B1881.26 Addendum V Questions and Answers.pdf
PDF 4 MB Posted
- Solicitation number
- BPM057702
- Issued by
- Washington County, Maryland
About this file
This is Addendum V (Questions and Answers) to Bid No. B1881.26 issued by the City of Hagerstown, Maryland for the Hagerstown Wastewater Treatment Plant Phase I Improvements Project. The addendum clarifies contract documents and provides responses to eighteen questions submitted by prospective bidders. Key modifications include: replacing local control stations with OIT (Operator Interface Terminal) rated for Class 1 Division 2 areas mounted on NEMA 4X panels; revising pump operating head ranges for horizontal end suction centrifugal pumps; establishing drain pump specifications; clarifying ceiling work scope for the Operations Building upper level; confirming shutdown sequencing flexibility for the RAS/WAS Pump Station; and removing the requirement for an Instrumentation and Control System Supplier Questionnaire. The addendum also includes detailed input/output field device signal listings, updated instrument device schedules, revised drawings with color-coded markings (red for additions, blue for notes/direction, green for deletions), and one-line diagrams for fire protection and signaling panels. Bids remain due on Tuesday, August 18, 2026 at 2:00 PM.
The addendum specifies that all contingency allowances, including a $550,000 Lump Sum for Allowances, are included within the $2,200,000 Contingency Allowance and establishes that qualification information is required for subcontractors only, not suppliers. Technical clarifications address PVC pressure pipe thickness specifications (DR-14), ductile iron pipe wall thickness classes compliant with ANSI/AWWA standards, coating requirements for buried versus exposed piping, and air valve/blowoff valve quantities (four locations assumed for bidding purposes). The contract requires adherence to NFPA 72 for fire detection and alarm systems, NFPA 820 for classified area electrical installations, and incorporation of Class 1 Division 2 rated equipment throughout applicable facility areas. Hazardous Materials reports were previously provided via Addendum III Attachment 3, and Paragraph SC 5.06 of the Supplementary Conditions appears on page 242 of the specifications volume.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID NO. B1881.26
ADDENDUM NO. V
CITY OF HAGERSTOWN
HAGERSTOWN, MARYLAND
Hagerstown Wastewater Treatment Plant Phase I Improvements Project
Date: August 12, 2026 Bids Due: Tuesday, August 18, 2026 @ 2:00PM
(Unchanged)
To Bidders:
This Addendum is hereby made a part of the Contract Documents on which all bids will be based and is issued to clarify the original documents.
Please acknowledge receipt of this Addendum at the appropriate space on the bid form by inserting its number and date. This Addendum consists of eighteen (18) pages.
This Addendum forms a part of the contract Documents as it supplements and/or modifies as follows:
The following Attachments are included:
Attachment 1 – Section 40 64 00 Appendix 1 – Input/Output field device signal listing Attachment 2 – Drawing I-11-601 Attachment 3 – Section 40 61 11 Instrument Device Schedule Additions Attachment 4 – Drawing E-11-101 and E-22-603 Attachment 5 - FPSP-HW Fire Protection and Signaling Panel One-Line Diagram
Addendum V – QUESTIONS AND ANSWERS
Bid No. B1881.26 Hagerstown Wastewater Treatment Plant Phase I Improvements Project
The attention to bidders submitting proposals for the above project is called to the following addendum that contains responses to all questions submitted by the prospective bidders. The items set forth herein, whether of omission, addition, substitution or clarifications are all to be included in and form part of the proposal submitted. This addendum shall take precedence or provide clarification.
All questions are sorted numerically as received from bidders and the response provided follows directly after each question submitted. Attachments to this Addendum are as follows:
The above-mentioned Addendum follows.
CLARIFICATIONS:
1. Prospective Bidders are advised that for revised drawings the following color legend applies:
a. Red – Addition
b. Blue – Notes/Direction
c. Green – Deletion
2. Attachment 1 – Appendix 1 - Input/Output List shall be added to Section 40 64 00 Programmable
Logic Controllers
3. The Attachment 2 Headworks drawings replace Sheet I-11-601 in their entirety.
4. Add the following after Paragraph 1.1.G in Section 28 31 19 (Fire Protection and Signaling
System)
G. The supplier shall furnish and install a complete automatic fire detection and alarm system that meets the requirements of NFPA 72, and all applicable codes for the following rooms on the
Upper level of the Operations Building: Training room, Electrical Room 1 & 2, Lab, Office, Control Room, and Instrumentation and Programming Office. A new fully functional fire protection and signaling control panel (FSPS-OPS) shall be designed and installed as specified in the Operations Building. At a minimum, the system shall include dedicated horn/strobe notification devices for area detection and duct smoke detection alarms.
5. Replace Paragraph 1.4.2 in Section 28 31 19 (Fire Protection and Signaling System) with the following in its entirety:
2. The system functions shall include sprinkler system monitoring, ventilation air flow detection monitoring, gas detection system monitoring, area detection and duct smoke detection.
6. Update Drawing I-61-601 with the additions and corrections shown in red below.
7. Remove the following Devices from Section 40 61 11 Instrument Device Schedule in their entirety.
8 AIT-021
9 AE-021
16 AIT-022
17 AE-022
8. Add the devices listed in Attachment 3 to the Section 40 61 11 Instrument Device Schedule.
9. Replace the tag numbers for Items 79 – 84 in the Section 40 61 11 Instrument Device Schedule as shown below.
10. Replace Drawing E-11-101 and E-22-603 with Attachment 4 in its entirety.
11. Update Section 26 05 11 – Electrical, Paragraph 2.10 to include the following.
12. Delete FPSP-HW Fire Protection and Signaling Panel One-Line Diagram on Drawing E-11-602 in its entirety and replace with the One-Line Diagram in Attachment 5.
13.
QUESTIONS AND ANSWERS:
Q1. Specification sections 46 21 53-2.6.D outlines a NEMA 7 local control station with (4) pilot devices and 46 21 73-2.6.C outlines a NEMA 7 local control station with (3) pilot devices and terminal blocks for field wiring. Please note, this differs greatly from the plans as drawing I-11-601 shows the local control stations for the screens with a OIT and drawing I-95-701 shows the local control stations with OITs, Ethernet switches, and Fiber connections. Please note, NEMA 7 control stations are explosion proof and cannot have OITs mounted on them. Can you please confirm that the local control stations will include the devices that are outlined in section 46 21 53 and 46 21 73 and will not include the OITs, Ethernet switches, and fiber connections that are shown on the drawings.
A1. Delete Paragraph 2.6.D– Local Control Stations of Section 46 21 53 Center Flow Perforated Plate Screens in its entirety and replace with the following:
1. Each screen and washer compactor shall be provided with an OIT rated for Class 1 Div 2 areas mounted on a NEMA 4X Panel. All components within the NEMA 4X enclosure, including ESTOPs, shall meet the Class 1 Div 2 area requirements. The OIT shall be a 12"
Schneider Electric Harmony IPC Modular Display without exception.
2. Provide the following controls:
a. Screen Hand/Off/Automatic (H-O-A) selector switch.
b. Brush Hand/Off/Automatic (H-O-A) selector switch.
c. Forward-Reverse (F-R) selector switch
d. E-Stop Pushbutton with Double Pole Double Throw (DPDT) contact blocks.
A1 Continued. Delete Paragraph 2.6.C in Section 46 21 73 Screenings Washer Compactor Equipment in its entirety and replace with the following:
C. The SHSS shall provide an OIT rated for Class 1 Div 2 areas mounted on a
NEMA 4X Panel. All components within the NEMA 4X enclosure, including
ESTOPS, shall meet the Class 1 Div 2 area requirements. The OIT shall be a 12’’
Schneider Electric Harmony IPC Modular Display without exception. OIT shall be mounted near the washer compactor at the operating floor level. The following controls shall be provided:
1. Push-To-Stop/Pull-To-Run emergency stop maintained push button with lockout.
2. Hand-Off-Auto (H-O-A) selector switch.
3. Forward-Reverse (F-R) selector switch
Q2. Section 43 23 13.14 (Horizontal End Suction Centrifugal Pumps): 2.2.A indicates the operating head range for full speed continuous operation to be 12 to 33 ft. for all three (3) pumps. This head range is outside of the primary and secondary design point head conditions (50 and 34.1 feet respectively). Please clarify if the 12 to 33 ft. head range is meant to be for reduced speed operation.
