B1881.26 Addendum IV Questions and Answers.pdf
PDF 8 MB Posted
- Solicitation number
- BPM057702
- Issued by
- Washington County, Maryland
About this file
Summary
This is an Addendum IV Questions and Answers document for the Hagerstown Wastewater Treatment Plant Improvements project administered by the City of Hagerstown, Maryland. The addendum addresses clarifications and modifications to contract documents for a comprehensive wastewater treatment facility upgrade project. Key modifications include replacement of Operations Roof drawings (Sheets S-61-102, A-61-105, A-61-501, H-61-102, and H-61-103), deletion and replacement of Pipeline Schedule 40 05 05.20-S01, revisions to Potable Water main specifications and drawings, addition of Resilient Seated Gate Valves specifications, replacement of multiple Electrical drawings (E-01-101, E-01-402, E-01-601, E-11-101, E-61-101, E-61-601, E-61-605, E-61-701, E-71-101, and E-95-604), and replacement of Structural drawings (S-11-102, S-61-103, S-95-506). The document establishes a new Reliability Demonstration Testing protocol requiring 30 continuous days of 7-day/week, 24-hour/day system operation at specified capacity prior to Final Completion, with provisions for test interruption and restart upon component failure. Significant revisions address 12-inch potable water main installation with service connections beginning after July 31, 2027, and potable water outages limited to one system or building at a time for maximum four-hour durations, with outages to buildings with restroom facilities scheduled between 6 PM and 6 AM.
The addendum includes 22 questions and answers addressing technical clarifications on electrical equipment connections, drawing conflicts, material specifications, and supplier approvals. Notable clarifications include confirmation that existing primary cables and conduits are adequate for new switch connections unless modifications are required by design layout; identification of Drawing E-11-101 as the source for PLC-3-1 and PLC-3 device feeds; specification that Peak Hour Flow No. 2 on Drawing G-00-605 controls screen design with a 44.4-inch downstream water depth; and approval of alternative manufacturers for items such as EBBA Megaflanges Model #1200 (equal to Romac FCA501s) and Romac DJ400 or Dresser Style 131 Dismantling Joints pending shop drawing review. Additional clarifications address conflicting pipe material designations for the potable water main (HDPE versus PVC), confirmation that buried water service lines require PVC per Attachment 7 specifications, and requirement for contractor-designed bypass pumping systems subject to Owner and Engineer approval. Alternative manufacturers may be approved for fire alarm systems and other components pending shop drawing review, and prospective bidders must submit written qualification information including financial data, previous experience, and present commitments for subcontractors and suppliers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
��!�-� August 3, � ������������������������34 ��/�-��/� 4�0���/�/ !�� �� ��5� -22&�� � � 6�$,(�$��47�
| ��� | ����� |
| ����� | ����������������������������� |
| � | �� | |
| �������������� | ����������� | ���� |
| ��� | � | |
| � | ������������������������ |
| � | �� |
| ���� | ����� |
| ���������������������� | ����� |
| ����������� ������������ | ������ |
| ���� | |
| ���� | � |
| ��� | ����� |
| �������� | ����������������� |
| � | �� | ���� | ������� |
| � | �� | ||
| �#���������� | �� | ������� |
| ��$�%�&�'� | ���(������� |
| ������� |
| � | ������������� ����� | )������ |
| � | �*+,$+$!-)��+,$+ |
��*�������)�*�������� 0!�! �! �-!+*!$�������������$�����"��
| ��/�%�&�'� | �����'�������� |
| ��������������$$ ����� | )������ |
| � | ��+!/+0!$)��+!/+0!-)��+!/+0!/)��+ |
!/+0!0)��+!/+$!$)��+!/+$!-)��+!/+$!/)��+!/+$!0)��+! /+$! )��+!1+ !0)��+!1+ ! ��� ��0�%�*�����
| �0!�! �,$�-/�+�&� | ���� |
| ��*��� ���2����3��'� | ��� |
�� �%�4���������������
| ��&�'� | �� |
| ���� |
| �"�������������$!����� | )������ |
| � | �4+!$+$!$) � |
4+!$+0!-)�4+!$+,!$)�4+$$+$!$)�4+,$+$!$)�4+,$+,!$)�4+,$+,! )�4+,$+5!$)�4+5$+$!$)�4+ 6 +,!0"� �
| ��,�%�7�������� | ��������������� | ||
| � | ������8� �� | ||
| ���7�9 | �����������/����� | )�*���� | �*+$$+$!-)�*+ |
��*+6 + !,"�
��5�%�*����� �0!�! �/$�$-�+�����'� ������� �������3�"���� ��������� ��1�%�:������������� �44�$4/%����8�9�
�34��"���� ��
| ���������� | � | ������� | |
| ������� | �� | ������ ������'�����=����� | ���������������������� |
| ��� | �� | ||||
| � | ��������>�� | ��� | |||
| � | �������������� ����� | �����'�������� | ����������� | � | �������������� |
| �������������������� ���� | ��� | |
| �������������� | ����� | |
| ���� | ����������������� |
| ����>�� | ��� | |
| ����� | ������ | |
| ������������ | ������'����� ��������� | �� |
| �������� | �� | |
| �����'����������� | ������� ��� | |
| �����������>�� | ��� | |
| � | ������������������ | |
| � | ������� | � ���� |
| ��������� | ������� |
| $�� ��� | �����'�������� | �������'� | ��������������'� | ����� ��� |
| � | ������������ |
a. Red – Addition
b. Blue – Notes/Direction
c. Green – Deletion
2. The Attachment 1 Operations Roof drawings replace Sheets S-61-102, A-61-105, A-61-501, H-
61-102 and H-61-103 in their entirety.
3. Delete Schedule 40 05 05.20-S01 – Pipeline Schedule and replace with Attachment 2 in its entirety.
4. The Potable Water (PW) main has been revised. See Attachment 3. Replace Sheets D-03-401, D-
03-402, D-03-403, D-03-404, C-03-101, C-03-102, C-03-103, C-03-104, C-03-105, C-08-504, C-
08-505 in their entirety.
5. See Attachment 4 for Section 40 05 61.23 - Resilient Seated Gate Valves to be added to the
Contract Documents.
6. See Attachment 5 which replaces the following Electrical drawings in their entirety: E-01-101, E-01-402, E-01-601, E-11-101, E-61-101, E-61-601, E-61-605, E-61-701, E-71-101, and E-95-
604.
