IN THE
FOUNDATION. SEE
S-501
14" CONCRETE WALL
T.O.F.= 99' - 4"
CF4-0
S T
E P
T.O.F.= 99' - 4"
CF4-0
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
T.O.F.= 99' - 4"
S-001
T.O.F.= 99' - 4"
T.O.F.= 97' - 10"
S T
E P
S T
E P
S T
E P
S T
E P
CF5-0
GB2-0
T.O.F.= 99' - 4"
CF2-0
GB1-4
T.O.F.= 99' - 0"
FLAG POLE FOUNDATION
24"⌀X18'-0" DEEP CONCRETE PIER
REINF. W/ [6] #8'S VERT. & #4 TIES @ 12" O.C.
COORDINATE W/ FLAG POLE SUPPLIER,
EXTERIOR PAVING, & ARCHITECTURAL
S-505
A-501
A-501
T.O.F.= 99' - 4"
PF5-0
STEP
STEP
STEP
STEP
STEP
GB3-0
T.O.F.= 88' - 6"
RWF-3
RWF-3
RWF-3
RWF-3
RWF-3
T.O.F.= 99' - 0"
T.O.F.= 98' - 4"
T.O.F.= 96' - 2"
T.O.F.= 94' - 2"
T.O.F.= 92' - 2"
T.O.F.= 89' - 10"
T.O.F.= 88' - 6"
RWF-5
RWF-7
RWF-6
RWF-4
RWF-4
CF3-0
CF3-0
S-509
S-509
S-509
FOUNDATION WALL OFF-SET
SEE ARCHITECTURAL
S-509
S-509
T.O.F.= 99' - 4"T.O.F.= 96' - 8"
CF2-0 CF2-0
14" CONCRETE WALL
T.O.F.= 99' - 4"
PF3-0
STEP
T.O.F.= 99' - 0"
T.O.F.= 99' - 0"
T.O.F.= 96' - 8"
CF2-6CF2-6 CF2-6
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
CF3-6
S-501
CIP WALL CONTROL /
SONSTRUCTION JOINTS
SEE
S-501
S-501
T.O.F.= 88' - 6"
CF2-0
T.O.F.= 99' - 4"
CF2-0
T.O.F.= 99' - 4"
CF2-0
T.O.F.= 99' - 4"
CF2-0
T.O.F.= 90' - 6"
T.O.F.= 92' - 6"
T.O.F.= 94' - 6"
T.O.F.= 96' - 8"
T.O.F.= 99' - 0"
S T
E P
S T
E P
'B'
'D'
'F'
'A'
'C'
'E' (OPTION 1)
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
D
R e v it
L o c a l2
\1
-0
-A
IS
V
R C s te v e
.m a cd o n a ld F
R
M .r v t
/2
/2
:0
:0
A
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
S-101-2A
Main Level Foundation Plan - Area A
18-0060
02/25/21
Checker Author
1/8" = 1'-0"
Main Level Foundation Plan - Area A
Revisions
H.9
H
L
2.6 7.6
B.1
K
8.6
D.9
F.3
J.9
G
F
4.8
G.5
1.7
5.4
J
E
C
C.5
PF4-6
PF5-0
PF5-6
PF5-6PF5-0
PF5-0
PF4-6
PF3-0
PF8-0PF8-0
PF5-0
PF4-6
PF4-6 PF4-6
PF4-6PF4-6
PF4-6 PF4-6 PF5-0
PF3-6PF3-6PF4-6
PF5-0
PF9-6
PF5-0
PF4-0 PF4-0
CF2-0
CF2-6
CF3-6
CF2-0
PF8-0PF8-0PF8-0PF8-0P8-0
GB2-0
1 2.5
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4" T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4" T.O.F.= 99' - 4"
T.O.F.= 99' - 4"T.O.F.= 99' - 4"
T.O.F.= 99' - 4" T.O.F.= 99' - 4" T.O.F.= 99' - 4"
T.O.F.= 99' - 4"T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4" T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4" T.O.F.= 99' - 4"
CF4-0
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
CF2-6
CF1-4
T.O.F.= 99' - 4" T.O.F.= 99' - 4"T.O.F.= 99' - 4"T.O.F.= 99' - 4"T.O.F.= 99' - 4"T.O.F.= 99' - 4"T.O.F.= 99' - 4"
6" CONCRETE SLAB ON GRADE
SEE REINFORCING SCHEDULE
FINISH FLOOR = 100'-0"
4" CONCRETE SLAB ON GRADE
SEE REINFORCING SCHEDULE
FINISH FLOOR = 100'-0"
6" CONCRETE SLAB ON GRADE
SEE REINFORCING SCHEDULE
FINISH FLOOR = 100'-0"
6" CONCRETE SLAB ON GRADE
SEE REINFORCING SCHEDULE
FINISH FLOOR = 100'-0"
4" CONCRETE SLAB ON GRADE
SEE REINFORCING SCHEDULE
FINISH FLOOR = 100'-0"
T.O.F.= 99' - 4"
CF1-4
CF1-4
CF1-4
CF2-0
T.O.F.= 99' - 4"
T.O.F.= 99' - 4" T.O.F.= 99' - 4"
CF1-4
CF1-4
CF1-4
CF1-4
CF1-4
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 0"
GB2-0
CF2-6
CF2-6
T.O.F.= 99' - 4"
S-501
T.O.F.= 99' - 4"
CF2-0
L O
W E
R
L O
W E
R
INDICATES LOWER BOTTOM OF
FOOTING TO MATCH BOTTOM
OF GRADE BEAM. SEE.
LOWER LOWER
T.O.F.= 99' - 4"T.O.F.= 99' - 4"
CF2-0
S-001
FROST SLABS
SEE
T.O.F.= 99' - 4"
PF4-0
LOWER
16" CONCRETE WALL
S T
E P
T.O.F.= 96' - 8"
T.O.F.= 99' - 0"
S-001
T.O.F.= 89' - 6"
CF2-6
GB2-0
S-504 CF2-0
S-504
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
CF2-0
T.O.F.= 99' - 0"
T.O.F.= 99' - 0"
T.O.F.= 96' - 8"
CF2-6CF2-6 CF2-6
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
CF3-6
GRADE BEAM CONSTRUCTION JOINT
SEE
S-501
S-501
S-501
S T
E P
PROVID #4 BARS @
OUTSET CORNERS.
TYPICAL
PROVID #4 BARS @
OUTSET CORNERS.
TYPICAL
'B'
'D'
'F'
'A'
'C'
'E' (OPTION 1)
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
D
R e v it
L o c a l2
\1
-0
-A
IS
V
R C s te v e
.m a cd o n a ld F
R
M .r v t
/2
/2
:0
:1
A
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
S-101-2C
Main Level FoundationPlan - Area C
18-0060
02/25/21
Checker Author
1/8" = 1'-0"
Main Level Foundation Plan - Area C
Revisions
A
3.62.6 10.87.6
B.1
8.64.8
B
9.8 11.65.4 9.2 10.6
PF4-6PF4-6
PF6-0
PF4-6PF4-6
GB2-0
GB2-0
GB2-0
L3X3X1/4 DECK BEARING ANGLE
DL=13.8 K
LL=17.5 K
DL=SERVICE LEVEL DEAD LOAD BEAM REACTION
LL=SERVICE LEVEL LIVE LOAD BEAM REACTION
T.O.F.= 99' - 4"T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"T.O.F.= 99' - 4"
GB4-0
T.O.F.= 95' - 2" T.O.F.= 97' - 2"
T.O.F.= 99' - 0"
T.O.F.= 97' - 2"
T.O.F.= 99' - 0"
S T
E P
S T
E P
S T
E P
S T
E P
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
S-001
FROST SLAB
SEE
T.O.F.= 99' - 0"
T.O.F.= 99' - 0"
T.O.F.= 99' - 0"
STEP
GB4-0
GB4-0
12" CONCRETE WALL
T.O.F.= 96' - 8"
16" CONCRETE WALL
S-505
T.O.F.= 99' - 4"
CF2-0
STEP
S-505
CHILLER PADS
S-508
S-508
S-501
A-704
A-704
GB2-0
T.O.F.= 99' - 0"
GB2-0
T.O.F.= 99' - 0"
W
.5
K
IP
S S
.8
K L F
'B'
'D'
'F'
'A'
'C'
'E' (OPTION 1)
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
D
R e v it
L o c a l2
\1
-0
-A
IS
V
R C s te v e
.m a cd o n a ld F
R
M .r v t
/2
/2
:0
:2
A
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
S-101-2E
Main Level Foundation Plan - Area E
18-0060
02/25/21
Checker Author
1/8" = 1'-0"
Main Level Foundation Plan - Area E
Revisions
8 9 10 11
P
L
Q
N
8.6
10.5
9.7
8.7
7.7
9.8
PF8-0
PF8-0
PF8-0
W 8X18
W 8X18
K
K
K
K
K
[24] 44LH-SP1 STEEL JOISTS
DOUBLE PITCH TOP CHORD
TL/LL = 240/120
R = 8.1 KIPS
L3 X
X
/4
D E
C K
B E
A R
IN
G
A N
G L E
L3 X
X
/4
D E
C K
B E
A R
IN
G
A N
G L E
DECK #1
SEE DETAIL
L3 X
X
/4
D E
C K
B E
A R
IN
G
A N
G L E
L3 X
X
/4
D E
C K
B E
A R
IN
G
A N
G L E
2' - 2"
23 SP. @
4'-0" = 92'-0"
2' - 2"
W
=8.0 KIPS
S=8.6 KLF
W
.5 K
IP
S
S 2.