A2. Revise the corresponding rows in the table under Section 43 23 13.14 Paragraph 2.2.A. The remaining rows of the table under Section 43 23 13.14 Paragraph 2.2.A are unchanged.
Pump tag numbers. OP-RSP-2
OP-RSP-3
OP-RSP-4
Operating head range for full speed continuous operation.
12 to 33 30 to 53 12 to 33 28 to 55 ft
Minimum head at reduced speed. 12.5 12.5 17.3 ft
Efficiency. 76 72 70 78 %
Minimum NPSHA at rated head. 26 19 26 19 ft
Minimum NPSHA at minimum operating head. 6.49 15 6.49 15 ft
Q3. There is no specification provided for the (3) three drain pumps (DRN-PLC-1, 2, & 3) shown in the
RAS/WAS PS. Please provide the specification for these pumps.
A3. Reference shall be made to Section 22 13 29.16, Part 1 and Part 3 for General and Installation requirements. See Keynote 2 on Drawing M-61-101 for product requirements. Revise Keynote 2 on Drawing M-61-101 as follows:
Q4. Page A61.103’s symbol legend notes that all hatched areas are not in the work scope. On the next page, many of the previously hatched areas have work listed for the existing ACT ceilings. Please confirm that all notes 3, 6 &7 on page A61.104 define required ceiling work for Operations Upper Level.
A4. Revise the Architectural Symbol Legend on Drawing A-61-103 as follows.
Q5. Specification section 01 11 13 – 1.14.D.6 General Work Sequence for the RAS & WAS Pump
Station state to do the work without interruption to the process and provides only a short time for a shutdown period, 7-days, and 2-hours. This timeframe is not reasonable for this work due to the limited access and amount of work associated with scope of work. Several additional weeks would be required to perform the work for these pumps, piping, and associated electrical work. Please confirm a time extension for this work will be provided for actual durations required to perform this work.
A5. Alternate shutdown sequencing methods and outage durations will be evaluated for approval as part of the Process Shutdown Request. It is not expected that the work in the RAS/WAS Pump Station will be critical path and therefore, no extension is required for the overall contract duration. Revise Section 01 11 13, Paragraph 1.14.D. as follow:
The following is a description of proposed sequencing for major shutdowns. This sequencing of construction has been developed to provide one approach to complete the work and meet the constraints imposed. This list is not considered to be all inclusive and Contractor is responsible for accounting for producing a complete list of shutdowns required throughout the project, and establishing a final sequencing procedure for each required shutdown. The Contractor may perform the work differently than outlined herein and many work items can be performed during various times at the
Contractor’s discretion. However, the schedule with sequence of construction shall be submitted, reviewed, and provided with a favorable review by the City, regardless of the method chosen and all construction constraints must be met. All items shall be outlined in the contractor’s construction schedule.
Q6. Is the Lump Sum for Allowances ($550,000) included in the $2,200,000 Contingency Allowance?
Or are the Lump Sum Allowances in addition to the Contingency Allowance?
A6. All specified contingency allowances are included in the price(s) set forth below, and have been computed in accordance with Paragraph 13.02 of the General Conditions.
Q7. System Integrator Allowance covers Sect. 406111. Micro-Tec is specified. Yet, spec section
004332 requires an “Instrumentation and Control System Supplier Questionnaire. Please clarify.
A7. Instrument and Control System Supplier Questionnaire is not required. Remove Section 00 43 32 in its entirety.
Q8. Is inorganic zinc primer a mandatory requirement for all ductile iron pipe, fittings, and appurtenances receiving an epoxy finish system, or is it offered as a Contractor/Applicator option in lieu of an epoxy primer coat ("same as finish coats")?
A8. Per Section 40 05 19, Paragraph 2.2.A, a universal primer shall be used for ductile iron pipe, manufacturer’s standard. If in contact with treated or potable water, certify as being in compliance with ANSI/NSF 61 and ANSI/NSF 600.
Q9. Reference addendum 4, PVC Pressure Pipe part 2.1.A. This section notes referencing PVC
Pressure Pipe Schedule 02630-S01 for the specified DR thickness for C900 PVC. This schedule cannot be located. Please clarify the DR thickness for PVC Pressure pipe.
A9. DR Thickness for PVC Pressure Pipe shall be DR-14.
Q10. Attachment 2 from addendum 4 added additional buried yard piping to the pipeline schedule. The schedule notes “coating” the buried copper and ductile iron pipe. Please confirm coatings only apply to exposed pipe and not buried.
A10. Addendum IV Attachment 2 is accurate. See Section 09 96 11 for coating requirements.
Q11. Please specify a thickness class for Ductile Iron Pipe. The specifications only note a pressure class.
A11. Add new paragraph in Section 40 05 19, Paragraph 2.1.B.
a. Pipe wall thickness for grooved and threaded end pipe shall be increased if necessary to comply with the following minimum thickness:
Pipe Size Minimum Thickness Class inches mm Threaded Ends (1) Grooved Ends (2)
4-16 100-400 53 53
18 450 53 54
20 500 53 55
24 600 53 56
30-54 750-1400 53 --
60 and 64 1500-1600 350 (3) --
(1) Complies with ANSI/AWWA C115/A21.15 for minimum pipe wall thickness for threaded flanges.
(2) Complies with ANSI/AWWA C606 for grooved and shouldered joint ductile iron pipe.
(3) Minimum class for 60 and 64 inch pipe is pressure class 350.
Q12. Reference the newly added note 3 on sheet C-03-101. Please provide a quantity and/or locations of blow off and air valves along the 12” PW due to the lack of profiles and elevation information.
A12. Quantity and locations of air valves and blowoffs will be reviewed during shop drawing approval.
Assume needed in 4 locations for bidding purposes.
Q13. Please provide a spec or detail of interior layout of the FRP Polymer Concrete manholes on the chemical duct bank lines. The civil drawings note a “back pressure valve”, but a spec/detail cannot be located.
A13. Chemical junction manholes shall be per Detail B / C-08-503. Back pressure valve, also referred to as pressure sustaining valve, shall be per Section 46 33 00, Paragraph 2.9.
Q14. Please confirm the line size for the backflow preventer on sheet C-03-103. 6” or 10”?
A14. See clarifying revisions to C-03-103 below.
Q15. Addendum 4 states that subcontractors and suppliers are to provide qualification information including financial data, project experience histories, and current workload commitments. This is not typical industry practice and may limit participation, as many firms do not routinely provide this information during the bidding process. Confirm that a subcontractor and supplier list is acceptable with the bid and that detailed qualification information will only be required after bid opening if requested by the owner.
A15. Qualification information is required for subcontractors only. Revise Section 00 21 13 Paragraph 3.01.D as follows.
Subcontractors and suppliers are to provide written qualification information, such as financial data, previous experience, and present commitments.
Q16. Section 01 11 13 references Paragraph SC 5.06 of the Supplementary Conditions for the
Environmental Assessment and Abatement Reports. However, Paragraph SC 5.06 and the referenced reports do not appear to be included in the bid documents. Please provide a copy of Paragraph SC 5.06 and the referenced reports or advise where they can be found.
A16. Paragraph SC 5.06 is on page 242 of 252 of Volume 1 Specifications. Hazardous Materials report was included via Addendum III Attachment 3.
Q17. Please provide the missing Limited Hazardous Material Survey.
A17. See Addendum III Attachment 3.