7. See Attachment 6 which replaces the following Structural drawings in their entirety: S-11-102, S-
61-103, S-95-506.
8. Add the following after Paragraph 2.1.A in Section 40 05 17 (Copper Tubing and Accessories)
9. In Section 01 91 00, 1.8, replace Operational Acceptance Testing with the following in its entirety:
1.8 RELIABILITY DEMONSTRATION TESTING
A. Purpose: To demonstrate prior to Final Completion of the Work that the systems and all related equipment, accessories, signals, and controls operate reliably and as specified as a complete, comprehensive, and coordinated system.
B. Complete the Startup of all necessary systems prior to any Reliability Demonstration
Testing. Complete successful Reliability Demonstration Test(s) on a complete system prior to incremental or overall Substantial Completion. If phasing and associated incremental Substantial Completions are implemented, each phase of construction shall require its own tests.
C. Reliability Demonstration Testing shall be performed using process materials (if applicable).
D. Maintain operational logs and all alarm printouts throughout the reliability demonstration period and make them available to the Owner/Engineer (if applicable).
E. The Reliability Demonstration Test may be monitored by the Owner/Engineer.
F. No changes or modifications shall be made to the SCADA System Software, PLC equipment or instrument settings, or other system adjustments during the Reliability
Demonstration Test without written permission of the Owner/Engineer.
G. The Reliability Demonstration Test shall be interrupted and the test restarted should a failure occur. The test duration resets to zero and is restarted after corrections have been made. A test failure is defined as any one of the following:
1. System operation outside of specified operating boundary conditions for a time duration to be determined by the Owner/Engineer.
2. A failure of a component or device that requires other than a normal maintenance effort to correct. Normal maintenance is defined as the level of support normally available from the Owner’s maintenance staff.
3. Repeated failure of the same component or device, regardless of cause or severity.
4. A failure requiring off-site parts or support to repair.
5. A failure of a component or device that cannot be repaired within 4 hours.
Repair times, for repairs requiring less than 4 hours, shall be added onto the end of the test duration.
H. Document actions taken and procedures developed that are not covered in the operations manuals, and provide as an appendix to the operating manuals.
I. Repeat Reliability Demonstration Testing as required by Engineer when modifications are made to Work after successful demonstration testing is complete.
J. Prior to Final Completion, operate and maintain each system for not less than 30 days continuously, based on 7-day/week, 24-hour/day operation, and at specified capacity to demonstrate that the system performs as specified herein. The system may include components furnished by the Owner/Engineer (if applicable) as well as components furnished by the Contractor.
10. Prospective Bidders are advised that Section 01 11 13 Paragraph 1.1.A.1 is revised to include:
l. Installation of 12’’ potable water main and abandonment or demolition of portions of the 6’’ potable water main.
11. Prospective Bidders are advised that Section 01 11 13 Paragraph 1.14.D. is revised to include:
10. 12’’ Potable Water Main
a. The installation and connection of services to the new 12’’ potable water main are to be started after July 31, 2027. Potable water outages are to only occur for one system or building at a time and for only a maximum duration of 4 hours. Potable water outages to buildings with restroom facilities are to be planned between the hours of 6 PM and 6 AM.
12. Revise the corresponding portion of the Table under Section 40 05 19 (Ductile Iron Pipe)
Paragraph 2.2.A as follows:
Push-on Joints ANSI/AWWA C111/A21.11
Restrained Push-on Joints, locking wedge type, 4-
18 inch, working pressure rating of at least 250 psi.
EBAA Iron "Megalug" Series 1700; U.S. Pipe
“TR Flex Gripper Ring”; Star Pipe Products
“StarGrip 3100P”; or American “Field Flex
Ring”, without exception.
13. See Attachment 7 for Section 40 05 31.12 – Polyvinyl Chloride (PVC) Pressure Pipe to be added to the Contract Documents.
14. Delete FPSP-HW Fire Protection and Signaling Panel One-Line Diagram on Drawing E-11-602 in its entirety and replace with the One-Line Diagram in Attachment 8.
QUESTIONS AND ANSWERS:
Q1. In reference to Drawing E-01-003 Note 1, this note says to reuse the existing primary cables and conduits and re-terminate. It also says it is required to provide new cables and conduits as required.
How are we supposed to know if the cables and conduits will need to be replaced at this time. We suggest the Owner to include an allowance for these items so as to not include in our estimate since it’s unknown at this time.
A1. The expectation is that the existing conductor and stub-ups are adequate for the connection to the new switches. However, if modifications are required to accommodate the new primary fuse switch driven by layout or design of the switch itself, that work shall be included in the bid.
Q2. In reference to Drawing E-22-603, please provide drawings showing all new devices being fed from
PLC-3-1 & PLC-3. Headworks screen CPs are shown but not the rest.
A2. See Drawing E-11-101.
Q3. In reference to Drawing E-25-601 Notes 1 – 5, Note 1 says to re-feed all equipment. Please re-issue drawing E-25-101 showing all equipment on the risers. If this is not possible, please provide maximum distance for each item.
A3. See the following for the approximate locations of the equipment to be re-fed. Awarded Contractor shall field-locate all locations of existing equipment to be re-fed, in accordance with Keynote 1, Drawing E-25-601.
Q4. In reference to Drawing E-25-602 Notes 1 & 2, please provide a drawing showing the location of all the equipment shown on the riser to be refed. If this is not possible, please provide a maximum distance for each item shown on the risers. Note 1 says to remove the existing wiring, will the conduits stay?
A4. See Drawing E-01-401.
Q5. In reference to Drawing E-61-105 Note 1, this note talks about the relocation of Pumps #1 & 2
VFDs, please provide a drawing showing the location of the pumps assuming we would need to relocate the load side of the VFDs to the pumps.
A5. The load side of the VFD is to remain (Drawing E-61-601) and spliced at the junction box (Keynote
4, Drawing E-61-105).
Q6. Specification 46 21 53 Centerflow Perforated Plate Screens 2.2.D indicates that the estimated downstream water level during the peak flow of 35.4MGD is 44.0 inches, while the hydraulic profile shown on Plan Sheet G-00-605 shows a downstream water level during the peak flow of
35.4MGD being 44.4inches or 36inches depending on the channel. Which value should be used as the basis of screen design?
