BELCHER_RD_(BELLEAIR_RD_-_EAST_BAY_DR)_-_Plans.pdf

PDF 7 MB Posted

Attached to
Fiscal Year 2027 Pavement Preservation - Package 1
Solicitation number
26-0361-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is a project plan document for Pinellas County, Florida's Fiscal Year 2027 Pavement Preservation Package 1, specifically detailing the Belcher Road resurfacing project between Belleair Road and East Bay Drive. The project involves milling existing asphalt pavement to a depth of 2 inches and resurfacing with SP 12.5 structural course material (Traffic C) across three distinct segments: Station 21+47.35 to 31+27.21, Station 31+27.21 to 97+07.89, and Station 97+07.89 to 101+49.38. The plans include typical cross-sections with 2 percent grade (or as directed by the engineer up to 4 percent maximum), and the project documentation consists of 21 sheets including general notes, typical sections, detailed station-by-station plans from 20+00.00 to 101+89.44, core location maps, and loop details. The plans were prepared by professional engineer Jeffrey S. Thompson (Florida PE #93254) with a document date of February 24, 2026.

The project represents one component of Pinellas County's broader FY2027 Pavement Preservation initiative, which encompasses four paving locations totaling approximately 38.55 lane miles and includes two arterial and two local (neighborhood) road projects. The Belcher Road segment falls within this countywide milling and resurfacing program designed to promote traffic safety and efficiency throughout the county's roadway network. No specific pricing information, contract award dates, response deadlines, or bidding terms are contained within this technical plan document.

View the file

Other files

File Type Posted
Fiscal_Year_2027_Pavement_Preservation_-_Package_1.pdf PDF
Pricing_Proposal26-0361_(reference_only).pdf PDF
Pricing_Proposal_26-0361_(reference_only).pdf PDF
Package_1_Engineer_Estimate_6-16-2026.xlsx XLSX spreadsheet
Plans_Group_C-_Local_Group_213.pdf PDF
Common_Carrier_Attestation_02.05.2025.pdf PDF
Human_Trafficking_Affidavit_02.05.2025_(3).pdf PDF
Plans_Group_B-_Keene_Rd_(Gulf_to_Bay_Blvd-Bellair_Rd).pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
Local_Group_216_-_Plans.pdf PDF
Specifications_26-0361.pdf PDF
Foreign_Countries_of_Concern_Affidavit_02.05.2025_(1).pdf PDF
QUALIFICATION_SUBMITTAL_FORM_4.26.pdf PDF
Sample_Agreement-26-0361.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
Specifications.pdf PDF
SBE_Compliance_Form.pdf PDF
Appendix_4_-_Special_Notices.pdf PDF
Sample_Application_for_Payment.pdf PDF
Sample_Change_Order.pdf PDF
Sample_Performance_and_Payment_Bonds_26-0361.pdf PDF
Appendix_1_-_Permits_.pdf PDF
4.26.Performance_and_Payment_Bonds.pdf PDF
E-Verify_Affidavit.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
OpenGov_Fillable-_Final.pdf PDF
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Package_1_-_County_LD_Schedule_(for_Purchasing_only).xlsx XLSX spreadsheet
Package_1_Engineer_Estimate_5-26-2026_(review_only).xlsx XLSX spreadsheet
Bid_Submittal_Form-JOC.pdf PDF
Project_Location_Map.pdf PDF
Airport_Security_Program.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PID 26-0361-006778A

FY2027 COUNTYWIDE PAVEMENT PRESERVATION

BELCHER RD (BELLEAIR RD - EAST BAY DR)

FINANCIAL PID 004192A

STATE OF

No.

PR

O

FESSIONAL ENGIN

EE

R

JE

FFR

EY S. THOMPSON

FLORI. A

93254

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (2")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")

BELCHER RD (EAST BAY DR - BELLEAIR RD)

STA. 21+47.35 TO STA. 31+27.21

TYPICAL SECTION

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (2")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")

BELCHER RD (EAST BAY DR - BELLEAIR RD)

STA. 31+27.21 TO STA. 97+07.89

TYPICAL SECTION

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (2")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (2")

BELCHER RD (EAST BAY DR - BELLEAIR RD)

STA. 97+07.89 TO STA. 101+49.38

TYPICAL SECTION

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

Feet

40200 10

Sheets and Views
1 Eng_Cover_SSM
2 GENERAL NOTES
3 TYP SEC
4 SH (20+00.00-26+20.00)
5 SH (26+20.00-32+40.00)
6 SH (32+40.00-38+60.00)
7 SH (38+60.00-44+80.00)
8 SH (44+80.00-51+00.00)
9 SH (51+00.00-57+20.00)
10 SH (57+20.00-63+40.00)
11 SH (63+40.00-69+60.00)
12 SH (69+60.00-75+80.00)
13 SH (75+80.00-82+00.00)
14 SH (82+00.00-88+20.00)
15 SH (88+20.00-94+40.00)
16 SH (94+40.00-100+60.00)
17 SH (100+60.00-101+89.44)
18 CORE LOCATION MAP
19 Typical Sections A_B
20 Typical Section C
21 LOOP DETAIL
2026-02-24T09:36:50-0500
Jeffrey S Thompson

File details come from the government source that posted it. Updated .