Tyler French, Procurement Administrator City of Hagerstown
Input Output Schedule
Item IO Type IO Tag Service Description Field Device Controller ID Signal Type Signal Range Power Type Signal Type Closed State Power Source Interp Relay P&ID Remarks
1 AI LDI-021 SCREENING AREA HEADWORKS SCREEN NO. 1 CHANNEL - DIFFERENTIAL LEVEL LDIT-021 PLC-3-1 MODBUS TCP PER EQUIP. SUPPLIER N/A N/A N/A N/A N/A I-11-601
2 AI AI-021B SCREENING AREA HEADWORKS SCREEN NO. 1 CHANNEL - HYDROGEN SULFIDE GAS PPM AE-021B PLC-3-1 4-20 mA 0-50 PPM 4-WIRE N/A N/A N/A N/A I-11-601
3 AI AI-021A SCREENING AREA HEADWORKS SCREEN NO. 1 CHANNEL - METHANE GAS PERCENT LEL AE-021A PLC-3-1 4-20 mA 0-100% 4-WIRE N/A N/A N/A N/A I-11-601
4 AI LDI-022 SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL - DIFFERENTIAL LEVEL LDIT-022 PLC-3-1 MODBUS TCP PER EQUIP. SUPPLIER N/A N/A N/A N/A N/A I-11-601
5 AI AI-022B SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL - HYDROGEN SULFIDE GAS PPM AE-021B PLC-3-1 4-20 mA 0-50 PPM 4-WIRE N/A N/A N/A N/A I-11-601
6 AI AI-022A SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL - METHANE GAS PERCENT LEL AE-021A PLC-3-1 4-20 mA 0-100% 4-WIRE N/A N/A N/A N/A I-11-601
7 AI PDI-023 SCREENING AREA WASHER COMPACTOR SYSTEM STRAINER NO. 1 - PRESSURE DIFFERENTIAL INDICATION PDIT-023 PLC-3-1 MODBUS TCP PER EQUIP. SUPPLIER N/A N/A N/A N/A N/A I-11-602
8 AI PDI-024 SCREENING AREA WASHER COMPACTOR SYSTEM STRAINER NO. 2 - PRESSURE DIFFERENTIAL INDICATION PDIT-024 PLC-3-1 MODBUS TCP PER EQUIP. SUPPLIER N/A N/A N/A N/A N/A I-11-602
9 AI AI-050 BNR BASING NITRATE CONCENTRATION AIT-050 PLC-3-1 4-20 mA 0-100 mg/L NO3 N/A N/A N/A N/A N/A I-22-601
10 AI EI-121A MCC AERATOR AB VOLTAGE PM-121 PLC-2 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-25-601
11 AI EI-121D MCC AERATOR AVERAGE VOLTAGE PM-121 PLC-2 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-25-601
12 AI EI-121B MCC AERATOR BC VOLTAGE PM-121 PLC-2 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-25-601
13 AI EI-121C MCC AERATOR CA VOLTAGE PM-121 PLC-2 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-25-601
14 AI JQI-121B MCC AERATOR ENERGY DEMAND PM-121 PLC-2 MODBUS TCP 0-999 kWH N/A N/A N/A N/A N/A I-25-601
15 AI SI-121 MCC AERATOR FREQUENCY PM-121 PLC-2 MODBUS TCP 0-60 Hz N/A N/A N/A N/A N/A I-25-601
16 AI II-121A MCC AERATOR PHASE A CURRRENT PM-121 PLC-2 MODBUS TCP 0-600 A N/A N/A N/A N/A N/A I-25-601
17 AI II-121D MCC AERATOR PHASE AVERAGE CURRRENT PM-121 PLC-2 MODBUS TCP 0-600 A N/A N/A N/A N/A N/A I-25-601
18 AI II-121B MCC AERATOR PHASE B CURRRENT PM-121 PLC-2 MODBUS TCP 0-600 A N/A N/A N/A N/A N/A I-25-601
19 AI II-121C MCC AERATOR PHASE C CURRRENT PM-121 PLC-2 MODBUS TCP 0-600 A N/A N/A N/A N/A N/A I-25-601
20 AI JI-121A MCC AERATOR POWER PM-121 PLC-2 MODBUS TCP 0-999 kvA N/A N/A N/A N/A N/A I-25-601
21 AI JI-121B MCC AERATOR POWER FACTOR PM-121 PLC-2 MODBUS TCP 0-1 N/A N/A N/A N/A N/A I-25-601
22 AI JQI-121A MCC AERATOR WATTAGE DEMAND PM-121 PLC-2 MODBUS TCP 0-999 kW N/A N/A N/A N/A N/A I-25-601
23 AI EI-120A MCC OZONE AB VOLTAGE PM-120 PLC-2 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-25-601
24 AI EI-120D MCC OZONE AVERAGE VOLTAGE PM-120 PLC-2 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-25-601
25 AI EI-120B MCC OZONE BC VOLTAGE PM-120 PLC-2 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-25-601
26 AI EI-120C MCC OZONE CA VOLTAGE PM-120 PLC-2 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-25-601
27 AI JQI-120B MCC OZONE ENERGY DEMAND PM-120 PLC-2 MODBUS TCP 0-999 kWH N/A N/A N/A N/A N/A I-25-601
28 AI SI-120 MCC OZONE FREQUENCY PM-120 PLC-2 MODBUS TCP 0-60 Hz N/A N/A N/A N/A N/A I-25-601
29 AI II-120A MCC OZONE PHASE A CURRRENT PM-120 PLC-2 MODBUS TCP 0-250 A N/A N/A N/A N/A N/A I-25-601
30 AI II-120D MCC OZONE PHASE AVERAGE CURRRENT PM-120 PLC-2 MODBUS TCP 0-250 A N/A N/A N/A N/A N/A I-25-601
31 AI II-120B MCC OZONE PHASE B CURRRENT PM-120 PLC-2 MODBUS TCP 0-250 A N/A N/A N/A N/A N/A I-25-601
32 AI II-120C MCC OZONE PHASE C CURRRENT PM-120 PLC-2 MODBUS TCP 0-250 A N/A N/A N/A N/A N/A I-25-601
33 AI JI-120A MCC OZONE POWER PM-120 PLC-2 MODBUS TCP 0-999 kvA N/A N/A N/A N/A N/A I-25-601
34 AI JI-120B MCC OZONE POWER FACTOR PM-120 PLC-2 MODBUS TCP 0-1 N/A N/A N/A N/A N/A I-25-601
35 AI JQI-120A MCC OZONE WATTAGE DEMAND PM-120 PLC-2 MODBUS TCP 0-999 kW N/A N/A N/A N/A N/A I-25-601
36 AI SI-072 RAS PUMP NO. 2 - SPEED RSP-002 PLC-1 MODBUS TCP 0-100 % N/A N/A N/A N/A N/A I-61-601
37 AI SI-073 RAS PUMP NO. 3 - SPEED RSP-003 PLC-1 MODBUS TCP 0-100 % N/A N/A N/A N/A N/A I-61-601
38 AI SI-074 RAS PUMP NO. 4 - SPEED RSP-004 PLC-1 MODBUS TCP 0-100 % N/A N/A N/A N/A N/A I-61-601
39 AI SI-071 WAS PUMP NO. 2 - SPEED WSP-001 PLC-1 MODBUS TCP 0-100 % N/A N/A N/A N/A N/A I-61-601
40 AI PI-071B WAS PUMP NO. 2 -DISCHARGE PRESSURE WSP-002 PLC-1 MODBUS TCP 0-30 psig N/A N/A PRESSURE HI MODBUS TCP N/A I-61-601
41 AI PI-071A WAS PUMP NO. 2 -SUCTION PRESSURE WSP-002 PLC-1 MODBUS TCP 0-30 psig N/A N/A N/A MODBUS TCP N/A I-61-601
42 AI EI-123A MCC OPFP AB VOLTAGE PM-123 PLC-1 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-61-603
43 AI EI-123D MCC OPFP AVERAGE VOLTAGE PM-123 PLC-1 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-61-603
44 AI EI-123B MCC OPFP BC VOLTAGE PM-123 PLC-1 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-61-603
45 AI EI-123C MCC OPFP CA VOLTAGE PM-123 PLC-1 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-61-603
46 AI JQI-123B MCC OPFP ENERGY DEMAND PM-123 PLC-1 MODBUS TCP 0-999 kWH N/A N/A N/A N/A N/A I-61-603
47 AI SI-123 MCC OPFP FREQUENCY PM-123 PLC-1 MODBUS TCP 0-60 Hz N/A N/A N/A N/A N/A I-61-603
48 AI II-123A MCC OPFP PHASE A CURRRENT PM-123 PLC-1 MODBUS TCP 0-800 A N/A N/A N/A N/A N/A I-61-603
49 AI II-123D MCC OPFP PHASE AVERAGE CURRRENT PM-123 PLC-1 MODBUS TCP 0-800 A N/A N/A N/A N/A N/A I-61-603
50 AI II-123B MCC OPFP PHASE B CURRRENT PM-123 PLC-1 MODBUS TCP 0-800 A N/A N/A N/A N/A N/A I-61-603
51 AI II-123C MCC OPFP PHASE C CURRRENT PM-123 PLC-1 MODBUS TCP 0-800 A N/A N/A N/A N/A N/A I-61-603
52 AI JI-123A MCC OPFP POWER PM-123 PLC-1 MODBUS TCP 0-999 kvA N/A N/A N/A N/A N/A I-61-603
53 AI JI-123B MCC OPFP POWER FACTOR PM-123 PLC-1 MODBUS TCP 0-1 N/A N/A N/A N/A N/A I-61-603