A6. Peak Hour Flow No. 2 on Drawing G-00-605 is the controlling basis for screen design. Revise the corresponding portion of the Table under Section 46 21 53 Paragraph 2.2.D, as follows:
Estimated downstream water depth at 35.4 mgd 44.0 44.4± in
Q7. Specification sections 46 21 53-2.6.D outlines a NEMA 7 local control station with (4) pilot devices and 46 21 73-2.6.C outlines a NEMA 7 local control station with (3) pilot devices and terminal blocks for field wiring. Please note, this differs greatly from the plans as drawing I-11-601 shows the local control stations for the screens with a OIT and drawing I-95-701 shows the local control stations with OITs, Ethernet switches, and Fiber connections. Please note, NEMA 7 control stations are explosion proof and cannot have OITs mounted on them. Can you please confirm that the local control stations will include the devices that are outlined in section 46 21 53 and 46 21 73 and will not include the OITs, Ethernet switches, and fiber connections that are shown on the drawings.
A7. To be addressed in a forthcoming addendum.
Q8. On sheet S-11-102 where the side mount guardrail and self-closing swing gate is shown, it is unclear what is supposed to be done at this location. This area is not shown on the building sections. Are we only providing new guardrails and swing gate at an existing platform? Please clarify the intent and provide an elevation or section cut.
A8. See Clarification 7 and Drawing S-11-102 in Attachment 6.
Q9. Is there a wage determination number to use on this project?
A9. See Addendum III, A47.
Q10. For Section 00 21 13, Article 3.01 Item D. Subcontractor and Supplier qualification information;
Can you please advise what specifically is being requested of the Subs/Suppliers. Do they need to provide a full qualification package to include financials, contractor’s license, previous experience…etc. or just a list of previous experience?
A10. Insert the following as sub-paragraph 1 under Section 00 21 13 Paragraph 3.01.D.
Subcontractors and suppliers are to provide written qualification information, such as financial data, previous experience, and present commitments.
Q11. Section 43 23 13.14 (Horizontal End Suction Centrifugal Pumps): 2.2.A indicates the operating head range for full speed continuous operation to be 12 to 33 ft. for all three (3) pumps. This head range is outside of the primary and secondary design point head conditions (50 and 34.1 feet respectively). Please clarify if the 12 to 33 ft. head range is meant to be for reduced speed operation.
A11. To be addressed in a forthcoming addendum.
Q12. I’m trying to get an equal status for Edwards to participate as a supplier of the Fire Alarm System equal. Our contact has been asked to bid and feels he cannot, do to Edwards not being listed.
A12. Alternative manufacturers may be approved pending shop drawing review.
Q13. Please clarify RPT containment / casing pipe size and schedule. Civil drawings call for 4” Sch. 80
PVC, while the Mechanical drawings indicate 3” Sch. 40 within the Chemical Facility.
A13. No conflict is anticipated. See Detail E Drawing M-95-503 and Detail A Drawing M-95-505 for transition details.
Q14. In response to Addendum #3, Q&A #59, please provide the GPM required to handle the bypass pumping for the drain valves, and where the suction and discharge points would be from/to.
Provide a complete drawing for this required bypass pumping system so we can figure on the distances required.
A14. See Drawing G-00-604 “Flow Rates” schedule. Contractor is responsible for the design and configuration of the bypass system, subject to Owner and Engineer approval in accordance with
Section 01 11 13 Paragraphs 1.13.C and 1.14.C.
Q15. Spec 40 05 19 page 6 - Flanged Coupling Adapters are specified as Romac FCA501's with anchor pins. Drilling holes in pipe walls for anchor pins will destroy he pipes integrity. Will the owner accept EBBA Megaflanges, Model #1200 as an equal for the required restraint?
A15. EBBA Megaflanges, Model #1200 may be considered an approved equal, pending shop drawing review.
Q16. Spec 40 05 19 page 6 - Dismantling Joints are currently specified as Viking Johnson but this is a
BABA project and Viking Johnson joints are made either in the U.K. or in China. Would the owner accept JCM Dismantling Joint Model #309 as an equal?
A16. Romac “DJ400” or Dresser “Style 131 Dismantling Joint” are two named alternatives. Alternative manufacturers may be approved pending shop drawing review.
Q17. In reference to the PW Main on Drawing C-03-103, the line size referenced is 10" HDPE. It ties in at the Chemical Building to a 6" WM. Note 7 on drawing c-03-103 references a detail C-08-503 for a backflow preventer using 6" DI. The hydrant valve referenced near the backflow preventer is a
10" PIV. Please clarify the PW line size and material designation as there seems to be conflicting sizes and pipe material.
A17. See Attachments 2 and 3.
Q18. Please confirm which PVC material classification (per Section 40 05 32) governs the buried 4" UW yard line and 10” PW, specifically, whether PVC-2 (Schedule 80, solvent-welded, ASTM D1785) applies, or whether a pressure-rated gasketed PVC pipe (e.g., AWWA C900, DR14/18/25) is intended for these buried water service line.
A18. See Attachment 2 and Attachment 7.
Q19. Please confirm the correct material for the 10" (and 6") Potable Water yard service line shown on
C-03-103, HDPE per the drawing, or PVC per the Pipeline Schedule. If HDPE is correct, please confirm the required DIPS or IPS sizing standard, SDR/pressure class, and jointing method (fusion, mechanical, etc.). If PVC is correct, please confirm the applicable class/standard (e.g., AWWA
C900, Schedule 40/80) and joint type, and confirm the drawing will be revised.
A19. See Clarification 3, and Attachments 2 and 3.
Q20. Please confirm the required copper tubing type for any buried water service lines on this project, specifically, whether soft-annealed Type K copper tubing (ASTM B88) is required for buried applications, as opposed to the CU-3 (Type L, hard drawn) classification in Section 40 05 17.
A20. See Attachment 2 for revised pipeline schedule.
Q21. Please confirm the required fitting type and joint method for buried copper service connections
(e.g., flared fittings per ANSI B16.26, compression fittings, or other approved buried-rated fittings), since Section 40 05 17 only specifies solder/brazed fittings conforming to ANSI B16.18 /
ANSI/ASME B16.22, which are not typically rated or accepted for direct-bury use.
A21. See Clarification 8.
Q22. Please confirm whether underground copper joints (if any) are permitted to be soldered/brazed, or whether all buried joints must be flared or compression-type with no buried solder joints, per standard water utility practice.