K
L F
W
=8.0 KIPS
S=8.6 KLF
W
.5 K
IP
S
S 2.
K
L F
W12X19
T.O.S.= 99' - 4 1/2"
W X
T .O
.S
W X
T .O
.S
SL-1
SL-1
5" 4 SP. @ 2'-0" = 8'-0" 1' - 6"1' - 6" 4 SP. @ 2'-0" = 8'-0" 1' - 5"
1' - 2"
1' - 8" 6 SP. @ 2'-0" = 12'-0" 1' - 6" 1' - 6" 7 SP. @ 2'-0" = 14'-0" 1' - 9"
1' - 4"
2' - 0" 2' - 0" 2' - 0" 2' - 8"
4-16K3
STEEL
JOISTS
4-16K3
STEEL
JOISTS
K
K
4 8-12K5 STEEL JOISTS 7-12K3 STEEL JOISTS
4-12K1
STEEL
JOISTS
/2
28-16K3 STEEL JOISTS
1' - 8"6 5/16"
27 SP. @ 2'-0" = 54'-0"
1' - 1 11/16"
28-24K6 STEEL JOISTS
R=5.6 KIPS
1' - 8"6 5/16"
27 SP. @ 2'-0" = 54'-0"
1' - 1 11/16"
5" SUPPORTED CONCRETE SLAB
FINISH FLOOR = 100'-0"
SEE SCHEDULE
5" SUPPORTED CONCRETE SLAB
FINISH FLOOR = 100'-0"
SEE SCHEDULE
C O
N C
R E
T E
B E
A M
C O
N C
R E
T E
B E
A M
S
P
'-0
'-0
' - 0
6-C12X20.7
STEEL CHANNELS
R=2.0 KIPS
W 4X
T .O
.S
19-12K1 STEEL JOISTS
R=2.8 KIPS
1' - 10"
6 SP. @
2'-0" = 12'-0"
1' - 11 3/16" 7 5/8" 9 11/16"
10 SP. @
2'-0" = 20'-0"
10 3/4"
L3 X
X
/4
D E
C K
B E
A R
IN
G
A N
G L E
HSS2-1/2X2-1/2X1/4
L X
X
/4
L X
X
/4
C X
0.
C
X
0.
L3 X
X
/4
D E
C K
B E
A R
IN
G
A N
G L E
9-20K4 STEEL JOISTS
R=4.7 KIPS
15 SP. @
2'-0" = 30'-0"
10 3/4"
Z E
R O
C A
M B
E R
O N
E Q
U A
R T E
R C
A M
B E
R O
N E
H A
L F C
A M
B E
R
Z E
R O
C A
M B
E R
O N
E Q
U A
R T E
R C
A M
B E
R
O N
E H
A L F C
A M
B E
R
L3X3X1/4
W
=3.1 KIPS
S=5.5 KLF
W=8.0 KIPS
S=6.9 KLF
W
=3.1 KIPS
S=5.5 KLF
S-504
S-504
S-503
S-503
L X
X
/4
D E
C K
B E
A R
IN
G
A N
G L E
L X
X
/4
D E
C K
B E
A R
IN
G
A N
G L E
S-503
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
CF2-0
CF2-0
S-503
S-503
S-503
W16X26
T.O.S.= 99' - 4 1/2"
W16X26
T.O.S.= 99' - 4 1/2"
W16X26
T.O.S.= 99' - 4 1/2"
W21X50
T.O.S.= 99' - 4 1/2"
12"X16" EMBED PLATE
W/ [8] 3/4"⌀X4" H.S.