54 AI JQI-123A MCC OPFP WATTAGE DEMAND PM-123 PLC-1 MODBUS TCP 0-999 kW N/A N/A N/A N/A N/A I-61-603
55 AI EI-122A MCC OPPP AB VOLTAGE PM-122 PLC-1 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-61-603
56 AI EI-122D MCC OPPP AVERAGE VOLTAGE PM-122 PLC-1 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-61-603
57 AI EI-122B MCC OPPP BC VOLTAGE PM-122 PLC-1 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-61-603
58 AI EI-122C MCC OPPP CA VOLTAGE PM-122 PLC-1 MODBUS TCP 400-550 volt N/A N/A N/A N/A N/A I-61-603
Local = Power originates from within the PLC or I/O enclosure.
Discrete Data (Interp Relay). This will be either 'Yes' or 'No' to indicate whether the input or output requires an interposing relay. Relays are typically required to isolate external voltage sources. See specifications for additional details.
DWG Name. This column indicates associated Process & Instrumentation Diagram.
Remarks. This column may include a cross reference to another specification section where applicable, or to a note which provides additional information. Notes are appended to the end of the I/O listing.
Analog Data Discrete Data
Field = External field power source. (May require interposing relays or isolated I/O module type.)
Type. This descibes the type of signal as defined by ISA or similar.
Loop Number. This is the loop number as shown on the P&ID drawing.
Service Description. This is the description or the function (i.e. Filter No. 1 Loss-of-Head).
Field Device. This is the tag number of equipment identifier associated with the I/O point. This may not be the full field device tag name, the prefix of the tag name may be noted on the individual P&ID drawings or on the P&ID legend sheets.
Controller ID. This is a sequential number for a given type within a specific controller (PLC or DCU).
Analog Data (Signal Type) . This will typically be 4-20mA, but could also be 1-5Vdc, serial, HART, FLD-BUS, ETHERNET, or similar to indicate the signal type of the associated input or output.
Analog Data (Signal Range) . This will be the scaled value of the input in engineering units.
Analog Data (Power Type). This will typically be '2-wire' for devices which are loop powered from the PLC enclosure, or '4-wire' for devices which are powered form external power supplies, unless noted otherwise. Devices
Discrete Data (Signal Type). This will be 120 VAC, 24 VDC, ETHERNET, or similar to indicate the signal type of the associated input or output.
Discrete Data (Closed State). This will indicate the state of the input or output when it is considered to be closed or energized (normal, alarm, running, failed, etc.).
Discrete Data (Power Source). This will indicate the location of the power source for the wetting voltage on the contacts, as follows:
DO = Discrete Output
Legend/Descriptions
Item. This is an arbitrary sequential number which is for reference only.
IO Type: This is the type of I/O signal, as follows:
AI = Analog Input
AO = Analog Output
DI = Discrete Input
Hagerstown Wastewater Treatment Plant Improvements
City of Hagerstown, Maryland
40 64 00 a
ISSUED FOR BID
BV Project No. 419612
0 | 5/2026 | ADDENDUM V
ATTACHMENT 1
Item IO Type IO Tag Service Description Field Device Controller ID Signal Type Signal Range Power Type Signal Type Closed State Power Source Interp Relay P&ID Remarks
59 AI JQI-122B MCC OPPP ENERGY DEMAND PM-122 PLC-1 MODBUS TCP 0-999 kWH N/A N/A N/A N/A N/A I-61-603
60 AI SI-122 MCC OPPP FREQUENCY PM-122 PLC-1 MODBUS TCP 0-60 Hz N/A N/A N/A N/A N/A I-61-603
61 AI II-122A MCC OPPP PHASE A CURRRENT PM-122 PLC-1 MODBUS TCP 0-1200 A N/A N/A N/A N/A N/A I-61-603
62 AI II-122D MCC OPPP PHASE AVERAGE CURRRENT PM-122 PLC-1 MODBUS TCP 0-1200 A N/A N/A N/A N/A N/A I-61-603
63 AI II-122B MCC OPPP PHASE B CURRRENT PM-122 PLC-1 MODBUS TCP 0-1200 A N/A N/A N/A N/A N/A I-61-603
64 AI II-122C MCC OPPP PHASE C CURRRENT PM-122 PLC-1 MODBUS TCP 0-1200 A N/A N/A N/A N/A N/A I-61-603
65 AI JI-122A MCC OPPP POWER PM-122 PLC-1 MODBUS TCP 0-999 kvA N/A N/A N/A N/A N/A I-61-603
66 AI JI-122B MCC OPPP POWER FACTOR PM-122 PLC-1 MODBUS TCP 0-1 N/A N/A N/A N/A N/A I-61-603
67 AI JQI-122A MCC OPPP WATTAGE DEMAND PM-122 PLC-1 MODBUS TCP 0-999 kW N/A N/A N/A N/A N/A I-61-603
68 AI LI-100A FERRIC CHLORIDE STORAGE TANKS AREA TANK NO. 1 - LEVEL LIT-100A PLC-5 4-20 mA 0-15 ft 4-WIRE N/A N/A N/A N/A I-71-601
69 AI LI-100B FERRIC CHLORIDE STORAGE TANKS AREA TANK NO. 2 - LEVEL LIT-100B PLC-5 4-20 mA 0-15 ft 4-WIRE N/A N/A N/A N/A I-71-601
70 AI FI-111 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 1 - OUTLET FLOW FIT-111 PLC-5 4-20 mA 0.3-19 gph 4-WIRE N/A N/A N/A N/A I-71-602
71 AI SI-111 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 1 - SPEED FEEDBACK PPS-111 PLC-5 MODBUS TCP 0-100 % N/A N/A N/A N/A N/A I-71-602
72 AI FI-112 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 2 - OUTLET FLOW FIT-112 PLC-5 4-20 mA 0.3-19 gph 4-WIRE N/A N/A N/A N/A I-71-602
73 AI SI-112 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 2 - SPEED FEEDBACK PPS-112 PLC-5 MODBUS TCP 0-100 % N/A N/A N/A N/A N/A I-71-602
74 AI FI-113 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 3 - OUTLET FLOW FIT-113 PLC-5 4-20 mA 0.3-19 gph 4-WIRE N/A N/A N/A N/A I-71-603
75 AI SI-113 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 3 - SPEED FEEDBACK PPS-113 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-603
76 AI FI-114 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 4 - OUTLET FLOW FIT-114 PLC-5 4-20 mA 0.3-19 gph 4-WIRE N/A N/A N/A N/A I-71-603
77 AI SI-114 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 4 - SPEED FEEDBACK PPS-114 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-603
78 AI FI-115 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 5 - OUTLET FLOW FIT-115 PLC-5 4-20 mA 0.3-19 gph 4-WIRE N/A N/A N/A N/A I-71-604
79 AI SI-115 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 5 - SPEED FEEDBACK PPS-115 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-604
80 AI FI-116 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 6 - OUTLET FLOW FIT-116 PLC-5 4-20 mA 0.3-19 gph 4-WIRE N/A N/A N/A N/A I-71-604
81 AI SI-116 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 6 - SPEED FEEDBACK PPS-116 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-604
