B08 Attachment 0026 -Annex B - Supply PRS_22 June 23.pdf
PDF 221 KB Posted
- Solicitation number
- W519TC-23-R-0096
About this file
This document outlines the quality control standards and requirements for property book management and supply services at an Army installation. The property book office must maintain accountability and supporting documentation on a daily basis with 98% accuracy. It must notify units of required inventory reviews at least 30 days in advance with 95% accuracy. Other requirements include reconciling inventory records within 3 days at 95% accuracy, processing excess requests within 30 days at 90% accuracy, and cataloging non-standard equipment within 1 day at 90% accuracy. The supply support activity must receive, process, and inventory shipments on a daily basis at 90% accuracy. It must also prepare discrepancy reports within 3 days of discovering damages or shortages at 90% accuracy and perform inventories and location surveys within required timelines at 90% accuracy.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annex B - Supply PRS
Task/Requirement Standard Sampling Method, Lot & Acceptable Quality Level (AQL)
INSTALLATION SUPPLY AND SERVICES DIVISION (ISSD) – GENERAL
CENTRAL ISSUE FACILITY (CIF)
5.15.1 - RESERVED
CLOTHING INITIAL ISSUE POINT (CIIP)
5.16.1 - RESERVED
SUBSISTENCE SUPPLY MANAGEMENT OFFICE (SSMO)
5.17.1 - RESERVED
CONSOLIDATED INSTALLATION PROPERTY BOOK OFFICE
5.18.1 Maintain property book accountability and supporting documentation on a continuing basis.
Timeliness: LIS generated issue documents closed out daily.
Quality: LIS generated issue documents closed out IAW ADSM 18 Series Manuals and SOP.
Random sampling
Lot: The number of documents closed out on the day of surveillance.
AQL: 98%
Notify hand receipt holders (SLOC) of required inventory review and provide inventory list
Timeliness: Notification no less than 30 calendar days of required inventory review and provide inventory list
Quality: Notify hand receipt holders (SLOC) of required inventory review and provide inventory list IAW local directives, AR 710-2, DA PAM 710-2-1
Random sampling
Lot: The number of required inventory review and inventory list on file at the time of surveillance.
AQL: 95%
Reconcile on-hand inventory with records, and update hand receipts accordingly
Timeliness: Reconcile/update within 3 working days upon turn-in of inventory report from hand receipt holders
Quality: Reconcile on-hand inventory with records, and update hand receipts accordingly IAW local directives, AR 710-2, DA PAM 710-2-1
Random sampling
Lot: The number of Reconcile on-hand inventory with records, and update hand receipts at the time of surveillance.
Process excess requests upon receipt of valid disposition instructions
Timeliness: Upon receipt of turn-in equipment, process excess removal within 30 working days Quality: Process excess requests upon receipt of valid disposition instructions IAW local directives, AR 710-2, DA PAM 710-2-1
Random sampling
Lot: The number of Process excess requests upon receipt of valid disposition instructions at the time of surveillance.
AQL: 90%
Process shortage requests to ensure authorized property is on hand or on order
Timeliness: Reconcile request within 10 working days
Quality: Process shortage requests to ensure authorized property is on hand or on order IAW local directives, AR 710-2, DA PAM 710-2-1
Random sampling
Lot: The number of Process shortage requests to ensure authorized property is on hand or on order at the time of surveillance.
Process lateral transfers
Timeliness: Upon request, post or accept transfer within 3 working days
Quality: Process lateral transfers IAW local directives, AR 710-2, DA PAM 710-2-1
Random sampling
Lot: The number of Process lateral transfers at the time of surveillance.
Process "found on installation" property
Timeliness: Post to property book within working 7 days
Quality: Process "found on installation" property IAW local directives, AR 710-2, DA PAM 710-2-1
Random sampling
Lot: The number of Process "found on installation" property at the time of surveillance.
AQL: 90%
5.18.1 Catalog non-standard equipment
Timeliness: Upon receipt of equipment, request non-standard LIN within 1 working day
Quality: Catalog non-standard equipment IAW local directives, AR 710-2, DA PAM 710-2-1
Random sampling
Lot: The number of Catalog non-standard equipment at the time of surveillance.
Process adjustment documents
Timeliness: Upon receipt of complete/accurate Financial Liability Investigations of Property Loss (FLIPL) -provide document number within 24 hours; Statement of Charges and AAR within 5 working days
Process adjustment documents IAW local directives, AR 710-2, DA PAM 710-2-1
Random sampling
Lot: The number of Process adjustment documents at the time of surveillance.
AQL: 90%
5.18.1 Provide printouts of current hand receipts for supported units and activities as requested
Timeliness: Copies of hand receipts provided within 8 hours of request.
Quality: Copies of hand receipts provided
IAW AR 710-2.
Random sampling
Lot: The number of printouts provided at the time of surveillance.
AQL: 100%
Request/order non-expendable items.
Timeliness: Order within 3 working days (dependent on customer funding availability)
Quality: Request/order non-expendable items IAW local directives and AR 710-2&
DA PAM 710-2-1.
Random sampling
Lot: The number of requisitions processed on the day of surveillance.
Reconcile open supply requests with Supply Support Activity (SSA)
Timeliness: Conduct on a monthly basis
Quality: Reconcile open supply requests with Supply Support Activity (SSA) IAW local directives and AR 710-2.
Random sampling
Lot: The percentage of Reconcile open supply requests with Supply Support Activity (SSA) at the time of surveillance.
Document all non-expendable/major end item acquisitions
Timeliness: Post received item to the property book within 3 working days
Quality: Document all non-expendable/major end item acquisitions IAW local directives and AR 710-2.
Random sampling
Lot: Documents of all non-expendable/major end item acquisitions at the time of surveillance.
Inventory and document Total Package Fielding/force modernization support equipment
Timeliness: (1) Document shortages immediately; (2) Post received items to the property book within 3 working days
Quality: Inventory and document Total Package Fielding/force modernization support equipment IAW local directives and AR 710-2.
Random sampling
Lot: Inventories and documents for Total Package Fielding/force modernization support equipment at the time of surveillance.
AQL: 100%
5.18.1 Set-up fiduciary accounts for Government furnished property (GFP)
Timeliness: Set-up accounts within 3 working days of contract start date (COR provides GFP annex to PBO)
Quality: Set-up fiduciary accounts for Government furnished property (GFP) IAW local directives and AR 710-2.
Random sampling
Lot: The number of Set-up fiduciary accounts for Government furnished property (GFP) at the time of
Notify Commander's Representative for pick-up of non-expendable dedicated items
Timeliness: Notify within 3 working days of item arrival
Quality: Notify Commander's Representative for pick-up of non-expendable dedicated items IAW local directives and AR 710-2.
Random sampling
Lot: The number of Notify Commander's Representative for pick-up of non-expendable dedicated items at the time of surveillance.
Review turn-ins for (1) compliance IAW contractual obligations (such as with Government furnished property (GFP)), (2) serviceability, and (3) correct inventory amount;
and post to the property book
Timeliness: Upon receipt of complete and accurate documentation and associated equipment, post within 3 working days
Quality: Review turn-ins IAW local directives and AR 710-2.
Random sampling
Lot: The number of reviewed turn-ins at the time of surveillance.
AQL: 90%
5.18.1 Timeliness: Signature cards updated
within 10 business days of expiration.
Surveillance activity checklist
Maintain a file of customer signature cards for supported units/activities.
Quality: Signature cards maintained IAW local directives, AR 710-2, and DA Pam 710-2-1.
Lot: Inspect all signature cards maintained at the time of surveillance.
AQL: 99%
5.18.2 Ensure that the warehouse is safe, fire-hazard free and free of debris, trash and other hazards at all times.
Timeliness: Inspect the warehouse daily
Quality: The warehouse is safe, fire-hazard free and free of debris, trash and other hazards IAW local directives, AR 710-2, and DA Pam 710-2-1.