A22. See Clarification 8.
Tyler French, Procurement Administrator
City of Hagerstown
D E F G H J K L
H1
PROVIDE 2L5x5x3/8"
UNDER HVAC EQUIPMENT,
TYP SEE NOTE 2
15'-1" 15'-1" 9'-8" 13'-0" 5'-0" 8'-0" 13'-0" 18'-8"
EXISTING JOIST
EXIST CONDENSING
UNIT TYP
SEE HVAC
EXHAUST FAN
TYP SEE HVAC
S-61-301
A
S-61-301
B
TYP
PROVIDE 2L5x5x3/8"
UNDER HVAC EQUIPMENT,
TYP
UNDER HVAC UNIT
TYP SEE NOTE 2
E X
IS
T
W
X
E X
IS
T
W
X
E X
IS
T
W
X
E X
IS
T
W
X
E X
IS
T
W
X
E X
IS
T
W
X
E X
IS
T
W
X
E X
IS
T
W
X
TYP
PROVIDE 2L5x5x3/8"
UNDER HVAC EQUIPMENT,
TYP SEE NOTE 2
PROVIDE 2L5x5x3/8"
UNDER HVAC
EQUIPMENT, TYP SEE
NOTE 2
PROVIDE 2L5x5x3/8"
UNDER HVAC
EQUIPMENT, TYP SEE
NOTE 2
1/2
D
0 OF
F
IL
E
0 1 2 4(SCALE BAR IS 4" AT FULL SCALE)
PROJECT NO.:
DESIGNED:
DETAILED:
CHECKED:
APPROVED:
DATE:
SUBCONSULTANT:
P L O
T T
E D
Black & Veatch Corporation Gaithersburg, Maryland
REVISIONS AND RECORD OF ISSUE
R E
V
IT
V E
R S
IO
N
PROFESSIONAL CERTIFICATION.
THE STATE OF MARYLAND
ENGINEER UNDER THE LAWS OF
APPROVED BY ME, AND THAT I AM A
DOCUMENTS WERE PREPARED OR
I HEREBY CERTIFY THAT THESE
DULY LICENSED PROFESSIONAL
LICENSE NO.: _______________,
EXPIRATION DATE: _______________.
A u to d e s k D o c s /4
H a g e rs to w n W
W T
P I m p ro v e m e n ts
-6
-O p e ra ti o n s B u ild in g .r v t
/2
/2
:0
:0
A
M
S-61-102
HAGERSTOWN
WASTEWATER
TREATMENT PLANT
IMPROVEMENTS
ROOF PLAN
STRUCTURAL
OPERATIONS BUILDING
419612
ASN
JS
BSB
KC
MAY 2026
1/4" = 1'-0"
ROOF LEVEL PLAN WITH ELECTRICAL ROOM OPENINGS
1/8" = 1'-0"
0'4'8' 8' 16'
GENERAL SHEET NOTES
1. CONTRACTOR SHALL FIELD-VERIFY EXISTING JOIST SPACING
AND METAL DECK CONDITIONS PRIOR TO INSTALLATION OF
NEW MEMBERS.
2. CONTRACTOR SHALL FIELD-VERIFY LOCATIONS OF NEW
DOUBLE-ANGLE FRAMING IN COORDINATION WITH NEW ROOF
EQUIPMENT LAYOUTS.
0 5/2026 ISSUED FOR BID
1 7/2026 REVISION 2
48144
12/14/2027
48144
12/14/2027
THIS DRAWING WAS ORIGINALLY
SEALED BY KIRAN CHANDRAN ON MAY
13, 2026, A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND (LICENSE NUMBER AND
EXPIRATION DATE BELOW).
THIS REPLACES THE ORIGINAL
SIGNED BID DRAWING.
ADDENDUM IV
ATTACHMENT 1
A B C D F G H J K L M
H1
1A
1 2
EXISTING
SLOPE
EXISTING
SLOPE
EX
IS
TI
N
G
SL
O
PE
EXISTING
SLOPE EXISTING
SLOPE
7 7
8 TYP.
LOCATION OF EXIST. ROOF CURB
ALIGN WEST EDGE OF
NEW ROOF CURB WITH
TO EDGE OF ROOF CURB
2'-0" FROM EDGE OF DRAIN
TO EDGE OF ROOF CURB
2'-0" FROM EDGE OF DRAIN
1/2
D
0 OF
FI
LE
0 1 2 4(SCALE BAR IS 4" AT FULL SCALE)
PROJECT NO.:
DESIGNED:
DETAILED:
CHECKED:
APPROVED:
DATE:
SUBCONSULTANT:
PL
O
TT
ED
REVISIONS AND RECORD OF ISSUE
Black & Veatch Architects, LLC 11401 Lamar Avenue
Overland Park, Kansas 66211
R
EV
IT
V
ER
SI
O N
PROFESSIONAL CERTIFICATION.
THE STATE OF MARYLAND
ENGINEER UNDER THE LAWS OF
APPROVED BY ME, AND THAT I AM A
DOCUMENTS WERE PREPARED OR
I HEREBY CERTIFY THAT THESE
DULY LICENSED PROFESSIONAL
LICENSE NO.: _______________,
EXPIRATION DATE: _______________.
Au to de sk
D oc s:
//4
- H ag er st ow n W
W
TP
Im pr ov em en ts
/4
2-
-O pe ra tio ns
B ui ld in g.
rv t 7/
/2
:1
9:
A M
A-61-105
HAGERSTOWN
WASTEWATER
TREATMENT PLANT
IMPROVEMENTS
ROOF PLAN
ARCHITECTURAL
OPERATIONS BUILDING
419612
CAA
SJU
PDR
PDR
MAY 2026
3/16" = 1'-0"
5' 10'2'6' 4' 0'
SHEET KEYNOTES
GENERAL SHEET NOTES
1.
2.
CONTRACTOR SHALL VERIFY AND MEASURE EXISTING
BUILDING CONDITIONS PRIOR TO BIDDING. EXISTING
CONDITIONS MUST BE CONFIRMED AND PREPARED FOR THE
ACCEPTANCE OF NEW CONSTRUCTION HEREIN.