82 AI FI-117 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 7 - OUTLET FLOW FIT-117 PLC-5 4-20 mA 0.3-19 gph 4-WIRE N/A N/A N/A N/A I-71-605
83 AI SI-117 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 7 - SPEED FEEDBACK PPS-117 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-605
84 AI FI-118 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 8 - OUTLET FLOW FIT-118 PLC-5 4-20 mA 0.3-19 gph 4-WIRE N/A N/A N/A N/A I-71-605
85 AI SI-118 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 8 - SPEED FEEDBACK PPS-118 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-605
86 AO SC-072 RAS PUMP NO. 2 - SPEED COMMAND RSP-002 PLC-1 MODBUS TCP 0-100 % N/A N/A N/A N/A N/A I-61-601
87 AO SC-073 RAS PUMP NO. 3 - SPEED COMMAND RSP-003 PLC-1 MODBUS TCP 0-100 % N/A N/A N/A N/A N/A I-61-601
88 AO SC-074 RAS PUMP NO. 4 - SPEED COMMAND RSP-004 PLC-1 MODBUS TCP 0-100 % N/A N/A N/A N/A N/A I-61-601
89 AO SC-071 WAS PUMP NO. 2 - SPEED COMMAND WSP-002 PLC-1 MODBUS TCP 0-100 % N/A N/A N/A N/A N/A I-61-601
90 AO SC-111 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 1 - SPEED COMMAND PPS-111 PLC-5 MODBUS TCP 0-100 % N/A N/A N/A N/A N/A I-71-602
91 AO SC-112 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 2 - SPEED COMMAND PPS-112 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-602
92 AO SC-113 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 3 - SPEED COMMAND PPS-113 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-603
93 AO SC-114 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 4 - SPEED COMMAND PPS-114 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-603
94 AO SC-115 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 5 - SPEED COMMAND PPS-115 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-604
95 AO SC-116 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 6 - SPEED COMMAND PPS-116 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-604
96 AO SC-117 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 7 - SPEED COMMAND PPS-117 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-605
97 AO SC-118 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 8 - SPEED COMMAND PPS-118 PLC-5 MODBUS TCP 0-100% N/A N/A N/A N/A N/A I-71-605
98 DI YI-035 SCREENING AREA HEADWORK BYPASS CHANEL CHANNEL INLET GATE - IN REMOTE SEW-SG-025 PLC-3-1 N/A N/A N/A 120 VAC IN REMOTE PLC NO I-11-601
99 DI ZIC-035 SCREENING AREA HEADWORK BYPASS CHANNEL INLET GATE - CLOSED SEW-SG-025 PLC-3-1 N/A N/A N/A 120 VAC CLOSED PLC NO I-11-601
100 DI ZIO-035 SCREENING AREA HEADWORK BYPASS CHANNEL INLET GATE - OPEN SEW-SG-025 PLC-3-1 N/A N/A N/A 120 VAC OPEN PLC NO I-11-601
101 DI ZIC-036 SCREENING AREA HEADWORK BYPASS CHANNEL OUTLET GATE - CLOSED SEW-SG-026 PLC-3-1 N/A N/A N/A 120 VAC CLOSED PLC NO I-11-601
102 DI ZIO-036 SCREENING AREA HEADWORK BYPASS CHANNEL OUTLET GATE - OPEN SEW-SG-026 PLC-3-1 N/A N/A N/A 120 VAC OPEN PLC NO I-11-601
103 DI YI-036 SCREENING AREA HEADWORK BYPASS CHANNEL OUTLET GATE - IN REMOTE SEW-SG-026 PLC-3-1 N/A N/A N/A 120 VAC IN REMOTE PLC NO I-11-601
104 DI YA-021B SCREENING AREA HEADWORKS SCREEN NO. 1 - EMERGENCY STOP PRESSED SCR-021 PLC-3-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-11-601
105 DI YA-021A SCREENING AREA HEADWORKS SCREEN NO. 1 - FAULT SCR-021 PLC-3-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-11-601
106 DI YI-021A SCREENING AREA HEADWORKS SCREEN NO. 1 - IN AUTO SCR-021 PLC-3-1 N/A N/A N/A MODBUS TCP IN AUTO N/A N/A I-11-601
107 DI YIR-021A SCREENING AREA HEADWORKS SCREEN NO. 1 - RUNNING SCR-021 PLC-3-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-11-601
108 DI YIR-021B SCREENING AREA HEADWORKS SCREEN NO. 1 CHANNEL - BRUSHES RUNNING SEW-SCR-MTR-021A PLC-3-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-11-601
109 DI YA-021B SCREENING AREA HEADWORKS SCREEN NO. 1 CHANNEL - HYDROGEN SULFIDE GAS HIGH AE-021B PLC-3-1 N/A N/A N/A 120 VAC GAS HI PLC NO I-11-601
110 DI LAH-021 SCREENING AREA HEADWORKS SCREEN NO. 1 CHANNEL - LEVEL HIGH LSH-021 PLC-3-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-11-601
111 DI YA-021A SCREENING AREA HEADWORKS SCREEN NO. 1 CHANNEL - METHANE GAS HIGH AE-021A PLC-3-1 N/A N/A N/A 120 VAC GAS HI PLC NO I-11-601
112 DI ZIC-031 SCREENING AREA HEADWORKS SCREEN NO. 1 INLET GATE - GATE CLOSED SEW-SG-021 PLC-3-1 N/A N/A N/A 120 VAC CLOSED PLC NO I-11-601
113 DI ZIO-031 SCREENING AREA HEADWORKS SCREEN NO. 1 INLET GATE - GATE OPEN SEW-SG-021 PLC-3-1 N/A N/A N/A 120 VAC OPEN PLC NO I-11-601
114 DI YI-031 SCREENING AREA HEADWORKS SCREEN NO. 1 INLET GATE - IN REMOTE SEW-SG-021 PLC-3-1 N/A N/A N/A 120 VAC IN REMOTE PLC NO I-11-601
115 DI ZIC-032 SCREENING AREA HEADWORKS SCREEN NO. 1 OUTLET GATE - CLOSED SEW-SG-022 PLC-3-1 N/A N/A N/A 120 VAC CLOSED PLC NO I-11-601
116 DI ZIO-032 SCREENING AREA HEADWORKS SCREEN NO. 1 OUTLET GATE - OPEN SEW-SG-022 PLC-3-1 N/A N/A N/A 120 VAC OPEN PLC NO I-11-601
117 DI YI-032 SCREENING AREA HEADWORKS SCREEN NO. 1 OUTLET GATE - IN REMOTE SEW-SG-022 PLC-3-1 N/A N/A N/A 120 VAC IN REMOTE PLC NO I-11-601
118 DI ZIC-021A SCREENING AREA HEADWORKS SCREEN NO. 1 WASH VALVE - CLOSED SCR-021 PLC-3-1 N/A N/A N/A MODBUS TCP CLOSED N/A N/A I-11-601
119 DI ZIO-021A SCREENING AREA HEADWORKS SCREEN NO. 1 WASH VALVE - OPEN SCR-021 PLC-3-1 N/A N/A N/A MODBUS TCP OPEN N/A N/A I-11-601
120 DI YA-022B SCREENING AREA HEADWORKS SCREEN NO. 2 - EMERGENCY STOP PRESSED SCR-022 PLC-3-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-11-601
121 DI YA-022A SCREENING AREA HEADWORKS SCREEN NO. 2 - FAULT SCR-022 PLC-3-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-11-601
122 DI YI-022A SCREENING AREA HEADWORKS SCREEN NO. 2 - IN AUTO SCR-022 PLC-3-1 N/A N/A N/A MODBUS TCP IN AUTO N/A N/A I-11-601
123 DI YIR-022A SCREENING AREA HEADWORKS SCREEN NO. 2 - RUNNING SCR-022 PLC-3-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-11-601
124 DI YIR-022B SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL - BRUSHES RUNNING SEW-SCR-MTR-022A PLC-3-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-11-601
125 DI YA-022B SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL - HYDROGEN SULFIDE GAS HIGH AE-022B PLC-3-1 N/A N/A N/A 120 VAC GAS HI PLC NO I-11-601
126 DI LAH-022 SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL - LEVEL HIGH LSH-022 PLC-3-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-11-601
