B08 Attachment 0025 -Annex A - Maintenance PRS_22 June 23.pdf

PDF 137 KB Posted

Attached to
EAGLE Aberdeen Proving Ground, MD W519TC-23-R-0096
Solicitation number
W519TC-23-R-0096
Issued by

About this file

This document outlines quality standards for materiel maintenance tasks under a federal contract opportunity. The solicitation is for materiel maintenance services at Aberdeen Proving Ground in Maryland under number W519TC-23-R-0096 issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal. Key maintenance tasks include establishing and managing equipment repair shops, performing technical inspections, repairs, and programs according to specifications in technical manuals and publications. Standards address quality, timeliness, sampling methods, and acceptable quality levels for tasks such as welding, machining, painting, body repair, and managing repair parts.

View the file

Other files

File Type Posted
B08 Attachment 0002 -APG-Staffing and Labor Mix 17OCT2023.xlsx XLSX spreadsheet
W519TC23R0096-0001.pdf PDF
B08 Attachment 0032 -APG QA Round 01_17OCT2023.xlsx XLSX spreadsheet
B08 Exhibit A -APG-DD1423-1.pdf PDF
B08 Exhibit H -PM-09 Performance Management Review Format (version 5-01-23).pptx PPTX presentation
B08 Attachment 0031 -Annex G - Government Property Incidental_9 June 23.pdf PDF
B08 Attachment 0029 -Annex E - Definitions Acronyms Abbreviations.pdf PDF
B08 Attachment 0026 -Annex B - Supply PRS_22 June 23.pdf PDF
B08 Attachment 0011 -Contract References Spreadsheet.xlsx XLSX spreadsheet
B08 Attachment 0030 -Annex F - Publications and Forms.pdf PDF
B08 Attachment 0004 -Letter of Consent.pdf PDF
B08 Attachment 0028 -Annex D - Environmental Requirements_9 June 23.pdf PDF
B08 Attachment 0001 -PPI 2.0 PWS_28 August 23.pdf PDF
B08 Exhibit J -PM-12 KTR Accident Reporting Format.xlsx XLSX spreadsheet
B08 Attachment 0013 -APG-Mission essential contractor_22 June 23.pdf PDF
APG W519TC-23-R-0096-Solicitation.pdf PDF
B08 Exhibit E -MMD-01 Maintenance Report Format.xlsx XLSX spreadsheet
B08 Attachment 0014 -Small Business Participation Plan.pdf PDF
B08 Attachment 0010 -Blocked File Extensions_with updated DoDAAC (1).pdf PDF
B08 Attachment 0005 -APG - Cost Price Matrix.xlsx XLSX spreadsheet
B08 Attachment 0003 -Performance Questionnaire.pdf PDF
B08 Attachment 0006 -Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf PDF
B08 Attachment 0007 -Department of Labor Wage Determinations (2015-4265).pdf PDF
B08 Exhibit F -PM-01 Contractor Employee Information Format.xlsx XLSX spreadsheet
B08 Attachment 0027 -Annex C - Transportation PRS_22 June 23.pdf PDF
B08 Attachment 0009 -Purchasing Invoicing Guide (PIG).docx DOCX document
B08 Exhibit C -CD-02 Burn Rate Report Format v10.xlsx XLSX spreadsheet
B08 Attachment 0002 -APG-Staffing and Labor Mix.xlsx XLSX spreadsheet
B08 Exhibit G -PM-08 Scheduled Government Furnished Property (SGFP).xlsx XLSX spreadsheet
B08 Exhibit B -APG-CDRL Listing Updated Format.xlsx XLSX spreadsheet
B08 Exhibit D -ITD-01 Transportation Report Format.xlsx XLSX spreadsheet
B08 Attachment 0015 -Subcontractor Cost Information Submission.pdf PDF
B08 Exhibit K -SS-01 Supply and Services Report Format.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex A – Maintenance PRS

Task/Requirement Standard Sampling Method, Lot & Acceptable Quality Level (AQL)

MATERIEL MAINTENANCE – GENERAL

5.1.1 Establish, operate, and manage equipment repair shops, and supporting functions.

Quality: Lateral transfers processed IAW local directives, AR 710-2, DA PAM 710-2-1 and ISM Operating Manual.

Random sampling (shop/activity scheduled periodically)

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.

AQL: 95%

5.1.4 Perform technical inspections in accordance with the maintenance request.

Quality: IAW AR 750-1, DA PAM 750-8, applicable LIS publications, installation policies and procedures, external and internal SOPs, and materiel maintenance (COR) guidance.

Random (shop/activity scheduled periodically)

Lot: All in-process and completed work orders, files, logs, and SOPs at time of surveillance.

MATERIEL MAINTENANCE – PROGRAMS/EFFORTS

5.2.1 Perform repairs IAW work request and applicable equipment TMs or equivalent publications.

Quality: Repairs will be IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment Technical Manuals (TMs), Technical Bulletins (TBs), Modification Work Orders (MWOs), Safety of Use Messages (SOUMs), Special Technical Inspection and Repairs (STIRs), other applicable Government technical publications, or OEM equivalent publications when a government technical publication is not available.

Random sampling

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing

5.2.1 Ensure minimum rejection rates for mechanical and electrical repair work completed are met in order to meet first time pass rates.

Quality: IAW AR 750-1, Appendix B-11, paragraphs (a-d)

Random (shop/activity scheduled periodically)

Lot: Equipment that has completed the repair cycle and has been deemed as ready for issue (RFI) back to the customer.

AQL: 97% for mechanical AQL: 98% for electrical

5.2.12 Perform all air conditioning & refrigeration maintenance / repair services.

Quality: IAW40 CFR, Part 82, and applicable state and federal regulations, and the installation environmental regulations and directives. Quality:

Special measurement items ordered IAW directive

IAW AR 700-84.

Random (shop/activity scheduled periodically)

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing

MATERIEL MAINTENANCE SUPPORT

5.3.2 Meet performance metrics found in AR 750-1 for base operations metrics.

Timeliness: Tasks completed within time allowed by the specific equipment publication or within times estimated at work induction or other program standard as designated by Chief, Materiel Maintenance/COR.

Quality: Perform maintenance IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment TMs, TBs, MWOs, SOUMs, STIRs, other applicable government technical publications, or OEM equivalent publications when a government technical publication is not available.

Random (shop/activity scheduled periodically)

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing

5.3.8 Maintain, repair, and replace tires on rims.

Quality: IAW TM 9-2610-200-14

Random (shop/activity scheduled periodically)

Lot: The number of line items on receipts processed on the day of

5.3.9 Provide wheel alignment support.

Quality: IAW applicable TMs and standards.

Random (shop/activity scheduled periodically)

Lot: All in process and completed work related to replacing front axle components (tie-rod/sway bar).

5.3.10 Perform glass repairs for vehicles.

Quality: Glass shall be installed to original design configurations with seals that are air and watertight.

Random (shop/activity scheduled periodically)

Lot: All in process and completed glass repair work as well as all existing logs and files at time of surveillance.

AQL: 95%

5.3.11 Perform maintenance and services of sensitive items.

Quality: IAW ASC Supplement 750-1 and AR 750-1.

Monthly

Lot: All parts/items in process

AQL: 100%

5.3.11 Maintain physical security of the Material Maintenance Arms room and sensitive items.

Timeliness: Notify the COR immediately of the discovery of a missing sensitive item or major administrative discrepancy.

Quality: IAW AR 190-11, AR 710-2, AR 750-1, DA PAM 750-8, and local SOPs.

Random (shop/activity scheduled periodically)

Lot: All in process and completed sensitive item work as well as all existing records and files within the shop or activity undergoing surveillance.

AQL: 100%

5.3.12 Management of Small Arms Repair Parts (SARP).

Quality: IAW ASC Supplement 750-1

Monthly

Lot: All parts in process

AQL: 100%

ALLIED TRADES

5.4.1 Perform welding, and Non-destructive testing as required.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work performed IAW work request and applicable military and industry standards. Welding performed by AWS certified welders; NDI performed by ANSI/ASNT CP-189 certified persons.

Random (shop/activity scheduled periodically)

Lot: All in process and completed welding, as well as all existing logs and files at time of surveillance.

AQL: 95%

5.4.2 Perform metal machining, and fabrication operations and Non-destructive testing as required.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work performed IAW work request and applicable military and industry standards. NDI performed by ANSI/ASNT CP-189 certified persons.

Random (shop/activity scheduled periodically)

Lot: All in process and completed metal machining and fabrication work as well as all existing logs and files at time of surveillance.

AQL: 95%

5.4.3 Prepare and paint supported equipment and components as required to perform materiel maintenance.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work completed IAW AR 750-1, applicable equipment TM 43-0139, TB 43-0209 and industry standard.

Random (shop/activity scheduled periodically)

Lot: All in process and completed body shop work as well as all existing logs and files at time of

5.4.3.1 Operate and maintain Materiel Maintenance paint booths and breathing air machines.

Quality: IAW OSHA 29 CFR 1910-107, AR 200-1

Periodic

Lot: All materiel maintenance paint booths and breathing air machines at time of

AQL: 100%

5.4.4 Perform body repair services.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work completed IAW AR 750-1, applicable equipment TM, and industry standard.

Random (shop/activity scheduled periodically)

Lot: All in process and completed body shop work as well as all existing logs and files at time of

5.4.5 Perform carpentry tasks required for the repair or modification of any Government owned, tactical or commercial equipment and customer requested fabrication.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work completed IAW customer request, applicable equipment TM, military, and industry standard.

Random (shop/activity scheduled periodically)

Lot: All in process and completed carpentry work as well as all existing logs and files at time of

REPAIR PARTS AND MATERIEL MANAGEMENT TASKS

5.5.1 Perform shop supply services;

use the automated Army supply system as the primary means of attaining materiel.

Quality: IAW AR 750-1, AR 710-2, DA PAM 25-30, AR

725-50, DA PAM 710-2-2; AR 740-1; AR 735-5; AR

710-1; AR 710-3; DA Pam 710-7; AR 710-3, DA Pam 710-2-1; FEDLOG; and LIS user’s manual

Random (shop/activity scheduled periodically)

Lot: All in-process and completed work orders, requisitions, requests, files, records, SOPs, and stockage at time of

5.5.6 Manage Standard Pricing (SP) items.

Timeliness: Meet SP turn- in criteria for timeliness of turn-ins.

Quality: IAW DFAS-IN Reg 37-1 Chapter 13, finance & accounting policy, implementation, unserviceable turn-ins, and current army guidance.

Periodic

Lot: The numbers of SP items processed during the period at time of

PRODUCTION CONTROL

5.6.1 Operate a production control capability that effectively manages the maintenance workload; provide personnel technically capable of performing all tasks found in the applicable maintenance LIS End User Manual. Operate multiple equipment receiving points; provide order statuses.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: IAW work request, AR 750-1, DA PAM 750-1, DA PAM 750-8, applicable LIS publications, local policies and procedures.

Random

Lot: All in process and completed work as well as all existing logs and files at time of surveillance

AQL 95%

FOOD SERVICE EQUIPMENT

5.7.1 - RESERVED

File details come from the government source that posted it. Updated .