This document is Amendment No. 2 for a National Park Service solicitation (140P8425R0001) to rehabilitate HVAC system components at Redwood National and State Parks' Headquarters (HQ) and North Operations Center (NOC) in Crescent City, California. The amendment extends the proposal due date to July 29, 2025 at 3:00 p.m. Pacific Daylight Time and provides detailed responses to 24 technical and procedural questions from potential contractors. Key clarifications include: the project requires a single contractor for both buildings, a bid bond at 20% of total proposed price is required, the buildings are not historic, working hours are Monday through Friday 7am to 5pm, and the period of performance is 365 days after the notice to proceed. The amendment also updates various federal acquisition regulation provisions and includes notices about system representation requirements.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REDWOOD NATIONAL
AND STATE PARKS
REHABILITATE HVAC SYSTEM
COMPONENTS AT
PARK HEADQUARTERS (HQ) AND
NORTH OPERATIONS CENTER (NOC)
PMIS No. 204034 / 266848
SOLICITATION NO. 140P8425R0001
AMENDMENT NO. 2
NATIONAL PARK SERVICE
PACIFIC WEST REGION
Solicitation 140P8425R0001, Attachment 8, Q-A & Amendment 2
SITE VISIT SUMMARY:
A pre-proposal meeting was conducted on July 1, 2025. Participants met at 10:00 a.m. Pacific Daylight Time (PDT) at the Redwood National Park Headquarters (HQ) in Crescent City, California. The project scope was reviewed at the meeting and potential contractors were given an opportunity to ask questions. The exterior, interior and roof of the building and existing equipment in the mechanical rooms were observed. Potential contractors then followed NPS staff to the North Operations Center (NOC) in Crescent City, California. The exterior and interior of the building and existing equipment in the mechanical rooms were observed. Questions asked during the site visit are answered below. The site visit concluded at approximately 1:30 p.m.
PROJECT QUESTIONS FROM PRE-PROPOSAL ONSITE MEETING:
1. Question: Can HQ and NOC Buildings be awarded individually?
Answer: No. Award will be given to both HQ and NOC to the same selected contractor.
2. Question: Are the buildings historic and/or on the historic register?
Answer: No, the buildings are not historic. NPS compliance has been completed approving this scope of work and the subsequent modifications to buildings.
3. Question: On the HQ building, can the ground mounted condensing units north of
Grid 1 be located on the roof to reduce refrigerant line length, thereby improving efficiency and security of the units.
Answer: Proposals shall include all work required for placing the condensing units on the ground north of Grid 1. Any potential adjustments to equipment location, proposed during construction submittals, will be reviewed and tracked as a modification as instructed by the contracting officer.
PROJECT QUESTIONS RECEIVED VIA EMAIL:
1. Do you require a Bid Bond?
Answer: Yes, a bid bond is required to be submitted with your proposal at 20% of total proposed price as stated within the solicitation.
2. Under Factor 4 of the technical proposal requirements, offerors are instructed to submit a copy of a valid California Contractor State License applicable to the work to be performed, such as “C-20” or “C-38". It also states that proposed subcontractors must submit their relevant license classification. Please confirm whether the prime contractor (offeror) is required to hold a valid California Contractor State License independent of any subcontractor, or if the offeror may submit a proposal relying solely on the license(s) of their proposed subcontractor(s) performing the licensed trade work.
Answer: We understand there may be wide variety of team configurations that offerors may choose to employ. We require a California Contractor State License as applicable to the type of work being performed on this project.
This is why the Solicitation instructs you to describe in detail in your proposal who will be performing what work with what license. While there may be acceptable scenarios where the proposed prime contractor does not have a license but the subcontractor does, the possession of a current and valid State License applicable to the work performed will be more favorably rated.
3. Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?
Additionally, please confirm whether these roles are allowed to be working roles or if they are required to be non-working and fully dedicated to supervision, QA/QC, and safety responsibilities during all on-site activities
Answer: No. Contractor may combine roles for qualified personnel. Roles can be performed by working personnel.
4. Are there any phasing requirements?
Answer: No. Contractor will prepare a project schedule that will identify the sequence of work for NPS review and approval prior to the start of construction.
5. If the buildings remain occupied, how many people will be in each building?
Answer: Undetermined. Typical daily government involves between 10 to 50 people within each building.
6. Are there any temporary heating/cooling requirements?
Answer: No.
7. Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?
Answer: The period of performance is 365 days after the date the Contractor receives the notice to proceed. The notice to proceed is issued after the initial post-award submittal phase and after the pre-construction conference. The allowable period of performance is considered sufficient. However, delays caused by unforeseeable causes beyond the control and without the fault or negligence of the Contractor may be excused as allowed by FAR clause 52.249- 10.
8. Are soil boring reports available? If not, it will be assumed that excavation will be clear of rocks and obstructions.
Answer: No reports are available. Excavation areas are assumed to be clear of large rocks and obstructions as these are in previously graded, soil fill areas.
9. Please provide bidding quantities for deteriorated underlayment (roofing).
Answer: Where roof membrane is to be replaced as part of the project scope, assume removal and replacement of underlayment.
10. Please confirm the manufacturer of the existing roofing system and who carries the current warranty of the roofing system.
Answer: Current roof system is out of warranty. Existing roof manufacturer is unknown.
11. Please provide the contact information for the building controls contractor.
Answer: This information is unavailable.
12. If BACnet or Modbus is required for BMS, please specify acceptable protocol and if a sole-source controls vendor is mandated.
Answer: Sole-source controls vendor is not mandated. See plans and specifications for new controls requirements.
13. Please provide the contact information for the building fire alarm company.
Answer: Advanced Security, Crescent City, CA.
14. Please provide the site visit attendee sign-in sheet.
Answer: Refer to solicitation documents on sam.gov for site visit attendee sign-in sheet (provided as Attachment 7).
15. Please provide photos of the job site and existing conditions.
Answer: General job site location can be reviewed from online sources such as google maps. Existing conditions photos are unavailable. Interested parties that attended the site visit were allowed to photograph existing equipment.
Reference demolition plans for additional information on existing equipment and locations.
16. Is this project tax exempt?
Answer: No. See FAR clause 52.229-3 Federal, State, and Local Taxes for additional information.
17. Are there any access constraints for equipment delivery or crane operations (e.g., road width, overhead obstructions, weight limits)?
Answer: Contractor is required to review any access constraints for vehicle travel and/or work within Crescent City and the surrounding public roads. The NPS does not know of any constraints to specifically address relative to this project scope.
18. Are there any restricted working hours or security protocols required for access to HQ or NOC during construction?
Answer: Yes. Building access/security will be coordinated between the contractor and the NPS COR. Working hours per specifications are Monday through Friday 7am to 5pm. Weekend or business hours work must be requested from and approved by the Contracting Officer in advance.
19. Should patched finishes match existing in texture and paint, or is repainting of entire rooms/ceilings required where disturbed?
Answer: Match in texture and paint is the minimum requirement.
20. Is there a third-party commissioning agent assigned? If so, who is responsible for coordinating functional performance testing? Are there any commissioning standards that need to be followed besides the process listed in specification 23 08 00 & 23 05 00 (e.g. ASHRAE 90.1 or ASHRAE Guideline 0-2019, CA ENERGY CODE section 120.8, etc.)?
Answer: No 3rd party commissioning agent. Functional performance testing will be coordinated by the contractor with the NPS Contracting Officer’s
Representative (COR). O&M instruction/handoff will be between the contractor, NPS COR and park facilities management.
21. Specification section 01 11 00 – 1.3 notes only one phase of construction. Will buildings need to be commissioned separately as they are completed or can commissioning begin once the last building has been finished, allowing a concentrated commissioning effort at project closeout?
Answer: The two buildings at tracked as separate contract line items. Therefore the expectation is that once work is completed at a building, and the system is ready for commissioning, that commissioning will take place within a reasonable timeframe in order for the equipment to be operating. If that happens within a similar calendar timeframe for both buildings, that is acceptable. If it needs to happen within different timeframes for each building, that can also be acceptable.
22. Are temporary enclosure or conditioning provisions required to meet start-up conditions for new HVAC equipment?
Answer: No.
23. Do you have a planholders list/sign in sheet available?
Answer: See the solicitation amendment attachment found with the solicitation on www.sam.gov for a list of site visit attendees. You may also visit www.sam.gov and search for the opportunity using keyword 140P8425R0001;
there you should be able to see/add yourself to the Interested Vendors List.
You may need to create an account and sign in to see this information.
24. Will the proposal due date be extended?
Answer: Yes, in addition to the previous extension provided by Amendment 0001, this Amendment 0002 extends the due date of proposals through 3:00 p.m. Pacific Daylight Time (PDT) on Tuesday, July 29, 2025.
Redwood Headquarters (HQ)
1. Please confirm whether asbestos or lead-based materials are present in any components scheduled for demolition (e.g., duct mastic, wallboard, roofing).
Answer: Per specifications 02 41 19, it is not expected that hazardous materials will be encountered in the work.
2. Will the Owner provide pre-demolition hazmat survey reports to verify environmental abatement scope?
Answer: No.
3. Section 23 81 29 describes VRF heat recovery systems. Please confirm if the Government has a preferred manufacturer or if any brand meeting the performance criteria is acceptable.
Answer: Any brand meeting the project specifications and equipment salient characteristics is acceptable.
4. Does the DDC system specified in 23 09 23 need to integrate with an existing BMS network? If so, please confirm protocol and integration point responsibilities.
Answer: The new system does not integrate with an existing BMS.
5. Will the Government provide current sequences of operation or logic diagrams to support DDC programming?
Answer: The contractor will coordinate current operation sequences etc. with the NPS facilities staff prior to construction.