127 DI YA-022A SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL - METHANE GAS HIGH AE-022A PLC-3-1 N/A N/A N/A 120 VAC GAS HI PLC NO I-11-601
128 DI ZIC-033 SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL INLET GATE - CLOSED SEW-SG-023 PLC-3-1 N/A N/A N/A 120 VAC CLOSED PLC NO I-11-601
129 DI ZIO-033 SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL INLET GATE - OPEN SEW-SG-023 PLC-3-1 N/A N/A N/A 120 VAC OPEN PLC NO I-11-601
130 DI YI-033 SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL INLET GATE - IN REMOTE SEW-SG-023 PLC-3-1 N/A N/A N/A 120 VAC IN REMOTE PLC NO I-11-601
131 DI ZIC-034 SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL OUTLET GATE - CLOSED SEW-SG-024 PLC-3-1 N/A N/A N/A 120 VAC CLOSED PLC NO I-11-601
132 DI ZIO-034 SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL OUTLET GATE - OPEN SEW-SG-024 PLC-3-1 N/A N/A N/A 120 VAC OPEN PLC NO I-11-601
133 DI YI-034 SCREENING AREA HEADWORKS SCREEN NO. 2 CHANNEL OUTLET GATE - IN REMOTE SEW-SG-024 PLC-3-1 N/A N/A N/A 120 VAC IN REMOTE PLC NO I-11-601
134 DI ZIC-022A SCREENING AREA HEADWORKS SCREEN NO. 2 WASH VALVE - CLOSED SCR-022 PLC-3-1 N/A N/A N/A MODBUS TCP CLOSED N/A N/A I-11-601
135 DI ZIO-022A SCREENING AREA HEADWORKS SCREEN NO. 2 WASH VALVE - OPEN SCR-022 PLC-3-1 N/A N/A N/A MODBUS TCP OPEN N/A N/A I-11-601
136 DI YA-102C SCREENING AREA HVAC UNIT - UNIT COMMON ALARM 11-MAU-001 PLC-3-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-11-601
137 DI YA-102B SCREENING AREA HVAC UNIT - VENTILATION FAILURE 11- PDS-002 PLC-3-1 N/A N/A 2-WIRE 120 VAC PRESSURE LO PLC NO I-11-601
138 DI YA-102A SCREENING AREA HVAC UNIT - VENTILATION FAILURE 11-PDS-001 PLC-3-1 N/A N/A 2-WIRE 120 VAC PRESSURE LO PLC NO I-11-601
139 DI LAH-020 SCREENING AREA INFLUENT - LEVEL HIGH LSH-020 PLC-3-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-11-601
140 DI YA-105 SCREENING AREA- ODOR CONTROL FAN FAILED OCF-105 PLC-3-1 N/A N/A 2-WIRE 120 VAC FAILED PLC N/A I-11-601
Hagerstown Wastewater Treatment Plant Improvements
City of Hagerstown, Maryland
40 64 00 a
ISSUED FOR BID
BV Project No. 419612
Item IO Type IO Tag Service Description Field Device Controller ID Signal Type Signal Range Power Type Signal Type Closed State Power Source Interp Relay P&ID Remarks
141 DI PDAL-105 SCREENING AREA- ODOR CONTROL FAN LOW DIFFERENTIAL PRESSURE OCF-105 PLC-3-1 N/A N/A 2-WIRE 120 VAC DIF PRESS LO PLC N/A I-11-601
142 DI YIR-105 SCREENING AREA- ODOR CONTROL FAN RUNNING OCF-105 PLC-3-1 N/A N/A 2-WIRE 120 VAC RUNNING PLC NO I-11-601
143 DI VAH-105 SCREENING AREA- ODOR CONTROL FAN VIBRATION HIGH OCF-105 PLC-3-1 N/A N/A 2-WIRE 120 VAC VIBRATION HI PLC NO I-11-601
144 DI YA-023B SCREENING AREA STRAINER NO. 1 - ESTOP ENGAGED STRB-023 PLC-3-1 N/A N/A N/A MODBUS TCP STOPPED N/A N/A I-11-602
145 DI YA-023A SCREENING AREA STRAINER NO. 1 - FAILED STRB-023 PLC-3-1 N/A N/A N/A MODBUS TCP FAILED N/A N/A I-11-602
146 DI YI-023 SCREENING AREA STRAINER NO. 1 - IN BACKWASH STRB-023 PLC-3-1 N/A N/A N/A MODBUS TCP IN BACKWASH N/A N/A I-11-602
147 DI YIR-023 SCREENING AREA STRAINER NO. 1 - RUNNING STRB-023 PLC-3-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-11-602
148 DI YIS-023 SCREENING AREA STRAINER NO. 1 - STOPPED STRB-023 PLC-3-1 N/A N/A N/A MODBUS TCP STOPPED N/A N/A I-11-602
149 DI YA-024B SCREENING AREA STRAINER NO. 2 - ESTOP ENGAGED STR-024 PLC-3-1 N/A N/A N/A MODBUS TCP STOPPED N/A N/A I-11-602
150 DI YA-024A SCREENING AREA STRAINER NO. 2 - FAILED STR-024 PLC-3-1 N/A N/A N/A MODBUS TCP FAILED N/A N/A I-11-602
151 DI YI-024 SCREENING AREA STRAINER NO. 2 - IN BACKWASH STR-024 PLC-3-1 N/A N/A N/A MODBUS TCP IN BACKWASH N/A N/A I-11-602
152 DI YIR-024 SCREENING AREA STRAINER NO. 2 - RUNNING STR-024 PLC-3-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-11-602
153 DI YIS-024 SCREENING AREA STRAINER NO. 2 - STOPPED STR-024 PLC-3-1 N/A N/A N/A MODBUS TCP STOPPED N/A N/A I-11-602
154 DI YA-021D SCREENING AREA WASHER COMPACTOR NO. 1 - EMERGENCY STOP PRESSED DWS-031 PLC-3-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-11-602
155 DI YA-021C SCREENING AREA WASHER COMPACTOR NO. 1 - FAULT DWS-031 PLC-3-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-11-602
156 DI YI-021B SCREENING AREA WASHER COMPACTOR NO. 1 - IN AUTO DWS-031 PLC-3-1 N/A N/A N/A MODBUS TCP IN AUTO N/A N/A I-11-602
157 DI YIR-021B SCREENING AREA WASHER COMPACTOR NO. 1 - RUNNING DWS-031 PLC-3-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-11-602
158 DI YA-022D SCREENING AREA WASHER COMPACTOR NO. 2 - EMERGENCY STOP PRESSED DWS-032 PLC-3-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-11-602
159 DI YA-022C SCREENING AREA WASHER COMPACTOR NO. 2 - FAULT DWS-032 PLC-3-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-11-602
160 DI YI-022B SCREENING AREA WASHER COMPACTOR NO. 2 - IN AUTO DWS-032 PLC-3-1 N/A N/A N/A MODBUS TCP IN AUTO N/A N/A I-11-602
161 DI YIR-022B SCREENING AREA WASHER COMPACTOR NO. 2 - RUNNING DWS-032 PLC-3-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-11-602
162 DI ZIC-021B SCREENING AREA WASHER COMPACTOR SYSTEM STRAINER NO. 1 VALVE - CLOSED STRB-023 PLC-3-1 N/A N/A N/A MODBUS TCP CLOSED N/A N/A I-11-602
163 DI ZIO-021B SCREENING AREA WASHER COMPACTOR SYSTEM STRAINER NO. 1 VALVE - OPEN STRB-023 PLC-3-1 N/A N/A N/A MODBUS TCP OPENED N/A N/A I-11-602
164 DI ZIC-022B SCREENING AREA WASHER COMPACTOR SYSTEM STRAINER NO. 2 VALVE - CLOSED STR-024 PLC-3-1 N/A N/A N/A MODBUS TCP CLOSED N/A N/A I-11-602
165 DI ZIO-022B SCREENING AREA WASHER COMPACTOR SYSTEM STRAINER NO. 2 VALVE - OPEN STR-024 PLC-3-1 N/A N/A N/A MODBUS TCP OPENED N/A N/A I-11-602
166 DI YIR-075 DRAIN PUMP RUNING DRN-PCL-1 PLC-1 N/A N/A 2-WIRE 120 VAC RUNNING PLC NO I-61-601
167 DI YIR-076 DRAIN PUMP RUNING DRN-PCL-2 PLC-1 N/A N/A 2-WIRE 120 VAC RUNNING PLC NO I-61-601
168 DI YIR-077 DRAIN PUMP RUNING DRN-PCL-3 PLC-1 N/A N/A 2-WIRE 120 VAC RUNNING PLC NO I-61-601
169 DI YA-072A RAS PUMP NO. 2 - AFD FAIL AFD-002 PLC-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-61-601
170 DI YIR-072 RAS PUMP NO. 2 - AFD RUNNING AFD-002 PLC-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-61-601
171 DI YA-072B RAS PUMP NO. 2 - EMERGENCY STOP HS-072 PLC-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-61-601