Surveillance activity checklist
Lot: Inspect the warehouse at the time of surveillance.
AQL: 99%
INSTALLATION SUPPLY SUPPORT ACTIVITY (RETAIL SUPPLY SVCS)
5.19.1 Maintain a file of customer signature cards for supported units/activities.
Timeliness: Signature cards updated within 10 business days of expiration.
Quality: Signature cards maintained IAW local directives, AR 710-2, and DA Pam 710-2-1.
Surveillance activity checklist
Lot: Inspect all signature cards maintained at the time of surveillance.
AQL: 99%
5.19.1 Maintain a voucher register for Found on Installation (FOI) items.
Timeliness: Document numbers assigned from the voucher register the same day the FOI is discovered.
Quality: Register maintained IAW local directives, AR 710-2, and DA PAM 710-2-2.
Random sampling
Lot: The number of document numbers assigned from the register at the time of
Process DLADS withdrawal documents.
Timeliness: DLADS withdrawals processed the same day received.
Quality: DLADS withdrawals processed IAW AR 710-2 and local directives.
Random sampling
Lot: The number of DLADS withdrawal documents processed at the time of
Perform inventory adjustment functions for
Timeliness: IAR’s processed within 2 days of notification of requirement.
Random sampling
Lot: The number of IAR’s processed at annual, cyclic, and special (sensitive items and weapons) inventories, and location surveys.
Quality: IAR’s processed IAW AR 710-2, AR 735-5, and local directives.
Screen turn-in documents for redirect to DLADS.
Timeliness: Turn-in documents screened within 1 business day.
Quality: Turn-in documents processed IAW DA PAM 710-2-2 and local directives.
Random sampling
Lot: The number of documents processed at the time of surveillance.
AQL: 90 %
5.19.1 Process warehouse denials.
Timeliness: Warehouse denials processed within 1 business day.
Quality: Warehouse denials processed IAW AR 710-2, GCSS-A manuals, ADSM-18- L1Y-AJT-ZZZ-EM, and local directives.
Random sampling
Lot: The number of warehouse denials processed at the time of surveillance.
Report excess CL VII vehicles, trailers and construction equipment.
Timeliness: Excess CL VII items reported within 1 business day of report of excess.
Quality: Excess CL VII items reported and kept in a suspense file until disposition instructions are received IAW GCSS-A Manual ADSM-18-LIY-AJT-ZZZ-EM.
Surveillance activity checklist
Lot: Inspect all CL VII items reported at the time of surveillance.
AQL 90%
5.19.1 Prepare a Supply Discrepancy Report (SDR) SF 364, for discrepancies of shortage, damages, or overages of shipments received.
Timeliness: SDRs prepared and processed within 3 business days after discovery of damages or discrepancies.
Quality: SDRs prepared IAW DA PAM 25- 30 and local directives.
Random sampling
Lot: The number of SDRs processed at
Perform causative research and annual, cyclic, and special (sensitive items and weapons) inventories and location surveys.
Timeliness: Causative research completed within 2 days of notification of requirement.
Quality: Causative research conducted IAW AR 710-2, AR 735-5, and local.
Random sampling
Lot: The number of Causative researches
5.19.2 Process DODAAC transactions to the LOGSA Army Central Service Point.
Timeliness: DODAAC transactions processed to LOGSA within 2 business days of receipt of request.
Quality: DODAAC transactions processed
IAW AR 725-50.
Random sampling
Lot: The number of DODAAC transactions
5.19.2 Notify requesting activity in writing when DODAAC transactions have been completed.
Timeliness: DODAAC memos forwarded to requesting activity within 1 business day of completion of transaction.
Quality: Requesting activity notified IAW
AR 725-50.
Random sampling
Lot: The number of DODAAC memos processed at the time of surveillance.
AQL: 90%
5.19.3 Process receipt documents.
Timeliness: Shipments received, inspected and inventoried daily.
Quality: Receipt documents processed IAW DA PAM 25-30, AR 710-2, and local directives.
Random sampling
Lot: The number of receipt documents processed at the time of surveillance.
AQL: 90%
5.19.3 Process Central Receiving Point (CRP) receipts.
Timeliness: Receipt documents processed within 1 business day.
Quality: Turn-in documents processed IAW DA PAM 710-2-2 and local directives.
Random sampling
Lot: The number of receipts processed at the time of surveillance.
AQL: 90%
5.19.3 Maintain customer signature cards, DA form 1687 for issues from the
CRP.
Timeliness: Signature cards updated within 10 business days of expiration.
Quality: Signature cards maintained IAW AR 710-2 and local directives.
Surveillance activity checklist
Lot: Inspect all signature cards maintained at the time of surveillance.
AQL: 99%
5.19.3 Notify customer upon receipt of “Push Shipments” that items are ready for pick up.
Timeliness: Customer notified within 1 business day.
Quality: Push shipments annotated in a log book with the date received, unit/activity
Random sampling
Lot: The number of push shipments annotated in the logbook at the time of recipient name, and phone number, date contacted IAW AR 710-2.
5.19.4 Operate and maintain the FEDEX PowerShip 2 system.
Timeliness: Express Packages prepared and processed within 2 business days of receipt.
Quality: Turn-in documents processed IAW FEDEX PowerShip instructions.
Random sampling
Lot: The number of Express Packages shipped at the time of surveillance.
AQL: 90%
5.19.4 Maintain a logbook recording FEDEX tracking numbers.
Timeliness: Tracking numbers recorded daily in the logbook.
Quality: Tracking numbers maintained in the logbook IAW DA PAM 710-2-2 and local directives.
Random sampling
Lot: The number of FEDEX tracking numbers logged at the time of
5.19.4 Maintain source document files for FEDEX documentation.
Timeliness: Documents filed with no more than a 2 day backlog.
Quality: Documents filed IAW AR 710-2 and local directives.
Random sampling
Lot: The number of documents filed on the day of surveillance.
5.19.4 Submit daily summary transmittal and keep on file for verifying FEDEX billing invoices.
Timeliness: Transmittals submitted daily.
Quality: Summary transmittals submitted IAW FEDEX PowerShip instructions.
Random sampling
Lot: The number of transmittals
5.19.5 Perform a monthly Arms Room inventory.
Timeliness: Arms Room inventory completed by the end of the last business day of the month.
Surveillance activity checklist
Lot: Inspect all items listed on the most recent inventory at the time of
Quality: Conduct inventory of all CCI and sensitive equipment IAW AR 710-2, AR 735-5, and DA PAM 710-2-1.
Process turn-ins for small arms.
Timeliness: Turn-ins of small arms processed and excess reported within 4 duty hours of receipt.
Quality: Turn-ins of small arms processed IAW AR 710-2 and local directives.
Surveillance activity checklist
Lot: Inspect all small arms turn-in documents processed at the time of surveillance.
AQL: 100%
5.19.5 Receive sensitive/special controlled items (i.e. rifles, carbines, machine guns, pistols, fire control equipment, missile training equipment, night vision goggles, devices, and unclassified/classified COMSEC material).
Timeliness: Receipts processed the same day items are received.
Quality: Receipt documents processed
IAW AR 710-2, DA PAM 710-2-1, AR 190-
11, and local directives.
Surveillance activity report.
Lot: Inspect all sensitive/special controlled item receipt documents processed at the time of surveillance.
AQL: 100%
5.19.5 Provide Packing and Crating services of shipments of weapons and COMSEC items.
Timeliness: Turn-in items packaged within 1 business day
Quality: Turn-in items packaged IAW DA PAM 710-2-2 and local directives.
Random sampling
Lot: The number of documents
Ensure that serial numbers for sensitive items are recorded on turn-in documents.
Timeliness: Turn-in documents screened within 1 business day.
Quality: Turn-in documents processed IAW ADSM-18-LIY-AJT-ZZZ-EM and local directives.
Random sampling
Lot: The number of sensitive item turn-ins processed at the time of surveillance.
Provide Packing and Crating services.
Timeliness: Shipments processed within 2 business days of receiving shipping instructions.
Lot: The number of shipment documents
Quality: Shipments processed IAW instructions received from the NICP.
Process turn-in documents.
Timeliness: Turn-in documents processed within 1 business day of receipt.
Quality: Turn-in documents processed
IAW AR 710-2, DA PAM 710-2-1, DA PAM
710-2-2, and local directives.
Random sampling
Lot: The number of turn-in documents
5.19.6 Perform care of supply in storage (COSIS).
Timeliness: Perform required inspections that identify discrepant packaging within the required cyclic times or by the Stock Readiness Program.
Quality: IAW Stock Readiness Program Business Rules, AR 710-2, AR 740-3, DA
PAM 700-32, DODM 4140.27, MIL-STD-
2073-1, and local directives.
Random sampling
Lot: Number of COSIS inspections performed within the established timeframes.
AQL: 95%
5.19.6.1 Determine crating and packaging requirements for storage.
Timeliness: Determination made the same day received.
Quality: Determination made IAW Stock Readiness Program Business Rules, AR
740-3, 2 MIL-STD-2073-1, DA PAM 700-32,
and local directives.
Random sampling
Lot: The number of determinations completed documents at the time of
5.19.6.1 Package turn-ins for redirect to DLADS or to depot.
Timeliness: Turn-in items packaged within 1 business day.
Quality: Turn-in items packaged IAW MIL-
STD-2073-1, DA PAM 700-32, AR 740-3,
and local directives.
Random sampling
Lot: The number of documents
5.19.8 Perform repairs and scheduled preventive
Timeliness: Repairs and scheduled preventive maintenance actions performed daily.
maintenance on Supply Division’s forklift fleet and associated equipment.
Quality: Repairs and scheduled preventive maintenance actions performed IAW local SOPs.
Lot: The number of PM actions performed at the time of surveillance.
Prepare and process DA form 2407 (work orders) for vehicle/equipment repair.
Timeliness: DA form 2407’s prepared for vehicles and equipment by COB next business day.
Quality: DA form 2407’s prepared for vehicles and equipment IAW AR 710-2.
Random sampling
Lot: The number of DA 2407’s processed
Report excess CL VII vehicles, trailers and construction equipment.
Timeliness: Excess CL VII items reported within 1 business day of report of excess.
Quality: Excess CL VII items reported and kept in a suspense file until disposition instructions are received IAW LIS Manual
ADSM-18-LIY-AJT-ZZZ-EM.
Surveillance activity checklist
Lot: Inspect all CL VII items reported at the time of surveillance.
AQL 90%
HAZARDOUS MATERIAL (HAZMAT)
5.20.1 Support Garrison Commander guidelines for Hazardous Material Control.
Timeliness: Ensure most recent copy is on hand at HMCP.
Quality: AR 200-1, AR 385-10, AR 700-141, DA PAM 710-7 (In Revision), DA Pam 710- 2, AUL (Authorized Use List)
Random sampling
Lot: Compliance at time of sampling.
5.20.2 Process HAZMAT received at the ISSA through GCSS-Army and manage in the Army’s Material Management System, Enterprise Environmental & Safety Occupational Health- Management Information System (EESOH-MIS).
Timeliness: Process and label HAZMAT through EESOH-MIS immediately upon receipt
Quality: The number of SDS printed at the time of surveillance. AR 200-1, TM 38-410
Random sampling
Lot: Percentage HAZMAT items labeled upon receipt:. 100-95% green, <95% - 90% amber, <90% -80% red, <80% black
5.20.3 Store items with hazard classification (Unit responsible for establishing Authorized Use Lists (AUL) at the 50% level.
Timeliness: Perform location maintenance, to include shelf life management, inventories of all Authorized to Forecast (ATF) and relocation of assets (bin-to-bin) and create new locations as required.
Quality: Material Release Orders (MROs) Class III (P) in accordance with HMCP internal procedures, AR 710-2 and DA
PAM 710 2-2.
Random sampling
Lot: Compliance at time of sampling.
AQL: 90%
5.20.4 Manage shelf-life and turn in expired HAZMAT (material not coded condition A or B)
Timeliness: HMCP sites will not accept Type 1 shelf-life items with no less than 24 months of remaining shelf-life and Type II shelf life items with no less than 12 months of remaining shelf life.
Quality: Logistics Readiness Center (LRC) Shelf-Life Management Procedures; first in first out rotation of that materiel to limit environmental waste. TM 38-410; 29 CFR (Code of Federal Regulations); DTR 4500.9R, Random sampling
Lot: Established AUL will use the materiel available IAW shelf life in order to limit stock on shelves.
5.20.5 Prepare and turn-in Class III
(P) products to DPW Recycle Center once products expiration date has been exceeded, or when product can no longer be extended.
Timeliness: The contractor shall ensure that adequate packing materials are on hand and or requisitioned to delivery of expired products to the recycle center.
Quality: Ensure that products are cleaned and properly packaged or palletized prior to delivery to the recycle center.
Random sampling
Lot: Process request within 1 business day.
AQL: 90%
FUEL OPERATIONS
5.21.1 Maintain at least the required levels of fuel for peacetime storage and war reserves.
Quality: Ensure required levels are maintained in accordance with AR 710-2.
Random sampling
Lot: Amount of required fuel at any given time.
AMMUNITION SUPPLY SERVICES
5.22.1 Receive ammunition and process receipts.
Timeliness: Receipt of ammunition processed within 2 duty hours of delivery appointment.
Quality: Receipt of ammunition processed IAW DA PAM 710-2-2, DOD 4500.9-R, Part 2, and local directives.
Random sampling
Lot: The number of ammo receipts processed at the time of surveillance.
AQL: 96%
5.22.1 Inspect commercial vehicles delivering ammunition and complete DD form 626 (Motor Vehicle Inspection) prior to their entry into the
ASP.
Timeliness: Vehicles inspected prior to entry to ASP.
Quality: All vehicles inspected prior to entry to the ASP and discrepancies noted
IAW AR 710-2.
Random sampling
Lot: The number of DD form 626’s processed at the time of surveillance.
AQL: 98%
5.22.1 Prepare manual Ammunition Stores Slip (DA form 3151-R).
Timeliness: Stores Slips prepared within 1 duty day.
Quality: Stores Slips prepared IAW internal
SOP.
Random sampling
Lot: The number of Stores Slips prepared
Process Request for Issue of Ammunition (DA form 581).
Timeliness: Requests for issue of ammo accepted and processed at the time of receipt.
Quality: Requests for issue of ammo accepted and processed IAW 700-2, DA PAM 710-2-1, and local directives.
Random sampling
Lot: The number of DA form 581’s processed on the day of surveillance.
AQL: 95%
5.22.1 Inspect military unit vehicles using Motor Vehicle Inspection (DD form 626) and verify unit driver’s licenses are valid and annotated to reflect the driver.
Timeliness: Military unit vehicles inspected prior to entry to the ASP.
Quality: Unit vehicles inspected and driver’s license endorsed IAW local directives.
Random sampling
Lot: The number of DD form 626’s processed at the time of surveillance.
AQL: 98%
5.22.1 Conduct ammunition surveillance inspections and
Timeliness: Perform surveillance inspections at specified intervals and unit turn-ins at time of receipt. Cyclic classify for serviceability;
reclassify munitions showing deterioration to appropriate Condition Code.
inspections are performed IAW commodity command directives. Classify ammunition according to condition.
Quality: Duties are performed by contractor surveillance inspectors under the guidance of a Quality Assurance Specialist (Ammunition Surveillance) (QASAS). Ammunition inspections are conducted IAW DA PAM 710-2-1, SB 742- 1, and SOPs.
Lot: Percent of surveillance inspections conducted IAW mandated policies and regulations.
AQL: 95%
5.22.1 Process Ammunition Inspection Records (DSR) (DA Form 3022-R) (ACR) (DA Form 2415).
Timeliness: Ammo Inspection Records processed in Munitions History Program (MHP) by COB daily.
Quality: Ammo Inspection records maintained in MHP IAW AR 702-12 and
SOP.
Random sampling
Lot: The number of Ammo Inspection Records processed at the time of surveillance.
AQL: 95%
5.22.1 Perform required inventories.
Timeliness: Inventories of ammunition performed.
Quality: Ammunition inventories performed IAW AR 710-2.
Surveillance activity checklist
Lot: Inspect the most recent inventories performed at the time of surveillance.
AQL: 99%
5.22.1 Process turn-in documents.
Timeliness: Turn-in documents processed prior to the customer departure daily.
Quality: Turn-in documents processed IAW local directives.
Random sampling
Lot: The number of turn-in documents
AQL: 97%
Perform conductive footwear tests.
Timeliness: Conductive footwear will be tested at the time of issue and daily before use.
Quality: Conductive footwear tests performed IAW DA PAM 385-64 and TB 385-4.
Surveillance activity checklist
Lot: Inspect all conductive footwear tests performed at the time of surveillance.
Reconcile issue document against LIVE munitions & RESIDUE turn-ins.
Timeliness: Complete reconciliation process within 5 working days from end of training event and/or test event as annotated on the DA Form 581.
Quality: Reconcile all unit documentation within SAAS-Mod.
Random sampling
Lot: The number of turn-in documents processed at time of receipt.
5.22.2 Post receipt of munitions.
Timeliness: Post documents in SAAS-MOD within 24 hours of receipt.
Quality: Post receipt of munitions to the stock record account (SRA) IAW DA PAM 710-2-2, chapter 24, 50 a-i.
Random sampling
Lot: The number of posted documents to records within 24 hours of receipt.
5.22.3 Maintain a Command Oriented Arms, Ammunition, and Explosives (AA&E) Security Screening, and Evaluation Record, (DA Form 7281).
Timeliness: Ensure DA 7708 is completed and updated IAW AR 190-13.
Quality: DA 7708 records are properly completed and available for review.
Semi-annual check
Lot: The number of posted documents to records within 24 hours of receipt.
5.22.4 Train A&E Employees IAW DA PAM 385-64, AMC Reg.
350-4, ALARACT Messages, and other training deemed necessary by Government.
Timeliness: Ensure all required training is completed prior to employee performing A&E duties.
Quality: All required training and certification certificates are reviewed by KO/COR prior to employee performing A&E duties.
Random sampling
Lot: All required training and certifications complete prior to employee performing A&E duties.
5.22.5 Perform surveillance Damage-in-Transit (DIT)/Receipt Inspections (RI); Reclassify munitions to
Timeliness: A DIT/RI is performed at time of receipt and can be conducted ICW vehicle inspection; Inspector signs DD Form 1348 to reflect DIT/RI and munitions are properly classified.
Random sampling
Lot: The number of DD Form 1348’s processed at time of surveillance.
appropriate condition code according to severity of damage.
Quality: All DIT/RI performed at time of receipt. Discrepancies and reclassification noted IAW AR 702-12 and surveillance SOPs.
5.22.5.1 Under technical guidance of the QASAS, conduct required inspections of the stockpile and surveillance of unit turn-ins.
Timeliness: Ensure all inspections are conducted IAW SB 742-1 and other applicable TM criteria and surveillance of unit turn-ins (live and residue) is provided.
Quality: Inspections are conducted IAW SB 742-1 and other applicable TM criteria.
Surveillance of unit turn-ins (live and residue) conducted to ensure proper segregation of ammunition residue and live ammunition.
Random sampling
Surveillance of unit turn-ins conducted during all unit turn-ins (live and residue).
5.22.6 Demil selected ammunition residue, components, packing, inert, and dummy ammunition items.
Timeliness: Selected ammunition residue, components, packing, inert and dummy ammunition items are demiled before transportation to the landfill or issue to DLA Disposition Services.