6. Specifications require electrical gear to comply with latest NEC and NPS standards.
Please confirm if arc flash analysis or updated panel schedules are required prior to submittals.
Answer: Updated panel schedules are required when complete. This will be coordinated by the contractor during construction with the NPS COR. Arc flash analysis not required.
7. Section 26 05 26 requires detailed grounding plans. Can existing facility grounding records be made available?
Answer: Potentially. This would be coordinated by the contractor with the NPS facilities staff prior to construction.
8. Section 31 20 00 includes earthmoving scope. Please confirm if excavation, backfill, and compaction for equipment pads and duct burial are included in the contractor’s scope.
Answer: Yes.
9. Section 32 13 20 lists site concrete. Please confirm whether perimeter housekeeping pads for outdoor mechanical units require integral steel reinforcement and curb details.
Answer: Yes. See plan notes, details and specifications for requirements.
10. S103 shows 4’ on-center bar trusses and the attached picture shows that but there is
(2) intermediary 2” x 4” or 6” flat framing so we need confirmation that this is carried all the way across the structure or just in the overhang?
Answer: Flat framing may be present on the wood trusses to act as truss bridging, or for wall or equipment support. The extent of this existing flat framing is unknown. Coordination with this existing framing would need to occur during construction.
11. The attic pictures show the attic to have an existing soffit vent and we need confirmation on where the building insulation envelope is in order to provide the required R values on the new ducting.
Answer: A current roof replacement project for the HQ building is under contract and will be completed prior to the start of this HVAC project. As part of the roof replacement, new spray foam installation is being installed inside the attic space. The vents will be closed, and the attic will be an actively conditioned space in conformance with this HVAC project plans & specifications.
12. On M111 there are (3) new fan coils shown to be installed in the attic which don’t show service access, lighting, etc. Please confirm if the attic space has a service access, and lighting?
Answer: Yes, the existing attic space has service access and lighting.
North Operations Center (NOC)
1. Section 02 41 13 does not describe abatement. Please confirm if demolition of HVAC systems includes removal of refrigerants and disposal tracking.
Answer: Yes, contractor is responsible for all removal and disposal tracking.
2. Please confirm whether ceiling systems impacted by duct removal are to be replaced in full or patched to match.
Answer: Patched to match is the minimum requirement.
3. Please confirm the required thickness and reinforcement details for new HVAC equipment concrete pads at exterior units and interior mechanical rooms.
Answer: See project structural plans, notes and specifications for requirements.
4. Gypsum wallboard patching is mentioned, but no Section 09 spec is provided. Please confirm performance and finish level requirements for patching at penetrations.
Answer: Patch to match existing. Gypsum wallboard in existing exposed areas is typically smooth painted (Level 5 finish etc.).
5. Is the existing radiant floor system at the paint room being reused in part, or fully replaced?
Answer: Where radiant floor exists, it will be reused in conjunction with hydronic equipment replacement per plan.
6. Section 23 81 46.13 specifies water-to-air heat pumps. Please confirm whether any existing piping or pumps are to remain or if all hydronic components are new.
Answer: Hydronic components shall be provided new per plans and specifications.
7. Are the new VRF condensing units and indoor fan coils to be tied into emergency backup power, or standard service only?
Answer: NOC is already wired for emergency backup power.
8. Section 26 05 48 requires seismic supports. Please confirm whether existing electrical panels require seismic anchorage retrofit or only new work.
Answer: Existing panels do not require new retrofit. All new work requires seismic supports per code.
AMENDMENT ITEMS:
The offeror shall make the following changes, modifications and additions to the pertinent sheets, pages and paragraphs of the specifications and drawings and all associated Solicitation documents, and shall take the same into consideration in the proposed prices:
1. Updated provisions and clauses
a. Section I is updated as follows:
Add 52.222-9 Apprentices and Trainees (JULY 2005) (DEVIATION FEB 2025)
Update 52.244-6 Subcontracts for Commercial Products and Commercial Services (JAN 2025) with (DEVIATION FEB 2025) version.
b. Section K is updated as follows:
Within 52.204-8, remove references to “(xiv) 52.222-22, Previous
Contracts and Compliance Reports” and “(xv) 52.222-25, Affirmative Action Compliance” under 52.204-8 – simply changes both (xiv) and
(xv) to: [RESERVED].
c. Section J is updated to include the following new attachments:
B08_Attachment_7_Site Visit Sign-In Sheet.pdf B08_Attachment_8_Q-A_Amendment_2_Summary.pdf
Updates to the Federal Acquisition Regulation (FAR) are underway with changes to date incorporated into this Amendment as summarized above.
The full text of a solicitation provision or clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/ https://www.acquisition.gov/diar https://www.acquisition.gov/caac-letters
Alternatively, please reach out to the contracting officer at alanna_gardner@nps.gov for any questions or clarifications.
Recent policy updates require the issuance of the following notices:
NOTICE: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
NOTICE: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.
Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
-- END OF NOTES --
File details come from the government source that posted it. Updated .