S-503
S-503
S-503
S-503
S-504
S-504
S-504
S-504
S-503
SIM.
S-503
SIM.
T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
S-501
T.O.F.= 95' - 2"
T.O.F.= 92' - 8"
T.O.F.= 90' - 2"
T.O.F.= 82' - 8"
T.O.F.= 85' - 2"
T.O.F.= 87' - 8"
INDICATES A STEP IN THE
FOUNDATION. SEE
STEP
T.O.F.= 96' - 8"
INDICATES A STEP IN THE
FOUNDATION. SEE
S-501
14" CONCRETE WALL
STEP
T.O.F.= 92' - 8"
T.O.F.= 85' - 4" T.O.F.= 90' - 6"
T.O.F.= 95' - 0"
T.O.F.= 93' - 0"
T.O.F.= 88' - 0"
T.O.F.= 97' - 6"
T.O.F.= 99' - 4"
CF4-0
T.O.F.= 95' - 0"
CF2-0
14" CONCRETE WALL
14" CONCRETE WALL
16" CONCRETE WALL
CF5-0
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
T.O.F.= 95' - 0"
T.O.F.= 97' - 0"
T.O.F.= 99' - 4"
CF4-0
16" CONCRETE WALL
S-504
S T
E P
S T
E P
S T
E P
PR
x2
T.O.F.= 84' - 6"
T.O.F.= 82' - 0"
T.O.F.= 87' - 0"
T.O.F.= 89' - 6"
CF2-6
PF8-0
CF2-6
T.O.F.= 90' - 4"
16" CONCRETE WALL
S-504
T.O.F.= 85' - 4"
T.O.F.= 87' - 10"T.O.F.= 99' - 4"
T.O.F.= 97' - 10"
T.O.F.= 95' - 4"
T.O.F.= 92' - 10"
T.O.F.= 90' - 4"
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
S T
E P
CF5-0
CF5-0
24" CONCRETE WALL
' - 6
T.O.F.= 99' - 4"
PF5-0
CF2-6
S-501
CMU WALL JOINTS
SEE
S-501
SEE
FOR SUPPORT OF CMU WALLS
TYPICAL
S-501
S-502
10.1
11.3
CF2-0
CF5-0
CF2-0
T.O.F.= 99' - 4"
CF2-0
A-406
DL=2.1 K
LL=3.0 K
S=SEISMIC LOAD CONTRIBUTION DUE TO ROOF
CONSTRUCTION. THE WEIGHT OF RESISTING
PRECAST CONCRETE WALL & OTHER WALLS
CONNECTED IS NOT INCLUDED.
W=SERVICE LEVEL WIND LOAD
W=14.5 KIPS
S=4.8 KLF
S-507
'B'
'D'
'F'
'A'
'C'
'E' (OPTION 1)
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
D
R e v it
L o c a l2
\1
-0
-A
IS
V
R C s te v e
.m a cd o n a ld F
R
M .r v t
/2
/2
:0
:3
A
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
S-103-1B
Main Level Framing Plan - Area B
18-0060
02/25/21
Checker Author
1/8" = 1'-0"
Main Level Framing Plan - Area B
Revisions
9 10 11
L
10.8
K.5
B.1
8.6
D.9
F.3
J.9
G.5
9.8 11.69.2 10.6
C.5
A-404
A-408
PF4-6
PF5-0
PF6-0
PF5-0
PF5-0
PF4-6PF4-6
PF5-0
PF5-6
PF5-6
PF5-0
PF4-6
PF4-6 GB2-0
W X
T .O
.S
/2
W X
T .O
.S
/2
W X
T .O
.S
/2
W X
T .O
.S
/2
W X
T .O
.S
/2
W X
T .O
.S
/2
W18X35
T.O.S.= 99' - 7"
W X
T .O
.S
/2
W X
T .O
.S
/2
W X
T .O
.S
/2
W X
T .O
.S
/2
W X
T .O
.S
/2
W X
T .O
.S
/2
W X
T .O
.S
/2
W X
T .O
.S
/2
W X
T .O
.S
/2
W12X19
T.O.S.= 99' - 4 1/2"
5-C12X20.7
1' - 0" 4-SP. @ 2'-0" = 8'-0" 1' - 2"
L3X3X1/4 DECK BEARING ANGLE
-C
X
.7
S T
E E
L C
H A
N N
E L S
S
P
/2
S
P
/2
S
P
S
P
S
P
S
P
S
P
-1
K
S
T E
E L J
O
IS
T S
-C
X
.7
C H
A N
N E
L S
S
P
/2
S
P
/2
S
P
S
P
S
P
S
P
/2
5" SUPPORTED CONCRETE SLAB
FINISH FLOOR = 100'-0"
FLOOR DECK 1
SEE SCHEDULE & DETAIL
14"X20" CONCRETE BEAM W/
[2] #5'S CONT. T&B
#4 STIRRUPS @ 12" O.C.
T.O.F.= 99' - 4" T.O.F.= 99' - 4"
T.O.F.= 99' - 4"T.O.F.= 99' - 4"
T.O.F.= 99' - 4"T.O.F.= 99' - 4"
T.O.F.= 99' - 4"T.O.F.= 99' - 4"
DL=13.8 K
LL=17.5 K
DL=SERVICE LEVEL DEAD LOAD BEAM REACTION
LL=SERVICE LEVEL LIVE LOAD BEAM REACTION
DL=2.1 K
LL=3.0 K
T.O.F.= 99' - 4" T.O.F.= 99' - 4"
T.O.F.= 99' - 4" T.O.F.= 99' - 4"
T.O.F.= 99' - 4"
L3X3X1/4
S-504
S-503
S-503
S-503
S-503
S-503
S-503
S-503
S-503
S T
E P
S T
E P
S T
E P
PR
x2
T.O.F.= 84' - 6"
T.O.F.= 82' - 0"
T.O.F.= 87' - 0"
T.O.F.= 89' - 6"
CF2-6
PF8-0
CF2-6
16" CONCRETE WALL
T.O.F.= 99' - 0"
CF2-6
S-502
DL=2.1 K
LL=3.0 K
W
.5
K
IP
S S
.8
K L F
S-507
'B'
'D'
'F'
'A'
'C'
'E' (OPTION 1)
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
D
R e v it
L o c a l2
\1
-0
-A
IS
V
R C s te v e
.m a cd o n a ld F
R
M .r v t
/2
/2
:0
:3
A
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
S-103-1D
Main Level Framing Plan - Area D
18-0060
02/25/21
Checker Author
1/8" = 1'-0"
Main Level Framing Plan - Area D
Revisions
P
L
M
Q
N
R
N.5
7.7
6.7
5.9
1.7
3.5
5.1
A-403
H S
S X
X
/4
H S
S X
X
/4
K
H
C
H
C
K
K
C.6
C.7
1 2.5
W X
T .O
.S
W X
T .O
.S
W X
T .O
.S
W X
T .O
.S
W14X22
T.O.S.= 111' - 3 1/2"
W14X22
T.O.S.= 111' - 3 1/2"
W14X22
T.O.S.= 111' - 3 1/2"
W14X22
T.O.S.= 111' - 3 1/2"
9-16K2 STEEL JOISTS 1
K
K
K
2' - 3 13/16"
1' - 8"
3' - 0" 6-SP. @ 2'-0" = 12'-0"
1' - 0"
1' - 4"
4' - 0" 4' - 0" 2' - 2"
2' - 3 13/16"
DECK #4
SEE DETAIL
DECK #4
SEE DETAIL
DECK #1
SEE DETAIL
DECK #1
SEE DETAIL
W
.4
K
IP
S S
.0
K L F
W
.1
K
IP
S
S .8
K L F
W=13.0 KIPS
S=10.5 KLF
W=12.1 KIPS
S=10.5 KLF
W=1.8 KIPS
S=2.3 KLF
18-20K5 STEEL JOISTS
R = 3.8 KIPS
18-18K3 STEEL JOISTS
R = 3.0 KIPS 3' - 1 3/16"
4' - 0"1' - 11 1/4"
-3
L H
-S P
/1
S
T E
E L J
O
IS
T S
R
.8
K
IP
S
' - 7
/ 4
(1 )-S
P A
C E
S
'-0
'-0
' - 7
/ 4
21-C12X20.7 STEEL JOISTS
R = 1.5 KIPS
(20)-SPACES @ 4'-0" = 80'-0"
1' - 2"
H S
S X
X
/4
R
.0
K
IP
S
R
.0
K
IP
S
W16X31
T.O.S.= 113' - 9 1/2"
W18X35
T.O.S.= 113' - 9 1/2"
W24X55
T.O.S.= 113' - 9 1/2"
W18X76
T.O.S.= 114' - 4 7/8"
W18X76
T.O.S.= 114' - 4 1/2"
4'-0"X8" DEEP PRECAST CONCRETE HOLLOW CORE PLANKS W/ 2"
COMPOSITE CONCRETE TOPPING W/ 6X6-10/10 W.W.M REINF.
