This Addendum II document, issued by the City of Hagerstown, Maryland, provides clarifications and modifications to Bid No. B1881.26 for the Hagerstown Wastewater Treatment Plant Improvements - Phase 1 project. The addendum extends the bid due date to August 18, 2026 at 2:00 PM and specifies that proposals must be submitted via the City of Hagerstown's Dropbox link, properly named as "B1881.26 (Name of Firm) - Hagerstown WWTP Improvements - Phase 1." The project involves comprehensive electrical and infrastructure improvements to the wastewater treatment facility, including demolition of existing equipment, installation of new electrical distribution systems, control panels, motor control centers, transformers, and associated power distribution components across multiple buildings including the headworks, BNR control building, and oxygen/ozone building. Milestone 3 has been extended to 604 calendar days from the Notice to Proceed to accommodate power distribution equipment lead times, with substantial completion required within 540-604 calendar days and final completion within 630-694 calendar days.
The addendum includes digital-native copies of unsealed electrical drawings for reference purposes, with the sealed versions included in the original contract documents serving as the governing documents. Key electrical work includes installation of new panelboards, one-line diagrams showing power distribution functional diagrams, conduit and duct bank systems with detailed scheduling, lighting and receptacle plans, and miscellaneous control schematics. The project encompasses significant electrical infrastructure upgrades with detailed specifications for equipment ratings, conductor sizes, conduit materials, and area type classifications for hazardous locations. The City of Hagerstown will not assume responsibility for proposals submitted late or incorrectly named, emphasizing strict compliance with submission procedures and formatting requirements outlined in Section 00 11 16 of the contract documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID NO. B1881.26
ADDENDUM NO. II
CITY OF HAGERSTOWN
HAGERSTOWN, MARYLAND
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Date: July 21, 2026 Bids Due: Tuesday, August 18, 2026 at 2:00P.M.
(REVISED)
To Bidders:
This Addendum is hereby made a part of the Contract Documents on which all bids will be based and is issued to clarify the original documents.
Please acknowledge receipt of this Addendum at the appropriate space on the bid form by inserting its number and date. This Addendum consists of thirteen (13) pages. This Addendum forms a part of the contract Documents as it supplements and/or modifies as follows:
ADDENDUM II – CLARIFICATIONS
Bid No. B1881.26 Hagerstown Wastewater Treatment Plant Improvements - Phase 1
The attention to bidders submitting proposals for the above project is called to the following addendum that contains responses to all questions submitted by the prospective bidders. The items set forth herein, whether of omission, addition, substitution or clarifications are all to be included in and form part of the proposal submitted. This addendum shall take precedence or provide clarification.
The above-mentioned Addendum follows.
CLARIFICATIONS:
1. Prospective Bidders are advised that the due date for bids has been extended to August 18, 2026 at 2:00
PM.
Revise Section 00 11 16, first paragraph to the following:
Proposals will be received via the City of Hagerstown’s Dropbox using the following link:
https://www.dropbox.com/request/xchndehj7j4fooshv8aj by no later than Monday, Aug 3rd Aug 18th, 2026 at 2:00pm. All proposals must be named “B1881.26 (Name of Firm) – Hagerstown WWTP Improvements
– Phase 1.” The City of Hagerstown will not assume responsibility for any proposals that are submitted late or incorrectly.
2. Prospective Bidders are advised that Milestone 3 has been extended to 604 calendar days, to accommodate market conditions in power distribution equipment lead times.
Revise Section 00 52 13 Paragraph 4.02.A to the following:
The Work will be substantially complete within 540 604 calendar days after the date when the Contract
Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 630 694 calendar days after the date when the Contract Times commence to run.
Revise Section 00 52 13 Paragraph 4.03.A.3 to the following:
Milestone 3 – Substantial completion of all remaining work as listed in the Contract, including installation, inspection, startup, functional testing, and commissioning activities must be complete in order for the Owner to take occupancy/utilization of the respective systems. Work to be completed on or before 18 months 604 calendar days of NTP.
3. Prospective Bidders are advised that digital-native copies of the unsealed electrical drawings are attached to this Addendum. Note that the sealed versions of these Drawings, included in the original Contract
Documents, govern, and the copy attached herein are provided as courtesy.
Tyler French, Procurement Administrator
City of Hagerstown
PANELBOARD: BNR 1 BUS: COPPER MAINS: 3P-100A MAIN BREAKER
PHASE SERVICE: 120/208V, 3PH, 4W, S/N RATING: 100A LOCATION: BNR CONTROL ROOM PHASE
"A" "B" "C" MOUNTING: SURFACE "A" "B" "C"
V.A. V.A. V.A. LOAD P BKR
CKT
# BKR P LOAD V.A. V.A. V.A.
HEADWORKS GFCI RECPT 1 20 1 2 20 1 AC CONTROL PANEL
INFLUENT SAMPLER HEADWORKS 1 20 3 4 20 1 TANK #2 GFI REC
LIGHTING & CONTROLS HEADWORKS 1 20 5 6 20 1 RECEPTS CHLORINATION ROOM
METERING INDICATORS HEADWORKS 1 20 7 8 20 1 INFLUENT SAMPLER EFFLUENT BOX
RECEPTS BLOWER ROOM 1 20 9 10 20 1 RECEPTS, CHLORINE STORAGE RM
CHLORINE LEAD DETECTOR 1 20 11 12 20 1 TANK HEATER CHLORINE STORAGE RM
RECPTS CHLORINATION ROOM 1 20 13 14 20 1 RECEPTS CHLORINATION ROOM
EX FANS STORAGE & CHLOR RM 1 20 15 16 20 1 N-WALL BS
HEAT TRACING HEADWORKS 1 20 17 18 20 1 E-WALL BS
RECPTS CHLORINATION ROOM 1 20 19 20 20 1 LIFT CONTROL PANEL
E-WALL BS 1 20 21 22 20 1 TANK #1 GFI RECEPT
SPACE 1 20 23 24 20 1 SPACE
SPACE 1 20 25 26 20 1 SPACE
SPACE 1 20 27 28 20 1 SPACE
SPACE 1 20 29 30 20 1 SPACE
EQUALIZATION FLOW CONTROL VAULT 3 20 31 32 20 1
EQUALIZATION FLOW CONTROL VAULT - - 33 34 20 1
EQUALIZATION FLOW CONTROL VAULT - - 35 36 20 1
SPARE 3 20 37 38 20 1
- - - 39 40 20 1
- - - 41 42 20 1
0 TOTAL "A" TOTAL "A" 0
0 TOTAL "B" 0 TOTAL "B" 0
0 TOTAL "C" TOTAL "C" 0
TOTAL = 0
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
6\
D -2
2-
1.
D
W G
/1
3/
:3 4:
P
M
HAGERSTOWN
WASTEWATER
TREATMENT PLANT
IMPROVEMENTS
419612
D-22-601
BNR CONTROL ROOM
DEMOLITION
PANELBOARD SCHEDULE
JRJ
GRH
SLC
RYK
GENERAL NOTES:
1. INFORMATION SHOWN ON THIS SHEET IS BASED ON
AS-BUILT INFORMATION FROM PAST CONTRACTS.
CONTRACTOR SHALL FIELD VERIFY INFORMATION PRIOR
TO STARTING WORK.
2. EXISTING CABLE AND CONDUIT TO BE DEMOLISHED.
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
SUBCONSULTANT:
D
FI
LE
PL
O
TT
ED
Gaithersburg, Maryland Black & Veatch Corporation
EXISTING PANEL BNR 1 DEMOLITION SCHEDULE
MAY 2026
ISSUED FOR BID4/20260
ISSUED FOR BID
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
Bal123501 Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K. KAMDEM ON APRIL 23, 2026, A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND (LICENSE NUMBER AND EXPIRATION DATE BELOW).
THIS DRAWING IS PROVIDED AS COURTESY; THE ORIGINAL, SIGNED BID DRAWINGS GOVERN.
Bal123501 Addition Text Box
ADDENDUM 2
PANELBOARD: OPCC BUS: COPPER MAINS: 3P-200A MAIN BREAKER
PHASE SERVICE: 120/208V, 3PH, 4W, S/N RATING: 400A
LOCATION: U-29 PHASE
"A" "B" "C" MOUNTING: SURFACE "A" "B" "C"
V.A. V.A. V.A. LOAD P BKR
CKT
# BKR P LOAD V.A. V.A. V.A.
Room U-28 208 V. Recpts 2 30 1 2 30 2 Room U-28 208 V. Recpts
- - - 3 4 - - -
Room U-28 208 V. Recpts 2 30 5 6 30 2 Room U-28 208 V. Recpts
- - - 7 8 - - -
Room U-28 208 V. Recpts 2 30 9 10 30 2 Room U-28 208 V. Recpts
- - - 11 12 - - -
Room U-30 208 V. Recpts 2 30 13 14 30 2 Room U-30 208 V. Recpts
- - - 15 16 - - -
Room U-28 208 V. Recpts 2 30 17 18 30 2 Room U-28 208 V. Recpts
- - - 19 20 - - -
Room U-28 208 V. Recpts 2 30 21 22 20 1 Space
- - - 23 24 20 1 Spare
Dishwasher Room U-28 1 20 25 26 20 1 Spare
Spare 1 20 27 28 20 1 Fume Hood Room U-28 (North Side)
Fume Hood Room U-28 (South Side) 1 20 29 30 20 1 Purifier Room U-29
Recpts. Room U-29 1 20 31 32 20 1 Recpts. Room U-28
Recpts. Room U-28 1 20 33 34 20 1 Recpts. Room U-28
Recpts. Room U-28 1 20 35 36 20 1 Recpts. Room U-28
Recpts. Room U-28 1 20 37 38 20 1 Incubator Room U-28
Recpts. Room U-28 1 20 39 40 20 1 Recpts. Room U-28
Recpts. Room U-30 1 20 41 42 20 1 Recpts. Room U-30
0 TOTAL "A" 0 TOTAL "A" 0
0 TOTAL "B" 0 TOTAL "B" 0
0 TOTAL "C" 0 TOTAL "C" 0
TOTAL = 0
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
6\
D -6
1-
1.
D
W G
/1
4/
:3 7:
A
TREATMENT PLANT
D-61-601
OPERATIONS BUILDING
DEMOLITION
PANELBOARD SCHEDULE
JRJ
JIG
GENERAL NOTES:
1. INFORMATION SHOWN ON THIS SHEET IS BASED ON
AS-BUILT INFORMATION FROM PAST CONTRACTS.