ALL ROOFING WORK SHALL BE PERFORMED BY A LICENSED
APPLICATOR CERTIFIED BY THE EXISTING ROOFING
MANUFACTURER. TO PRESERVE THE EXISTING WARRANTY,
CONTRACTOR SHALL INSPECT ON SITE AND COORDINATE
WITH EXISTING ROOFING MANUFACTURER WARRANTY
REQUIREMENTS.
1/8" = 1'-0"
ROOF PLAN
1. NEW EQUIPMENT ACCESS ROOF HATCH TO REPLACE
EXISTING. CONFIRM EXACT SIZE AND LOCATION IN FIELD.
PATCH AND REPAIR EXISTING ROOFING MEMBRANE AS
REQUIRED. SEE DETAIL 6/A-61-501.
2. EXISTING EPDM ROOF TO REMAIN.
3. EXISTING ROOF HATCH TO REMAIN.
4. INSTALL INSULATED STRUCTURAL GALVANIZED STEEL
CURB. CONFIRM EXACT SIZE AND LOCATION WITH
EQUIPMENT SUPPLIED. PATCH AND REPAIR EXISTING
ROOFING MEMBRANE AND INSULATION AS REQUIRED. SEE
DETAIL 1/A-61-501.
5. INSTALL INSULATED GALVANIZED STEEL CURB. CONFIRM
EXACT SIZE AND LOCATION WITH EQUIPMENT SUPPLIED.
PATCH AND REPAIR EXISTING ROOFING MEMBRANE AND
INSULATION AS REQUIRED. SEE DETAIL 3/A-61-501.
6. INSTALL INSULATED GALVANIZED STEEL CURB OPENING
ADAPTER. CONFIRM EXACT SIZE AND LOCATION WITH
EQUIPMENT SUPPLIED. PATCH AND REPAIR EXISTING
ROOFING MEMBRANE AND INSULATION AS REQUIRED. SEE
DETAIL 4/A-61-501.
7. INSTALL AN INSULATED ROOF CURB CAP ON EXISTING ROOF
CURB WHERE HVAC EQUIPMENT SHALL BE REMOVED. SEE
DETAIL 7/A-61-501.
8. INSTALL DUCT SUPPORT POST. SEE DETAIL 2/A-61-501.
9. DUCTWORK ABOVE. SEE HVAC DRAWINGS.
10. NEW ROOFING CRICKET.
11. EXISTING ROOFING CRICKET.
12. MODIFY EXISTING ROOFING CRICKET AS REQUIRED TO
ACCOMMODATE NEW HVAC CURB CRICKET.
0 5/2026 ISSUED FOR BID
1 7/2026 REVISION 2
ARCHITECT UNDER THE LAWS OF
DULY LICENSED REGISTERED
19237 11/14/2027
THIS DRAWING WAS ORIGINALLY
SEALED BY PHILIP D. RISHEL ON MAY
13, 2026, A DULY LICENSED
ARCHITECT UNDER THE LAWS OF THE
STATE OF MARYLAND (LICENSE
NUMBER AND EXPIRATION DATE
BELOW).
TTHIS REPLACES THE ORIGINAL
SIGNED BID DRAWING.
2' -0
EXISTING ROOF
METAL DECK
HVAC EQUIPMENT
STRUCTURAL ROOF
EQUIPMENT SUPPORT CURB,
SEE STRUCTURAL
DRAWINGS
WOOD BLOCKING
BATT INSULATION
& ROOF DECK OR
DUCT OPENING, AS
SHOWN ON ROOF
PLAN
EXISTING ROOF
MEMBRANE, OVER COVER
BOARD, OVER RIGID
INSULATION.
CUT/PATCH/REPAIR AS
REQUIRED TO INSTALL
ROOF CURB
FLASHING MEMBRANE
(MATCH EXISTING ROOFING
MEMBRANE MATERIAL),
OVER COVER BOARD
RIGID INSULATION INSIDE
ROOF CURB WALLS
EXISTING STEEL
ROOF FRAMING
BONDING ADHESIVE
GALVANIZED SHEET STEEL
LINER OVER RIGID
INSULATION (1 1/2" MINIMUM
THICKNESS)
SINGLE-PLY ROOF
MEMBRANE OVER
COVERBOARD OVER
TAPERED RIGID
INSULATION
6" MIN
2" M
IN
8" M
IN
CLAMPING RING
LAP SEALANT
BONDING ADHESIVE
FLASHING MEMBRANE
AS REQUIRED BY
ROOFING MANUFACTURER
DUCT SUPPORT
SEE STRUCTURAL
DRAWINGS
DUCT SUPPORT ANCHOR
TO ROOF STRUCTURE
SEE STRUCTURAL
DRAWINGS
EXISTING ROOF
METAL DECK
2' -0
EXISTING ROOF
METAL DECK 6"
FLASHING MEMBRANE
4"
CAP FLASHING
PREFABRICATED METAL
CURB, WELD TO ROOF
DECK 12" O.C. (TYP)
(FOR STRUCTURAL CURBS
SEE STRUCTURAL DRAWINGS)
BY EQUIPMENT FURNISHED
DIMENSION DETERMINED
RIGID INSULATION
IN METAL CURB
EXISTING ROOF
MEMBRANE OVER
COVERBOARD
RIGID
INSULATION
METAL LINER AT
BOTH SIDES
EXISTING METAL
DECK
6" MIN
2" M
IN
8" M
IN
CLAMPING RING
LAP SEALANT
BONDING ADHESIVE
FLASHING MEMBRANE
AS REQUIRED BY
ROOFING MANUFACTURER VENT STACK
CENTER LINE OF VENT
TYPE 8 RISER CLAMP & BASE
PLATE REQUIRED WHENEVER
UNSUPPORTED LENGTH OF VENT
BELOW DECK EXCEEDS 5'-0"
WELD ONE SIDE OF CLAMP ONLY
TO BASE PLATES
1/4x3x6 BASE PLATE
WELD TO METAL DECK
TYP
6"
EXISTING ROOF
MEMBRANE, OVER
COVER BOARD, OVER
RIGID INSULATION.
CUT/PATCH/REPAIR AS
REQUIRED TO INSTALL
ROOF CURB
EXISTING METAL ROOF DECK
FLASHING MEMBRANE
(MATCH EXISTING ROOFING
MEMBRANE MATERIAL)
OVER COVER BOARD
PREFABRICATED INSULATED
METAL ROOF CURB
EXISTING ROOF MEMBRANE OVER
COVERBOARD, OVER RIGID
INSULATION, CUT/PATCH REPAIR AS
REQUIRED TO INSTALL ROOF CURB
BONDING ADHESIVE
EXISTING ROOF DECK OPENING
REINFORCEMENT, VERIFY ON SITE
1' -6
6"
SHEET METAL FLASHING
FASTENED TO WOOD BLOCKING
HVAC DUCTWORK
EXISTING METAL ROOF DECK
FLASHING MEMBRANE
(MATCH EXISTING ROOFING
MEMBRANE MATERIAL)
OVER COVER BOARD
EXISTING ROOF MEMBRANE OVER
COVERBOARD, OVER RIGID
INSULATION, CUT/PATCH/REPAIR AS
REQUIRED TO INSTALL ROOF CURB
BONDING ADHESIVE
EXISTING ROOF DECK OPENING
REINFORCEMENT, VERIFY ON SITE
2' -0
PREFABRICATED INSULATED
METAL ROOF CURB
SHEET METAL FLASHING
FASTENED TO WOOD
BLOCKING
EQUIPMENT ACCESS HATCH
TO REPLACE EXISTING
EXISTING METAL ROOF DECK
EXISTING ROOF CURB TO
REMAIN
EXISTING ROOF
MEMBRANE OVER
COVERBOARD
EXISTING RIGID
INSULATION
CURB COVERS SHALL BE
SECURELY FASTENED TO
ROOF CURB
DRIP EDGE FLASHING
RIGID INSULATION (1-INCH MINIMUM)
SLOPE
TO DRAIN
PREFABRICATED INSULATED METAL
CURB COVER
STEEL STIFFENER
SHEET METAL LINER
1/2
D
0 OF
FI
LE
0 1 2 4(SCALE BAR IS 4" AT FULL SCALE)
PROJECT NO.:
DESIGNED:
DETAILED:
CHECKED:
APPROVED:
DATE:
SUBCONSULTANT:
PL
O
TT
ED
REVISIONS AND RECORD OF ISSUE
Black & Veatch Architects, LLC 11401 Lamar Avenue
Overland Park, Kansas 66211
R
EV
IT
V
ER
SI
O N
PROFESSIONAL CERTIFICATION.
THE STATE OF MARYLAND
ENGINEER UNDER THE LAWS OF
APPROVED BY ME, AND THAT I AM A
DOCUMENTS WERE PREPARED OR
I HEREBY CERTIFY THAT THESE
DULY LICENSED PROFESSIONAL
LICENSE NO.: _______________,
EXPIRATION DATE: _______________.
Au to de sk
D oc s:
//4
- H ag er st ow n W
W
TP
Im pr ov em en ts
/4
2-
-O pe ra tio ns
B ui ld in g.
rv t 7/
/2
2:
:4
PM
A-61-501
HAGERSTOWN
WASTEWATER
TREATMENT PLANT
IMPROVEMENTS
ROOF DETAILS
ARCHITECTURAL
OPERATIONS BUILDING
419612
CAA
SJU
PDR
PDR
MAY 2026
GENERAL SHEET NOTES
1.
2.
CONTRACTOR SHALL VERIFY AND MEASURE EXISTING
BUILDING CONDITIONS PRIOR TO BIDDING. EXISTING
CONDITIONS MUST BE CONFIRMED AND PREPARED FOR THE
ACCEPTANCE OF NEW CONSTRUCTION HEREIN.
ALL ROOFING WORK SHALL BE PERFORMED BY A LICENSED
APPLICATOR CERTIFIED BY THE EXISTING ROOFING
MANUFACTURER. TO PRESERVE THE EXISTING WARRANTY,
CONTRACTOR SHALL INSPECT ON SITE AND COORDINATE
WITH EXISTING ROOFING MANUFACTURER WARRANTY
REQUIREMENTS.
1 1/2" = 1'-0"
ROOF STRUCTURAL CURB DETAIL - LARGE
EQUIPMENT1
1 1/2" = 1'-0"
0'3"12" 1'6"9"
1 1/2" = 1'-0"
ROOF POST DETAIL - DUCT SUPPORT2
1 1/2" = 1'-0"
ROOF CURB DETAIL - CLEAR OPENING3
1 1/2" = 1'-0"
ROOF PENETRATION DETAIL - SMALL PIPE5
1 1/2" = 1'-0"
ROOF CURB DETAIL - OPENING ADAPTER4
1 1/2" = 1'-0"
ROOF CURB DETAIL - EQUIPMENT ACCESS HATCH6
1 1/2" = 1'-0"
ROOF CURB COVER DETAIL7
0 5/2026 ISSUED FOR BID
1 7/2026 Revision 2
ARCHITECT UNDER THE LAWS OF
DULY LICENSED REGISTERED
19237 11/14/2027
THIS DRAWING WAS ORIGINALLY
SEALED BY PHILIP D. RISHEL ON MAY
13, 2026, A DULY LICENSED
ARCHITECT UNDER THE LAWS OF THE
STATE OF MARYLAND (LICENSE
NUMBER AND EXPIRATION DATE
BELOW).
THIS REPLACES THE ORIGINAL
SIGNED BID DRAWING.
T
T
T
T
T
D E F G H J K L M
JANITOR ROOM
TRAINING ROOM
OFFICE
CONTROL ROOM
ELECTRICAL
ROOM (EX)
RESTROOM
PLC ROOM
EXISTING
INSTRUMENTATION
AND
PROGRAMMING
OFFICE
EXISTING MEN'S
RESTROOM
EXISTING
CONFERENCE
ROOM
EXISTING
WOMEN'S
RESTROOM
EXISTING LUNCH
ROOM
ELECTRICAL
ROOM 1
LAB
ELECTRICAL
ROOM 2
H1
"x
(L
12"x10"
SR-1-440
(TYP OF 3)
22"x18" (L1), DUCT UP
20"x14" (L1), DUCT UP
RETURN
1750 CFM,
BIRDSCREEN
VCD (TYP)
12"x12"-6"
SR-1-100
6" DIA (L)
8"x14" (L1)
12"x14" (L1)
12" DIA (TYP)
24"x24"-12"
SD-1-325
22"x18" (L1)
30"x16" (L1) DUCT UP, CONNECT TO PAC-001
30"x16" (L1) DUCT UP, CONNECT TO PAC-1
30"x16" (L1)
"x
(L
24"x10" (L1)
18"x12" (L1)
24"x6" (L1)
12"x10"
RG-1-100
12"x10" (L1)
24"X24"-22"x22"
RD-1-780
12"x16" (L1)
24"x6" (L1)
24"X24"-22"x22"
RD-1-750
24"x24"-10"
SD-1-175
24"x12"- 12"x10"
RD-2-210
24"x12"- 12"x10"
RD-2-100
24"x24"-6"
SD-1-100
6" DIA (L1)
6" DIA (L1)
10" DIA (L1)
12"x16" (L1)
24"x24"-10"
SD-1-280
(TYP OF 2)
12"x24"-8"x8"
RD-2-80
(TYP OF 2)
24"x24"-8"
SD-1-175
8" DIA (L1)
8" DIA (L1)
8" DIA (L1)
8" DIA (L1)
24"x24"-8"
SD-1-250
8" DIA (L1)
24"x24"-8"
SD-1-225
12"x24"-12"x10"
RD-2-480
(TYP OF 2)
24"x24"-16"x16"
RD-1-720
24"x24"-16"x16"
RD-1-1100
32"x18" (L1)
DUCT UP,
CONNECT
TO PAC-005
18"x32" (L1) DUCT UP, CONNECT TO PAC-005
8" DIA (L1)
8" DIA (L1)
6" DIA (L1)
8" DIA (L1)
8" DIA 8" DIA (L1)
8" DIA (L1)
24"x12"-12"x10"
RD-2-250
(TYP OF 2)
24"x12"-10"x8"
RD-2-150
(TYP OF 2)
12"x12"-6"
SR-1-50
24"x24"-8"
SD-1-225
24"x24"-8"
SD-1-200
(TYP OF 4)
24"x24"-8" SD-1-75 24"x24"-8"
SD-1-125
16"x12"(L1)
8" DIA (L1)
24"x24"-6"
ED-1-50
24"x24"-10"
ED-1-250
6" DIA
6" DIA
10" DIA
24"x24"-10"
SD-1-325
10" DIA (L1)
8" DIA (L1)
8" DIA (L1)
20"x32"
DUCT UP
32"x18"
DUCT UP
24"x24"-18"x18"
RD-1-1030
24"x24"-18"X18"
RD-1-1100
10" DIA (L1)
"x
(L
32"x18" (L1)
14"x16" (L1)
24"x16" (L1)
24"x24"-10"
SD-1-325
12"x12"-6"
SR-1-50
14"x16" (L1)
14"x16" (L1)
24"x24"-12"
SD-1-350
(TYP OF 2)
12"x10" (L1)
8" DIA (L1)
24"x24"-8"
SD-1-50
16"x16" (L1)
24"x24"-16"x16"
RD-1-880
(TYP OF 2)
6"x6"
24"x24"-8"
ED-1-125
6"x6"
DUCT UP
TO 61-EF-001
6"x6"
H
H-95-501
CEILING DIFFUSER -
HORIZONTAL DUCT
CONNECTION (TYP)
B
H-95-501
REGISTER /
GRILLE (TYP)
8" DIA (L1)
8" DIA (L1)
12"x10" (L1)
(TYP)
6" DIA (L1)
VCD
(TYP)
EL 485.33'
10" DIA DUCT
BDD
8"x8" DUCT UP
TO ROOF HOOD
BDD
8"x8" DUCT UP
TO ROOF HOOD
BDD
8"x8" DUCT UP
TO ROOF HOOD
24"x24"
SR-2-3800
28"x28" (L1), DUCT UP TO
ROOF
BIRD SCREEN
OVER DUCT
OPENING
24"x24" (L1)
DUCT UP
TO ROOF
61-T-003
61-T-001 61-T-002 61-T-005
61-T-004
14"x10" (L1)
16"x12"(L1)
14"x12"12"x10"(L1)
24"x24"-6"
SD-1-50
24"x24"-12"
SD-1-300
24"x24"-8"
SD-1-150
12"x10"
SR-1-430
DUCT CONNECT
TO 61-EF-002
EXISTING
OPS. LAB
61-EF-003
6"x6"
61-EF-005
6"x6"
61-EF-004
12"x10"
10"x8"
12"x10"
24"x12"-14"x10"
RD-2-300
J
H-95-501
WALL PENETRATION
INTERIOR (TYP)
32"x18" (L1)
16"x16" (L1)
18"x18"
18"x18"
32"x20"
1/2
D
0 OF
F
IL
E
0 1 2 4(SCALE BAR IS 4" AT FULL SCALE)
PROJECT NO.:
DESIGNED:
DETAILED:
CHECKED:
APPROVED:
DATE:
SUBCONSULTANT:
P L O
T T
E D
Black & Veatch Corporation Gaithersburg, Maryland
REVISIONS AND RECORD OF ISSUE
R E
V
IT
V E
R S
IO
N
PROFESSIONAL CERTIFICATION.
THE STATE OF MARYLAND
ENGINEER UNDER THE LAWS OF
APPROVED BY ME, AND THAT I AM A
DOCUMENTS WERE PREPARED OR
I HEREBY CERTIFY THAT THESE
DULY LICENSED PROFESSIONAL
LICENSE NO.: _______________,
EXPIRATION DATE: _______________.
A u to d e s k D o c s /4
H a g e rs to w n W
W T
P I m p ro v e m e n ts
-6
-O p e ra ti o n s B u ild in g .r v t
/2
/2
:5 :4
A
M
H-61-102
HAGERSTOWN
WASTEWATER
TREATMENT PLANT
IMPROVEMENTS
OVERALL UPPER LEVEL
FLOOR PLAN
HVAC
OPERATIONS BUILDING
419612
JCM
RKS
MFR
MFR
MAY 2026
3/16" = 1'-0"
UPPER LEVEL - HVAC PLAN
3/16" = 1'-0"
5' 10'2'6' 4' 0'
GENERAL SHEET NOTES
SHEET KEYNOTES
1. SEE DRAWING H-00-001, LEGENDS, ABBREVIATIONS, AND
GENERAL NOTES.
1. (E) SPLIT SYSTEM TO REMAIN.
2. (E) HYDRONIC HEATER ABOVE CEILING TO REMAIN.
3. 24"x24" CONTINUATION.
0 5/2026 ISSUED FOR BID
33747
2/27/2027
ADDENDUM IV
THIS DRAWING WAS ORIGINALLY
SEALED BY MICHELE F. ROTH ON MAY
13, 2026, A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND (LICENSE NUMBER AND
EXPIRATION DATE BELOW).
THIS REPLACES THE ORIGINAL
SIGNED BID DRAWING.
1 7/2026 REVISION 2
D E F G H J K L M
H1
METAL EQUIPMENT CURB,
SEE ARCH DETAIL DRAWING
(TYP) 22"x18" L2, DUCT DN
20"x14" L2, DUCT DN
32"x18" L2, DUCT DN
32"x18" L2, DUCT DN
33"x18" L2, DUCT DN
32"x18" L2, DUCT DN
32"x20" L2, DUCT DN
32"x18" L2, DUCT DN
61-PAC-004
61-PAC-002
6"x6"
DUCT DN
CONDENSATE
DRAIN (TYP)
E
H-95-501
DRAIN PAN TRAP -
DRAW THROUGH
(TYP)
F
H-95-501
ROOF
MOUNTED FAN
METAL EQUIPMENT CURB,
SEE ARCH DETAIL
DRAWING (TYP)
P
H-95-501
ROOF HOOD
(TYP)
8"x8" DUCT DN
8"x8" DUCT DN
8"x8" DUCT DN
10" DIA
DUCT DN
FLEX
CONN (TYP)
24"x24" (L2)
24"x24" (L2), DUCT DN
28"x28" (L2), DUCT DN
"x
(L
28"x28" (L2)
28"x28" (L2)
28"x28" (L2)
61-RH-001
61-RH-002
61-RH-003
61-EF-007
61-EF-006
61-PAC-005
61-PAC-001
61-PAC-003
1/2
D
0 OF
F
IL
E
0 1 2 4(SCALE BAR IS 4" AT FULL SCALE)
PROJECT NO.:
DESIGNED:
DETAILED:
CHECKED:
APPROVED:
DATE:
SUBCONSULTANT:
P L O
T T
E D
Black & Veatch Corporation Gaithersburg, Maryland
REVISIONS AND RECORD OF ISSUE
R E
V
IT
V E
R S
IO
N
PROFESSIONAL CERTIFICATION.
THE STATE OF MARYLAND
ENGINEER UNDER THE LAWS OF
APPROVED BY ME, AND THAT I AM A
DOCUMENTS WERE PREPARED OR
I HEREBY CERTIFY THAT THESE
DULY LICENSED PROFESSIONAL
LICENSE NO.: _______________,
EXPIRATION DATE: _______________.
A u to d e s k D o c s /4
H a g e rs to w n W
W T
P I m p ro v e m e n ts
-6
-O p e ra ti o n s B u ild in g .r v t
/2
/2
:5 :1
A
M
H-61-103
HAGERSTOWN
WASTEWATER
TREATMENT PLANT
IMPROVEMENTS
ROOF PLAN
HVAC
OPERATIONS BUILDING
419612
JCM
RKS
MFR
MFR
MAY 2026
3/16" = 1'-0"
5' 10'2'6' 4' 0'
3/16" = 1'-0"
ROOF LEVEL - HVAC PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
1. SEE DRAWING H-00-001, LEGENDS, ABBREVIATIONS, AND
GENERAL NOTES.
1. (E) CONDENSING UNIT TO REMAIN.
2. ROOF HOOD EQUAL TO GREENHECK FGR GRAVITY
RELIEF, 8x8 NECK SIZE, WITH BACKDRAFT DAMPER.
3. MODIFY EXISTING OPENING AS NEEDED TO ACCOMMODATE
DUCT. PROVIDE, CURB OPENING ADAPTER PER
ARCHITECTURAL DETAIL.
4. EXISTING ROOF OPENING COVERED BY ARCHITECTURAL CURB
CAP. REFER TO ARCHITECTURAL DETAIL DRAWINGS.
5. REFER TO DETAIL C/S-95-511
6. REFER TO DETAIL D/S-95-511
7. REFER TO DETAIL E/S-95-511
8. RELOCATE EXISTING CONDENSING UNIT AS NEEDED TO
PROVIDE CLEARANCE FOR PAC UNIT.
0 5/2026 ISSUED FOR BID
1 7/2026 REVISION 2
33747
2/27/2027
THIS DRAWING WAS ORIGINALLY
SEALED BY MICHELE F. ROTH ON MAY
13, 2026, A DULY LICENSED
PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF
MARYLAND (LICENSE NUMBER AND
EXPIRATION DATE BELOW).
THIS REPLACES THE ORIGINAL
SIGNED BID DRAWING.
Pipeline Schedule
Nominal
Size, in Service Location Installation Material Coating* Lining
18 Sanitary Sewer Yard Piping Buried DIP A4 Cement Mortar
16 In-Plant Pumping, IP In-Plant Pump Station Outdoors, insulated with heat trace DIP A7 Ceramic Epoxy
≤16 Return Activated Sludge, RAS RAS/WAS Pump Station, Operations Building Indoors DIP A2 Ceramic Epoxy
4-12 10 Potable Water, PW Yard Piping Buried PVC DIP N/A A4 N/A Cement Mortar
4 Waste Activated Sludge, WAS RAS/WAS Pump Station, Operations Building Indoors DIP A2 Ceramic Epoxy
4 Primary Sludge, PS RAS/WAS Pump Station, Operations Building Indoors DIP A2 Ceramic Epoxy
4 Utility Water, UW Yard Piping Buried PVC Pressure Pipe N/A N/A
4 Non-potable water, NPW Headworks Indoors DIP A7 Ceramic Epoxy
2.5 Drain, DRN Yard Piping Buried PVC-2 N/A N/A
1 Magnesium Oxide, MgO Yard Piping Buried CPVC N/A N/A
1 Chemical Yard Piping Chemical Duct Bank RPT N/A N/A
<4 Potable Water, PW Yard Piping Buried CU-1 F2 N/A
* See the Protective Coatings section for coating designations
SCHEDULE 40 05 05.20-S01 - Pipeline Schedule
City of Hagerstown
Hagerstown WWTP Phase 1 Improvements
40 05 05.20-S01
Addendum IV
BV Project No. 419612
July 30
ATTACHMENT 2
| ATTACHMENT 1 - OPS BUILDING |
| ATTACHMENT 2 - 40 05 05.20 S01 - Pipeline Schedule |