PLANKS SLOPE
SEE SCHEDULE FOR TOPPING REINFORCING
SEE AREA "B" FOR ADDITIONAL INFORMATION
S-505
SIM.
S-505 SIM.
S-505
SIM.
SL-1
W8X18
SL-1
W8X18
ML-1
M L -2
M L -2
LL=2.34 KIPS/FT
DL=6.1 K
LL=13.1 K
DL=9.2 K
LL=8.9 K
DL=6.3 K
LL=5.7 K
DL=6.8 K
LL=6.2 K
S-510
2' - 0"
(11)-SPACES @ 4'-0" = 44'-0"
3' - 8 5/8" 4' - 0"
2' - 6" 4' - 0"
4' - 0" 4' - 0"
4' - 0" 4' - 0"
L6X4X5/16
L6X4X5/16
L X
X
/4
" D E
C K
B E
A R
IN
G
A N
G L E
L X
X
/4
D
E C
K B
E A
R
IN
G A
N G
L E
L X
X
/4
D
E C
K B
E A
R
IN
G A
N G
L E
S-505
S-505
S-001
S-001
S-001
S-001
S-502
S-502
DECK PENETRATIONS
SEE
S-502
L3x3x1/4" CONT.
DECK BEARING ANGLE
L3x3x1/4" DECK BEARING ANGLE
S-505
A-704
K
RTU CURB
CONNECTION DETAIL
SEE
S-507
S-507
W
.3
K
IP
S S
.8
K L F
L3X3X1/4" DECK BEARING ANGLE
L3X3X1/4" DECK BEARING ANGLE
S-507
SIM.
'B'
'D'
'F'
'A'
'C'
'E' (OPTION 1)
SHEET NUMBER
SHEET TITLE
CLIENT INFORMATION
PROJECT INFORMATION
JOB #
ISSUE DATE
Checked by Drawn by
Davis Design All Rights Reserved
E a s t
M a in
S u it e
V e rm ill io n S
D
P h o n e
-6
-1
V e rm il li o n
N S tr e e t, S u it e
L in c o ln N
E
P h o
-4
-9
F a x
-4
-9
L in c o ln L in c o ln
N th
S tr e e t, S u it e
O m a h a
N E
-4
-3
W a rd
P a rk w a y
K a n s a s C it y
M O
-3
-9
D
R e v it
L o c a l2
\1
-0
-A
IS
V
R C s te v e
.m a cd o n a ld F
R
M .r v t
/2
/2
:0
:4
A
M
Nebraska National Guard
Bellevue Readiness Center S. 25th and Capehart Rd., Bellevue, NE
S-103-2A
Roof Framing Plan - Area A
18-0060
02/25/21
Checker Author
1/8" = 1'-0"
Roof Framing Plan - Area A
Revisions
L
Q
N
8.6
10.5
9.7
8.7
7.7
9.8
A-408
H
C
H
C
K
K
DECK #4
SEE DETAIL
W=7.4 KIPS
S=8.1 KLF
W=2.5 KIPS
S=11.1 KLF
W=3.7 KIPS
S=16.4 KLF
W
.6
K
IP
S
S
.3
K L F
3' - 1 3/16" 4' - 0"1' - 11 1/4"
11-20K5 STEEL JOISTS
R = 3.8 KIPS
14-18K3 STEEL JOISTS
R = 3.0 KIPS
3' - 0"
(10)-SPACES @ 4'-0" = 40'-0"
3' - 0" 2' - 0"1' - 8" 3' - 0"
(6)-SPACES @ 4'-0" = 24'-0"
2' - 7"
2' - 3"
(13)-SPACES @ 4'-0" = 52'-0"
2' - 3"
4'-0"X8" DEEP PRECAST CONCRETE HOLLOW CORE PLANKS W/ 2"
COMPOSITE CONCRETE TOPPING W/ 6X6-10/10 W.W.M REINF.
PLANKS SLOPE
SEE SCHEDULE FOR TOPPING REINFORCING
4'-0"X8" DEEP PRECAST CONCRETE HOLLOW CORE PLANKS W/ 2"
COMPOSITE CONCRETE TOPPING…