CONTRACTOR SHALL FIELD VERIFY INFORMATION PRIOR
TO STARTING WORK.
2. EXISTING CABLE AND CONDUIT TO BE DEMOLISHED.
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
SUBCONSULTANT:
D
FI
LE
PL
O
TT
ED
Gaithersburg, Maryland Black & Veatch Corporation
EXISTING PANEL OPCC DEMOLITION SCHEDULE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
MAY 2026
ISSUED FOR BID4/20260
ISSUED FOR BID
WIL84530
Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K. KAMDEM ON APRIL 23, 2026, A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND (LICENSE NUMBER AND EXPIRATION DATE BELOW).
THIS DRAWING IS PROVIDED AS COURTESY; THE ORIGINAL, SIGNED BID DRAWINGS GOVERN.
WIL84530
1500KVA
2.4KV Δ - 480Y/277V
3-PH, 60HZ
3P-20
S4
S2
S1
K
59G
V
3P -5
MS
OL
P
V
V
SIZE 2 COMBINATION MAGNETIC MOTOR
STARTER, REVERSING OR 2 SPEED
FUSE AND DISCONNECT SWITCH
HIGH VOLTAGE DRAWOUT CONTACTOR
LOW VOLTAGE DRAWOUT AIR
CIRCUIT BREAKER
SIZE 4 COMBINATION
MAGNETIC MOTOR STARTER
LOW VOLTAGE AIR CIRCUIT
BREAKER, 3 POLE, 20 AMPERE
HIGH VOLTAGE DRAWOUT AIR OR
VACUUM CIRCUIT BREAKER
CIRCUIT NO.22 WITH 3#8 INSULATED
CONDUCTORS AND 1#10 GROUND WIRE
FOR A 20HP MOTOR WITH 3 POLE,
60A, MOTOR DISCONNECT SWITCH AND
4#14 INSULATED CONDUCTORS FOR
AUXILIARY ITEM, AS FOR EXAMPLE A
CONTROL STATION, ALL IN 2"
CONDUIT.
TRANSFORMER WITH PRIMARY AND SECONDARY
VOLTAGE, AND KVA RATING AS NOTED
CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
SIZE 1 COMBINATION REDUCED
VOLTAGE AUTOTRANSFORMER
22:3#8,#10G, 4#14,2"
GENERATOR
KIRK KEY INTERLOCK
RESISTOR
PROTECTION RELAY WITH IEEE
DEVICE FUNCTION AS SHOWN
SINGLE-FUNCTION METER
SURGE OR LIGHTNING ARRESTER
GROUND CONNECTION
CURRENT OR POTENTIAL TEST SWITCH
INDICATES THAT ALL OR PART OF
CIRCUIT MAY BE ROUTED IN DUCT BANK
OR UNDERGROUND. CONDUIT SIZE SHOWN
ON ONE-LINE IS ABOVE GROUND AND/OR
INSIDE OF STRUCTURE. SEE DUCT BANK
SCHEDULE AND SECTIONS FOR CONDUIT
SIZE OF UNDERGROUND PORTION OF
CIRCUIT.
ONE-LINE SHOWING POWER AND CONTROL
TO A PACKAGE UNIT, AS FOR EXAMPLE A
STEAM GENERATOR OR AN AIR HANDLING
UNIT, SHALL IMPLY THAT ANY AND ALL
ASSOCIATED EQUIPMENT SHALL ALSO BE
INSTALLED AND WIRED AS REQUIRED BY
THE EQUIPMENT FURNISHED.
CS
3P-60
4#14,3/4"
CONDUCTORS FOR AUXILIARY ITEM
SHALL NOT PASS THROUGH MOTOR
DISCONNECT SWITCH.22:3#8,#10G
4#14,2"
AUXILIARY ITEMS MAY NOT
BE COMPLETELY SHOWN
AUXILIARY ITEMS MAY
NOT BE COMPLETELY
SHOWN
SURGE ARRESTER WITH SURGE CAPACITOR
G
ELECTRICAL INTERLOCKE
5KV
1200A
49KA
A 5KV CLASS MEDIUM-VOLTAGE, DRAWOUT, VACUUM OR
AIR INSULATED CIRCUIT BREAKER WITH A 1,200 AMPERE
FRAME. BREAKER HAS A 49,000 AMPERE MAXIMUM
FAULT CURRENT INTERRUPTING RATING.
A LOW VOLTAGE FIXED MOUNTED MOLDED CASE CIRCUIT
BREAKER WITH A 50 AMPERE TRIP RATING.
TRIP UNIT IS NON-ADJUSTABLE THERMAL-MAGNETIC
TYPE.
A LOW VOLTAGE FIXED MOUNTED MOLDED CASE
CIRCUIT BREAKER WITH A 1200 AMPERE FRAME AND
A 1000 AMPERE TRIP RATING.
TRIP UNIT IS ADJUSTABLE SOLID-STATE TYPE WITH
LONG-TIME, SHORT-TIME, INSTANTANEOUS, GROUND
FAULT AND ARC-FLASH REDUCTION PROTECTION
FEATURES.
A LOW VOLTAGE, DRAWOUT, POWER OR INSULATED CASE
CIRCUIT BREAKER WITH A 1600A FRAME AND SOLID-STATE
TRIP UNIT.
TRIP UNIT HAS A SENSOR MODULE RATED FOR 1000
AMPERES AND WITH A TRIP RATING OF 800 AMPERES AND
ARC-FLASH REDUCTION PROTECTION FEATURES.
1000AT
1200AF
SST
LSIG
AFRD
800AT
1000AS
1600AF
AFRD
DETAIL A
DETAIL B
DETAIL C
CONDUIT PLUGGED FLUSH. CONDUIT CAPPED.
UNDERGROUND CONCRETE ENCASED
ELECTRICAL BANK ROUTED BENEATH
SLAB-ON-GRADE
UNDERGROUND CONCRETE ENCASED
ELECTRICAL DUCT BANK
WALL MOUNTED LIGHTING FIXTURE. REFER TO
NUMBER OR LETTER IN FIXTURE SCHEDULE.
POWERED FROM LIGHTING PANEL LP1, CIRCUIT 1.
CONTROLLED VIA FROM SWITCH A.
POLE OR STANCHION MOUNTED LIGHTING FIXTURE.
REFER TO NUMBER OR LETTER IN FIXTURE
SCHEDULE. POWERED FROM LIGHTING PANEL LP1,
CIRCUIT 1. CONTROLLED VIA FROM SWITCH A.
GROUND CONDUCTOR
DIRECT BURIED CONDUIT
CONDUIT TURNING UP. CONDUIT TURNING DOWN.
CONDUIT CONCEALED
CONDUIT EXPOSED
RECEPTACLE POWERED FROM
LIGHTING PANEL LP1, CIRCUIT 1.LP1-1
CEILING, PENDANT, OR RECESSED LIGHTING
FIXTURE. REFER TO NUMBER OR LETTER IN
FIXTURE SCHEDULE. POWERED FROM LIGHTING
PANEL LP1, CIRCUIT 1. CONTROLLED VIA FROM
SWITCH A.
LP1-1
A
LINEAR LIGHTING FIXTURE. REFER TO
NUMBER OR LETTER IN FIXTURE SCHEDULE.
POWERED FROM LIGHTING PANEL LP1,
CIRCUIT 1. CONTROLLED VIA SWITCH A.
LP1-1 A
UNDERGROUND ELECTRIC
OVERHEAD CIRCUIT
L2 - 5
TYPICAL FOR HOME RUN TO BE ROUTED TO
LIGHTING PANEL L2 & CONNECTED TO CIRCUIT
#5 (MINIMUM NO. 12 AWG CONDUCTORS AND
3/4" CONDUIT)
OH OH
UE UE
HORN & STROBE
HORN
THERMOSTAT
JUNCTION BOX
GROUND ROD
GROUND ROD WITH TEST WELL
GROUND CONNECTION
DISCONNECT SWITCH
COMBINATION STARTER
POWER PANEL
LIGHTING PANEL
MISCELLANEOUS PANEL
LIGHTING CONTACTOR
T
J
STROBE
CAMERA
SINGLE POLE SWITCH
CX
TWO POLE SWITCH
THREE-WAY SWITCH
CONTROLLING LIGHTS WITH "A" DESIGNATION
FOUR-WAY SWITCH
3A
MOMENTARY SWITCH
CONTROLLING CONTACTOR C1
C1 M
DUPLEX RECEPTACLE 120 VOLT
SIMPLEX RECEPTACLE
TWISTLOCK RECEPTACLE
240V, 1Ø RECEPTACLE, TYPICAL
AMPERE RATING NOTED
DUPLEX FLOOR OUTLET
TELEPHONE OUTLET
480V, 3Ø WELDING RECEPTACLE, TYPICAL
AMPERE RATING NOTED
120 VOLT DUPLEX
RECEPTACLE (UPS)
TELEPHONE FLOOR OUTLET
COAXIAL CABLE OUTLET
RANGE RECEPTACLE
DATA NETWORK OUTLET
WIRE CONNECTION POINT
EXTERNAL CONNECTION POINT
NORMALLY OPEN CONTACT
NORMALLY CLOSED CONTACT
STARTER, CONTACTOR OR RELAY COIL
NORMALLY OPEN PUSH BUTTON
NORMALLY CLOSED PUSH BUTTON
MAINTAINED PUSH BUTTON
NORMALLY CLOSED GEARED LIMIT SWITCH
NORMALLY OPEN GEARED LIMIT SWITCH
INDICATING LIGHT
FUSE
POTENTIOMETER
CAPACITOR
DIODE
RESISTOR
CONTROL POWER TRANSFORMER
SWITCH
MANUAL STARTER
OVERLOAD
OVERLOAD
ELECTRODE
FLOAT SWITCH
(CLOSING ON RISING LEVEL)
FLOAT SWITCH
(OPENING ON RISING LEVEL)
PRESSURE SWITCH
(CLOSING ON RISING PRESSURE)
PRESSURE SWITCH
(OPENING ON RISING PRESSURE)
VACUUM SWITCH
(CLOSING ON INCREASING VACUUM)
VACUUM SWITCH
(OPENING ON INCREASING VACUUM)
TEMPERATURE SWITCH
(CLOSING ON RISING TEMPERATURE)
TEMPERATURE SWITCH
(OPENING ON RISING TEMPERATURE)
FLOW ACTUATED SWITCH
(CLOSING ON INCREASE IN FLOW)
FLOW ACTUATED SWITCH
(OPENING ON INCREASE IN FLOW)
ON TIME DELAY CONTACT
(NORMALLY OPEN, WHEN THE COIL IS ENERGIZED
THE CONTACT WILL CLOSE AFTER A TIME DELAY)
ON TIME DELAY CONTACT
(NORMALLY CLOSED, WHEN THE COIL IS ENERGIZED
THE CONTACT WILL OPEN AFTER A TIME DELAY)
OFF TIME DELAY CONTACT
(NORMALLY OPEN, WHEN THE COIL IS DE-ENERGIZED
THE CONTACT WILL OPEN AFTER A TIME DELAY)
OFF TIME DELAY CONTACT
(NORMALLY CLOSED, WHEN THE COIL IS DE-ENERGIZED
THE CONTACT WILL CLOSE AFTER A TIME DELAY)
TORQUE SWITCH
(NORMALLY OPEN)
TORQUE SWITCH
(NORMALLY CLOSED)
LIMIT SWITCH
(NORMALLY OPEN)
LIMIT SWITCH
(NORMALLY OPEN, HELD CLOSED)
LIMIT SWITCH
(NORMALLY CLOSED)
LIMIT SWITCH
(NORMALLY CLOSED, HELD OPEN)
DIFFERENTIAL PRESSURE SWITCH
(NORMALLY OPEN, CLOSING ON INCREASING DIFF.)
DIFFERENTIAL PRESSURE SWITCH
(NORMALLY CLOSED, OPENING ON INCREASING DIFF.)
25 - SYNCHRONIZING OR SYNCHRONISM-CHECK DEVICE
27 - UNDERVOLTAGE RELAY
32 - DIRECTIONAL POWER RELAY
37 - UNDERCURRENT OR UNDERPOWER RELAY
46 - REV. PHASE OR PHASE-BAL. CURRENT RELAY
47 - PHASE SEQ. OR PHASE BAL. VOLTAGE RELAY
49 - MACHINE OR TRANSFORMER THERMAL RELAY
50 - INSTANTANEOUS OVERCURRENT
51 - AC TIME OVERCURRENT RELAY
52 - AC CIRCUIT BREAKER
59 - OVERVOLTAGE RELAY
63 - PRESSURE SWITCH
64 - GROUND DETECTOR RELAY
67 - AC DIRECTIONAL OVERCURRENT RELAY
71 - LIQUID OR GAS LEVEL RELAY
81 - FREQUENCY RELAY
83 - AUTOMATIC SELECTIVE CONTROL OR TRANSFER RELAY
86 - LOCKOUT RELAY
87 - DIFFERENTIAL PROTECTIVE RELAY
BREAKER DETAILSSCHEMATIC SYMBOLS
CONDUIT & WIRING INSTALLATION LEGEND
SWITCH & OUTLET SYMBOLS MISCELLANEOUS SYMBOLS
ONE-LINE DIAGRAM LEGEND
PROTECTION/RELAY DEVICE NUMBERS
HS
20 3P-60
P
CEILING MOUNTED OCCUPANCY
SENSOROS
HORN SPEAKER
DUAL HORN SPEAKER
WALL MOUNTED
CONE SPEAKER
CEILING MOUNTED
CONE SPEAKER
SK
COMMUNICATION SYMBOLS
EX
EXIT LIGHTING FIXTURE. REFER TO
FIXTURE NUMBER OR LETTERS IN FIXTURE
SCHEDULE. POWERED FROM LIGHTING
PANEL 1, CIRCUIT 1.
EM
EMERGENCY LIGHTING FIXTURE. REFER
TO FIXTURE NUMBER OR LETTERS IN
FIXTURE SCHEDULE. POWERED FROM
LIGHTING PANEL 1, CIRCUIT 1.
LP1-1
A
LP1-1
A
LP1-1
LP1-1
R
DIMMING WALL SWITCH
CONTROLLING LIGHTS WITH "A" DESIGNATION
DM
A
WALL SWITCH OCCUPANCY SENSOR
CONTROLLING LIGHTS WITH "A" DESIGNATION
OS
A
OS WALL MOUNTED OCCUPANCY
SENSOR
E
EE
ELECTRICAL LEGENDS
FD
C
:\P W
_W O
R
KI
N G
\B
VW
_A M
ER
IC
AS
_2
\D
9\ E-
-0
.D
W G
4/
/2
1:
:5
PM
TREATMENT PLANT
IMPROVEMENTS
419612
ISSUED FOR BID
MAY 2026
E-00-001
GENERAL
ELECTRICAL
LEGEND
JRJ
ADJ
SLC
RYK
4/2026 ISSUED FOR BID0
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
SUBCONSULTANT:
D
FI
LE
PL
O
TT
ED
Gaithersburg, Maryland Black & Veatch Corporation
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
WIL84530
Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K. KAMDEM ON APRIL 23, 2026, A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND (LICENSE NUMBER AND EXPIRATION DATE BELOW).
THIS DRAWING IS PROVIDED AS COURTESY; THE ORIGINAL, SIGNED BID DRAWINGS GOVERN.
WIL84530
B
C
D
E
F
G
H
I
J
K
L
M
N
O
NOT USED
Q
R
T
U
V
W
P
X
Y
Z
S
AREA TYPE 12
AREA TYPE 1A
AREA TYPE 7B
AREA TYPE 7A
AREA TYPE 4
THE SPECIAL AREA DESIGNATION BOXES, AS DEFINED BELOW, ARE LOCATED ON THE PLAN DRAWINGS TO DEFINE ELECTRICAL INSTALLATION REQUIREMENTS. DESIGNATION BOXES ARE LOCATED WITHIN ROOM OR BELOW ROOM NUMBER. ALL INDOOR AREAS NOT INDICATED OTHERWISE ARE AREA TYPE 1 AND MINIMUM NEMA TYPE 1 ENCLOSURES.
CORROSIVE CHEMICAL FEED AND STORAGE ROOMS. CONDUIT SYSTEM SHALL BE EXPOSED
SCHEDULE 80 PVC RIGID NON-METALLIC CONDUIT WITH PVC FITTINGS, BOXES AND ACCESSORIES.
INDOOR WET LOCATIONS SUCH AS VAULTS, HOSEDOWN AREAS, BASEMENTS, ETC. MINIMUM NEMA
TYPE 4 ENCLOSURE FOR EQUIPMENT AND GASKETED FITTINGS IN A CONDUIT SYSTEM.
CLASS I, DIVISION 1 AREA AS DEFINED BY NEC. ALL EQUIPMENT AND CONDUIT SYSTEMS SHALL BE
RATED FOR USE IN THIS AREA.
CLASS I, DIVISION 2, GROUP C AND D (METHANE, GASOLINE) AS DEFINED BY NEC. EQUIPMENT AND
CONDUITS SYSTEMS SHALL BE RATED FOR USE IN THIS AREA.
INDOOR, DRY, DIRTY AREA. REQUIRES MINIMUM NEMA TYPE 12 GASKETED ENCLOSURES FOR ALL
EQUIPMENT AND GASKETED FITTINGS IN CONDUIT SYSTEMS.
AREA DESIGNATIONS
GENERAL REQUIREMENTS
ELECTRICAL ABBREVIATIONSELECTRICAL GENERAL NOTES
A AMBER, AMPERE, ALARM
AC ALTERNATING CURRENT
ACB AIR CIRCUIT BREAKER
ACR ACCESS CARD READER
AF AMPERE FRAME
AFD ADJUSTABLE FREQUENCY DRIVE
AFRD ARC-FLASH REDUCTION DEVICE
AM AMMETER
ANN ANNUNCIATOR
AR ALARM RELAY
AS AMMETER SWITCH, AMPERE SENSOR
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
AWG AMERICAN WIRE GAUGE
J,JB JUNCTION BOX
ONE, SINGLE PAIR, TWISTED
SHIELDED #16 CABLE
THREE, SINGLE, SEVEN CONDUCTOR #14
MULTICONDUCTOR CONTROL CABLES
1-1PR#16S
3-7/C#14
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ROUTING ALL CONDUITS NOT SHOWN ON THE PLANS. THIS SHALL INCLUDE ALL CONDUITS SHOWN ON THE ONE-LINES AND HOME-RUNS SHOWN ON THE PLAN DRAWINGS. CONDUITS SHALL BE ROUTED AS DEFINED
IN THE SPECIFICATION.
2. SPARE WIRES SHALL BE TAPED AND COILED AND LABELED TO INDICATE WHERE OTHER END OF SPARE WIRE IS LOCATED.
3. IF EQUIPMENT SUPPLIED BY MANUFACTURER HAS A LARGER LOAD THAN VALUE SHOWN, THE CABLE CONDUIT AND ELECTRICAL
EQUIPMENT SHALL BE ENLARGED, AS REQUIRED, TO ACCOMMODATE THE HIGHER VALUE.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING PROPERLY SIZED STARTER OVERLOADS FOR EQUIPMENT FURNISHED.
5. LIGHTING AND RECEPTACLE CIRCUITS DESIGNATED ON THE FLOOR PLANS ARE NOT SHOWN ON THE ONE-LINES. CONDUCTORS FOR LIGHTING, RECEPTACLES, AND MISCELLANEOUS 120VAC CIRCUITS SHALL BE MINIMUM NO. 12AWG. CONDUIT FOR LIGHTING, RECEPTACLES, AND MISCELLANEOUS 120VAC CIRCUITS SHALL BE MINIMUM 3/4".
6. IN AREAS WHERE THERE ARE OVERHEAD BRIDGE CRANES, HOISTS, ETC. NO CONDUITS SHALL BE RUN OVERHEAD THAT WILL
INTERFERE WITH THE OPERATION OF THE EQUIPMENT.
1. SOLID LINES ( ) INDICATE NEW WORK OR EQUIPMENT.
2. SCREENED LINES ( ) INDICATE EXISTING WORK OR EQUIPMENT.
3. DASHED LINES ( ) INDICATE FUTURE WORK OR EQUIPMENT.
4. REFER TO INDIVIDUAL DISCIPLINE CONTRACT DRAWINGS FOR ADDITIONAL ABBREVIATIONS, DETAILS, AND GENERAL DESIGN
NOTES.
5. LEGEND SHEETS ARE GENERAL. SOME SYMBOLS AND ABBREVIATIONS MAY NOT BE UTILIZED ON THIS SPECIFIC PROJECT.
6. INFORMATION RELATED TO CIRCUIT IDENTIFICATION, WIRE & CONDUIT SIZES, AND ROUTING, IS ON THE FOLLOWING DRAWING
TYPES.
A. ONE-LINE DIAGRAMS SHOW CIRCUIT IDENTIFICATION, WIRE QUANTITY AND SIZES, AND CONDUIT SIZE WITHIN STRUCTURES. ONE-LINE DIAGRAMS ALSO INDICATE ORIGIN AND DESTINATION OF CIRCUITS, AND IDENTIFY CIRCUITS
ROUTED UNDERGROUND.
B. FOR CIRCUITS WITHOUT UNDERGROUND PORTIONS, BUILDING FLOOR PLANS SHOW LOCATION OF EQUIPMENT FOR DETERMINING CIRCUIT LENGTH WITHIN THE STRUCTURE. FOR CIRCUITS WITH UNDERGROUND PORTIONS, ANTICIPATED PENETRATION OF UNDERGROUND CONDUITS ARE SHOWN ON STRUCTURE PLANS FOR DETERMINING THE LENGTH OF THE IN-STRUCTURE PORTIONS OF CIRCUITS. BUILDING FLOOR PLANS MAY ALSO SHOW HOME RUNS FOR LIGHTING, RECEPTACLE, AND OTHER MISCELLANEOUS EQUIPMENT CIRCUITS.
C. SITE PLANS INDICATE THE GENERAL ROUTING OF UNDERGROUND CONDUITS AND DUCT BANKS. CIRCUITS ROUTED IN UNDERGROUND CONDUITS OR DUCT BANKS ARE INDICATED IN DUCT BANK SECTIONS REFERENCED ON THE SITE PLAN.
D. DUCT BANK SECTIONS AND SCHEDULES IDENTIFY CONDUIT SIZE, CONDUIT MATERIAL, ARRANGEMENT OF THE
UNDERGROUND CONDUITS, AND CIRCUITS ROUTED IN EACH UNDERGROUND CONDUIT.
B BUS
BC BATTERY CHARGER
BKR BREAKER
BR BRAKE
BT BEARING TEMPERATURE
C CLOSE, COUNTER, CONTACTOR, CONTROL,
CCTV CAMERA
CAP CAPACITOR
CB CIRCUIT BREAKER
CB"A" CIRCUIT BREAKER AUXILIARY CONTACT
(OPEN WHEN BREAKER IS OPEN)
CB"B" CIRCUIT BREAKER AUXILIARY CONTACT
(CLOSED WHEN BREAKER IS OPEN)
CD CONTROL DAMPER
CI CELL INTERLOCK
CKT CIRCUIT
CL2 CHLORINE
COS CABLE OPERATED SWITCH
CP CONTROL PANEL
CPT CONTROL POWER TRANSFORMER
CR CURRENT OF CONTROL RELAY, CARD READER
CS CONTROL STATION
CT CYCLE TIMER OR CURRENT TRANSFORMER
CTC CYCLE TIMER CLUTCH
CTM CYCLE TIMER MONITOR
2/C 2 CONDUCTOR
4"C 4" CONDUIT
DC DIRECT CURRENT, DOOR CONTACT
DI DOOR INTERLOCK
DM DAMPER MOTOR, DEMAND METER,
DIMMER SWITCH
DPDT DOUBLE POLE DOUBLE THROW
DPST DOUBLE POLE SINGLE THROW
DPR DIFFERENTIAL PRESSURE REGULATOR
DPS DIFFERENTIAL PRESSURE SWITCH
DS DISCONNECT SWITCH, DOOR SWITCH,
DESKTOP STATION
DVLS DISCHARGE VALVE LIMIT SWITCH
E ELECTRIC OPERATOR FOR CONTROL
DAMPER OR VALVE
EC EMPTY CONDUIT
EDS ELECTRICAL DOOR STRIKE
EL ELEVATION, EMERGENCY LIGHT
EMH ELECTRICAL MANHOLE
ER ELECTRODE RELAY
ES END SWITCH, REQUEST TO EXIT SENSOR
E-STOP EMERGENCY STOP
ETM ELAPSED TIME METER
EX EXISTING
EXC EXISTING CONDUIT
EXP EXPLOSION PROOF
F FORWARD, FIELD
FO FIBER OPTIC
FPR FEEDER PROTECTION RELAY
FS FLOW SWITCH
G GREEN, GROUND, GENERATOR,
GROUND FAULT
GD GROUND DETECTOR
GEN GENERATOR
GFCI,GFI GROUND FAULT CURRENT INTERRUPTOR,
GROUND FAULT INTERRUPTOR
GLS GEARED LIMIT SWITCH
GPR GENERATOR PROTECTION RELAY
GND GROUND
#8G #8 GROUND WIRE
H HIGH, HUMIDISTAT
HH HANDHOLE
HMT HIGH MOTOR TEMPERATURE
HOA HAND-OFF-AUTO
HOR HAND-OFF-REMOTE
HP HORSEPOWER
HS HAND STATION
HWCO HIGH WATER CUTOFF
HZ HERTZ (CYCLE)
I/O INPUT/OUTPUT
I INSTANTANEOUS
IJB INTERCOM JUNCTION BOX
K KEY INTERLOCK
KAIC THOUSAND AMPERES INTERRUPTING CURRENT
KCMIL THOUSAND CIRCULAR MIL
KO KEY OPERATED
KV KILOVOLT
KVA KILOVOLT AMPERE
KVAR KILOVAR
KW KILOWATT
KWH KILOWATT HOUR
L LOW, LEVEL, LONG-TIME
LA LIGHTNING ARRESTER
LAN LOCAL AREA NETWORK
LC LIGHTING CONTRACTOR
LCE LIGHTING CONTACTOR ENCLOSURE
LIGHTING CONTROL ENCLOSURE
LCP LOCAL CONTROL PANEL
LCS LOCAL CONTROL STATION
LOA LOCAL-OFF-AUTO
LOR LOCAL-OFF-REMOTE
LOS LOCK OUT STOP
LP LIGHTING PANEL
LS LIMIT OR LEVEL SWITCH
LTG LIGHTING
LWCO LOW WATER CUTOFF
M MAGNETIC MOTOR STARTER
MA MILLIAMPERE
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MCLU MOTOR CONTROL LINEUP
MD MOISTURE DETECTOR, MOTION DETECTOR
MDL MAGNETIC DOOR LOCK
MFR MANUFACTURER
MH MANHOLE, MOUNTING HEIGHT
MOV MOTOR OPERATED VALVE
MPR MOTOR PROTECTION RELAY
MS MANUAL MOTOR STARTER
MSH MOTOR SPACE HEATER
MTS MANUAL TRANSFER SWITCH
MV MILLIVOLT, MEDIUM VOLTAGE
MVA MEGAVOLT AMPERE
N NEUTRAL
NGR NEUTRAL GROUNDING RESISTOR
NGT NEUTRAL GROUNDING TRANSFORMER
NC NORMALLY CLOSED
NO NORMALLY OPEN, NUMBER
O OPEN
OL OVERLOAD
OOA ON-OFF-AUTO
OOR ON-OFF-REMOTE
OS OCCUPANCY SENSOR
O/U OVER/UNDER
P PRIMARY, POWER, POLE
PCS PLANT CONTROL SYSTEM
PB PUSH BUTTON, PULL BOX
PE PHOTOELECTRIC SENSOR, PHOTOCELL
PF POWER FACTOR
PFCC POWER FACTOR CORRECTION CAPACITOR
PH PHASE
PL PILOT LIGHT
PLC PROGRAMMABLE LOGIC CONTROLLER
PP POWER PANEL
PR PAIR
PRS PROXIMITY SWITCH
PS PRESSURE SWITCH
PT POTENTIAL TRANSFORMER, PROGRAM TIMER
R RED, RAISE, RELAY, REVERSE
RECP RECEPTACLE
RES RESISTOR
RH REMOTE HANDSET
RT REPEATING TIMER
RTD RESISTANCE TEMPERATURE DETECTOR
RTU REMOTE TERMINAL UNIT
RVSS REDUCED VOLTAGE SOLID STATE STARTER
S SHORT-TIME, SHIELDED, STARTER
SA SURGE ARRESTER, SPEAKER AMPLIFIER
SCADA SUPERVISORY CONTROL AND
DATA ACQUISITION
SF6 SULFUR HEXAFLOURIDE
SH SPACE HEATER
SN SOLID NEUTRAL
SO SOLENOID OILER
SP SINGLE POLE
SPD SURGE PROTECTION DEVICE
SPDT SINGLE POLE DOUBLE THROW
SPST SINGLE POLE SINGLE THROW
SS SELECTOR SWITCH, START/STOP, STAINLESS STEEL
SSM SOLID-STATE METERING
SSS SOLID STATE STARTER
SST SOLID-STATE TRIP
SUPV SUPERVISORY CONTROL
SV SOLENOID VALVE
SWB,SWBD SWITCHBOARD
SWG,SWGR SWITCHGEAR
T THERMOSTAT, TIMER, TOTALIZER,
TRANSFORMER
TACH TACHOMETER
TB TERMINAL BLOCK
TC TIMER CLUTCH
TD TIME DELAY RELAY
TEMP TEMPERATURE
TM TIMER MOTOR
TQ TORQUE
TR TIMER RELAY, TRIAD
TS TEMPERATURE SWITCH
TTB TELEPHONE TERMINAL BOARD
UG UNDERGROUND
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLTS, VOLTAGE RESTRAINED
VA VOLT AMPERE
VAR VARMETER
VFD VARIABLE FREQUENCY DRIVE
VI VACUUM INTERRUPTER
VLS VALVE LIMIT SWITCH
VM VOLTMETER
VPI VALVE POSITION INDICATOR
VS VOLTMETER SWITCH
W WHITE, WATTS
WH WATTHOUR METER
WM WATT METER
WP WEATHERPROOF
WPI WEATHERPROOF IN-USE
WS WALL STATION
X AUXILIARY RELAY
XFMR TRANSFORMER
XP EXPLOSION PROOF
Z AUXILIARY RELAY, IMPEDANCE
ZS POSITION SWITCH
ZSS ZERO SPEED SWITCH
Y YELLOW
ELECTRICAL ABBREVIATIONS & NOTES
FD
C
:\P W
_W O
R
KI
N G
\B
VW
_A M
ER
IC
AS
_2
\D
9\ E-
-0
.D
W G
4/
/2
1:
:3
TREATMENT PLANT
IMPROVEMENTS
419612
ISSUED FOR BID
MAY 2026
E-00-002
GENERAL
ELECTRICAL
ABBREVATION AND NOTES
JRJ
ADJ
SLC
RYK
4/2026 ISSUE FOR BID 0
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
SUBCONSULTANT:
D
FI
LE
PL
O
TT
ED
Gaithersburg, Maryland Black & Veatch Corporation
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
WIL84530
Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K. KAMDEM ON APRIL 23, 2026, A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND (LICENSE NUMBER AND EXPIRATION DATE BELOW).
THIS DRAWING IS PROVIDED AS COURTESY; THE ORIGINAL, SIGNED BID DRAWINGS GOVERN.
WIL84530
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
9\
E-
-0
.D W
G 4/
/2
1:
:2
TREATMENT PLANT
IMPROVEMENTS
419612
ISSUED FOR BID
MAY 2026
E-01-002
GENERAL
ELECTRICAL
DEMOLITION POWER
DISTRIBUTION
FUNCTIONAL DIAGRAM
JRJ
ADJ
SLC
RYK
4/2023 ISSUE FOR BID0
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
SUBCONSULTANT:
D
FI
LE
PL
O
TT
ED
Gaithersburg, Maryland Black & Veatch Corporation
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
G
G
3P -2
A
1 2
SHEET KEYNOTES
GENERAL SHEET NOTES
1. REFER TO E-00-001 AND E-00-002 FOR LEGEND,
ABBREVIATIONS AND NOTES
1. EXISTING BREAKER LABEL INDICATES "RETURN SLUDGE
PUMPS". AFTER DEMOLITION OF DOWNSTREAM EQUIPMENT,
BREAKER SHALL BE PROVIDED WITH NEW LABEL, INDICATING
"SPARE".
2. EXISTING BREAKER LABEL INDICATES "KLOCKNER MOELLER
MCC"
3. CABLE TO THE PRIMARY FUSED SWITCH SHALL BE
DISCONNECTED AND PRESERVED FOR REUSE.
4. PNL-OZA TO BE DEMOLISHED, AND EXISTING BRANCH
CIRCUITS SHALL BE MAINTAINED FOR REUSE.
13.8KV, 3Ø PRIMARY SERVICE
FROM UTILITY WEST TERMINAL POLE
100E 40E
AC
TI
VA
TE
S
LU
D G
E
PU
M P
ST
AT
IO
N
150E 50E 40E 150E100E
KK KK KK KK KK
DS-2 DS-3A
DS-2A DS-3
KV
A, Ø
.8
KV
-4
/2
V
LR
1200AF
1200ATAS-MCC-1
800AF
800AT
800AF
800AT
ADMIN BUILDING
KV
A
(A A)
/2
0K
VA
(F A)
, 3 Ø
.8
KV
-4
/2
V
L.A.
150E
2000AF
2000AT
SECONDARY
SUBSTATION USOP
400AF
400AT
1200AF
1200AT
KV
A
(A A)
/2
0K
VA
(F A)
3Ø
.8
KV
-4
/2
V
L.A.
150E
2000AF
2000AT
SUBSTATION USOZ
400AF
400AT
600AF
600AT
800AF
800AT
NR-PP-1
0K
VA
, 3
Ø
.8
KV
-4
/2
V
PELLETIZER
600AF
600AT
PANELBOARD
PPDGA
0K
VA
(A
A) /1
0K
VA
(F
A) , 3
Ø
.8
KV
-4
/2
V
L.A.
150E
GENERATOR
500KW, 480V
EXISTING
ATS-USPC
480V, 1200A
800AF
700AT
1200AF
1200AT
SUBTATION
USPC
600AF
600AT
800AF
800AT
BR-MCC-1BR-MCC-2
GARAGE
800AF
800AT
GENERATOR
750KW, 480V
ATS
480V 800A
1000AT
1200AF
SWBD-EGEN
800AT
1200AF
1000AT
1200AF
MCC-OPPP-AMCC-RSP
400AF
400AT
1200AF
1200AT
MCC-OZONE MCC-AERATOR PNL-OZA
800AF
800AT
600AF
600AT
400AF
400AT
400AF
400AT
400AF
400AT
MCC
SECTION 2
MCC
SECTION 1
AT
S-
U V
M C
C -E
N R
PA
N
EL
H
P
SWBD-USOP 2000A, 3Ø, 4W
400AF
400AT
PNL-OPA
400AF
400AT
EXISTING
MAIN BREAKER
SWBD-USOZ 2000A, 3Ø, 4W
600AF
600AT
MCC-OZA
600AF
600AT
13.8KV, 3Ø PRIMARY SERVICE
FROM UTILITY EAST TERMINAL POLE
2000A USOP
GENERATOR SWITCH
2000A USOZ
GENERATOR SWITCH
400AF
400AT
PANEL OPB MCC-OPPP-B
XFMR-OPA
PANEL OPBBR PANEL OPBBL
XFMR-OPBB PNL-OPAA
(SECTION 1)
PNL-OPAA
(SECTION 2)
PNL-OPAA
(SECTION 3)
400AF
400AT
1600A SWBD
100AF
100AT
PUMP STATION #4
200AF
200AT
PANEL PCB
200AF
200AT
PANEL TCA
PANEL OZAA-R
TX-OZAA
PANEL OZAA-L
DS-1
1600A, 3PH, 4W
800AF
800AT
MCC-OPFP
JB PANEL OPEE
WIL84530
Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K. KAMDEM ON APRIL 23, 2026, A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND (LICENSE NUMBER AND EXPIRATION DATE BELOW).
THIS DRAWING IS PROVIDED AS COURTESY; THE ORIGINAL, SIGNED BID DRAWINGS GOVERN.
WIL84530
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
9\
E-
-0
.D W
G 4/
/2
1:
:1
TREATMENT PLANT
IMPROVEMENTS
419612
ISSUED FOR BID
MAY 2026
E-01-003
GENERAL
ELECTRICAL
POWER DISTRIBUTION
FUNCTIONAL DIAGRAM
JRJ
ADJ
SLC
RYK
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
SUBCONSULTANT:
D
FI
LE
PL
O
TT
ED
Gaithersburg, Maryland Black & Veatch Corporation
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
100E 40E
AC
TI
VA
TE
S
LU
D G
E
PU
M P
ST
AT
IO
N
150E 50E 40E 150E100E
KK KK KK KK KK
EXISTING DS-1 EXISTING DS-2 EXISTING DS-3A
EXISTING DS-2A EXISTING DS-3
KV
A, Ø
.8
KV
-4
/2
V
LR
1200AF
1200ATEXISTING
AS-MCC-1
800AF
800AT
800AF
800AT
ADMIN BUILDING
TX
-U
SO
P
KV
A
(A A)
/2
0K
VA
(F A)
, 3 Ø
.8
KV
-4
/2
V
L.A. 200E
PRIMARY FUSED SWITCH
PRI-USOP
2000AF
2000AT
SECONDARY
SUBSTATION USOP
400AF
400AT
1200AF
1200AT
MCC-OPPP-A
TX
-U
SO
Z
KV
A
(A A)
/2
0K
VA
(F A)
, 3 Ø
.8
KV
-4
/2
V
L.A. 200E
PRIMARY FUSED SWITCH
PRI-USOZ
2000AF
2000AT
SUBSTATION USOZ
400AF
400AT
250AF
250AT
600AF
600AT
800AF
250AT
MCC-OZONE MCC-AERATOR PP-OZA EXISTING
PANEL-HP
PP-OPA
EXISTING
NR-PP-1
0K
VA
, 3
Ø
.8
KV
-4
/2
V
PELLETIZER
600AF
600AT
EXISTING
PANELBOARD
PPDGA
TX
-U
SP
C
0K
VA
(A
A) /1
0K
VA
(F
A) , 3
Ø
.8
KV
-4
/2
V
L.A. 100E
PRIMARY FUSED SWITCH
PRI-USPC
G GENERATOR
500KW, 480V
EXISTING
ATS-USPC
480V, 1200A
800AF
700AT
1200AF
1200AT
SUBTATION
USPC
600AF
600AT
800AF
800AT
EXISTING
BR-MCC-1
EXISTING
BR-MCC-2
GARAGE
200AF
200AT
EXISTING
PANEL TCA
200AF
200AT
EXISTING
PANEL PCB
100AF
100AT
EXISTING
PUMP STATION #4
400AF
400AT
1200AF
1200AT
250AF
250AT
600AF
600AT
400AF
400AT
800AF
800AT
MCC-OPFP
G
EXISTING
GENERATOR
750KW, 480V
EXISTING
ATS-OPFP
480V 800A
1000AT
1200AF
800AF
700AT
EXISTING
SWBD-EGEN
800AT
1200AF
1000AT
1200AF
400AF
400AT
400AF
400AT
EXISTING
MCC-ENR
EXISTING
ATS-UV
EXISTING SWBD-USOP 2000A, 3Ø, 4W
400AF
400AT
SP
AR
E
EXISTING
MAIN BREAKER
SWBD-USPC
EXISTING SWBD-USOZ
1. REFER TO E-00-001 AND E-00-002 FOR LEGEND,
ABBREVIATIONS AND NOTES
1. EXISTING CABLE TO PRIMARY FUSED SWITCH TO BE
REUSED AND TERMINATED ON NEW SWITCH. ANY CHANGES
TO THE CABLE OR CONDUIT, IF REQUIRED, TO FACILITATE
THE INSTALLATION OF THE NEW SWITCH SHALL BE
PROVIDED. CABLE AND CONDUIT TYPE AND SIZE SHALL
MATCH EXISTING INSTALLATION.
2. FLEX BRAIDED CABLE SHALL BE INSTALLED ON SECONDARY
OF TRANSFORMER AS REQUIRED TO PROVIDE CONNECTION
TO DOWNSTREAM EQUIPMENT. REFER TO SPECIFICATION
26 05 11 FOR REQUIREMENTS OF CABLE.
3. BOND SECONDARY OF UNIT SUBSTATION TRANSFORMER
WITH TWO #4/0 GND TO EXISTING BUILDING GROUND
SYSTEM. IF EXISTING BUILDING GROUND SYSTEM IS UNABLE
TO BE IDENTIFIED, INSTALL GROUND ROD ON EXTERIOR OF
BUILDING AND BOND TRANSFORMER TO GROUND ROD.
4. FLOOR MOUNTED JUNCTION BOXES SHALL SERVE AS A
SPLICE POINT BETWEEN NEW AND EXISTING CABLE. FLOOR
MOUNTED JUNCTION BOXES SHALL BE INSTALLED IN THE
SAME LOCATION AS THE DEMOLISHED MCC SECTION 1 AND
MCC SECTION 2.
13.8KV, 3Ø PRIMARY SERVICE
FROM UTILITY WEST TERMINAL POLE
13.8KV, 3Ø PRIMARY SERVICE
FROM UTILITY EAST TERMINAL POLE
2000A USOP
GENERATOR SWITCH
2000A USOZ
GENERATOR SWITCH
4 4 4
PANEL OZAA-R
TX-OZAA
PANEL OZAA-L
200A
PP-HW
PP-CH MCC-OPPP-B
XFMR-OPA
PNL-OPAA
(SECTION 1)
PNL-OPAA
(SECTION 2)
PNL-OPAA
(SECTION 3)
400AF
400AT
PANEL OPB
PANEL-OPBBR PANEL-OPBBL
XFMR-OPBB
400AF
400AT
SHEET KEYNOTES
GENERAL SHEET NOTES
PANEL-OPEE
WIL84530
Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K. KAMDEM ON APRIL 23, 2026, A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND (LICENSE NUMBER AND EXPIRATION DATE BELOW).
THIS DRAWING IS PROVIDED AS COURTESY; THE ORIGINAL, SIGNED BID DRAWINGS GOVERN.
WIL84530
118.0141°
X
X
118.0141°118.0141°
NOTE
NOTENOTE
NOTE
NOTE MLEADER STYLE : IB-GEN
MLEADER STYLE : IB-LDR-SQUIGGLEMLEADER STYLE : IB-LDR-AREA-ARROW
MLEADER STYLE : IB-LDR-DBL-ARROWMLEADER STYLE : IB-LDR-LOOP
MLEADER STYLE : IB-DET
BLOCK NAME : EL_FULL_ML.erasel
FINAL
CLARIFIER
NO. 6
FINAL
CLARIFIER
NO. 5
PRIMARY
CLARIFIER
NO. 2
PRIMARY
CLARIFIER
NO. 1
BIOLOGICAL
SLUDGE
HOLDING
TANK NO.2
BIOLOGICAL
SLUDGE
HOLDING
TANK NO.1
PELLETIZER
BUILDING
GARAGE
UTILITIES
DEPARTMENT
OFFICE
FINAL
CLARIFIER TANK
NO. 4
EQUALIZATION TANK
BNR BASINS
ENGINE GENERATOR
ENGINE
GENERATOR
DIGESTER BUILDING STORMWATER
PUMP STATION
OUTFALL STRUCTURE
METHANOL
FEED FACILITY
DENITRIFICATION
FILTERS
FINAL
CLARIFIER
NO. 1
FINAL
CLARIFIER
NO. 2
BLENDING
TANK
NO. 2
PUMP STATION
(NOT IN USE)
OXYGEN AERATION BASINS BLENDING
TANK
NO. 1
FERMENTER
(NOT IN USE)
PRIMARY
SLUDGE
HOLDING
TANK
(NOT IN USE)
MIXING
TANK
(NOT IN USE)
UTILITY WATER
STORAGE TANK
(NOT IN USE) (NOT IN USE)
(NOT IN USE)
(NOT IN USE)
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
9\
E-
-1
.D W
G 4/
/2
2:
:5
TREATMENT PLANT
IMPROVEMENTS
419612
ISSUED FOR BID
MAY 2026
E-01-101
SITE PLAN
ELECTRICAL
OVERALL SITE PLAN
JRJ
DMF
SLC
RYK
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
SUBCONSULTANT:
D
FI
LE
PL
O
TT
ED
Gaithersburg, Maryland Black & Veatch Corporation
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
25'50' 0 50' 100'
1"=50'
OPERATIONS
BUILDING
BNR
CONTROL
BUILDING
IN-PLANT PUMP STATION
HEADWORKS
OXYGEN/OZONE
BUILDING
OVERALL SITE PLAN
1" = 50'-0"
E-01-601
CHEMICAL BUILDING
E
E
E
E
GENERAL SHEET NOTES
EXISTING
MANHOLE EMH-2
EXISTING LIGHT
POLE
ABOVEGROUND WALL
MOUNTED PULL BOX
SHEET KEYNOTES
1. DUE TO SITE GRADING, EXISTING LIGHT POLE REQUIRES
TEMPORARY REMOVAL AND REINSTALLATION IN THE SAME
LOCATION. EXTEND CABLE AND CONDUIT AS REQUIRED FOR
REINSTALLATION. SPLICING CABLE ACCEPTABLE.
2. DUE TO SITE GRADING, MANHOLE REQUIRES EXTENSION TO
COVER.
3. BOND #4/0 GROUND IN DUCT BANK TO OPERATIONS
BUILDING EXISTING GROUND RING. IF EXISTING GROUND
RING IS NOT FOUND, TWO GROUND RODS SHALL BE
INSTALLED A MINIMUM OF 10FT APART CONNECTED WITH A
#4/0 GROUND CONDUCTOR. ONE OF THE GROUND RODS
SHALL BE FURNISHED WITH A GROUND TEST STATION AS
DETAILED.
4. TWO #4/0 GROUND CONDUCTORS REQUIRED FROM EXISTING
(OR NEW) GROUND RING TO ELECTRICAL ROOM 1 AND
ELECTRICAL ROOM 2 GROUND BAR. ELECTRICAL ROOM 1
AND ELECTRICAL ROOM 2 DEPICTED ON E-61-103.
5. HANDHOLE INSTALLED ADJACENT TO ROADWAY EXTENSION
TO CHEMICAL BUILDING SUCH THAT THE DUCT BANK TO THE
CHEMICAL BUILDING AVOIDS THE BACKFLOW PREVENTER.
6. CHEMICAL BUILDING BACKFLOW PREVENTER NOT SHOWN.
REFER TO CIVIL YARD PIPING ENLARGED PLANS. DUCT BANK
FROM CHEMICAL BUILDING TO BACKFLOW PREVENTER
REQUIRED, REFER TO CHEMICAL BUILDING POWER PLAN
FOR DUCT BANK REQUIREMENTS. GFCI/WP RECEPTACLE
REQUIRED TO BE INSTALLED WITHIN BACKFLOW PREVENTER
ENCLOSURE.
7. EXISTING DUCT BANK DEMOLISHED LOCATED IN CHEMICAL
BUILDING FOOTPRINT. NEW DUCT BANK INSTALLED AS
SHOWN, AND NEW CABLE SHALL BE SPLICED TO EXISTING
AT ENDPOINTS SHOWN.
1. REFER TO E-00-001 AND E-00-002 FOR LEGEND,
ABBREVIATIONS AND NOTES.
E E E
E-01-601
E-01-601
ACTIVATED SLUDGE
PUMPING STATION
E E
E
E
E
E
E-01-601
3 4
E
E E
EXISTING
ABOVEGROUND
PULLBOX
(1)2" 3#4,#10G
(1)2" SPARE
EXISTING
UNDERGROUND PULLBOX
E
HANDHOLE
HH-1
E-01-401
ENLARGED PLAN
AREA 1
E E E
E
OPERATIONS OFFICE
(OLD LAB BUILDING)
E-01-601
ABOVE GROUND
WALL MOUNTED
PULL BOX
E-01-402
ENLARGED PLAN
AREA 2
WIL84530
Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K. KAMDEM ON APRIL 23, 2026, A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND (LICENSE NUMBER AND EXPIRATION DATE BELOW).
THIS DRAWING IS PROVIDED AS COURTESY; THE ORIGINAL, SIGNED BID DRAWINGS GOVERN.
WIL84530
BNR BASINS
FINAL
CLARIFIER
NO. 6
FINAL
CLARIFIER
NO. 5
PRIMARY
CLARIFIER
NO. 2
PRIMARY
CLARIFIER
NO. 1
BNR
CONTROL
BUILDING
ENGINE
GENERATOR
OXYGEN AERATION BASINS
IN-PLANT
PUMP STATION
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
9\
E-
-4
.D W
G 4/
/2
2:
:5
TREATMENT PLANT
IMPROVEMENTS
419612
ISSUED FOR BID
MAY 2026
E-01-401
ENLARGED SITE PLAN
ELECTRICAL
AREA 1
JRJ
DMF
SLC
RYK
40'20' 10' 20'0
1"=20'
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
SUBCONSULTANT:
D
FI
LE
PL
O
TT
ED
Gaithersburg, Maryland Black & Veatch Corporation
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
M
AT
C H
L
IN
E
- S
EE
D
W G
E-
-4
ENLARGED PLAN - AREA 11
1" = 20'-0"
GENERAL SHEET NOTES
SHEET KEYNOTES
1. REFER TO E-00-001 AND E-00-002 FOR
LEGEND, ABBREVIATIONS AND
NOTES.
HEADWORKS
1E-01-601
E E
E
EAIT-050AE-050
ELECTRIC
MANHOLE EMH-1
LP-HW
LT-HW
PP-HW
11-WF-001
STARTER
5' 3' 0 5' 10'
1"=5'
OCF-105
STARTER
E-01-601
E-01-601
1. EQUIPMENT RACK SHALL BE LOCATED A
MINIMUM OF 10FT FROM ALL HEADWORKS
EQUIPMENT, INCLUDEING GRIT CLASSIFIER
AND DUMPSTER. REFER TO TYPICAL
EQUIPMENT MOUNTING DETAIL FOR
INSTALLATION OF EQUIPMENT.
2. INSTALL SPLASH BLOCK ADJACENT TO
EXISTING ROADWAY CURB. SEE DETAIL
FOR ADDITIONAL INFORMATION.
3. INSTALL PULL BOX UNDERNEATH
EQUIPMENT RACK FOR CONDUIT
REQUIRED TO TERMINATE AT EQUIPMENT
ON RACK.
4. CONCRETE PAD INSTALLED UNDER
EQUIPMENT RACK. REFER TO EXTERIOR
EQUIPMENT PAD DETAIL ON STRUCTURAL
MISCELLANEOUS DETAILS SHEET.
5. BOND #4/0 GND IN DUCT BANK TO EXISTING
BUILDING GROUND RING. IF EXISTING
GROUND RING IS NOT FOUND BOND #4/0
GROUND TO ABOVEGROUND PULLBOX.
5E-01-601
MANHOLE EMH-1
SUMP PUMP
DISCONNECT
UNDERGROUND 2"
PVC PIPE FOR
MANHOLE SUMP
PUMP DRAIN
SPLASH BLOCK
6E-01-601
E
E
E
E
E
E
E
E E
E
E
E
EE
E E
E
E
E
ENLARGED VIEW - DETAIL-A2
1" = 5'-0"
ENLARGED PLAN
DATAIL-A
LAB-SCADA-FOPP
ABOVE GROUND
WALL MOUNTED
PULL BOX
E FOR CONTINUATION
SEE DRAWING
E-01-101
E-01-601
E
#4/0 GND
OPERATIONS OFFICE
(OLD LAB BUILDING)
AERATOR #11 AERATOR #12 AERATOR #13 AERATOR #15
AERATOR #14
AERATOR #6 AERATOR #7 AERATOR #8 AERATOR #10
PURGE
BLOWER #5
AERATOR #9PURGE BLOWER #4
AERATOR #1
PURGE BLOWER #1
AERATOR #2 AERATOR #3
AERATOR #5
PURGE BLOWER #2 PURGE
BLOWER #3
AERATOR #4
WIL84530
Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K. KAMDEM ON APRIL 23, 2026, A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND (LICENSE NUMBER AND EXPIRATION DATE BELOW).
THIS DRAWING IS PROVIDED AS COURTESY; THE ORIGINAL, SIGNED BID DRAWINGS GOVERN.
WIL84530
488.7
GPS-
RBC
490.0
GPS-
MAG
488.3
GPS-
RBC
495.13
GPS-XMARK
488.7
GPS-
RBC
BIOLOGICAL
SLUDGE
HOLDING
TANK NO.2
BIOLOGICAL
SLUDGE
HOLDING
TANK NO.1
OPERATIONS
BUILDING
PELLETIZER
BUILDING
GARAGE
BLENDING
TANK
NO. 1
FERMENTER
(NOT IN USE)
PRIMARY
SLUDGE
HOLDING
TANK
(NOT IN USE)
MIXING
TANK
(NOT IN USE)
STORMWATER
DIGESTER
BUILDING
ENGINE
GENERATOR
9.3%
42.5 LF
E
E
E
E
E
E
E
E
E E
E
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
9\
E-
-4
.D W
G 4/
/2
2:
:1
TREATMENT PLANT
IMPROVEMENTS
419612
ISSUED FOR BID
MAY 2026
E-01-402
ENLARGED SITE PLAN
ELECTRICAL
AREA 2
JRJ
DMF
SLC
RYK
40'20' 10' 20'0
1"=20'
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
SUBCONSULTANT:
D
FI
LE
PL
O
TT
ED
Gaithersburg, Maryland Black & Veatch Corporation
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
ENLARGED PLAN - AREA 22
1" = 20'-0"
GENERAL SHEET NOTES
(1)2" 3#4,#10G
(1)2" SPARE
CHEMICAL
BUILDING
EXISTING
ABOVEGROUND
PULLBOX
HANDHOLE
HH-1
EXISTING LIGHT POLE
ABOVEGROUND WALL
MOUNTED PULL BOX
EXISTING
MANHOLE EMH-2
E-01-601
M
AT
C H
L
IN
E
- S
EE
D
W G
E-
-4
1. REFER TO E-00-001 AND E-00-002 FOR
LEGEND, ABBREVIATIONS AND
NOTES.
E-01-601
E-01-601
BACKFLOW
PREVENTER
ENCLOSURE
WIL84530
Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K. KAMDEM ON APRIL 23, 2026, A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND (LICENSE NUMBER AND EXPIRATION DATE BELOW).
THIS DRAWING IS PROVIDED AS COURTESY; THE ORIGINAL, SIGNED BID DRAWINGS GOVERN.
WIL84530
1 EX
EX EX
EX EX EX
EXEXEX3
EX EX EX EX
1 EX
EX
EX EX
EXEXEX3
EX EX EX EX
DUCT BANK SCHEDULE
NO SCALE
4 7
8 11
141296
36 37 B B
A
4 7
8 11
141296
36 37 B B
7 10
8 11
141296
B B
39 18
20 26
34332221
A A 41 35
29 B
30 A
A31
A32
#4/0 GND (TYP)
DUCT BANK SCHEDULE
COND.
NO. SIZE CIRCUIT NUMBER REMARKS
A 2" EMPTY CONDUIT WITH PULLSTRING - -
B 3" EMPTY CONDUIT WITH PULLSTRING - -
1 3" BRM1-2, BRM1-5 EXISTING CONDUIT (NOTE 2) C
2 2" BRM1-3, BRM1-6 EXISTING CONDUIT (NOTE 2) C
3 2" BRM1-1, BRM1-4 EXISTING CONDUIT (NOTE 2) C
4 3" BRM2-1 BR-MCC-2 TO PP-HW P
5 3"
SCR021-1,SCR021-4,SCR021-5,SCR021-6,SCR0
21-7,SCR021-9,SCR021-10,SCR021-11,SCR021-
SEW-SCR-021-CP TO HEADWORKS
C
6 2" SCR021-2,SCR022-2 SCREENS CP TO HEADWORKS A
7 2" SCR021-3,SCR021-8 SEW-SCR-021-CP TO HEADWORKS P
8 2" SCR021-13 SEW-SCR-021-CP TO HEADWORKS P
9 3"
SCR022-1,SCR022-4,SCR022-5,SCR022-6,SCR0
22-7,SCR022-9,SCR022-10,SCR022-11,SCR022-
SEW-SCR-022-CP TO HEADWORKS
C
10 2" SCR022-3,SCR022-3A,SCR022-8,SCR021-8A SEW-SCR-022-CP TO HEADWORKS P
11 2" SCR022-13 SEW-SCR-022-CP TO HEADWORKS P
12 2" FPSPHW-1 FIRE ALARM PANEL TO HEADWORKS C
13 3"
PLC3-1,PLC3-2,PLC3-3,PLC3-4,PLC3-5,PLC3-
6,PLC3-10,PLC3-11,PLC3-12,PLC3-15,PLC3-1
6,PLC3-18
PLC3 TO HEADWORKS
C
14 2" FPSPHW-4,FPSPHW-5 FPSP-HW TO HEADWORKS A
15 2" PPHW-1,PPHW-2 PP-HW TO HEADWORKS P
16 2" PPHW-3,PPHW-4 PP-HW TO HEADWORKS P
17 2" SCR021-3B, SCR021-3C SEW-SCR-021-CP TO HEADWORKS P
18 2" PPHW-7A,PPHW-9A PP-HW TO HEADWORKS P
19 2" PPHW-7B,PPHW-7D,PPHW-9B EF AND OCF TO HEADWORKS C
20 2" PPHW-8 MAU TO HEADWORKS P
21 2" PPHW-11,PPHW-12 PP-HW TO HEADWORKS P
22 2" PPHW-13 PP-HW TO HEADWORKS P
23 3"
PLC3-1,PLC3-2,PLC3-3,PLC3-4,PLC3-5,PLC3-
6,PLC3-11,FPSPHW-2,FPSPHW-3,PLC3-18
PLC3 TO HEADWORKS
C
24 2" LPHW-1,LPHW-2,LPHW-3 LP-HW TO HEADWORKS P
25 2" LPHW-4,LPHW-5,LPHW-6 LP-HW TO HEADWORKS P
26 2" LPHW-7,LPHW-8,LPHW-9 LP-HW TO HEADWORKS P
27 2" LPHW-10,LPHW-11 LP-HW TO HEADWORKS P
28 2" LPHW-13 LP-HW TO EMH-1 P
29 3" MOPPPB-27 MCC-OPPPB TO PP-CH P
30 2" PLC5-10 PLC5 TO OPPERATIONS BUILDING C
31 2" PLC5-11 PLC5 TO OPPERATIONS BUILDING C
32 2" LPCH-4 CHEM BLDG TO BACKFLOW PREVENTER P
33 2" LPHW-12,LPHW-14 LP-HW TO HEADWORKS P
34 2" LPHW-16,LPHW-20 LP-HW TO HEADWORKS P
35 2" LPHW-19,LPHW-21 LP-HW TO HEADWORKS P
36 2" SCRO22-6A HEADWORKS TO BNR FO
37 2" SCRO21-6A HEADWORKS TO BNR FO
38 2" SCR022-3B, SCR022-3C SEW-SCR-022-CP TO HEADWORKS P
39 2" LPHW-22, LPHW-23 LP-HW TO HEADWORKS P
40 2" PLC5-14 PLC5 TO OPERATIONS OFFICE C
41 2" LPHW-24,LPHW-25,LPHW-26 LP-HW TO HEADWORKS P
SECTION3
NO SCALE
SECTION4
NO SCALE
SECTION1
NO SCALE
A
A
A
A
36 37
A
A
SECTION5
NO SCALE
SECTION6
NO SCALE
SECTION2
NO SCALE
SECTION7
NO SCALE
A40
SECTION8
NO SCALE
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
9\
E-
-6
.D W
G 4/
/2
2:
:0
TREATMENT PLANT
IMPROVEMENTS
419612
ISSUED FOR BID
MAY 2026
E-01-601
SITE LAN
ELECTRICAL
DUCT BANK SCHEDULE
AND SECTIONS
JRJ
IDM
SLC
RYK
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
SUBCONSULTANT:
D
FI
LE
PL
O
TT
ED
Gaithersburg, Maryland Black & Veatch Corporation
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
GENERAL SHEET NOTES
1. REFER TO E-00-001 AND E-00-002 FOR LEGEND,
ABBREVIATIONS AND NOTES.
2. EXISTING DUCT BANK INCLUDES CIRCUITS FOR ALL
IN-PLANT PUMPS. CONTRACTOR ONLY TO REPLACE
EXISTING CONTROL CABLE ASSOCIATED WITH PUMPS 1
AND 3 AS SHOWN ON ONE-LINE DIAGRAM. EXISTING CABLE
WITHIN DUCT BANK TO BE REMOVED AND REINSTALLED TO
FACILITATE INSTALLATION OF NEW CABLE.
WIL84530
Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K. KAMDEM ON APRIL 23, 2026, A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND (LICENSE NUMBER AND EXPIRATION DATE BELOW).
THIS DRAWING IS PROVIDED AS COURTESY; THE ORIGINAL, SIGNED BID DRAWINGS GOVERN.
WIL84530
EP
D
S
TT
T
T
PDS
P
D S
E E
SEW-SG-023
SEW-SG-021
11-EUH-001
11-EUH-003
11-EUH-004
11-EUH-002
LE-021B
SEW-SCR-021-LCP
SEW-SCR-022-LCP
LE-022B
LDIT-022
LSH-022
LE-022A
11-MAU-001
GROUND ROD
#4/0 GND TO BUILDING
LIGHTNING PROTECTION
SYSTEM
#4/0 GND
FOR CONTINUATION,
SEE DRAWING E-01-101
ABOVE GROUND WALL
MOUNTED PULLBOX
GROUND ROD
W/TEST WELL
LDIT-021
LE-021A
LSH-021
11-EF-001 HEAT TRACE
CONTROL PANEL
HT-HW2
#4/0 GND TO
BUILDING STEEL
(TYP OF 3)
AREA TYPE 7B
(NOTE 3)
AREA TYPE 7B
(NOTE 2)
#4/0 GND TO EQUIPMENT RACK
#4/0 GND TO PP-HW
#8 GND TO TX-HW
E-01-601
COMPOSITE
SAMPLER
11-EUH-001
DISCONNECT
SEW-SG-021
DISCONNECT
GO/NO
GO LIGHTS 3
SEW-SG-025
AV ALARM 3
11-EUH-002
DISCONNECT
SEW-SG-025
DISCONNECT
SEW-SG-023
DISCONNECT
11-EUH-003
DISCONNECT
GRT-GRV-052
11-EUH-004
DISCONNECT
SEW-SG-024
SEW-SG-024
DISCONNECT
SEW-SCR-026
SEW-SG-026
DISCONNECT
SEW-SG-022
DISCONNECT
11-EUH-005
DISCONNECT
ODOR CONTROL FAN
DISCONNECT
PDSL-105
VSH-105
11-EUH-006
DISCONNECT
ODOR CONTROL FAN
OCF-105
SCR-DWS-021
SCR-DWS-022
SEW-SCR-MTR-021A
DISCONNECT SCR-DWS-031
DISCONNECT
SEW-SCR-MTR-022A
DISCONNECT SCR-DWS-032
DISCONNECT
GRT-GRV-051
AV ALARM3
NPW-STRB-023
NPW-VBM-023
LSH-020
AIT-021
AIT-022
11-PDS-002
11-CD-001
11-PDS-001
AV ALARM3
AREA TYPE 7B
(NOTE 3)
AREA TYPE 7B
(NOTE 3)
HEAT TRACE
CONTROL PANEL
HT-HW1
LCS-022B
AE-021
MOTOR SPACE HEATER
PSL-021
NPW-VBM-021SEW-SCR-MTR-021A
MOTOR SPACE HEATER
LCS-021B
PDIT-023
NPW-STR-023-LCP
MOTOR SPACE HEATER
AE-022
SEW-SCR-MTR-022A
MOTOR SPACE
HEATER
MOTOR SPACE HEATER
NPW-STRB-024
NPW-VBM-024
NPW-VBM-022
PSL-022
MOTOR SPACE HEATER
NPW-STR-024-LCP
PDIT-024
SEW-SCR-MTR-021B
SEW-SCR-MTR-022B
SEW-SCR-MTR-021B
DISCONNECT
SEW-SCR-MTR-022B
DISCONNECT
SEW-SG-022
11-EF-001
DISCONNECT
11-MAU-001
DISCONNECT
1/2
D
0 OF
F
IL
E
0 1 2 4(SCALE BAR IS 4" AT FULL SCALE)
PROJECT NO.:
DESIGNED:
DETAILED:
CHECKED:
APPROVED:
DATE:
SUBCONSULTANT:
P L O
T T
E D
Black & Veatch Corporation Gaithersburg, Maryland
REVISIONS AND RECORD OF ISSUE
R E
V
IT
V E
R S
IO
N
A u to d e s k D o c s /4
H a g e rs to w n W
W T
P I m p ro v e m e n ts
-1
-H e a d w o rk s .r v t
/3
/2
:2 :4
P
M
E-11-101
HAGERSTOWN
WASTEWATER
TREATMENT PLANT
IMPROVEMENTS
OPERATING LEVEL PLAN
ELECTRICAL
HEADWORKS
419612
JRJ
MRP
SLC
RYK
1/4" = 1'-0"
OPERATING LEVEL - PLAN
GENERAL SHEET NOTES
1. REFER TO E-00-001 AND E-00-002 FOR LEGEND,
ABBREVIATIONS AND NOTES.
2. HEADWORKS FACILITY IS CLASS I DIVISION 2 PER NFPA 820
TABLE 5.2.2 ROW 2 LINE b. EXTENT OF CLASSIFIED AREA IS
THE ENTIRE ENCLOSED SPACE. ALL ELECTRICAL
INSTALLATION SHALL BE RATED FOR INSTALLATION IN THIS
AREA.
3. HEADWORKS EFFLUENT CHANNEL AND OUTDOOR
HEADWORKS EQUIPMENT IS CLASS I DIVISION 2 PER NFPA
820 5.2.2 ROW 2 LINE c. EXTENT OF CLASSIFIED AREA IS
WITHIN A 10FT ENVELOPE AROUND EQUIPMENT AND OPEN
CHANNEL. ALL ELECTRICAL INSTALLATION SHALL BE RATED
FOR INSTALLATION IN THIS AREA.
SHEET KEYNOTES
1/4" = 1'-0"
0'2'4' 4' 8'
1. PROVIDE BONDED CONNECTIONS IN THE SIZE AND
QUANTITY FROM THE GROUND RING TO THE LIGHTNING
PROTECTION SYSTEM AS REQUIRED BY THE LIGHTNING
PROTECTION DESIGN AS SPECIFIED IN 26 41 13.
2. NEW GROUND RING SHALL BE BONDED TO EXISTING
GROUND RING. IF EXISTING GROUND RING IS NOT FOUND,
AN ADDITIONAL GROUND ROD SHALL BE INSTALLED
LOCATED A MINIMUM OF 10 FEET FROM GROUND ROD
W/TEST WELL.
3. GO/NO GO LIGHTS, AV ALARMS AND ALL GAS DETECTION
EQUIPMENT (NOT SHOWN) SHALL BE PROVIDED AS
SPECIFIED IN 28 31 19.
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
MAY 2026
ISSUED FOR BID4/20260
ISSUED FOR BID
WIL84530
Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K. KAMDEM ON APRIL 23, 2026, A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND (LICENSE NUMBER AND EXPIRATION DATE BELOW).
THIS DRAWING IS PROVIDED AS COURTESY; THE ORIGINAL, SIGNED BID DRAWINGS GOVERN.
WIL84530
EP
D
S
TT
T
T
PDS
X P
X P
P D
S
A
B
C
D
F
10E10E
B
10E
E
10E
10E
B
A
A
11E
A
10E
WPI/GFI/XP
A B
E X
GFI/XP
GFI/XP
GFI/XP
WPI/GFI/XP
LP-HW-16 LP-HW-16
LP-HW-16
LP-HW-16
LP-HW-16
LP-HW-18
LP-HW-18
LP-HW-18
GFI/XP
LP-HW-12
WPI/GFI/XPWPI/GFI/XP
LP-HW-10LP-HW-9
WPI/GFI/XP
LP-HW-11
LP-HW-14
LP-HW-20
LP-HW-20
LP-HW-20
LP-HW-20
LP-HW-20
LP-HW-20
LP-HW-12
GFI/XP
AREA TYPE 7B
(NOTE 3)
AREA TYPE 7B
(NOTE 2)
L P
-H W
-1
PE
PE
PE
PE
PE
PE
LP-HW-7
WPI/GFI/XP
LP-HW-8
TANK HEATED
BLANKET TANK HEATED
BLANKET
1/2
D
0 OF
F
IL
E
0 1 2 4(SCALE BAR IS 4" AT FULL SCALE)
PROJECT NO.:
DESIGNED:
DETAILED:
CHECKED:
APPROVED:
DATE:
SUBCONSULTANT:
P L O
T T
E D
Black & Veatch Corporation Gaithersburg, Maryland
REVISIONS AND RECORD OF ISSUE
R E
V
IT
V E
R S
IO
N
A u to d e s k D o c s /4
H a g e rs to w n W
W T
P I m p ro v e m e n ts
-1
-H e a d w o rk s .r v t
/3
/2
:3 :4
P
M
E-11-102
HAGERSTOWN
WASTEWATER
TREATMENT PLANT
IMPROVEMENTS
LIGHTING & RECEPTACLE
PLAN
ELECTRICAL
HEADWORKS
419612
AWR
AWR
EMB
RYK
1/4" = 1'-0"
OPERATING LEVEL - LIGHTING & RECEPTACLE PLAN
GENERAL SHEET NOTES
1. SEE DRAWINGS E2-00-00-001 AND E2-00-00-002 FOR
ELECTRICAL LEGENDS & ABBREVIATIONS AND GENERAL
REQUIREMENTS.
2. HEADWORKS FACILITY IS CLASS I DIVISION 2 PER NFPA
820 TABLE 5.2.2 ROW 2 LINE b. EXTENT OF CLASSIFIED
AREA IS THE ENTIRE ENCLOSED SPACE. ALL ELECTRICAL
INSTALLATION SHALL BE RATED FOR INSTALLATION IN
THIS AREA.
3. HEADWORKS EFFLUENT CHANNEL IS CLASS I DIVISION 2
PER NFPA 820 5.2.2 ROW 2 LINE c. EXTENT OF CLASSIFIED
AREA IS WITHIN A 10FT ENVELOPE AROUND EQUIPMENT
AND OPEN CHANNEL. ALL ELECTRICAL INSTALLATION
SHALL BE RATED FOR INSTALLATION IN THIS AREA.
PENDENT MOUNT 17'
AFF (TYP OF 5)
WALL MOUNT 14' ABOVE
OPERATING LEVEL
(TYP OF 6)
WALL MOUNT 1'
ABOVE DOOR
WALL MOUNT 1'
ABOVE DOOR
COMPOSITE SAMPLER
TROUGH HEATED
BLANKET
TANK HEATED
BLANKET
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND
EXPIRATION DATE: _______________.
LICENSE NO.: _______________,
09/14/2027 51546
MAY 2026
ISSUED FOR BID4/20260
ISSUED FOR BID
WIL84530
Addition Text Box THIS DRAWING WAS ORIGINALLY SEALED BY ROLAND YANNICK K.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .