B08_Attachment_2_Drawings_REDW_204034_HQ_HVAC.pdf
PDF 7 MB Posted
- Attached to
- Repair/Replace HVAC at HQ/NOC, NPS-REDW
- Solicitation number
- 140P8425R0001
About this file
These are comprehensive architectural and engineering design drawings for rehabilitating the HVAC system at Redwood National Park Headquarters in Del Norte County, California. The 37-sheet drawing set includes detailed plans for mechanical, electrical, structural, and civil work, covering both first and second floor systems. Key components include installing new split system cooling units, energy recovery ventilation units, dedicated outside air systems, electric duct heaters, condensing units, and branch controllers. The drawings specify technical details such as equipment locations, electrical connections, piping routes, and structural modifications, with a focus on upgrading the existing HVAC infrastructure to improve building climate control and energy efficiency.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASIC DATA: BOUNDARY MAPS
PACIFIC WEST
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
OF
SHEET
DEPARTMENT OF THE INTERIOR
UNITED STATES
STATEREGION COUNTY
LOCATION WITHIN PARK
NAME OF PARK
TITLE OF DRAWING DRAWING NO.
PMIS/PKG NO.
QUALITY DESIGN CERTIFICATION
Prepared in Accordance with design
Development (Title I)
Drawing No.
Variance from Design Development (Title I)
Approved by Superintendent on
Date
OR
Construction Drawing Not Preceded by
Design Development (Title I)
OR
Project Manager Date
InitialDateREVISIONSheetMark
HEADQUARTERS
REDWOOD NATIONAL AND STATE PARKS
CALIFORNIAPACIFIC WEST DEL NORTE
FINAL CD
CALIFORNIA
ANDERSON HALLAS ARCHITECTS, PC
STRUCTURAL:
JVA, INC.
BOULDER, CO
80302
CIVIL:
OTAK
REDMOND, WA
98052
MECHANICAL / PUMBING:
360 ENGINEERING
GOLDEN, CO
80403
ELECTRICAL:
AE DESIGN
DENVER, CO
80202
PRIME / ARCH:
ANDERSON HALLAS, PC
GOLDEN, CO 80401
- 140P2019D0016
PMIS
/5
/2
8:
:3
A
M A ut od es k
D oc s:
//2
4-
N P
S R
E D
W P ar k
H Q
H V
A C
/2
4-
N
P S
R E
D W
H Q
_H V
A C
_v
_B
IM
0.
rv t
REHAB HVAC SYSTEM AT PARK HQ
1 37
204034
19549
204034
PROJECT LOCATION
REDWOOD NATIONAL PARK
PROJECT LOCATION
REHABILITATE HVAC SYSTEM AT PARK HEADQUARTERS
REDWOOD NATIONAL
AND STATE PARKS
REDWOOD
NATIONAL AND
STATE PARKS
ENLARGED AREA - CRESCENT CITY, CALIFORNIA EXTENTS OF REDWOOD NATIONAL AND STATE PARKS
1. DO NOT SCALE DRAWINGS.
2. ALL WORK TO BE PERFORMED TO APPLICABLE BUILDING CODES (IBC 2024 AND IEBC 2021).
3. ALL DIMENSIONS ARE TO FACE OF STRUCTURE OR WALL FACE UNLESS OTHERWISE NOTED.
ALL DIMENSIONS INDICATING REQUIRED CLEARANCES ARE TO FACE OF FINISH UNLESS
OTHERWISE NOTED.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE
CONTRACT DOCUMENTS, VERIFYING FIELD CONDITIONS AND DIMENSIONS, AND CONFIRMING
THAT THE WORK MAY BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH
CONSTRUCTION. CONTRACTOR SHALL NOTIFY C.O. IN WRITING OF ANY DISCREPANCY
WITHIN THE CONTRACT DOCUMENTS AND REQUEST CLARIFICATION PRIOR TO PROCEEDING
WITH DESIGN CONSTRUCTION.
5. SHOULD THERE BE ANY QUESTIONS CONCERNING THE CONTRACT DOCUMENTS, EXISTING
CONDITIONS, AND/OR DESIGN INTENT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
OBTAINING A CLARIFICATION FROM THE C.O. PRIOR TO PROCEEDING WITH THE WORK, OR
RELATED WORK IN QUESTION.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADVISING THE C.O. OF ALL ITEMS
REQUIRING A LONG LEAD TIME UPON NOTICE TO PROCEED THAT WILL AFFECT THE
SCHEDULE, AND SHALL SUBMIT ORDER CONFIRMATIONS AND DELIVERY DATES FOR THE
ITEMS IN QUESTION TO THE C.O.
7. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT ACCORDANCE
WITH THE MANUFACTURER'S RECOMMENDED SPECIFICATIONS, EXCEPT WHERE THE
CONTRACT DOCUMENTS ARE MORE STRINGENT. ANY MISCELLANEOUS ITEMS OR
MATERIALS NOT SPECIFICALLY NOTED, BUT REQUIRED FOR PROPER INSTALLATION SHALL
BE FURNISHED AND INSTALLED BY THE CONTRACTOR. THIS MAY INCLUDE MISCELLANEOUS
DRYWALL PATCHING. MATCHING ADJACENT ASSEMBLIES WILL BE REQUIRED. CONTRACTOR
TO QUANTIFY ESTIMATED QUANTITIES OF PATCH AND REPAIRS THAT WILL BE NECESSARY
BASED ON THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS.
8. THE CONTRACTOR SHALL FURNISH TO THE C.O. ALL WARRANTIES AND GUARANTEES
REQUIRED AT THE CONCLUSION OF THE PROJECT. ALL IDENTIFIED SELECTIVE
REMOVAL/DEMO ACTIVITIES SHALL BE EXECUTED IN A MANNER WHICH PROTECTS ALL
UNDERLYING MATERIALS AND EXISTING ADJACENT FINISHES.
9. CONTRACTOR TO VERIFY WITH C.O. PRIOR TO ANY SELECTIVE FINISHES DEMO IF ANY "ATTIC
STOCK" OR EXISTING FINISHES SURPLUS IS AVAILABLE, SPECIFICALLY RELATED TO THE
EXISTING SPLINED ACOUSTICAL CEILING AND INTERIOR PAINT. CEILING REPLACEMENT IS
NOT ANTICIPATED, THEREFORE PROTECTION OF THE EXISTING CEILING BY THE
CONTRACTOR DURING SELECTIVE DEMO AND INSTALLATION OF NEW EQUIPMENT IS
REQUIRED.
10. WHERE COLOR-MATCHING OF EXISTING INTERIOR PAINT IS REQUIRED FOR ANY
MISCELLANEOUS DRYWALL PATCHING/REPAIR, CONTRACTOR TO PAINT THE PATCH OR
REPAIR IN A MANNER WHERE THE PAINT COLOR AND SHEEN IS CONSISTENT WITH EXISTING,
ADJACENT PAINT, AND WHERE THE PAINT TOUCH-UP IS NOT RECOGNIZABLE. CONTRACTOR
SHOULD ASSUME THAT PAINT TOUCH UP IN SELECT AREAS MAY NEED TO EXTEND FROM
CORNER TO CORNER AND OR FLOOR TO CEILING, TO ENSURE THE WALL COLOR APPEARS
CONSISTENT.
GENERAL NOTES
ROOM
250 SF
A#.#
A#.#
FIRST FLOOR
100'-0"
KEY
NOTE
DOOR
NUMBER
ELEVATION
MARK
NORTH
ARROW
DETAIL
REFERENCE
BUILDING
SECTION
ROOM
TAG
SYMBOLS
B L D G
N O
R T H
B L
D G
N O
R T
H
BUILDING
NORTH ARROW
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF11
/8
/2
9:
:0
A
M A ut od es k
D oc s:
//2
4-
N P
S R
E D
W P ar k
H Q
H V
A C
/2
4-
N
P S
R E
D W
H Q
_H V
A C
_v
_B
IM
0.
rv t
G001
BC
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ
19549
204034
BC
CR/WS
11/08/2024 2 37
GENERAL NOTES AND
INDEX
GENERAL ABBREVIATIONS
**DISCLAIMER: DRAWINGS WERE DEVELOPED USING ASBUILT DRAWINGS PROVIDED BY NPS.
SHEET SUB SHEET TITLE OF SHEET
GENERAL
1 G000 COVER SHEET
2 G001 GENERAL NOTES AND INDEX
CIVIL
3 C100 DEMOLITION PLAN
4 C200 SITE PLAN
ARCHITECTURAL
5 A103 ROOF PLAN
6 A400 ROOF DETAILS
STRUCTURAL
7 S000 STRUCTURAL GENERAL NOTES
8 S001 ABBREVIATIONS, SYMBOLS, & DETAILS
9 S101 FOUNDATION & FIRST FLOOR PLAN
10 S102 SECOND FLOOR FRAMING PLAN
11 S103 ROOF FRAMING PLAN
MECHANICAL
12 M000 MECHANICAL LEGENDS AND NOTES
13 M101 MECHANICAL DEMO PLAN - FIRST FLOOR
14 M102 MECHANICAL DEMO PLAN - SECOND FLOOR
15 M111 MECHANICAL PLAN - FIRST FLOOR
16 M112 MECHANICAL PLAN - SECOND FLOOR
17 M121 MECHANICAL PIPING PLAN - FIRST FLOOR
18 M122 MECHANICAL PIPING PLAN - SECOND FLOOR
19 M400 MECHANICAL ENLARGED PLAN
20 M500 MECHANICAL DETAILS
21 M600 MECHANICAL SCHEDULES
22 M601 MECHANICAL SCHEDULES
23 M602 MECHANICAL SCHEDULES
24 M603 MECHANICAL SCHEDULES
25 M700 MECHANICAL CONTROLS
26 M701 MECHANICAL CONTROLS
27 M800 MECHANICAL CALCS AND TITLE 24
28 M801 MECHANICAL CALCS AND TITLE 24
29 M802 MECHANICAL CALCS AND TITLE 24
30 M900 MECHANICAL MISC/ 3D
ELECTRICAL
31 E000 ELECTRICAL COVER SHEET
32 ED01 ELECTRICAL DEMOLITION PLANS FIRST FLOOR
33 ED02 ELECTRICAL DEMOLITION PLANS SECOND FLOOR
34 E101 ELECTRICAL PLANS FIRST FLOOR
35 E102 ELECTRICAL PLANS SECOND FLOOR
36 E300 ELECTRICAL ONE-LINE DIAGRAM
37 E301 ELECTRICAL SCHEDULES
# POUND(S) or NUMBER
& AND
(S) SEALANT
(T) TEMPERED
< ANGLE
<E> EXISTING
<N> NEW
@ AT
A/V AUDIO VISUAL
ABA ARCHITECTURAL BARRIERS ACT
ABV ABOVE
ACM ASBESTOS CONTAINING MATERIAL
ACT ACOUSTICAL CEILING TILE
ADD ADDENDUM
ADJ ADJACENT or ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AL ALUMINUM
ALT ALTERNATE
APPROX APPROXIMATE(LY)
ARCH ARCHITECTURAL
ASPH ASPHALT
BC BASE CABINET
BLDG BUILDING
BLKG BLOCKING
BO BOTTOM OF
BR BACKER ROD
BTWN BETWEEN
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTBB CEMENTITIOUS TILE BACKER BOARD
CTR CENTER
DBL DOUBLE
DEMO DEMOLITION
DET DETAIL
DF DRINKING FOUNTAIN
DIAM DIAMETER
DIM DIMENSION
DN DOWN
DS DOWNSPOUT
E EAST
EA EACH
EG FOR EXAMPLE
ELEC ELECTRICAL
ELEV ELEVATION
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQP EQUIPMENT
ETR EXISTING TO REMAIN
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH(ED)
FIXT FIXTURE
FLR FLOOR(ING)
FO FACE OF
FP FIRE PROTECTION
FRP FIBERGLASS REINFORCED PANEL(ING)
FT FEET
FTG FOOTING
FURR FURRING
GA GAUGE OR GYPSUM ASSOCIATION
GALV GALVANIZED
GC GENERAL CONTRACTOR
GD GRADE
GL GLASS or GLAZING
GND GROUND
GRT GROUT
GWB GYPSUM WALLBOARD
HAZMAT HAZARDOUS MATERIAL
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING, VENTILATION and AIR CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
INCL INCLUDING
INFO INFORMATION
INS INSULATION or INSULATED
INT INTERIOR
JT JOINT
LAV LAVATORY
LIN LINOLEUM
LS LANDSCAPE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL and PLUMBING
MFG MANUFACTURING
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
N NORTH
NA NOT APPLICABLE
NH NONHALOGENATED
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OTE OPEN TO EXISTING
OTS OPEN TO STRUCTURE
OVH OVERHANG
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLUMB PLUMBING
PT PAINT
PTD PAINTED
PWD PLYWOOD
QT QUARRY TILE
RAD RADIUS
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE: REFER TO or REFERENCE
REINF REINFORCED
RELOC RELOCATED
REQ REQUIRED
REV REVISE, REVISED or REVISION
RM ROOM
RO ROUGH OPENING
RR RESTROOM(S)
RS ROUGH SAWN
S SOUTH
SCHED SCHEDULE
SF SQUARE FEET
SHTG SHEATHING
SIM SIMILAR
SOG SLAB ON GRADE
SPEC SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STN STAIN
STRUC STRUCTURE or STRUCTURAL
T&G TONGUE AND GROOVE
TD THRESHOLD
TO TOP OF
TYP TYPICAL
UC UPPER CABINET
UON UNLESS OTHERWISE NOTED
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VIN VINYL
VTR VENT THROUGH ROOF
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WIN WINDOW
OPTION 01 - STAIR ROOF STRUCTURE AND ROOFING MEMBRANE - REMOVE EXISTING ROOF
MEMBRANE, SHEATHING, AND CRIPPLE WALL FRAMING AS INDICATED AT EACH STAIR (FOUR
TOTAL). BUILD NEW CRIPPLE WALLS, ROOF JOISTS, AND SHEATHING WITH MINERAL WOOL
INSULATION, RIGID NH POLYISO INSULATION BOARD, TPO ROOFING AND ASSOCIATED METAL
FLASHINGS. PROVIDE NEW INSULATED ROOF HATCH WITH INTEGRAL LADDER AT EACH STAIR.
bcrowell Text Box "TPO" ROOFING NOTED HERE SHALL BE TPO OR PVC, TO MATCH TYPE, COLOR AND THICKNESS OF NEW ROOFING THROUGHOUT REMAINDER OF BUILDING. THE NEW ROOF ON REMAINDER OF BUILDING IS ANTICIPATED TO BE CONSTRUCTED IN 2025.
DESIGNED:
TECH REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
KK
AB
KK
11/08/2024
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ 37
204034
194549
LIC
EN
SE
D P
ROFESSIONAL ENGINEER
STATE OF CALIFORNIAC IV IL
KY
LE
DAVID CHILDERS68843 C100
DEMOLITION
PLAN
DESIGNED:
DATE:
SUB SHEET NO. TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
KK
AB
KK
11/08/2024
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ 37
204034
194549
LIC
EN
SE
D P
ROFESSIONAL ENGINEER
STATE OF CALIFORNIAC IV IL
KY
LE
DAVID CHILDERS68843 C200
SITE PLAN
4 5 76 8 9 10
B
E
F
H
1 2 3
G
C
+/- 14'-0"
NEW INSULATED ROOF
HATCH 36x36 MIN AND
INTEGRAL LADDER,
COORDINATE LOCATION
WITH MECH EQUIPMENT
BELOW, RE: STRUCT
NEW INSULATED ROOF
HATCH 36x36 MIN AND
INTEGRAL LADDER,
COORDINATE LOCATION
WITH MECH EQUIPMENT
BELOW, RE: STRUCT
M A
T C
H L
IN
E
M A
T C
H L
IN
E
R-1
R-1
<N> EXHAUST FAN
/4
+/- 14'-0"
/4 " 1
A400
A400
/4
M
IN
S L
O P
E
/4
O P
E
STAIR A STAIR BSTAIR A STAIR BSTAIR A STAIR B
11 12 13 14 15 16
B
E
F
H
G
C
<E> SOLAR PANELS, NIC
<E> SOLAR PANELS, NIC
<E> TELEPHONE
TOWER TO REMAIN
NEW INSULATED ROOF
HATCH 30x54 MIN AND
INTEGRAL LADDER,
COORDINATE LOCATION
WITH MECH EQUIP
BELOW, RE: STRUCT
M A
T C
H L
IN
E
M A
T C
H L
IN
E
R-1 R-1
+/- 14'-3 1/8"
/4
+/- 14'-0"
A400
A400
NEW INSULATED ROOF
HATCH 36x36 MIN AND
INTEGRAL LADDER,
COORDINATE LOCATION
WITH MECH EQUIPMENT
BELOW, RE: STRUCT <E> SOLAR PANELS, NIC
<E> SOLAR PANELS, NIC
/4
O P
E
/4
O P
E
STAIR C STAIR D
<E> ROOF ASSEMBLY TO REMAIN, PROTECT IN PLACE
OPTION 01: R-1, TPO ROOF ASSEMBLY
ROOF PLAN LEGEND
ROOF ASSEMBLY TYPES:
XR1
FULLY ADHERED TPO
MEMBRANE ROOF
COVER BOARD
RIGID BOARD NH POLYISO
INSULATION, R-20 MIN
<N> ROOF SHEATHING,
RE: STRUCTURAL
ROOF JOIST,
RE: STRUCTURAL
VAPOR RETARDER
N.T.S.
1. DRAWINGS WERE DEVELOPED USING AS-BUILT DRAWINGS PROVIDED BY NPS. VERIFY ALL
DIMENSIONS AND CONDITIONS IN FIELD.
2. REFER TO ALL DISCIPLINES FOR FULL SCOPE OF WORK.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL ELEMENTS/MATERIALS TO
REMAIN.
4. PATCH AND REPAIR IN-KIND ALL FINISHES IMPACTED BY CONSTRUCTION ACTIVITIES,
INCLUDING ANY ABANDONED PENETRATIONS.
5. IF OPTION 01 IS NOT SELECTED, EXISTING STAIR ROOF TO REMAIN.
GENERAL NOTES
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
/5
/2
8:
:3
A
M A ut od es k
D oc s:
//2
4-
N P
S R
E D
W P ar k
H Q
H V
A C
/2
4-
N
P S
R E
D W
H Q
_H V
A C
_v
_B
IM
0.
rv t
A103
BC
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ
19549
204034
BC
CR/WS
11/08/2024 5 37
ROOF PLAN
80 168
SCALE OF FEET
SCALEA103 A
ROOF PLAN - NORTH1
SCALEA103 A
ROOF PLAN - SOUTH2
B L D
G
N O
R T
H
OPTION 01
P
IT
C H
R O
O F
/4
F
T M
IN
T .O
W
A L L V
A R
IE
S
R E
S
T R
U C
T U
R A
L
<E> ROOFING TO REMAIN
<E> WD SIDING &
PLY SHEATHING
FULLY ADHERED TPO MEMBRANE ROOFING
COVER BOARD
RIGID BOARD NH POLYISO INSULATION, R-20 MIN
TREATED WOOD BLOCKING
PREFINISHED SS EDGE METAL & SS
CONTINUOUS CLEAT
NEW FIBER CEMENT SIDING TO MATCH <E>
DEMO <E> SS COPING
TERMINATION BAR & CONTINUOUS SEALANT
SELF-ADHERED TPO FLASHING TAPE
SS REGLET & COUNTERFLASHING
GASKETED SS FASTENER
M
IN
<E> ROOF ASSEMBLY TO REMAIN,
PROTECT IN PLACE
RE: STRUCTURAL FOR
REINFORCING OF <E> RAFTERS
MINERAL WOOL BATT INSULATION, R-20 MIN
DEMO <E> ROOF
STRUCTURE
ABOVE THIS LINE
<N> JOIST AND SHEATHING, RE: STRUCT
<N> CRIPPLE WALL, RE: STRUCT
FILL CAVITY WITH
<N> MINERAL WOOL
BATT INSULATION
V
IF
ROOF MOUNTED EQUIPMENT,
RE: ROOF PLANS AND MECH
GASKETED SS FASTENER
SS REGLET & COUNTERFLASHING
TERMINATION BAR &
CONTINUOUS SEALANT
TPO FLASHING MEMBRANE,
PROVIDE PREFABRICATED TPO
FLASHING OUTSIDE CORNERS
TPO PERIMETER FASTENERS
WHERE REQUIRED
HEAT WELD & CUT EDGE SEALANT
ROOF ASSEMBLY AS INDICATED,
RE: ROOF PLANS
PREFABRICATED INSULATED
ROOF CURB
<N> ROOF OPENING FRAMING
RE: STRUCTURAL
C L
M
IN
SEALING GASKET
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
/5
/2
8:
:3
A
M A ut od es k
D oc s:
//2
4-
N P
S R
E D
W P ar k
H Q
H V
A C
/2
4-
N
P S
R E
D W
H Q
_H V
A C
_v
_B
IM
0.
rv t
A400
BC
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ
19549
204034
BC
CR/WS
11/08/2024 6 37
ROOF DETAILS
12012 6
SCALE OF INCHES
SCALEA400
STAIR ENCLOSURE SECTION - OPTION 011
ASCALEA400
ROOF CURB DETAIL - OPTION 012
A
IMAGE A: EXISTING ROOF CONDITIONS AT STAIRS
VERIFY <E> CONDUIT AND PIPING TO BE REINSTALLED,
RE: MECH AND ELEC
<E> SS COPING TO BE REMOVED
DEMO <E> ROOF STRUCTURE
ABOVE THIS LINE
IMAGE B: EXISTING ROOF CURB CONDITION
VERIFY <E> CONDUIT AND PIPING TO BE REINSTALLED,
RE: MECH AND ELEC
<E> ROOFING ASSEMBLY TO
REMAIN, PROTECT IN PLACE
STRUCTURAL GENERAL NOTES
DESIGN LOADS:
1. SITE INFORMATION:
A. COORDINATES: 41.7530, -124.1943
B. ELEVATION: 10 FT
2. AUTHORITY HAVING JURISDICTION: UNITED STATES GOVERNMENT
3. DESIGN LOADS BASED ON: 2024 INTERNATIONAL BUILDING CODE, ASCE 7-22, AND REFERENCED DOCUMENTS
4. RISK CATEGORY: II STANDARD
5. ROOFS:
A. ROOF DEAD LOAD 10 PSF
B. ROOF LIVE LOAD 20 PSF, 300 LBS
C. GROUND SNOW LOAD, Pg (ULTIMATE) 11 PSF D. FLAT-ROOF SNOW LOAD, Pf 10 PSF E. SNOW EXPOSURE FACTOR, Ce 1.0 F. THERMAL FACTOR, Ct 1.0
6. WIND:
A. BASIC DESIGN WIND SPEED, V, (3-SECOND GUST) 93 MPH
B. ALLOWABLE STRESS DESIGN WIND SPEED, VASD, (3-SECOND GUST) 72 MPH
C. INTERNAL PRESSURE COEFFICIENT 0.18 (ENCLOSED)
D. WIND EXPOSURE D
E. GROUND ELEVATION FACTOR 1.0
1. SEISMIC:
A. SPECTRAL RESPONSE ACCELERATION PARAMETERS
1. SHORT PERIOD
a. SS 2.65g
b. SDS 1.99g
2. ONE SECOND
a. S1 1.02g
b. SD1 1.39g
B. SOILS SITE CLASS DEFAULT (C, CD, OR D)
C. SEISMIC IMPORTANCE FACTOR 1.0
D. SEISMIC DESIGN CATEGORY E
POST-INSTALLED ANCHORS
1. ALL CAST-IN-PLACE ANCHORS DESIGNED IN ACCORDANCE WITH ACI 318.
2. POST-INSTALLED ANCHORS SHALL ONLY BE USED WHERE SPECIFIED ON THE CONSTRUCTION DOCUMENTS.
THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CONTRACTING OFFICER PRIOR TO INSTALLING POST-
INSTALLED ANCHORS IN PLACE OF MISSING OR MISPLACED CAST-IN-PLACE ANCHORS.
3. CARE SHALL BE TAKEN IN PLACING POST-INSTALLED ANCHORS TO AVOID CONFLICTS WITH EXISTING REBAR.
EXISTING REINFORCING BARS SHALL NOT BE CUT UNLESS APPROVED BY THE CONTRACTING OFFICER.
4. ALL ANCHORS MUST BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER’S PRINTED INSTALLATION INFORMATION (MPII) IN CONJUNCTION WITH EDGE DISTANCE, SPACING, AND EMBEDMENT DEPTH AS INDICATED ON THE DRAWINGS. HOLES SHALL BE DRILLED AND CLEANED IN ACCORDANCE WITH THE MPII.
5. SUBSTITUTION REQUESTS FOR PRODUCTS OTHER THAN THOSE SPECIFIED SHALL BE SUBMITTED BY THE CONTRACTOR TO THE CONTRACTING OFFICER ALONG WITH CALCULATIONS THAT ARE PREPARED & SEALED BY A REGISTERED PROFESSIONAL ENGINEER; REGISTRATION MUST BE IN THE STATE IN WHICH THE PROJECT IS LOCATED. THE CALCULATIONS SHALL DEMONSTRATE THAT THE SUBSTITUTED PRODUCT IS CAPABLE OF ACHIEVING EQUIVALENT PERFORMANCE VALUES (MINIMUM) OF THE SPECIFIED PRODUCT USING THE APPROPRIATE DESIGN PROCEDURE AND/OR STANDARD(S) AS REQUIRED BY THE AUTHORITY HAVING
JURISDICTION.
6. THE CONTRACTOR SHALL ARRANGE FOR A MANUFACTURER’S FIELD REPRESENTATIVE TO PROVIDE INSTALLATION TRAINING FOR ALL PRODUCTS TO BE USED, PRIOR TO THE ANCHOR INSTALLATION. A RECORD OF TRAINING SHALL BE KEPT ON SITE AND MADE AVAILABLE TO THE CONTRACTING OFFICER/ SPECIAL
INSPECTOR AS REQUESTED.
7. ADHESIVE ANCHORS INSTALLED IN HORIZONTAL TO VERTICALLY OVERHEAD ORIENTATION THAT SUPPORT SUSTAINED TENSION LOADS SHALL BE DONE BY A CERTIFIED ANCHOR INSTALLER (AAI) AS CERTIFIED THROUGH ACI/CRSI (ACI 318-19 17.2.3). PROOF OF CURRENT CERTIFICATION SHALL BE SUBMITTED TO THE CONTRACTING
OFFICER FOR APPROVAL PRIOR TO COMMENCEMENT OF INSTALLATION.
8. ADHESIVE ANCHORS MUST BE INSTALLED IN CONCRETE AGED A MINIMUM OF 21 DAYS (ACI 318-19 17.2.2).
9. ALL POST-INSTALLED ANCHORS SHALL BE INSTALLED IN DRY HOLES THAT HAVE BEEN DRILLED, CLEANED, AND
PREPARED IN STRICT ACCORDANCE WITH THE MANUFACTURER’S PRINTED INSTALLATION INFORMATION AND
THE RESPECTIVE ICC-ES EVALUATION REPORTS.
10. PROVIDE SPECIAL INSPECTION FOR ALL MECHANICAL AND ADHESIVE ANCHORS PER THE APPLICABLE BUILDING
CODE AND PER THE CURRENT ICC-ES REPORT (IBC TABLE 1705.3 NOTE B).
STRUCTURAL WOOD FRAMING:
1. IN-GRADE BASE VALUES HAVE BEEN USED FOR DESIGN.
2. DIMENSIONAL LUMBER FRAMING SHALL BE S4S HEM FIR NO. 2 AND BETTER UNO.
3. SOLID TIMBER BEAMS AND POSTS SHALL BE DOUGLAS FIR-LARCH NO. 1 AND BETTER UNO.
4. STUDS SHALL BE HEM FIR STUD GRADE AND BETTER UNO.
5. TOP AND BOTTOM PLATES SHALL BE DOUGLAS FIR-LARCH NO. 2 AND BETTER UNO.
6. ALL LUMBER SHALL BE 19% MAXIMUM MOISTURE CONTENT AT THE TIME OF INSTALLATION UNO.
7. ALL WOOD EXPOSED TO WEATHER OR IN CONTACT WITH CONCRETE OR MASONRY SHALL BE PRESSURE TREATED
DOUGLAS FIR-LARCH OR SOUTHERN YELLOW PINE. PRESERVATIVE-TREATED WOOD SHALL BE TREATED IN ACCORDANCE WITH AWPA STANDARDS U1 AND M4. TREATMENTS SHALL HAVE NO AMMONIA ADDED AND SHALL BE THE FOLLOWING USE
CATEGORY:
A. UC2 AT INTERIOR
B. UC3B AT EXTERIOR WITH NO GROUND CONTACT
C. UC4B AT EXTERIOR WITH GROUND CONTACT
8. FASTENERS FOR USE WITH TREATED WOOD SHALL BE CORROSION RESISTANT IN ACCORDANCE WITH SECTION 2304.10.6.
9. ALL CONNECTORS USED WITH PRESSURE-TREATED MATERIAL SHALL BE STAINLESS STEEL ASTM 304 OR 316, OR HAVE A
SIMPSON Z-MAX (G185) OR HDG COATING. STANDARD COATING (G90) IS ACCEPTABLE AT INTERIOR CONDITIONS WITH NON PRESSURE-TREATED LUMBER ONLY. CONNECTORS ARE TO BE IN ACCORDANCE WITH ASTM A653 OR ASTM 123.
10. ALL IRON AND STEEL PRODUCTS ATTACHED TO TREATED LUMBER SHALL BE HOT-DIPPED GALVANIZED IN ACCORDANCE
WITH ASTM A123 OR SHALL BE TYPE 304 OR 316 STAINLESS STEEL.
11. STRUCTURAL MEMBERS SHALL NOT BE CUT FOR PIPES, ETC. UNLESS SPECIFICALLY NOTED OR DETAILED ON THE
STRUCTURAL DRAWINGS.
12. ALL BOLTS SHALL BE RETIGHTENED PRIOR TO CLOSING IN OF WALLS, FLOORS, AND ROOFS.
13. ALL BOLTS BEARING ON WOOD SHALL HAVE STANDARD CUT WASHERS UNDER HEAD AND/OR NUT, UNO.
14. LIGHT GAGE METAL FRAMING CONNECTORS SPECIFIED IN THE DRAWINGS ARE SIMPSON STRONG-TIE CODE-APPROVED
PRODUCTS. THEY ARE SPECIFIED AS THE BASIS OF DESIGN. ALTERNATE PRODUCTS WITH CODE-APPROVED TESTING REPORTS MAY BE SUBSTITUTED THAT HAVE EQUAL OR GREATER SALIENT CHARACTERISTICS. CHARACTERISTICS INCLUDE SAME OR GREATER ALLOWABLE STRESS DESIGN CAPACITIES FOR THE SAME INTENDED USE(S) AND SIMILAR BASIC GEOMETRIC PROPERITES. NOTE THAT EXACT SIZE, GAGE, AND FASTENERSIZE/COUNT NEED NOT MATCH UNLESS SUCH CHARACTERISTICS ARE SPECIFICALLY NOTED IN THE DRAWINGS. THE CONTRACTOR SHALL COMPARE SPECIFIED BASIS OF DESIGN PRODUCTS USING THE LATEST EDITION OF SIMPSON STRONG-TIE'S CATALOG TO PROPOSED SUBSTITUTION PRODUCTS AND SUBMIT TO CONTRACTING OFFICER FOR APPROVAL. CONNECTORS SHALL BE INSTALLED WITH ALL HOLES FILLED (ROUND AND TRIANGULAR) WITH THE MAXIMUM SIZE FASTENERS RECOMMENDED BY THE MANUFACTURER TO
DEVELOP THE MAXIMUM RATED CAPACITY, UNLESS SPECIFICALLY NOTED OTHERWISE.
15. CONNECTOR BOLTS AND LAG SCREWS SHALL CONFORM TO ANSI/ASME B18.2.1 AND ASTM SAE J429 GRADE 1.
16. NAILS AND SPIKES SHALL CONFORM TO ASTM F1667.
17. WOOD SCREWS SHALL CONFORM TO ANSI/ASME B18.6.1.
18. LEAD HOLES FOR LAG SCREWS SHALL BE 40%-70% OF THE SHANK DIAMETER AT THE THREADED SECTION AND EQUAL TO
THE SHANK DIAMETER AT THE UNTHREADED SECTION.
19. CONVENTIONAL LIGHT FRAMING SHALL COMPLY WITH IBC SECTION 2308.
20. COLUMNS / MULTIPLE STUDS IN BEARING WALLS SUPPORTING ALL BEAMS AND HEADERS SHALL OCCUR CONTINUOUSLY
THROUGH EACH FLOOR LEVEL DOWN TO THE FOUNDATION OR ANOTHER SUPPORT BEAM. SOLID SQUASH BLOCKING EQUIVALENT IN AREA TO THE COLUMN/MULTIPLE STUDS ABOVE SHALL BE PROVIDED WITHIN THE JOIST SPACE BENEATH
THE COLUMN/MULTIPLE STUDS.
21. ALL BEAMS AND TRUSSES SHALL BE BRACED AGAINST ROTATION AT POINTS OF BEARING.
22. 2X BLOCKING SHALL BE PLACED BETWEEN JOISTS OR RAFTERS AT ALL SUPPORTS, UNO.
23. CROSS-BRIDGING OR SOLID BLOCKING SHALL BE PROVIDED AT 8'-0" MAX UNO. FOR ALL JOISTS AND RAFTERS MORE THAN
10" IN DEPTH, 2X3 OR APPROVED METAL TYPE BRIDGING MAY BE USED.
24. PROVIDE A MINIMUM OF (3) STUDS AT EACH CORNER, UNO.
25. ALL JOISTS AND BEAMS (EXCLUDING I-JOISTS) SHALL BE SEAT-CUT FOR FULL UNIFORM BEARING AT SUPPORTS, SEATS, CAPS, ETC.
26. VENTING IS REQUIRED IN ALL ENCLOSED ROOF AND CRAWL SPACE FRAMING CAVITIES, SEE ARCHITECTURAL DRAWINGS.
27. EXCEPT AS NOTED OTHERWISE, MINIMUM NAILING SHALL BE PROVIDED AS SPECIFIED IN TABLE 2304.10.2 "FASTENING
SCHEDULE".
28. ALL MULTIPLE MEMBER BEAMS SHALL BE NAILED TOGETHER WITH MAX NUMBER OF 10D NAILS VERTICALLY @ 3" AND
HORIZONTALLY @ 12" PER PLY.
29. ALL ROOF RAFTERS, JOISTS, TRUSSES, AND BEAMS SHALL BE ANCHORED TO SUPPORTS WITH H2.5A METAL FRAMING
ANCHORS UNO. PROVIDE (2) WITHIN 4'-0" OF ALL CORNERS.
WOOD SHEATHING:
1. PLYWOOD AND ORIENTED STRAND BOARD (OSB) FLOOR AND ROOF SHEATHING SHALL BE APA RATED WITH STAMP INCLUDING
APA TRADEMARK AND PANEL SPAN RATING.
A. MINIMUM ROOF SHEATHING: 19/32" OSB OR CDX PLYWOOD, APA 40/20, NAILED.
B. MINIMUM WALL SHEATHING: 15/32" OSB OR CDX PLYWOOD, APA 32/16, BLOCKED AND NAILED.
2. NAIL WALL SHEATHING WITH MINIMUM 8D COMMON OR 10D BOX AT 6" AT PANEL EDGES, AND 12" AT INTERMEDIATE FRAMING
EXCEPT AS NOTED. BLOCK AND NAIL ALL EDGES BETWEEN STUDS.
3. MINIMUM (3) 8D NAILS PER STUD. NAIL ALL PLATES USING EDGE NAIL SPACING INDICATED.
4. SHEATHING SHALL BE CONTINUOUS FROM BOTTOM PLATE TO TOP PLATE. CUT IN "L" AND "T" SHAPES AROUND OPENINGS. LAP
SHEATHING OVER SINGLE 2X PLATE MEMBER AT RIM JOIST. AT RIM JOIST PROVIDE A MINIMUM OF 3" BETWEEN SHEATHING
EDGE AND TOP/BOTTOM EDGE OF RIM.
5. ALL SHEATHING SHEETS SHALL HAVE 1/8" GAP AT ALL EDGES AND JOINTS.
6. PROVIDE (1) PANEL SHEATHING CLIP AT ALL UNSUPPORTED ROOF SHEATHING PANEL EDGES. WHERE SPANS ARE GREATER
THAN 32" PROVIDE (2) CLIPS.
1' h a a
0.6 h
0.6 h 0.6h
0.6h
0.2h
0.2h
FLAT ROOF (0° ≤ θ ≤ 7°)
0.6h a a
0.6h0.6 h
0.6 h
WIND ZONE
DIMENSIONS:
a = 3' h = 35'
FIELD VERIFICATION OF EXISTING CONDITIONS:
1. THE GENERAL CONTRACTOR SHALL THOROUGHLY INSPECT AND SURVEY THE EXISTING STRUCTURE TO VERIFY
CONDITIONS THAT AFFECT THE WORK SHOWN ON THE DRAWINGS.
2. THE GENERAL CONTRACTOR SHALL REPORT ANY VARIATIONS OR DISCREPANCIES TO THE CONTRACTING OFFICER
BEFORE PROCEEDING.
STRUCTURAL ERECTION AND BRACING REQUIREMENTS:
1. THE STRUCTURAL DRAWINGS ILLUSTRATE AND DESCRIBE THE COMPLETED STRUCTURE WITH ELEMENTS IN THEIR
FINAL POSITIONS, PROPERLY SUPPORTED, CONNECTED, AND/OR BRACED.
2. THE STRUCTURAL DRAWINGS ILLUSTRATE TYPICAL AND REPRESENTATIVE DETAILS TO ASSIST THE GENERAL
CONTRACTOR. DETAILS SHOWN APPLY AT ALL SIMILAR CONDITIONS UNLESS OTHERWISE INDICATED. ALTHOUGH DUE DILIGENCE HAS BEEN APPLIED TO MAKE THE DRAWINGS AS COMPLETE AS POSSIBLE, NOT EVERY DETAIL IS
ILLUSTRATED AND NOT EVERY EXCEPTIONAL CONDITION IS ADDRESSED.
3. ALL PROPRIETARY CONNECTIONS AND ELEMENTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS'
RECOMMENDATIONS.
4. ALL WORK SHALL BE ACCOMPLISHED IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH THE APPLICABLE
CODES AND LOCAL ORDINANCES.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL WORK, INCLUDING LAYOUT AND DIMENSION VERIFICATION, MATERIALS COORDINATION, SHOP DRAWING REVIEW, AND THE WORK OF SUBCONTRACTORS. ANY DISCREPANCIES OR OMISSIONS DISCOVERED IN THE COURSE OF THE WORK SHALL BE
IMMEDIATELY REPORTED TO THE CONTRACTING OFFICER FOR RESOLUTION.
6. CONTINUATION OF WORK WITHOUT NOTIFICATION OF DISCREPANCIES RELIEVES THE CONTRACTING OFFICER FROM
ALL CONSEQUENCES.
7. UNLESS OTHERWISE SPECIFICALLY INDICATED, THE STRUCTURAL DRAWINGS DO NOT DESCRIBE METHODS OF
CONSTRUCTION.
8. VERIFY ALL OPENINGS THROUGH FLOORS, ROOFS AND WALLS WITH ARCHITECTURAL, MECHANICAL, AND ELECTRICAL
REQUIREMENTS. COORDINATE DIMENSIONS WITH SUPPLIERS PRIOR TO FABRICATION.
9. SIGNIFICANT PERMANENT EQUIPMENT SIZES, WEIGHTS AND LOCATIONS ARE INDICATED ON THE DRAWINGS AS PROVIDED TO THE ENGINEER DURING DESIGN. CHANGES IN SIZE, WEIGHT, OR LOCATION MUST BE SUBMITTED IN WRITING FOR REVIEW BY THE CONTRACTING OFFICER. REQUIRED CURBS, SUPPORTS, OR BRACES NOT SHOWN ON
THE DRAWINGS ARE THE RESPONSIBILITY OF THE EQUIPMENT SUPPLIER.
10. THE GENERAL CONTRACTOR, IN THE PROPER SEQUENCE, SHALL PERFORM OR SUPERVISE ALL WORK NECESSARY TO ACHIEVE THE FINAL COMPLETED STRUCTURE, AND TO PROTECT THE STRUCTURE, WORKMEN, AND OTHERS DURING CONSTRUCTION. SUCH WORK SHALL INCLUDE, BUT NOT BE LIMITED TO TEMPORARY BRACING, SHORING FOR CONSTRUCTION EQUIPMENT, SHORING FOR EXCAVATION, FORMWORK, SCAFFOLDING, SAFETY DEVICES AND PROGRAMS OF ALL KINDS, SUPPORT AND BRACING FOR CRANES AND OTHER ERECTION EQUIPMENT.
11. THE CONTRACTING OFFICER BEARS NO RESPONSIBILITY FOR THE ABOVE ITEMS, AND OBSERVATION VISITS TO THE
SITE DO NOT IN ANY WAY INCLUDE INSPECTIONS OF THESE ITEMS.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
IRG / JSS
CBB / DJM
CBB / JSS
/1
/2
:2 :3
P
M A u to d e s k D o c s /2
-1
N
P S
R E
D W
P a rk
H Q
H V
A C
/2 .S
T R
R E
D W
H Q
J V
A S
.r v t
S000
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ
19549
204034
11/08/2024
STRUCTURAL GENERAL
NOTES
STRUCTURAL DRAWING LIST
S000 STRUCTURAL GENERAL NOTES
S001 ABBREVIATIONS, SYMBOLS, & DETAILS
S101 FOUNDATION & FIRST FLOOR PLAN
S102 SECOND FLOOR FRAMING PLAN
S103 ROOF FRAMING PLAN
CONCRETE POST-INSTALLED ANCHORS
ANCHOR TYPE DEWALT HILTI SIMPSON
ADHESIVE AC200+ (ICC ESR-4027) HIT HY-200 V3 (ICC ESR-4868) AT-3G (ICC ESR-5026)
SCREW SCREW-BOLT+ (ICC ESR-3889) KWIK HUS-EZ (ICC ESR-3027) TITEN HD (ICC ESR-2713)
EXPANSION POWER-STUD+ SD2 (ICC ESR-2502) KWIK BOLT TZ2 (ICC ESR-4266) STRONG-BOLT 2 (ICC ESR-3037)
COMPONENT AND CLADDING
ULTIMATE WIND PRESSURE -
FLAT ROOF
ROOF
(EFFECTIVE
WIND AREA)
ROOF SURFACE
PRESSURE (psf)
10 sf 100 sf
Negative Zone 1 -42.4 -33.1
Negative Zone 1' -24.4 -24.4
Negative Zone 2 -56.0 -44.0
Negative Zone 3 -76.3 -52.4
Positive All Zones 16.0 16.0
WALL
(EFFECTIVE
WIND AREA)
WALL SURFACE
PRESSURE (psf)
10 sf 100 sf
Negative Zone 4 -26.4 -22.8
Negative Zone 5 -32.5 -25.3
Positive Zone 4 & 5 24.4 20.8
GRID
SWx
X
DIRECTION OF DECK SPAN
GRID DESIGNATION
REVISION
SHEAR WALL
SHORING
CIP CONCRETE
EXISTING CONCRETE
EARTH
(XXX'-X) TOP OF FOOTING ELEVATION
TOP OF FLOOR ELEVATIONXXX'-X
SYMBOLS KEY
WELL HI (E) ROOF JOISTS,
SEE PLAN
2x6 @ 16" MAX CRIPPLE WALL W/ DOUBLE 2x6 TOP PLATE
(3) 2x6 BOTTOM PLATE
PANEL EDGE NAILING, SEE
NOTE ON ROOF PLAN
PANEL SHEATHING, SEE
NOTE ON ROOF PLAN
A35 CLIP
ANGLE @ 16" 15/32" APA 32/16, EXP 1 ON
EXTERIOR FACE. NAIL WALL
SHEATHING W/ 8d (0.113"x 2 3/8"
Ø) @ 4" AT PANEL EDGES AND @
12" IN FIELD OF PANEL. BLOCK
AND NAIL ALL EDGES BETWEEN
STUDS. IF GUN NAILS ARE USED
FOR NAILING, NAILS MUST BE AT
A MINIMUM THE DIAMETER AND
LENGTH NOTED ABOVE
(E) 3x6 @ 16"
STUDS
(E) BLOCKING &
PANEL EDGE
NAILING
VERIFY OR PROVIDE
8d @ 3" PANEL EDGE
NAILING
(E) LEDGER
(E) ANGLE CLIPS
(E) SHEATHING
(E) TRUSS
5 1/2" LAG
SCREWS @ 16"
2x8 RIM
VARIES
FASCIA, SEE ARCH
H2.5A EA
ROOF JOIST
ABBREVIATIONS KEY
(E) 2x4 FLAT @ 24"
A34 SIMPSON OR
EQ EA END, TYP
(E) TRUSS, DO
NOT CUT/ALTER
(E) 2x RAFTER
2x6 TO (E) 2x4 FLAT W/ 10d @ 8" EA SIDE UNIT
2x4 EA SIDE (E) TRUSS,
(2) PANEL POINTS MIN,
EXTEND BEYOND PANEL
FOR FULL BRG TO (E) 2x4
1/2"Ø BOLT ABV
EA PANEL POINT,
CLAMP IN PLACE
CUT (E) 2x4 AT
UNIT AS REQ
(E) 2x4 @ 16" BETWEEN
TRUSS, CUT AT UNIT AS REQ
IN CEILING MECH UNIT,
ATTACH TO 2x6 PER MFR
A
A A-A
HUNG MECH UNIT W/
INTEGRATED BOLT TABS
(E) 2x4 FLAT @ 24"
A34 SIMPSON OR
EQ EA SIDE, EA
END 2x4, TYP
(E) TRUSS, DO
NOT CUT/ALTER
(E) 2x RAFTER
2x4 EA SIDE UNIT
M A
X
2x4 BLKG OVER (E) TRUSS W/ (2) 16d END NAIL EA END
3/8"Ø ROD EA CORNER
W/ DBL NUT EA END
L2x2x1/8 SWAY
BRACE, (2) EA DIR
(4 TOT), COPE &
BEND LEG AT
UNIT, 1/2"Ø BOLT
TO 2x4 AT ROOF
L2 1/2x2 1/2x1/4 x 0'-2" W/ 1/2"Ø BOLT TO 2x4
E Q
E
QA
A
A-A
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
IRG / JSS
CBB / DJM
CBB / JSS
/1
/2
:2 :3
P
M A u to d e s k D o c s /2
-1
N
P S
R E
D W
P a rk
H Q
H V
A C
/2 .S
T R
R E
D W
H Q
J V
A S
.r v t
S001
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ
19549
204034
11/08/2024
ABBREVIATIONS, SYMBOLS,
& DETAILS
(E) EXISTING
(N) NEW
(R) REMOVE
@ ON CENTER SPACING
AB ANCHOR ROD (BOLT)
ADDL ADDITIONAL
ADJ ADJUSTABLE
AESS ARCH EXPOSED STRUCTURAL STEEL
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
AMT AMOUNT
ANCH ANCHOR, ANCHORAGE
APPROX APPROXIMATE
ARCH ARCHITECT, -URAL
ATR ALL THREAD ROD
AVG AVERAGE
BC BOTTOM OF CONCRETE
BL BRICK LEDGE
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BW BOTTOM OF WALL
CB COUNTERBORE
CF CUBIC FOOT
CFS COLD FORMED STEEL
CG CENTER OF GRAVITY
CIP CAST-IN-PLACE
CJ CONSTRUCTION JOINT, CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTER LINE
CLG CEILING
CLR CLEAR
CM CONSTRUCTION MANAGER, -MENT
CMU CONCRETE MASONRY UNIT
COL COLUMN
COM COMMON
COMB COMBINATION
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS, CONTINUE
COORD COORDINATE, COORDINATION
CS COUNTERSINK
CTR CENTER
CY CUBIC YARD
DAB DEFORMED ANCHOR BAR
DET DETAIL
DEV DEVELOP
DIAG DIAGONAL
DIM DIMENSION
DL DEAD LOAD
DN DOWN
DP DRILLED PIER
DT DOUBLE TEE
DWG DRAWING
DWL DOWEL
E-E END TO END
E-W EAST TO WEST
EA EACH
ECC ECCENTRIC
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC, ELECTRICAL
EMBED EMBEDMENT
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES EACH SIDE
EST ESTIMATE
EXC EXCAVATE
EXP EXPANSION
EXT EXTERIOR
F-F FACE TO FACE
FD FLOOR DRAIN
FDN FOUNDATION
FF FINISHED FLOOR, FAR FACE
FIG FIGURE
FL FLUSH
FLG FLANGE
FLR FLOOR
FO FACE OF
FP FULL PENETRATION
FS FOOTING STEP, FAR SIDE
FTG FOOTING
GA GAGE, GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERAL
GL GLUED LAMINATED, GLULAM
GND GROUND
GR GRADE
GT GIRDER TRUSS
GYP BD GYPSUM BOARD
HAS HEADED ANCHOR STUD
HDG HOT-DIP GALVANIZED
HDR HEADER
HORIZ HORIZONTAL
HP HIGH POINT
HT HEIGHT
ID INSIDE DIAMETER
IF INSIDE FACE
INT INTERIOR, INTERMEDIATE
IT INVERTED TEE
JB JOIST BEARING
JST JOIST
JT JOINT
K KIPP (1,000 LBS)
LA LANDSCAPE ARCHITECT
LGS LIGHT GAGE STEEL
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LP LOW POINT
LSL LAMINATED STRAND LUMBER
LT LIGHT
LVL LAMINATED VENEER LUMBER
MACH MACHINE
MASY MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURE, -ER, -ED
MIN MINIMUM
ML MICROLLAM (TRUS-JOIST BRAND LVL)
MO MASONRY OPENING
MTL METAL
N-S NORTH TO SOUTH
NF NEAR FACE
NIC NOT IN CONTRACT
NS NEAR SIDE
NTS NOT TO SCALE
OCJ OSHA COLUMN JOIST
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
PAF POWDER ACTUATED FASTENER
PC PRECAST
PCF POUNDS PER CUBIC FOOT
PE PRE-ENGINEERED
PEN PENETRATION
PERP PERPENDICULAR
PJP PARTIAL JOINT PENETRATION
PL PLATE
PLF POUND PER LINEAR FOOT
PNL PANEL
PP PANEL POINT
PS PRESTRESSED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PARALLEL STRAND LUMBER
PT POST TENSIONED, PRESSURE TREATED
PTN PARTITION
PWD PLYWOOD
QTY QUANTITY
R RADIUS
RE REFERENCE, REFER TO
RECT RECTANGLE
REINF REINFORCE, -ED, -ING
REQ REQUIRED
REQMT REQUIREMENT
RET RETAINING
RM ROOM
RMO ROUGH MASONRY OPENING
RO ROUGH OPENING
SC SLIP-CRITICAL
SCH SCHEDULE
SDST SELF-DRILLING/SELF-TAPPING
SECT SECTION
SF SQUARE FEET, SUB-FLOOR
SFRS SEISMIC FORCE-RESISTING SYSTEM
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SLH SHORT LEG HORIZONTAL
SLV SHORT LEG VERTICAL
SOG SLAB ON GRADE
SP SPACES, SPACED
SPEC SPECIFICATIONS
SQ SQUARE
SSR SHEAR STUD RAIL
ST SNUG-TIGHT
STD STANDARD
STIFF STIFFENER
STL STEEL
STRUCT STRUCTURE, -AL
SUPT SUPPORT
SY SQUARE YARD
SYM SYMMETRICAL
T&B TOP AND BOTTOM
T&G TOUNGE AND GROOVE
TB TOP OF BEAM
TC TOP OF CONCRETE
TCA TORQUE-CONTROLLED ANCHOR
TD TOP OF DECK
THD THREAD
THK THICK, -NESS
TJ TOP OF JOIST
TL TOTAL LOAD
TPG TOPPING
TRANS TRANSVERSE
TW TOP OF WALL
TYP TYPICAL
ULT ULTIMATE
UON UNLESS OTHERWISE NOTED
VERT VERTICAL
VIF VERIFY IN FIELD
WP WORK POINT
WT WEIGHT
WTS WELDED THREADED STUD
WWF WELDED WIRE FABRIC
XS EXTRA STRONG
XSECT CROSS SECTION
XXS DOUBLE EXTRA STRONG
SCALE AS001
BID OPTION 1: CRIPPLE WALL1
10 2 31
SCALE OF FEET
SCALE AS001
IN CEILING MECH UNIT AT ROOF TRUSS2
SCALE AS001
HUNG MECH UNIT AT ROOF TRUSS3
1 2 3 4 5 6 7 8 9 10
C
E
F
G
H
MECH PAD, SEE
CIVIL DWGS
S E
E
/S
PAD MOUNTED MECH UNIT:
• CU-2, WT = 1,386 LBS
• ANCHOR W/ (4) 1/2"Øx4"
SCREW ANCHORS AT MFR
HOLES (2 PER MODULE)
ON (2) SIDES
• SEE MECH FOR UNIT INFO,
DIMS, AND EXACT LOC
PAD MOUNTED MECH UNIT:
• CU-1, WT = 1,026 LBS
• ANCHOR W/ (3) 1/2"Øx4"
SCREW ANCHORS AT MFR
HOLES ON (2) SIDES
• SEE MECH FOR UNIT INFO,
DIMS, AND EXACT LOC
PAD MOUNTED MECH UNIT:
• CU-3, WT = 739 LBS
• ANCHOR W/ (2) 1/2"Øx4"
SCREW ANCHORS AT MFR
HOLES ON (2) SIDES
• SEE MECH FOR UNIT INFO,
DIMS, AND EXACT LOC
14 1511 12 13 16
B
C
E
F
G
H
S E
E
/S
TYPICAL NONSTRUCTRUAL M/E/P COMPONENT ANCHORAGE, SEISMIC
DESIGN CATEGORY D:
ALL PERMANENT COMPONENTS TO BE ATTACHED TO THE STRUCTURE
SHALL BE SEISMICALLY ANCHORED/BRACED PER ASCE 7 CHAPTER 13
WHERE BOTTOM SUPPORTED COMPONENTS WEIGH MORE THAN 400#
AND WHERE HUNG COMPONENTS WEIGH MORE THAN 20# OR 5 PLF:
• MECHANICAL/ELECTRICAL/PLUMBING DUCTS, PIPES,
RACES/TRAYS, ETC ANCHORAGE SHALL BE DESIGN-BUILD BY
THE CONTRACTOR PER THE SPECIFICATIONS
• MECHANICAL UNITS SPECIFICALLY SHOWN WITH TOTAL
OPERATING WEIGHT OF UNIT INDICATED THUS: WT = XXX#, SEE
MECHANICAL DRAWINGS, SHALL BE ANCHORED AS DETAILED
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
IRG / JSS
CBB / DJM
CBB / JSS
/1
/2
:2 :3
P
M A u to d e s k D o c s /2
-1
N
P S
R E
D W
P a rk
H Q
H V
A C
/2 .S
T R
R E
D W
H Q
J V
A S
.r v t
S101
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ
19549
204034
11/08/2024
FOUNDATION & FIRST
FLOOR PLAN
SCALE AS101
FIRST FLOOR NORTH2
SCALE AS101
FIRST FLOOR SOUTH1 80 168
SCALE OF FEET
4 5 6 7 8 9 10
C
E
F
G
H
(E) 10 3/4" x 42" GLULAMS @ 2'-9"±
BOT MOUNTED MECH UNITS < 400LBS:
• ANCHOR IN CEILING PER MFR,
CUT/HDR (E) JST AS REQ, SEE
• SEE MECH FOR UNIT INFO, DIMS,
AND EXACT LOC
(E) 3/4" PLYWOOD
(E x J
O
IS
T S
S E
E
/S
(E) 2x10 JOISTS @ 16"
3/S102
14 15
11 12 13
B
C
E
F
G
H
(E) 10 3/4" x 42" GLULAMS @ 3'-8"±(E) 10 3/4" x 42" GLULAMS @ 3'-8"±
BOT MOUNTED MECH UNITS < 400LBS:
• ANCHOR IN CEILING PER MFR,
CUT/HDR (E) JST AS REQ, SEE
• SEE MECH FOR UNIT INFO, DIMS,
AND EXACT LOC
(E x J
O
IS
T S
(E) 3/4" PLYWOOD(E) 3/4" PLYWOOD
(E x J
O
IS
T S
S E
E
/S
(E) 2x10 JOISTS @ 16"
3/S102
D
X
L
(E) JOIST CUT OFF TO
ACCOMMODATE MECH
UNIT W/ SIMPSON LUS
SERIES HANGER OR
EQ TO (N) HEADER
(2) 2xD HEADER
W/ SIMPSON
LUS SERIES
HANGER OR
EQ EA END
(E) ADJACENT JOISTS
MAY REQUIRE
SISTER, SEE NOTES
BELOW FOR CRITERIA
(N) IN CEILING MECH
UNIT OR DUCT
• ADJACENT JOISTS SUPPORTING (N) HEADER SHALL BE
SISTERED PER IF CUT WITHIN MIDDLE 1/2 SPAN (X > L/4);
OTHERWISE, NO SISTERING REQUIRED
• LUS HANGERS SHALL BE OF APPROPRIATE DEPTH TO
ACCOMMODATE SUPPORTED MEMBER AND BE ATTACHED W/
MAXIMUM FASTENERS SPECIFIED BY MANUFACTURER
TYPICAL HEADER AT MECHANICAL
4/S102
TYPICAL EXISTING DAMAGED JOIST STRENGTHENING
(E) 2x W/ EXCESSIVE HOLE OR NOTCH
OUTSIDE MIDDLE 1/3 SPAN AT LOC "X",
SISTER PART LENGTH AT A MIN
/2
1 1/2" MIN BRG L/2 MIN
(E) 2x W/ EXCESSIVE HOLE OR
NOTCH WITHIN MIDDLE 1/3 SPAN AT
LOC "X", SISTER FULL LENGTH
(6) SCREWS AT
UNSUPPORTED ENDS
AT X < L/4 AT X > L/4
• (E) 2x W/ EXCESSIVE HOLES OR NOTCHES EXCEEDING IBC
SECTION 2308.7.4 ARE UNACCEPTABLE & MUST BE SISTERED
• (E) 2x W/ DECAY OR DAMAGE MUST BE SISTERED
• (E) 2x W/ DECAY OR DAMAGE SHOWN TO BE SISTERED
REGARDLESS OF CONDITION SHALL BE SISTERED EA SIDE
• WHERE PLANS SHOW (E) 2x TO BE SISTERED, SISTER MUST BE
FULL LENGTH AS SHOWN ON PLAN
/2
"L" = CLR SPAN
X > L/4X < L/4
1" CLR MAX
0.22"Øx3" SDWS
SCREWS @ 8"
STAGGER T&B
2x SISTER TO MATCH (E) 2x
TYPICAL NONSTRUCTRUAL M/E/P COMPONENT ANCHORAGE, SEISMIC
DESIGN CATEGORY D:
ALL PERMANENT COMPONENTS TO BE ATTACHED TO THE STRUCTURE
SHALL BE SEISMICALLY ANCHORED/BRACED PER ASCE 7 CHAPTER 13
WHERE BOTTOM SUPPORTED COMPONENTS WEIGH MORE THAN 400#
AND WHERE HUNG COMPONENTS WEIGH MORE THAN 20# OR 5 PLF:
• MECHANICAL/ELECTRICAL/PLUMBING DUCTS, PIPES,
RACES/TRAYS, ETC ANCHORAGE SHALL BE DESIGN-BUILD BY
THE CONTRACTOR PER THE SPECIFICATIONS
• MECHANICAL UNITS SPECIFICALLY SHOWN WITH TOTAL
OPERATING WEIGHT OF UNIT INDICATED THUS: WT = XXX#, SEE
MECHANICAL DRAWINGS, SHALL BE ANCHORED AS DETAILED
• ASSUME MINOR MODIFICATIONS OF THE (E) 2x FRAMING (DO
NOT CUT (E) GLULAMS) TO ACCOMMODATE (N) DUCTING AND
PIPE PENETRATIONS IN THE FORM OF HEADERS AND HANGERS
• DO NOT MODIFY BOX BLOCKING/BRIDGING BETWEEN THE
GLULAM BEAMS/JOISTS
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: B
SCALE: A
IRG / JSS
CBB / DJM
CBB / JSS
/1
/2
:2 :3
P
M A u to d e s k D o c s /2
-1
N
P S
R E
D W
P a rk
H Q
H V
A C
/2 .S
T R
R E
D W
H Q
J V
A S
.r v t
S102
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ
19549
204034
11/08/2024
SECOND FLOOR FRAMING
PLAN
SCALE AS102
SECOND FLOOR NORTH2
SCALE AS102
SECOND FLOOR SOUTH1 80 168
SCALE OF FEET
SCALE BS102
JOIST HEADER3
SCALE BS102
RAFTER OR JOIST STRENGTHENING4
10 2 31
1 2
3 4 5 6 7 8 9 10
B
C
E
F
G
H
BID OPTION 1:
WELL HI 2x8 @ 16"
BID OPTION1: WELL HI 2x8 @ 16"
WELL LO - (E) 2x8
RAFTERS. SISTER
RAFTERS W/ (N) 2x8
WHERE (E) RAFTERS TO
SUPPORT (N) MECH UNIT
AT INTERFACE OF LO ROOF AND WELL
WALLS, VERIFY OR PROVIDE PANEL
EDGE NAILING INTO LEDGER PER
BID OPTION 1: WELL HI
PANEL SHEATHING,
SEE PLAN NOTE
BID OPTION 1:
WELL HI PANEL
SHEATHING,
SEE PLAN NOTE
HIGH ROOF
BID OPTION 1:
ACCESS HATCH,
SEE ARCH
BID OPTION
1: ACCESS
HATCH, SEE
ARCH
1/S001
S001
S001
S E
E
/S
LO ROOF
BID OPTION 1:
SLOPE, SEE ARCH
BID OPTION 1:
SLOPE, SEE ARCH
(E
/4 x
G L U
L A
M S
(E) 3x12
RAFTERS @ 42"
(E
O
P E
N W
E
W
O O
D T
R U
S S
BOT MOUNTED MECH UNITS < 400LBS:
• ANCHOR IN CEILING PER MFR, DO
NOT CUT (E) RAFTERS, PROVIDE
(N) 2x12 W/ LUS HANGER EA END
AT MECH UNIT EDGES AS REQ
BOT MOUNTED MECH UNITS < 400LBS:
• ANCHOR IN CEILING PER MFR, W/
(N) 2x6 EA SIDE, SEE
HUNG MECH UNIT:
• FC-9, WT = 67 LBS
• HANG FROM (N) 2x4, SEE
2/S001
3/S001
BOT MOUNTED MECH UNITS < 400LBS:
• ANCHOR TO WELL LO PER MFR,
SISTER RAFTERS, SEE
BOT MOUNTED MECH UNITS < 400LBS:
• ANCHOR TO ROOF PER MFR
• FRAME OPNG PER
4/S102
WELL LO (E) 2x8 @ 16"
3/S103
14 15
11 12 13
B
C
E
F
G
H
BID OPTION 1: WELL HI 2x8 @ 16" BID OPTION1: WELL HI 2x8 @ 16"
WELL LO - (E) 2x8 RAFTERS.
SISTER RAFTERS W/ (N) 2x8
WHERE (E) RAFTERS TO
SUPPORT (N) MECH UNIT
AT INTERFACE OF LO ROOF AND WELL
WALLS, VERIFY OR PROVIDE PANEL
EDGE NAILING INTO LEDGER PER
BID OPTION 1:
WELL HI PANEL
SHEATHING, SEE
PLAN NOTE
BID OPTION 1:
WELL HI PANEL
SHEATHING, SEE
PLAN NOTE
HIGH ROOF
BID OPTION 1:
ACCESS HATCH,
SEE ARCH
BID OPTION 1:
ACCESS HATCH,
SEE ARCH
1/S001
S001
S001
S E
E
/S
BID OPTION 1:
SLOPE, SEE ARCH
BID OPTION 1:
SLOPE, SEE ARCH
(E
O
P E
N W
O
D T
R U
S S
BOT MOUNTED MECH UNITS < 400LBS:
• ANCHOR IN CEILING PER MFR, W/
(N) 2x6 EA SIDE, SEE 2/S001
BOT MOUNTED MECH UNITS < 400LBS:
• ANCHOR IN CEILING PER MFR, W/
(N) 2x6 EA SIDE, SEE 2/S001
HUNG MECH UNIT:
• FC-8, WT = 91 LBS
• HANG FROM (N) 2x4, SEE 3/S001
HUNG MECH UNIT:
• FC-7, WT = 91 LBS
• HANG FROM (N) 2x4, SEE 3/S001
BOT MOUNTED MECH UNIT < 400LBS:
• ANCHOR TO ROOF PER MFR
• FRAME OPNG PER
WELL LO (E) 2x8 @ 16"
BOT MOUNTED MECH UNIT < 400LBS:
• ANCHOR TO WELL LO PER MFR,
SISTER RAFTERS, SEE 4/S102
3/S103
BOT MOUNTED MECH UNIT < 400LBS:
• ANCHOR TO WELL LO PER MFR,
SISTER RAFTERS, SEE 4/S102
(E
O
P E
N W
O
D T
R U
S S
BOT MOUNTED MECH UNIT < 400LBS:
• ANCHOR TO ROOF PER MFR
• FRAME OPNG PER 3/S103
• ALL MECH UNITS ON THIS LEVEL, SEE MECH DWGS FOR UNIT INFO,
DIMENSIONS, AND EXACT LOCATIONS
• ASSUME MINOR MODIFICATIONS OF THE 2x FRAMING (DO NOT ALTER (E)
TRUSSES) TO ACCOMMODATE (N) DUCTING AND PIPE PENETRATIONS IN
THE FORM OF HEADERS AND HANGERS, SEE
• AT OPENINGS IN HI WELL ROOFS FOR LOUVERED MECH HOODS AND
ACCESS HATCHES, FRAME OUT OPENINGS.
3/S102
TYPICAL ROOF SHEATHING:
19/32" APA 40/20 RATED SHEATHING FASTENED WITH 10d NAILS (0.128"Ø x 3") @ 6" ALONG PANEL EDGES AND @ 12" ALONG
INERMEDIATE FRAMING MEMBERS. LAY PANELS PERPENDICULAR
TO FRAMING MEMBERS AND STAGGER PANEL JOINTS.
TYPICAL NONSTRUCTRUAL M/E/P COMPONENT ANCHORAGE, SEISMIC
DESIGN CATEGORY D:
ALL PERMANENT COMPONENTS TO BE ATTACHED TO THE STRUCTURE
SHALL BE SEISMICALLY ANCHORED/BRACED PER ASCE 7 CHAPTER 13
WHERE BOTTOM SUPPORTED COMPONENTS WEIGH MORE THAN 400#
AND WHERE HUNG COMPONENTS WEIGH MORE THAN 20# OR 5 PLF:
• MECHANICAL/ELECTRICAL/PLUMBING DUCTS, PIPES,
RACES/TRAYS, ETC ANCHORAGE SHALL BE DESIGN-BUILD BY
THE CONTRACTOR PER THE SPECIFICATIONS
• MECHANICAL UNITS SPECIFICALLY SHOWN WITH TOTAL
OPERATING WEIGHT OF UNIT INDICATED THUS: WT = XXX#, SEE
MECHANICAL DRAWINGS, SHALL BE ANCHORED AS DETAILED
O P E N
IN
G
2x FLAT
BLOCKING UNO
SIMPSON LUS
SERIES HANGER
OR EQ, TYP
CS16 x "W" LENGTH STRAP AT EA
SIDE OF OPNG GREATER THAN
24"x24" OVER SHTG, W/ (2) 10d @ 4"
DBL 2x FRAMING
MEMBER EA SIDE
OF OPNG WHERE
FRAMING IS
INTERRUPTED UNO
SHTG EDGE NAILING
TO MEMBER AT
EDGE OF OPNG
FOR 3 TIMES LENGTH
OF OPNG
DOUBLE 2x TO MATCH
FRAMING UNO
4'-0" MAX
L
W /2
M A
X
W W
/2
PLAN VIEW OF DIAPHRAGM OPENING UP TO 4'-0" SQUARE
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: B
SCALE: A
IRG / JSS
CBB / DJM
CBB / JSS
/1
/2
:2 :3
P
M A u to d e s k D o c s /2
-1
N
P S
R E
D W
P a rk
H Q
H V
A C
/2 .S
T R
R E
D W
H Q
J V
A S
.r v t
S103
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ
19549
204034
11/08/2024
ROOF FRAMING PLAN
80 168
SCALE OF FEET
SCALE AS103
ROOF NORTH2
SCALE AS103
ROOF SOUTH1
SCALE BS103
DIAPHRAGM OPENING DETAIL3
10 2 31
MECHANICAL ABBREVIATIONS
AC AIR CONDITIONER
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
BAS BUILDING AUTOMATION SYSTEM
BTU BRITISH THERMAL UNIT
BLDG BUILDING
BTUH BRITISH THERMAL UNIT PER HOUR
CHWS CHILLED WATER SUPPLY
CHWR CHILLED WATER RETURN
CA COMPRESSED AIR
CD CONDENSATE DRAIN
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CWS CONDENSER WATER SUPPLY
CWR CONDENSER WATER RETURN
Cx COMMISSIONING
(D) DEMOLISH
DIA DIAMETER
DN DOWN
DX DIRECT EXPANSION
(E) EXISTING
EA EXHAUST AIR
FFA FROM FLOOR ABOVE
FFB FROM FLOOR BELOW
FD FIRE DAMPER
FPM FEET PER MINUTE
F/S COMBINATION FIRE+SMOKE DAMPER
GPM GALLONS PER MINUTE
HPC HIGH PRESSURE CONDENSATE RETURN
HPS HIGH PRESSURE STEAM SUPPLY
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
I.D. INSIDE DIAMETER
LPC LOW PRESSURE CONDENSATE RETURN
LPG LIQUEFIED PROPANEPETROLEUM GAS (PROPANE)
LPS LOW PRESSURE STEAM SUPPLY
MAX MAXIMUM
MIN MINIMUM
(N) NEW
NG NATURAL GAS
NIC NOT IN CONTRACT
N.O. NORMALLY OPEN
N.C. NORMALLY CLOSED
OA OUTSIDE AIR
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
PSIA POUNDS PER SQUARE INCH (ABSOLUTE)
PSIG POUNDS PER SQUARE INCH (GAUGE)
MECHANICAL ABBREVIATIONS CONT.
(R) RELOCATED
RA RETURN AIR
RE:__ REFERENCE ____
REQ REQUIRED/REQUIREMENT
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
SA SUPPLY AIR
SD SMOKE DAMPER
SF SQUARE FEET
SL SEA LEVEL
S.S. STAINLESS STEEL
STD STANDARD
TA TRANSFER AIR
TFA TO FLOOR ABOVE
TFB TO FLOOR BELOW
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VA VENTILATION AIR
PIPING SERVICES
CONDENSATE DRAIN
REFRIGERANT SUCTION
REFRIGERANT LIQUID
MECHANICAL LEGEND
CD
RS
RL
PIPING SYSTEM COMPONENTS
ELBOW DOWN
ELBOW UP
TEE DOWN
TEE UP
CAP
UNION
FLEXIBLE CONNECTION
DRAIN VALVE
STRAINER
FLOW SENSOR
TEMPERATURE SENSOR
AUTOMATIC AIR CENT
GAUGE
THERMOMETER
MANUAL AIR VENT
P&T TAP
IN LINE PUMP
METER
THERMOSTAT
PRESSURE SENSOR
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
S
FS
T
P
M
CO₂
CO
RECTANGULAR DUCT
ROUND DUCT
MANUAL DAMPER
MOTORIZED DAMPER
RECT. SUPPLY DUCT
RECT. RETURN DUCT
ECCENTRIC REDUCER
DUCT SLOPE
SUPPLY DIFFUSER/RETURN GRILLE
SUPPLY DIFFUSER W/ FLEX CONNECTION
SLOT DIFFUSER
FIRE/SMOKE DAMPER (F/S)
SMOKE DAMPER (SD)
DN
A 10"Ø
375 CFM
NECK SIZE
AIR FLOW
SCHEDULE
DESIGNATION
DIFFUSER CALLOUT
HVAC SYSTEM COMPONENTS
18X12
10"Ø
M
VALVES
GATE VALVE
BALL VALVE
PLUG VALVE
CHECK VALVE
2WAY ATC VALVE
3WAY ATC VALVE
PRESSURE REDUCING VALVE
SAFETY RELIEF VALVE
BACK FLOW PREVENTER
BALANCING VALVE
BUTTERFLY VALVE
DRAWING NOTATION
NEW TO EXISTING
NEW WORK
EXISTING ITEMS
EXISTING ITEMS TO BE DEMOLISHED
MECHANICAL NOTES
1. GENERAL
1. ALL WORK SHALL BE IN ACCORDANCE WITH SMACNA STANDARDS AND SPECIFICATIONS, AND
LOCAL AUTHORITY HAVING JURISDICTION.
2. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED TO SHOW ALL
TRANSITIONS, OFFSETS, ETC. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND
PROVIDE ALL NECESSARY FITTINGS TO COMPLETE THE INTENT OF THE DRAWINGS. ANY
DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED TO THE
CONTRACTING OFFICER FOR RESOLUTION. CONTRACTOR MAY LOCATE MECHANICAL
EQUIPMENT DIFFERENTLY THAN SHOWN ON DRAWINGS DUE TO CONFLICTS, AS LONG AS
FUNCTION AND/OR APPEARANCE ARE NOT AFFECTED.
3. COORDINATE SPACE REQUIREMENTS, SUPPORTS, AND INSTALLATION OF MECHANICAL WORK,
WHICH ARE INDICATED DIAGRAMMATICALLY ON THE DRAWINGS. FOLLOW ROUTING SHOWN
FOR PIPES AND DUCTS AS CLOSELY AS PRACTICABLE; PLACE RUNS PARALLEL WITH LINES OF
BUILDING. UTILIZE SPACES EFFICIENTLY TO MAXIMIZE ACCESSIBILITY FOR OTHER
INSTALLATIONS, FOR MAINTENANCE, AND FOR REPAIRS.
4. COMPLY WITH MANUFACTURER'S INSTRUCTIONS INCLUDING EACH STEP IN SEQUENCE.
SHOULD MANUFACTURERS' INSTRUCTIONS CONFLICT WITH THE DRAWINGS REQUEST
CLARIFICATION FROM THE CONTRACTING OFFICER BEFORE PROCEEDING.
5. DUCT SIZES ARE INSIDE DIMENSION.
6. CONTRACTOR SHALL REVIEW THESE DOCUMENTS CAREFULLY. CONTRACTOR SHALL
CONTACT THE CONTRACTING OFFICER, FOR RESOLUTION OF ANY DISCREPANCIES,
OMISSIONS, OR CLARIFICATIONS, BEFORE BID DATE. IN THE EVENT THAT AN INTERPRETATION
OF BID DOCUMENTS IS NECESSARY AFTER THE BID DATE, THE DECISION OF THE
CONTRACTING OFFICER SHALL BE FINAL AND BINDING.
7. PRODUCT DELIVERY, STORAGE, AND HANDLING: PROVIDE EQUIPMENT AND PERSONNEL TO
HANDLE PRODUCTS BY METHODS TO PREVENT DAMAGE. PROMPTLY INSPECT SHIPMENTS TO
ENSURE THAT PRODUCTS ARE UNDAMAGED. STORE AND PROTECT PRODUCTS IN
ACCORDANCE WITH MANUFACTURERS' INSTRUCTIONS.
8. THE CONTRACTOR IS RESPONSIBLE FOR THE COSTS OF ALL CHANGE ORDERS, WHICH THE
NATIONAL PARK SERVICE (NPS) AND CONTRACTING OFFICER HAVE NOT APPROVED IN WRITING
PRIOR TO THE EXECUTION OF THE ASSOCIATED WORK.
9. IN THE CASE OF A CONFLICT, UNLESS OTHERWISE NOTED, KEYNOTES ON MECHANICAL PLANS
SHALL SUPERCEDE ANY GENERAL NOTES ON THE PLANS.
10. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES AND NOTIFY THE
CONTRACTING OFFICER IF ANY CONFLICTS OCCUR.
11. THERMOSTAT LOCATIONS TO BE COORDINATED WITH GOVERMENT, VERIFIED BY THE
CONTRACTING OFFICER. THERMOSTAT HEIGHTS SHALL BE 48" AFF TO MATCH LIGHTSWITCH
HEIGHTS AND INSTALLED TO MEET ICC A117.1. CONTRACTOR TO CALIBRATE ALL
THERMOSTATS SHOWN ON THIS PLAN. IT SHALL BE THE GENERAL CONTRACTOR'S
RESPONSIBILITY TO ENSURE THAT ALL EXISTING THERMOSTATS REMAIN INTACT DURING
DEMOLITION. HEATING THERMOSTATS MUST REMAIN OPERATIONAL AT ALL TIMES. IF
REQUIRED FOR BETTER PROTECTION, THERMOSTATS MAY BE TEMPORARILY MOUNTED ON A
WALL OR CEILING DURING DEMOLITION.
12. PROVIDE VOLUME DAMPERS AT ALL DIFFUSER TAKEOFFS.
13. ALL TAKEOFFS, RUNOUTS, AND FLEX DUCTWORK TO DIFFUSERS SHALL BE THE SAME SIZE AS
DIFFUSER INLET UNLESS OTHERWISE NOTED.
14. MECHANICAL CONTRACTOR TO CHECK OPERATION AND CONDITION OF ALL EXISTING
MECHANICAL EQUIPMENT WITHIN THE CONFINES OF THIS SPACE (UNIT HEATERS, AND GAS
STOVE) AND PREPARE A WRITTEN LIST OF ANY DEFICIENCIES IN EQUIPMENT OPERATION OR
CONDITION. LIST SHALL BE SUBMITTED TO PROPERTY MANAGER TWO WEEKS AFTER THE
AWARD OF THE CONTRACT.
15. THERMOSTAT CONTROL LINES SHALL BE SUPPORTED AT INTERVALS NOT TO EXCEED 4'-0".
16. PROVIDE EXTERNAL INSULATION ON ALL NEW RIGID ROUND DUCTWORK.
17. PROVIDE ACCESS DOORS IN DUCTWORK AS REQUIRED FOR ACCESS TO FIRE DAMPERS,
FIRE/SMOKE DAMPERS, OR ANY OTHER MECHANICAL EQUIPMENT REQUIRING MAINTENANCE
OF SERVICE.
18. ALL PIPE AND DUCT PENETRATIONS THOUGH RATED WALLS SHALL BE SEALED PER 2024 IBC.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF24
/1
1/
5:
:2
A ut od es k
D oc s:
//2
4-
N P
S R
E D
W P ar k
H Q
H V
A C
/2 2-
4C
N P
S R
E D
W H
Q _R
_M ec h.
rv t
M000
AP/MK
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ
194549
204034
AP/MK
BG
11/08/2024 12 37
MECHANICAL
LEGENDS AND NOTES
MECHANICAL SHEET LIST
NUMBER SHEET NAME
M000 MECHANICAL LEGENDS AND NOTES
M100 MECHANICAL DEMO PLAN - FIRST FLOOR
M101 MECHANICAL DEMO PLAN - SECOND FLOOR
M110 MECHANICAL PLAN - FIRST FLOOR
M111 MECHANICAL PLAN - SECOND FLOOR
M120 MECHANICAL PIPING PLAN - FIRST FLOOR
M121 MECHANICAL PIPING PLAN - SECOND FLOOR
M400 MECHANICAL ENLARGED PLAN
M500 MECHANICAL DETAILS
M600 MECHANICAL SCHEDULES
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES
M603 MECHANICAL SCHEDULES
M700 MECHANICAL CONTROLS
M701 MECHANICAL CONTROLS
M800 MECHANICAL CALCS AND TITLE 24
M801 MECHANICAL CALCS AND TITLE 24
M802 MECHANICAL CALCS AND TITLE 24
M900 MECHANICAL MISC./3D
F
H
CL
G
C
4 5 76 8 9 101 2 3
23.34
23.34
23.36
23.36
23.36
23.36
23.40
23.41
23.41
23.43
M A
T C
H L
IN
E
B
E
F
H
CL
G
C
11 12 13 14 15 16
23.43
23.34
23.34
23.41
23.41
23.44
M A
T C
H L
IN
E
23.45
23.46
KEYPLAN
AREA A AREA B
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
/1
1/
5:
:3
A ut od es k
D oc s:
//2
4-
N P
S R
E D
W P ar k
H Q
H V
A C
/2 2-
4C
N P
S R
E D
W H
Q _R
_M ec h.
rv t
M100
AP/MK
REDWOOD NATIONAL PARK
REHAB HVAC SYSTEM AT PARK HQ
194549
204034
AP/MK
BG
11/08/2024 13 37
MECHANICAL DEMO
PLAN - FIRST FLOOR
GENERAL NOTES:
SCALE AM100
1 FIRST FLOOR - MECHANICAL DEMO PLAN - AREA A
SCALE AM100
2 FIRST FLOOR - MECHANICAL DEMO PLAN - AREA B
KEYNOTES:
23.34 EXISTING GRILLE/DIFFUSER TO REMAIN FOR
REUSE.
23.36 DEMO AND REMOVE ELECTRIC UNIT HEATER.
PATCH AND REPAIR WALL TO MATCH
SURROUNDING AREA IF NECESSARY.
23.40 DEMO AND REMOVE EXISTING EXHAUST FAN
ON ROOF ABOVE. PATCH AND REPAIR EXISTING
ROOF PENETRATION. CUT VERTICAL EXHAUST
DUCT BELOW ROOF PENETRATION FOR
CONNECTION TO NEW DUCTWORK.
23.41 EXISTING ELECTRIC UNIT HEATER TO REMAIN.
23.43 EXISTING EXHAUST DUCTWORK TO REMAIN
FOR REUSE.
23.44 EXISTING GAS-FIRED STOVE TO REMAIN.
23.45 DEMO (E) DUCTWORK UP TO LEVEL ABOVE.
23.46 (E) DUCTWORK UP TO LEVEL ABOVE TO
REMAIN.
1. DEMO AND REMOVE ALL MECHANICAL
EQUIPMENT, ACCESSORIES, AND DUCTWORK
IN HATCHED REGIONS UNLESS NOTED
OTHERWISE.
2. CONTRACTOR TO CLEAN ALL EXPOSED
GRILLE FACES.
80 168
F
H
CL
G
C
4 5 76 8 9 101 2 3
23.3723.34
23.34
23.37
23.34
23.39
23.39
23.3923.34 23.34 23.34 23.34
23.3423.34 23.34 23.34 23.34
M A
T C
H L
IN
E
TYP. FOR ALL EXISTING RETURN GRILLES
TYP. FOR ALL EXISTING
RETURN GRILLES
23.47
23.34 23.34 23.34 23.34
B
E
F
H
CL
G
C
11 12 13 14 15 16
23.34
23.37
23.34 23.34
23.34
23.34
23.37 23.39 23.3923.39 23.39
23.43
23.40
23.34 23.34 23.34 23.34
23.34
23.34 23.34 23.3423.34 23.34 23.34
M A
T C
H L
IN
E
23.4723.47
TYP. FOR ALL EXISTING
RETURN GRILLES
TYP. FOR ALL EXISTING
RETURN GRILLES
23.34 23.34 23.34 23.34
23.48
23.34
23.49
KEYPLAN
AREA A AREA B
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
/1
1/
5:
:3
A ut od es k
D…
This is the start of the file's text. The full file is on GovTribe.