Quality: Maintain a log on quantities by type of item demiled and transportation to the landfill or DLA Disposition Services monthly to ensure items are not stored over one month IAW AR 710-2, AIS Manual, SAAS-MOD, and local SOP.
Random sampling
Lot: The number of items disposed/demiled at the time of surveillance.
AQL: 95%
5.22.6 Conduct PC&H (packing, crating, & handling) for shipment of munitions IAW
Timeline: Munitions shipped RDD w/o customer noted damage in transit.
Quality: Perform 100% of the time IAW CFR 49 and individual technical drawings.
Random sampling
Lot: The Shipping Discrepancy Reports (SDRs) against number of shipments.
individual technical drawings.
5.22.6.1 Process ammunition suspension and restriction notices.
Timeliness: Ammunition suspension and restriction notices input into SAAS-MOD the same day received.
Quality: Ammunition suspension and restriction notices received and input into SAAS-MOD and maintained on file IAW TB 9-1300-385.
Surveillance activity checklist
Lot: Inspect all suspension and restriction notices received and filed at the time of
5.22.6.2 Prepare and mark light boxes and non-standard packs.
Timeliness: Light boxes and non-standard packs processed and issued on day of scheduled pick up.
Quality: Light boxes and non-standard packs processed IAW FORSCOM Reg 700- 4, MIL-STD-129 series, Marking for Shipment, and Storage.
Random sampling
Lot: The number of light boxes and non-standard packs processed on the day of
5.22.6.2 Prepare and mark all light boxes and non-standard packs IAW CFR 40, MIL-STD- 129 Series and AMC regulations and drawings.
Timeliness: Ensure all light boxes and non-standard packs are configured IAW applicable regulations.
Quality: All light boxes and non-standard packs are properly marked IAW aforementioned publications.
Daily spot check of light boxes and non-standard packs as they are created during unit turn-ins and/or unit issues.
Lot: All light boxes and non-standard packs created during unit turn-ins and/or unit issues.
AQL: 100%
5.22.6.3 Process Ammunition Transfer Records (ATR’s) (DA form 4508).
Timeliness: Ammo Transfer Records processed by COB daily.
Quality: Ammo transfer records maintained in a central control register
IAW TM 743-200-1.
Random sampling
Lot: The number of ammo transfer records processed at the time of
5.22.6.4 Maintain and update the Signature Card File (DA Form 1687) IAW DA PAM 700-16 and applicable ALARACT Messages.
Timeliness: Quarterly review of all on-hand signature cards.
Quality: All signature cards on-hand will be reviewed to ensure that only the most current and properly filled out signature cares are maintained on file at the ASP.
ASP will contact those units who need to provide an updated signature card.
Random Sampling
Lot: All signature cards on-hand will be reviewed.
AQL: 100%
5.22.6.4 Maintain and update a signature card file (DA form 1687).
Timeliness: Signature cards updated within 10 business days of expiration.
Quality: Signature cards maintained and updated IAW DA PAM 710-2-1 and HQDA Memorandums (dated 20 March 2015 & 13 May 2015).
Surveillance activity checklist
Lot: Inspect all signature cards maintained at the time of surveillance.
AQL: 99%
5.22.6.6 Accept ammunition from installation commander's amnesty program and ammunition found on installation (FOI).
Timeliness: Amnesty turn-ins must be posted to the accountable records within 24 hours of processing at the ASP.
Quality: Turn-in completed IAW AR 710-2.
Random sampling
Lot: Complete amnesty turn-in at time of receipt.
AQL: 100%
5.22.6.6 Accept ammunition turned in under the provisions of the AE amnesty program IAW DA PAM 700-16 and AR 190-11.
Timeliness: Accept all amnesty or found on installation ammunition upon notification.
Quality: All ammunition turned in under the amnesty program is exempt from the 24-hour advance turn-in notification and will be picked up on the SRA; no turn-in documentation is necessary.
Random Sampling
Lot: All ammunition turned in under the AE amnesty program will be accepted.
File details come from the government source that posted it. Updated .