172 DI YI-072 RAS PUMP NO. 2 - IN AUTO RSP-002 PLC-1 N/A N/A N/A MODBUS TCP IN AUTO N/A N/A I-61-601
173 DI TAH-072 RAS PUMP NO. 2 - MOTOR TEMPERATURE HIGH TSH-072 PLC-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-61-601
174 DI YA-073A RAS PUMP NO. 3 - AFD FAIL AFD-003 PLC-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-61-601
175 DI YIR-073 RAS PUMP NO. 3 - AFD RUNNING AFD-003 PLC-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-61-601
176 DI YA-073B RAS PUMP NO. 3 - EMERGENCY STOP HS-073 PLC-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-61-601
177 DI YI-073 RAS PUMP NO. 3 - IN AUTO RSP-003 PLC-1 N/A N/A N/A MODBUS TCP IN AUTO N/A N/A I-61-601
178 DI TAH-073 RAS PUMP NO. 3 - MOTOR TEMPERATURE HIGH TSH-073 PLC-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-61-601
179 DI YA-074A RAS PUMP NO. 4 - AFD FAIL AFD-004 PLC-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-61-601
180 DI YIR-074 RAS PUMP NO. 4 - AFD RUNNING AFD-004 PLC-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-61-601
181 DI YA-074B RAS PUMP NO. 4 - EMERGENCY STOP HS-074 PLC-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-61-601
182 DI YI-074 RAS PUMP NO. 4 - IN AUTO RSP-004 PLC-1 N/A N/A N/A MODBUS TCP IN AUTO N/A N/A I-61-601
183 DI TAH-074 RAS PUMP NO. 4 - MOTOR TEMPERATURE HIGH TSH-074 PLC-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-61-601
184 DI YA-103A RAS/WAS PUMP STATION VENTILATION FAILURE 61-PDS-001 PLC-1 N/A N/A 2-WIRE 120 VAC PRESSURE LO PLC NO I-61-601
185 DI YA-103D RAS/WAS PUMP STATION HVAC UNIT COMMON ALARM 61-MAU-001 PLC-1 N/A N/A N/A 120 VAC ALARM PLC NO I-61-601
186 DI YA-103C RAS/WAS PUMP STATION VENTILATION FAILURE 61-PDS-003 PLC-1 N/A N/A 2-WIRE 120 VAC PRESSURE LO PLC NO I-61-601
187 DI YA-103B RAS/WAS PUMP STATION VENTILATION FAILURE 61-PDS-002 PLC-1 N/A N/A 2-WIRE 120 VAC PRESSURE LO PLC NO I-61-601
188 DI LAL-075 SUMP HIGH LEVEL LS-075B PLC-1 N/A N/A 2-WIRE 120 VAC LEVEL HI PLC NO I-61-601
189 DI LAL-076 SUMP HIGH LEVEL LS-076B PLC-1 N/A N/A 2-WIRE 120 VAC LEVEL HI PLC NO I-61-601
190 DI LAL-077 SUMP HIGH LEVEL LS-077B PLC-1 N/A N/A 2-WIRE 120 VAC LEVEL HI PLC NO I-61-601
191 DI LAH-075 SUMP LOW LEVEL LS-075A PLC-1 N/A N/A 2-WIRE 120 VAC LEVEL LO PLC NO I-61-601
192 DI LAH-076 SUMP LOW LEVEL LS-076A PLC-1 N/A N/A 2-WIRE 120 VAC LEVEL LO PLC NO I-61-601
193 DI LAH-077 SUMP LOW LEVEL LS-077A PLC-1 N/A N/A 2-WIRE 120 VAC LEVEL LO PLC NO I-61-601
194 DI YIR-071 WAS PUMP NO. 2 - AFD RUNNING AFD-001 PLC-1 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-61-601
195 DI YA-071B WAS PUMP NO. 2 - EMERGENCY STOP HS-071 PLC-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-61-601
196 DI TAH-071 WAS PUMP NO. 2 - MOTOR TEMPERATURE HIGH TSH-071 PLC-1 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-61-601
197 DI PAH-071 WAS PUMP NO. 2 -DISCHARGE PRESSURE HIGH WSP-001 PLC-1 N/A N/A 2-WIRE MODBUS TCP OPEN N/A N/A I-61-601
198 DI PAL-071 WAS PUMP NO. 2 -SUCTION PRESSURE LOW WSP-001 PLC-1 N/A N/A 2-WIRE MODBUS TCP PRESSURE LO N/A N/A I-61-601
199 DI PAL-003 ACTIVATED SLUDGE INFLULENT PRESSURE LOW PSL-003 PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-602
200 DI LAH-080 SANITARY GRINDER PUMPS AREA - HIGH LEVEL LSH-080 PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-602
201 DI YIR-080B SANITARY GRINDER PUMPS AREA PUMP NO. 1 - EMERGENCY STOP GR-001 PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-602
202 DI UA-080A SANITARY GRINDER PUMPS AREA PUMP NO. 1 - FAIL GR-001 PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-602
203 DI MAH-080A SANITARY GRINDER PUMPS AREA PUMP NO. 1 - MOISTURE DETECTED MSH-080A PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-602
204 DI YIR-080A SANITARY GRINDER PUMPS AREA PUMP NO. 1 - RUNNING GR-001 PLC-1 N/A N/A N/A 120 VAC RUNNING PLC NO I-61-602
205 DI TAH-080A SANITARY GRINDER PUMPS AREA PUMP NO. 1 - TEMPERATURE HIGH TSH-080A PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-602
206 DI YIR-080D SANITARY GRINDER PUMPS AREA PUMP NO. 2 - EMERGENCY STOP GR-002 PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-602
207 DI UA-080B SANITARY GRINDER PUMPS AREA PUMP NO. 2 - FAIL GR-002 PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-602
208 DI MAH-080B SANITARY GRINDER PUMPS AREA PUMP NO. 2 - MOISTURE DETECTED MSH-080B PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-602
209 DI YIR-080C SANITARY GRINDER PUMPS AREA PUMP NO. 2 - RUNNING GR-002 PLC-1 N/A N/A N/A 120 VAC RUNNING PLC NO I-61-602
210 DI TAH-080B SANITARY GRINDER PUMPS AREA PUMP NO. 2 - TEMPERATURE HIGH TSH-080B PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-602
211 DI YA-131 OPS BUILDING SMOKE ALARM FPSP-OPS PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-603
212 DI YA-132 OPS BUILDING SMOKE ALARM FPSP-OPS PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-603
213 DI YA-133 OPS BUILDING SMOKE ALARM FPSP-OPS PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-603
214 DI YA-134 OPS BUILDING SMOKE ALARM FPSP-OPS PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-603
215 DI YA-135 OPS BUILDING SMOKE ALARM FPSP-OPS PLC-1 N/A N/A N/A 120 VAC NORMAL PLC NO I-61-603
216 DI YA-104C CHEMICAL BUILDING HVAC UNIT COMMON ALARM 71-MAU-001 PLC-5 N/A N/A N/A 120 VAC ALARM PLC NO I-71-601
217 DI YA-104B CHEMICAL BUILDING VENTILATION FAILURE 71-PDS-002 PLC-5 N/A N/A 2-WIRE 120 VAC PRESSURE LO PLC NO I-71-601
218 DI YA-104A CHEMICAL BUILDING VENTILATION FAILURE 71-PDS-001 PLC-5 N/A N/A 2-WIRE 120 VAC PRESSURE LO PLC NO I-71-601
219 DI FA-101A FERRIC CHLORIDE STORAGE TANKS AREA - EYEWASH/SHOWER ACTIVATED FS-100A PLC-5 N/A N/A N/A 120 VAC EYEWASH ACTIVATED PLC NO I-71-601
220 DI FA-101B FERRIC CHLORIDE STORAGE TANKS AREA - EYEWASH/SHOWER ACTIVATED FS-100B PLC-5 N/A N/A N/A 120 VAC EYEWASH ACTIVATED PLC NO I-71-601
221 DI LAH-100C FERRIC CHLORIDE STORAGE TANKS AREA CONTAINMENT - LEVEL HIGH LSH-100C PLC-5 N/A N/A N/A 120 VAC NORMAL PLC NO I-71-601
222 DI LAH-100A FERRIC CHLORIDE STORAGE TANKS AREA TANK NO. 1 - LEVEL HIGH LSH-100A PLC-5 N/A N/A N/A 120 VAC NORMAL PLC NO I-71-601
Hagerstown Wastewater Treatment Plant Improvements
City of Hagerstown, Maryland
40 64 00 a
ISSUED FOR BID
Item IO Type IO Tag Service Description Field Device Controller ID Signal Type Signal Range Power Type Signal Type Closed State Power Source Interp Relay P&ID Remarks
223 DI LAH-100B FERRIC CHLORIDE STORAGE TANKS AREA TANK NO. 2 - LEVEL HIGH LSH-100B PLC-5 N/A N/A N/A 120 VAC NORMAL PLC NO I-71-601
224 DI UA-111 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 1 - COMMON FAIL PPS-111 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-602
225 DI YI-111 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 1 - IN REMOTE PPS-111 PLC-5 N/A N/A N/A MODBUS TCP IN REMOTE N/A N/A I-71-602
226 DI MAH-111 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 1 - LEAK DETECTED MSH-111 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-602
227 DI PAH-111 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 1 - OUTLET PRESSURE HIGH PSH-111 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-602
228 DI YIR-111 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 1 - RUNNING PPS-111 PLC-5 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-71-602
229 DI UA-112 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 2 - COMMON FAIL PPS-112 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-602
230 DI YI-112 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 2 - IN REMOTE PPS-112 PLC-5 N/A N/A N/A MODBUS TCP IN REMOTE N/A N/A I-71-602
231 DI MAH-112 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 2 - LEAK DETECTED MSH-112 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-602
232 DI PAH-112 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 2 - OUTLET PRESSURE HIGH PSH-112 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-602
233 DI YIR-112 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 2 - RUNNING PPS-112 PLC-5 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-71-602
234 DI UA-113 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 3 - COMMON FAIL PPS-113 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-603
235 DI YI-113 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 3 - IN REMOTE PPS-113 PLC-5 N/A N/A N/A MODBUS TCP IN REMOTE N/A N/A I-71-603
236 DI MAH-113 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 3 - LEAK DETECTED MSH-113 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-603
237 DI PAH-113 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 3 - OUTLET PRESSURE HIGH PSH-113 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-603
238 DI YIR-113 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 3 - RUNNING PPS-113 PLC-5 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-71-603
239 DI UA-114 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 4 - COMMON FAIL PPS-114 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-603
240 DI YI-114 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 4 - IN REMOTE PPS-114 PLC-5 N/A N/A N/A MODBUS TCP IN REMOTE N/A N/A I-71-603
241 DI MAH-114 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 4 - LEAK DETECTED MSH-114 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-603
242 DI PAH-114 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 4 - OUTLET PRESSURE HIGH PSH-114 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-603
243 DI YIR-114 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 4 - RUNNING PPS-114 PLC-5 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-71-603
244 DI UA-115 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 5 - COMMON FAIL PPS-115 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-604
245 DI YI-115 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 5 - IN REMOTE PPS-115 PLC-5 N/A N/A N/A MODBUS TCP IN REMOTE N/A N/A I-71-604
246 DI MAH-115 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 5 - LEAK DETECTED MSH-115 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-604
247 DI PAH-115 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 5 - OUTLET PRESSURE HIGH PSH-115 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-604
248 DI YIR-115 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 5 - RUNNING PPS-115 PLC-5 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-71-604
249 DI UA-116 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 6 - COMMON FAIL PPS-116 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-604
250 DI YI-116 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 6 - IN REMOTE PPS-116 PLC-5 N/A N/A N/A MODBUS TCP IN REMOTE N/A N/A I-71-604
251 DI MAH-116 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 6 - LEAK DETECTED MSH-116 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-604
252 DI PAH-116 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 6 - OUTLET PRESSURE HIGH PSH-116 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-604
253 DI YIR-116 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 6 - RUNNING PPS-116 PLC-5 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-71-604
254 DI UA-117 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 7 - COMMON FAIL PPS-117 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-605
255 DI YI-117 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 7 - IN REMOTE PPS-117 PLC-5 N/A N/A N/A MODBUS TCP IN REMOTE N/A N/A I-71-605
256 DI MAH-117 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 7 - LEAK DETECTED MSH-117 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-605
257 DI PAH-117 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 7 - OUTLET PRESSURE HIGH PSH-117 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-605
258 DI YIR-117 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 7 - RUNNING PPS-117 PLC-5 N/A N/A N/A MODBUS TCP RUNNING N/A N/A I-71-605
259 DI UA-118 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 8 - COMMON FAIL PPS-118 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-605
260 DI YI-118 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 8 - IN REMOTE PPS-118 PLC-5 N/A N/A N/A MODBUS TCP IN REMOTE N/A N/A I-71-605
261 DI MAH-118 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 8 - LEAK DETECTED MSH-118 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-605
262 DI PAH-118 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO. 8 - OUTLET PRESSURE HIGH PSH-118 PLC-5 N/A N/A N/A MODBUS TCP NORMAL N/A N/A I-71-605
263 DI YIR-118 FERRIC CHLORIDE METERING PUMPS AREA PUMP NO.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .